A structure suitable for preventing leakage of slurry for precast beam slab

By using sealing components within the channel steel in precast beams and slabs, and utilizing the air pressure linkage mechanism of airbags to achieve automatic expansion of the sealing strip, the problem of grout leakage at the joint between the template and the platform is solved, improving the reliability of the seal and the grout leakage prevention effect.

CN224993789UActive Publication Date: 2026-11-20CHIZHOU JIANTOU DINGSHENG PREFABRICATED COMPONENTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522359147.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-11-20
Estimated Expiration
2035-11-06

AI Technical Summary

Technical Problem

In the industrial production of precast beams and slabs, tiny gaps can easily form at the joints between the formwork and the pedestal, causing concrete grout to seep out. Existing technologies are unable to effectively prevent this leakage.

Method used

The sealing components inside the channel steel include sealing strips, sealing rings, and airbags. The airbags automatically expand when the template squeezes the sealing strips, fitting the template seams in real time and dynamically filling irregular gaps through a pneumatic linkage mechanism.

Benefits of technology

It significantly improves sealing reliability, ensuring no grout leakage occurs during concrete pouring, and provides a double sealing barrier to prevent the sealing structure from loosening or gaps from widening due to grout side pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224993789U_ABST
    Figure CN224993789U_ABST
Patent Text Reader

Abstract

The utility model discloses a structure suitable for prefabricated beam slab leak -proof paste, include: channel steel, sealing assembly, including the sealing strip of installation in channel steel, integrally formed setting in the both sides of sealing strip and located channel steel outside's sealing ring and along the extension direction of sealing strip set up in sealing strip's multiple group air bag no.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of building technology, and in particular relates to a structure suitable for preventing grout leakage in precast beams and slabs. Background Technology

[0002] In the industrial production of precast beams and slabs (such as prestressed concrete hollow slabs, T-beams, box girders, etc.), fixed platforms are usually used in conjunction with side molds for concrete pouring. To ensure the dimensional accuracy and appearance quality of the components, the molds and platforms must fit tightly together. However, due to factors such as platform surface flatness error, mold installation deviation, lateral pressure during concrete pouring, and vibration compaction, tiny gaps are easily generated at the joint between the molds and platforms, causing concrete grout to seep out from the gaps, i.e., "grout leakage". Therefore, a structure suitable for preventing grout leakage in precast beams and slabs is proposed to solve this problem. Utility Model Content

[0003] This utility model addresses the problems in the prior art by proposing the following technical solution: This utility model provides a structure suitable for preventing grout leakage in precast beams and slabs, including: channel steel; The sealing assembly includes a sealing strip installed inside the channel steel, an integrally formed sealing ring disposed on both sides of the sealing strip and located outside the channel steel, and multiple sets of airbags I opened inside the sealing strip along the extension direction of the sealing strip. The sealing ring is provided with airbags II corresponding one-to-one in number and position to the multiple sets of airbags I. The sealing strip is provided with a flow channel connecting the airbags I and the corresponding airbags II. A plastic part is disposed inside the sealing strip and below the airbags I.

[0004] As an improvement to the above technical solution, the top of the sealing strip is arched upward to form a protrusion, and the top of the airbag is adapted to the protrusion.

[0005] As an improvement to the above technical solution, the sealing ring is recessed inward on the side away from the sealing strip to form a notch.

[0006] As an improvement to the above technical solution, multiple sets of the plastic parts are connected in series by an elastic skeleton.

[0007] As an improvement to the above technical solution, the bottom of the plastic part is provided with two sets of symmetrically distributed elastic elements, and the included angle between the two sets of elastic elements is an acute angle.

[0008] The beneficial effects of this utility model are as follows: Through the air pressure linkage mechanism connecting airbag one and airbag two via the flow channel, the sealing ring is automatically triggered to expand when the template squeezes the sealing strip, and fits the template joint in real time, realizing dynamic filling of irregular gaps and significantly improving sealing reliability. Attached Figure Description

[0009] Figure 1 The schematic diagram of the overall structure of this utility model is shown below; Figure 2 The diagram shows the distribution structure of the plastic part and the elastic skeleton of this utility model.

