Floating offshore wind power structure foundation
By filling the column structure with concrete and utilizing prestressed steel bars and rubber pads, the problem of the large weight of floating offshore wind power structure foundations was solved, achieving the effects of lightweighting and convenient installation.
Patent Information
- Application Number
- CN202522319628.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-31
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-10-31
AI Technical Summary
Existing floating offshore wind turbine foundations are heavy due to their all-steel structure, which affects manufacturing and installation costs and requires the use of large floating cranes.
The column structure is filled with concrete, which provides strength to reduce the thickness of the steel pipe. The structure is subjected to multi-directional compression through prestressed steel bars and rubber pads, which reduces the amount of steel used and improves the reliability of the structure.
It effectively reduced the structural weight and steel consumption, lowered manufacturing costs, improved the overall reliability and ease of installation of the structure, and reduced reliance on large floating crane equipment.
Smart Images

Figure CN224994963U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of offshore wind power engineering technology, specifically to a floating offshore wind power structural foundation. Background Technology
[0002] Existing floating foundations mainly adopt an all-steel structure system. In order to meet the operating requirements of wind turbines in deep-sea environments, the design size of floating foundations is usually very large. Therefore, the amount of steel used in the steel structure of floating foundations is large, resulting in a large weight of floating foundations. Utility Model Content
[0003] The purpose of this invention is to provide a floating offshore wind power structure foundation that can reduce weight.
[0004] Therefore, the present invention adopts the following technical solution:
[0005] A floating offshore wind turbine foundation includes a column structure and a heave chamber. The column structure comprises a first steel pipe, a second steel pipe, a first end plate, a second end plate, and a first layer of concrete. Radially, the first steel pipe is located outside the second steel pipe, and the first end plate is located below the first steel pipe and connected to both the first and second steel pipes. The second end plate is located above the first steel pipe and connected to both the first and second steel pipes. An annular cavity is formed between the first steel pipe, the second steel pipe, the first end plate, and the second end plate, and at least a portion of the first concrete fills the annular cavity. The heave chamber is located below the column structure and includes a first flange; the column structure is connected to the first flange.
[0006] As a preferred technical solution of the present invention: the offshore wind power structural foundation includes a column structure, the column structure includes the column body structure and a plurality of first prestressed steel bars, the column body structure includes a plurality of first sleeves, the first sleeves are fixedly connected to the first end plate and the first sleeves are fixedly connected to the second end plate in the axial direction of the column body structure, the first sleeves include a first cavity, the first end plate includes a first hole, the second end plate includes a second hole, the first cavity connects the first hole and the second hole, the first prestressed steel bars pass through the first hole and the second hole, and a portion of the first concrete is located in the first hole, the first cavity, and the second hole, or a portion of the first concrete is located in the first hole and the first cavity.
[0007] As a preferred technical solution of the present invention: the offshore wind power structure foundation includes a first bolt assembly, the column structure is located on the first flange, the first end plate is circular, the first bolt assembly is located inside the annular receiving cavity, the heave chamber includes a first flange, and the column structure is connected to the first flange through the first bolt assembly.
[0008] As a preferred technical solution of the present invention: the first end plate is in the shape of a circular plate, the first end plate is welded and fixed to the first steel pipe, the first end plate is welded and fixed to the second steel pipe, the second end plate is in the shape of a circular plate, the second end plate is welded and fixed to the first steel pipe, the second end plate is welded and fixed to the second steel pipe, and a first cavity is included between the second steel pipe, the first end plate and the second end plate.
[0009] As a preferred embodiment of the present invention: the column structure includes a first steel plate and stiffening ribs. The first steel plate extends axially along the column structure and is fixedly connected to the inner wall of the first end plate and the inner wall of the second end plate. The first steel plate is also fixedly connected to the inner wall of the second steel pipe. The stiffening ribs extend circumferentially along the column structure and are fixedly connected to the inner wall of the second steel pipe. The stiffening ribs are also fixedly connected to the first steel plate.