[0010] Reference numerals: 10, channel steel; 20, sealing strip; 21, plastic part; 22, elastic part; 23, elastic skeleton; 24, protrusion; 25, sealing ring; 251, notch; 252, airbag two; 26, airbag one; 27, flow channel. Detailed Implementation

[0011] To make the objectives, technical solutions, and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments.

[0012] A structure suitable for preventing grout leakage in precast beams and slabs includes: channel steel 10; The sealing assembly includes a sealing strip 20 installed inside the channel steel 10, an integrally formed sealing ring 25 disposed on both sides of the sealing strip 10 and located outside the channel steel, and multiple sets of airbags 26 formed inside the sealing strip 20 along the extension direction of the sealing strip 20. The sealing ring 25 is provided with airbags 252 corresponding to the number and position of the multiple sets of airbags 26. The sealing strip 20 is provided with a flow channel 27 connecting the airbags 26 and the corresponding airbags 252. A plastic part 21 is provided inside the sealing strip 20 and below the airbags 26.

[0013] Specifically, the channel steel 10 is installed on both sides of the pedestal, and the sealing assembly is assembled into the channel steel 10. At this time, the sealing strip 20 serves as the core sealing base, with its bottom tightly fitting against the inner wall of the channel steel 10. The integrally formed sealing rings 25 on both sides extend to the outside of the channel steel 10, corresponding to the splicing position of the precast beam and slab template, laying the structural foundation for subsequent sealing operations. At the same time, the plastic part 21 inside the sealing strip 20 provides basic support for the sealing strip, ensuring that the sealing assembly maintains a stable structural shape after pre-assembly and avoiding displacement or deformation due to external interference. When the precast beam and slab template comes into contact with the top of the sealing strip, it will squeeze the sealing strip 20. The pressure generated by the squeezing will compress the gas in the first airbag 26, and the gas pressure will increase accordingly. At this time, since the flow channel 27 in the sealing strip 20 has pre-connected the first airbag 26 with the corresponding second airbag 252, the compressed gas will flow quickly along the flow channel 27 to the second airbag 252 in the sealing ring 25, pushing the second airbag 252 to expand synchronously. As the airbag expands, its outer wall will tightly fit the splicing gaps of the precast beam and slab template, completely filling any possible tiny gaps and forming a targeted sealing barrier. At the same time, after the gas flows out, the continuous extrusion pressure applied by the template will cause the sealing strip 20 to further fit the inner wall of the channel steel 10, significantly improving the fit between the sealing strip 20 and the inner wall of the channel steel 10. This eliminates any gaps that may remain between the bottom of the sealing strip 20 and the channel steel 10 due to initial assembly, forming a second sealing barrier. During this process, the plastic part 21 located below the airbag 26 can reduce the deformation of the lower part of the sealing strip by the airbag 26, allowing the compressed gas in the airbag 26 to enter the airbag 252. The continuous compression of the sealing strip 20 by the template will keep the entire sealing assembly in a stable pressure state. This pressure is balanced with the elastic reaction force of the airbag 26 and the airbag 252, which not only ensures the tightness of each sealing part, but also effectively resists the lateral pressure generated by the grout during subsequent concrete pouring, providing double protection for the grout leakage prevention effect of subsequent pouring operations, and avoiding the problem of loosening of the sealing structure or expansion of gaps due to the lateral pressure of the grout.