[0010] As a preferred technical solution of the present invention: the offshore wind power structural foundation includes a column structure, the column structure includes the column body structure, a first rubber pad group and a second rubber pad group, the number of the column body structure is greater than or equal to two, the upper column structure is located on the second end plate of the lower column structure, and the first end plate of the upper layer is fixedly connected to the second end plate of the lower layer.
[0011] The first rubber pad assembly is located below the first steel pipe, and the second rubber pad assembly is located below the second steel pipe. In the axial direction of the column structure, both ends of the first rubber pad assembly abut against the heave chamber and the first end plate, respectively, and the other end of the first rubber pad assembly abuts against the heave chamber. In the axial direction of the column structure, both ends of the second rubber pad assembly abut against the heave chamber and the first end plate, respectively.
[0012] As a preferred technical solution of the present invention: the offshore wind power structure foundation includes a connecting beam, the heave chamber includes a second flange, the connecting beam is connected to the second flange in the radial direction of the column structure, the connecting beam includes a third steel pipe, a fourth steel pipe, and a second concrete, the third steel pipe is fitted with the fourth steel pipe, a filling cavity is included between the third steel pipe and the fourth steel pipe, and the second concrete is at least partially located in the filling cavity.
[0013] As a preferred embodiment of the present invention: the connecting beam includes a plurality of second prestressed steel bars and a plurality of second sleeves, the second sleeves are located in the filling cavity, the second sleeves extend axially along the third steel pipe, the second prestressed steel bars are located in the second cavity of the second sleeves, the second prestressed steel bars extend axially along the third steel pipe, and a portion of the second concrete is located in the second cavity.
[0014] As a preferred technical solution of the present invention: the number of helical chambers is set to at least three, the number of connecting beams is set to at least three, at least three helical chambers are distributed at intervals along the axial direction of the column structure, and the connecting beams are connected to the helical chambers on both sides.
[0015] The connecting beam includes a third rubber pad group and a fourth rubber pad group. The two ends of the third rubber pad group abut against the third steel pipe and the second flange, respectively. The fourth rubber pad group is located between the fourth steel pipe and the second flange.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] This invention employs a method of filling a first concrete within an annular cavity of a column structure. This annular cavity is formed between a first steel pipe, a second steel pipe, a first end plate, and a second end plate. Relative to the location of structural stress concentration, the strength provided by the first concrete allows for a reduction in the thickness of the first and second steel pipes. The first and second steel pipes act as a constrictor for the first concrete. While participating in the stress distribution, the first and second steel pipes place the first concrete under multi-directional compression, thereby improving its ultimate strength, plasticity, and toughness. This effectively reduces the amount of steel used in the column structure and enhances the overall structural reliability. Attached Figure Description
[0018] Figure 1 This is a three-dimensional structural diagram of the offshore wind power structural foundation of this utility model;
[0019] Figure 2 For the present utility model in Figure 1 A cross-sectional schematic diagram of the connection between the column structure and the helical chamber.
[0020] Figure 3 For the present utility model in Figure 1 A first-view schematic diagram of the columnar structure in the image;
[0021] Figure 4 For the present utility model in Figure 3 A schematic diagram at point A in the middle;
[0022] Figure 5 For the present utility model in Figure 1A schematic diagram of the columnar structure from a second perspective;
[0023] Figure 6 For the present utility model in Figure 5 A schematic diagram at point B in the middle;
[0024] Figure 7 For the present utility model in Figure 1 Explosion-proof diagram of the connecting beam;
[0025] Figure 8 For the present utility model in Figure 7 Cross-sectional schematic diagram of the connecting beam;
[0026] Figure 9 For the present utility model in Figure 7 A schematic diagram at point C in the middle;
[0027] Figure 10 For the present utility model in Figure 1 A three-dimensional schematic diagram of the mid-swing chamber;
[0028] Figure 11 For the present utility model in Figure 10 A top-down view of the mid-swing chamber. Detailed Implementation
[0029] The present invention will be further described below with reference to the accompanying drawings and embodiments, but this should not be construed as limiting the present invention.
[0030] like Figure 1-11As shown, a floating offshore wind power structural foundation includes a column structure 4 and a heave chamber 2. The column structure 4 includes a first steel pipe 41, a second steel pipe 42, a first end plate 43, a second end plate 44, and a first concrete 45. In the radial direction of the column structure 4, the first steel pipe 41 is located outside the second steel pipe 42, the first end plate 43 is located below the first steel pipe 41 and is connected to the first steel pipe 41 and the second steel pipe 42, and the second end plate 44 is located above the first steel pipe 41. The two end plates 44 are connected to the first steel pipe 41 and the second steel pipe 42. The first steel pipe 41, the second steel pipe 42, the first end plate 43 and the second end plate 44 include an annular cavity 401. The inner diameter of the second steel pipe 42 is greater than the difference between the inner diameter of the first steel pipe 41 and the outer diameter of the second steel pipe 42. At least part of the first concrete 45 fills the annular cavity 401. The heave chamber 2 is located below the column structure 4. The heave chamber includes a first flange. The column structure 4 is connected to the first flange 21. In this embodiment, the annular cavity 401 of the column structure 4 is filled with first concrete 45, and the annular cavity 401 is formed between the first steel pipe 41, the second steel pipe 42, the first end plate 43 and the second end plate 44. Relative to the location of concentrated structural stress, the strength provided by the first concrete 45 can reduce the thickness of the first steel pipe 41 and the second steel pipe 42. The first steel pipe 41 and the second steel pipe 42 act as a clamp on the first concrete 45. While participating in the stress, the first steel pipe 41 and the second steel pipe 42 put the first concrete 45 in a multi-directional compressive state to improve its ultimate strength, plasticity and toughness, thereby effectively reducing the amount of steel used in the column structure 4 and improving the overall structural reliability.
[0031] It should be noted that, to meet the operational requirements of wind turbines in deep-sea environments, floating offshore wind power foundations are typically designed to be very large. The significant structural weight not only impacts manufacturing costs but also necessitates the use of large floating cranes for transportation and installation, resulting in correspondingly higher installation costs. Compared to the all-steel floating foundations in the prior art, the column structure 4 in this embodiment effectively reduces the amount of steel used and the structural weight.
[0032] It should also be noted that the first concrete 45 provides support for the first steel pipe 41 and the second steel pipe 42, preventing or delaying local buckling of the first steel pipe 41 and the second steel pipe 42, and ensuring that the steel performance is fully utilized. Furthermore, in this embodiment, the column structure 4 uses a steel structure shell as the outer boundary of the first concrete 45, thus eliminating the need for concrete molds, reducing reliance on concrete mold development, and effectively saving construction costs.
[0033] like Figure 2-4As shown, the offshore wind power structural foundation includes a column structure 1 and two or more column structures 4. The upper column structure 4 is located on the second end plate 44 of the lower column structure 4. The first end plate 43 of the upper layer is fixedly connected to the second end plate 44 of the lower layer. In this embodiment, the first end plate 43 of the upper layer and the second end plate 44 of the lower layer are fixedly connected by bolts to ensure that the upper column structure 4 is fixedly connected to the lower column structure 4. Thus, by decomposing the entire column structure 1 into several column structures 4 for processing, the ease of processing can be improved.
[0034] Meanwhile, the offshore wind power structure foundation includes a first bolt assembly 5, a column structure 4 located on a first flange 21, a first end plate 43 in the shape of a circular plate, and the first bolt assembly 5 located inside the annular receiving cavity 401. The heave chamber 2 includes a first flange 21, and the column structure 4 is connected to the first flange 21 via the first bolt assembly 5. Figure 3 As shown, the first bolt assembly 5 has several bolts evenly arranged around the circumference of the column structure 4 to improve the connection strength between the column structure 4 and the first flange 21.