[0014] In one embodiment, the top of the sealing strip 20 arches upward to form a protrusion 24. The top of the airbag 26 is adapted to the protrusion 24. After the channel steel 10 is installed on both sides of the precast platform, the sealing strip 20 is embedded in the channel steel 10 with the protrusion 24 on its top facing upward towards the bottom edge of the beam formwork or the lower edge of the side formwork to be installed. During the concrete pouring process, the formwork will be slightly pressed down or moved towards the platform due to the lateral pressure of the concrete. At this time, the protrusion 24 first contacts the formwork to form a preliminary seal. Since the top shape of the airbag 26 matches the inner cavity of the protrusion 24, when subjected to pressure from the formwork or concrete, the airbag 26 is compressed. The gas inside flows rapidly through the flow channel 27 to the airbag 252 in the sealing ring 25, causing the sealing ring 25 to expand outward and adhere tightly to the outer wall of the formwork to achieve a seal. At the same time, the arched structure of the protrusion 24 has stress dispersion and elastic rebound characteristics, and can return to its original shape after the pressure is released.

[0015] In one embodiment, the sealing ring 25 is recessed inward on the side away from the sealing strip 20 to form a notch 251. When the sealing ring 25 expands outward due to the inflation of the airbag 252, the presence of the notch 251 makes the free end of the sealing ring 25 form a flexible deformation area. On the one hand, the notch 251 reduces the local structural stiffness of the sealing ring 25, making it easier to fit the micro-unevenness or geometric deviation of the template surface under air pressure, thereby improving the adaptability and fit of the seal. On the other hand, when the sealing ring 25 is pressed to fit the template, the notch 251 can produce a local curling or covering effect, forming a structure similar to a "lip seal", which effectively prevents concrete grout from seeping out along the gap.

[0016] In one embodiment, multiple sets of plastic parts 21 are connected in series by an elastic skeleton 23. The elastic skeleton 23 connects multiple discrete plastic parts 21 into a composite support system, which not only retains the stable support function of the plastic parts 21 when under local pressure, but also realizes the continuity and coordinated deformation capability of the overall structure through the elastic skeleton 23.

[0017] In one embodiment, the bottom of the plastic part 21 is provided with two sets of symmetrically distributed elastic elements 22, and the included angle between the two sets of elastic elements 22 is an acute angle. After the sealing strip 20 is embedded in the channel steel 10, the elastic elements 22 at the bottom naturally expand outward due to the acute angle structure, which can press against the inner wall of the channel steel 10, play a role in pre-positioning and preventing loosening, and prevent the sealing strip 20 from shifting before pouring.

[0018] The above embodiments are only used to illustrate the technical solution of this utility model, and are not intended to limit it.

Claims

1. A structure suitable for preventing grout leakage in precast beams and slabs, characterized in that, include: Channel steel (10); The sealing assembly includes a sealing strip (20) installed in the channel steel (10), an integrally formed sealing ring (25) disposed on both sides of the sealing strip (20) and located outside the channel steel, and multiple sets of airbags (26) opened in the sealing strip (20) along the extension direction of the sealing strip (20). The sealing ring (25) is provided with airbags (252) corresponding to the number and position of the multiple sets of airbags (26). The sealing strip (20) is provided with a flow channel (27) connecting the airbags (26) and the corresponding airbags (252). A plastic part (21) is provided in the sealing strip (20) and below the airbags (26).

2. The structure for preventing grout leakage in precast beams and slabs according to claim 1, characterized in that, The top of the sealing strip (20) arches upward to form a protrusion (24), and the top of the airbag (26) is adapted to the protrusion (24).

3. A structure for preventing grout leakage in precast beams and slabs according to claim 2, characterized in that, The sealing ring (25) is recessed inward on the side away from the sealing strip (20) to form a notch (251).

4. A structure for preventing grout leakage in precast beams and slabs according to claim 3, characterized in that, Multiple sets of the plastic parts (21) are connected in series by an elastic skeleton (23).

5. A structure for preventing grout leakage in precast beams and slabs according to claim 1, characterized in that, The bottom of the plastic part (21) is provided with two sets of symmetrically distributed elastic elements (22), and the included angle between the two sets of elastic elements (22) is an acute angle.