[0035] like Figure 2-4 As shown, the column structure 1 includes the aforementioned column structure 4 and several first prestressed steel bars 6. The first prestressed steel bars 6 are prestressed steel strands. The column structure 4 includes several first sleeves 46. The several first sleeves 46 are evenly distributed around the circumference of the column structure 4. In the axial direction of the column structure 4, the first sleeves 46 are fixedly connected to the first end plate 43 and the second end plate 44. The first sleeves 46 include a first cavity 461. The first end plate 43 includes a first hole 431. The second end plate 44 includes a second hole 441. The first cavity 461 connects the first hole 431 and the second hole 441. The first prestressed steel bars 6 pass through the first hole 431 and the second hole 441. A portion of the first concrete 45 is located in the first hole 431, the first cavity 461, and the second hole 441, or a portion of the first concrete 45 is located in the first hole 431 and the first cavity 461. After several column structures 4 are connected and fixed in sequence, the first prestressed steel bar 6 is inserted into the sleeve 46, and the bottom of the first prestressed steel bar 6 is fixed to the sleeve 46 by grouting a portion of the first concrete 45 into the sleeve 46. Then, the first concrete 45 is grouted into the annular cavity 401. After the first concrete 45 hardens to the corresponding strength, the first prestressed steel bar 6 is tensioned as a whole by post-tensioning to ensure that the first concrete 45 in the annular cavity 401 is under pressure. In this way, the structural integrity and load-bearing capacity of the column structure 1 are improved.
[0036] like Figure 3As shown, the first end plate 43 is circular and is welded to the first steel pipe 41 and the second steel pipe 42. The second end plate 44 is also circular and is welded to the first steel pipe 41 and the second steel pipe 42. A first cavity 402 is formed between the second steel pipe 42, the first end plate 43, and the second end plate 44. By providing the first cavity 402, which is not filled with concrete, the core concrete with low load-bearing capacity is removed, significantly reducing the self-weight of the column structure 4. Furthermore, the first concrete 45 is placed as far away from the center of the cross-section of the column structure 4 as possible to maximize the bending stiffness and efficiency of the cross-section.
[0037] like Figure 3 As shown, the column structure 4 includes a first steel plate 48 and stiffening ribs 49. The first steel plate 48 extends axially along the column structure 4 and is fixedly connected to the inner wall of the first end plate 43 and the inner wall of the second end plate 44. The first steel plate 48 is also fixedly connected to the inner wall of the second steel pipe 42. The stiffening ribs 49 extend circumferentially along the column structure 4 and are fixedly connected to the inner wall of the second steel pipe 42. The stiffening ribs 49 are also fixedly connected to the first steel plate 48. There are several first steel plates 48, evenly distributed axially along the column structure 4. Similarly, there are several stiffening ribs 49, also evenly distributed axially along the column structure 4. The connection between the first steel plate 48 and the stiffening ribs 49 is welded and fixed. Thus, the first steel plate 48 enhances the overall integrity and shear resistance, improves bending stiffness and load-bearing capacity, and the stiffening rib 49 provides internal support for the second steel pipe 42, greatly improving the local stability of the column structure 4, effectively preventing premature buckling instability under compression, and allowing the material strength to be fully utilized.
[0038] like Figure 11 As shown, the offshore wind power structural foundation includes a column structure 1, which comprises a first rubber pad assembly 11 and a second rubber pad assembly 12. The first rubber pad assembly 11 is located below the first steel pipe 41, and the second rubber pad assembly 12 is located below the second steel pipe 42. Along the axial direction of the column structure 4, both ends of the first rubber pad assembly 11 abut against the heave chamber 2 and the first end plate 43, respectively, while the other end of the first rubber pad assembly 11 abuts against the heave chamber 2. Similarly, along the axial direction of the column structure 4, both ends of the second rubber pad assembly 12 abut against the heave chamber 2 and the first end plate 43, respectively. This collaborative working mechanism of flexible energy dissipation achieved through the first rubber pad assembly 11 and the second rubber pad assembly 12 helps ensure the uniform transmission of structural forces after the column structure 4 is connected to the heave chamber 2.
[0039] Among them, the lowest column structure 4 of the column structure 1 is not only connected and fixed to the heave chamber 2 by the first bolt assembly 5, but the lowest column structure 4 is also welded to the heave chamber 2 to improve the strength of the connection.
[0040] like Figure 8-9 As shown, the offshore wind power structure foundation includes a connecting beam 3, and the heave hull 2 includes a second flange 22. The connecting beam 3 is connected to the second flange 22 radially along the column structure 4. The connecting beam 3 includes a third steel pipe 31, a fourth steel pipe 33, and a second concrete 34. The third steel pipe 31 is fitted with the fourth steel pipe 33, and a filling cavity 301 is included between the third steel pipe 31 and the fourth steel pipe 33. The second concrete 34 is at least partially located in the filling cavity 301. Thus, by filling the filling cavity 301 with the second concrete 34, the thickness of the third steel pipe 31 and the fourth steel pipe 33 can be reduced using the strength provided by the second concrete 34. The third steel pipe 31 and the fourth steel pipe 33 act as a constrictor for the second concrete 34. While participating in the load-bearing process, the third steel pipe 31 and the fourth steel pipe 33 place the second concrete 34 under multi-directional compression, thereby improving its ultimate strength, plasticity, and toughness. This effectively reduces the amount of steel used in the connecting beam 3 and improves the overall structural reliability.
[0041] The number of fourth steel pipes 33 is at least one, and the number is selected according to the width of the actual connecting beam 3. In the width direction of the third steel pipe 31, the adjacent fourth steel pipes 33 are spaced apart. A portion of the second concrete 34 is also located between the adjacent fourth steel pipes 33 to improve the structural strength of the connecting beam 3.
[0042] like Figure 8-9 As shown, the connecting beam 3 includes several second prestressed steel bars 7 and several second sleeves 35. The second sleeves 35 are located in the filling cavity 301 and extend axially along the third steel pipe 31. The second prestressed steel bars 7 are located in the second cavity 351 of the second sleeves 35 and extend axially along the third steel pipe 31. A portion of the second concrete 34 is also located in the second cavity 351. The function and principle of the second prestressed steel bars 7 are the same as those of the first prestressed steel bars 6 mentioned above, and will not be elaborated further here. This improves the structural integrity and load-bearing capacity of the connecting beam 3.
[0043] like Figure 8As shown, the connecting beam 3 includes at least one connecting sub-beam. The principle and function of setting several connecting sub-beams are the same as those of the column structure 4, thereby improving the ease of processing the connecting beam 3. Furthermore, before the second concrete 34 is grouted into the filling cavity 301, the connecting beam 3 is sealed axially with a mold to prevent leakage of the second concrete 34. After grouting is completed, the mold is removed, and a portion of the bolts 32 is fixed inside the second concrete 34 so that the connecting beam 3 and the second flange 22 of the helical chamber 2 are connected and fixed by the bolts 32.
[0044] The connecting beam 3 includes a third rubber pad group (not shown in the figure) and a fourth rubber pad group (not shown in the figure). The two ends of the third rubber pad group abut against the third steel pipe 31 and the second flange 22, respectively. The fourth rubber pad group is located between the fourth steel pipe 33 and the second flange 22. The third and fourth rubber pad groups realize a flexible energy dissipation collaborative working mechanism, which helps to ensure the uniform transmission of structural forces after the connecting beam 3 is connected to the heave chamber 2.
[0045] like Figure 1 As shown, the number of heave chambers 2 is set to at least three, and the number of connecting beams 3 is set to at least three. At least three heave chambers 2 are spaced apart along the axial direction of the column structure 4, and the connecting beams 3 connect to the heave chambers 2 on both sides. In this embodiment, the offshore wind power structure foundation is a three-column foundation, that is, the number of heave chambers 2 is set to three, the number of connecting beams 3 is set to three, and the number of column structures 1 is set to three. In the axial projection direction of the column structure 1, the column structures 1 are arranged in an equilateral triangle. Heave chambers 2 are provided at the bottom of the column structure 1, and two heave chambers 2 are connected by connecting beams 3.
[0046] A construction method for a floating offshore wind power structure foundation includes the aforementioned floating offshore wind power structure foundation, prefabricating the column structure 1, heave chamber 2, and connecting beam 3 at a processing site, and assembling, tensioning, and grouting the connections using hoisting equipment. The construction method includes the following steps:
[0047] S1. First assembly: Connect at least two column structures 4 along the axial direction of the column structure 4 to form column structure 1. After the column structure 1 is assembled, it is hoisted to the corresponding work position of the helical chamber 2. After laying multiple layers of first rubber pad group 11 and multiple layers of second rubber pad group 12 between the connection surface of column structure 1 and helical chamber 2, several first prestressed steel bars 6 are evenly arranged in column structure 1. Insert the first prestressed steel bars 6 into the first sleeve 46. Apply the initial pre-tightening force to the first prestressed steel bars 6 using the graded tensioning process to complete the temporary locking. Then, grout the first concrete 45 to cover the first prestressed steel bars 6 to complete the connection and fixation between the first prestressed steel bars 6 and the first sleeve 46. Then, complete the connection and fixation between column structure 1 and first flange 21 through the first bolt assembly 5. Finally, complete the welding work between the helical chamber 2 and the outer steel plate of the lowest column structure 4.
[0048] S2. Second assembly: Install multi-layer third rubber pad group and multi-layer fourth rubber pad group at the connection surface between the connecting beam 3 and the heave chamber 2. Insert the second prestressed steel bar 7 into the second sleeve 35. Use a graded tensioning process to apply initial pre-tightening force to the second prestressed steel bar 7 to complete temporary locking. The initial tensioning applies initial stress (10%-20% prestress) to the prestressed tendon to complete temporary locking. The first stage of tensioning increases the prestress to 50% and holds for 5 minutes. The third stage of tensioning increases the prestress to 100% and holds for 5 minutes. Then, grout the second concrete 34 to cover the second prestressed steel bar 7 to complete the connection and fixation between the second prestressed steel bar 7 and the second sleeve 35. Then, connect and fix the second flange 22 of the connecting beam 3 and the heave chamber 2. Finally, complete the welding work of the steel plate on the outside of the heave chamber 2 and the connecting beam 3.
[0049] S3. Distribute several heave chambers 2 at axial intervals along the column structure 4. Repeat step S2 when one heave chamber 2 is connected to another heave chamber 2. That is, ensure that the three heave chambers 2 are arranged in an equilateral triangle. Repeat step S2 at the connection between the third heave chamber 2 and the other two heave chambers 2.
[0050] S4. Final tensioning of the prestressed system: The steel strands at the connection of the heave chamber 2 are symmetrically tensioned using a tensioning system, with three levels of loading and holding for 5 minutes each. Within 48 hours after all tensioning channels are completed, another part of the second concrete 34 is grouted into the filling cavity 301 of the connecting beam 3, and another part of the first concrete 45 is grouted into the annular receiving cavity 401 of the column structure 4.
[0051] The construction method of the offshore wind power structure foundation in this embodiment is conducive to ensuring the uniform transmission of structural forces after the connection between the column structure 1 and the heave chamber 3 and the connecting beam 3 and the heave chamber 2, improving the strength of the connection, and effectively improving the construction convenience of the overall structure.
[0052] Furthermore, this construction method reduces the requirements for steel structure processing plants, transport and installation vessels, and docks, lowers the difficulty and threshold of construction, and allows for segmented construction in different areas and final assembly on the same site, improving processing convenience.
[0053] The above embodiments are merely preferred technical solutions of this utility model. Those skilled in the art should understand that modifications or substitutions to the technical solutions or parameters in the embodiments can be made without departing from the principles and essence of this utility model, and all such modifications or substitutions should be covered within the protection scope of this utility model.
Claims
1. A floating offshore wind power structural foundation, characterized in that: The structure includes a column structure (4) and a heave chamber (2). The column structure (4) includes a first steel pipe (41), a second steel pipe (42), a first end plate (43), a second end plate (44), and a first concrete (45). In the radial direction of the column structure (4), the first steel pipe (41) is located outside the second steel pipe (42), the first end plate (43) is located below the first steel pipe (41), and the first end plate (43) is connected to the first steel pipe (41) and the second steel pipe (42). The second end plate (44) is located above the first steel pipe (41), and the second end plate (44) is connected to the first steel pipe (41) and the second steel pipe (42). An annular cavity (401) is included between the first steel pipe (41), the second steel pipe (42), the first end plate (43), and the second end plate (44). At least a portion of the first concrete (45) fills the annular cavity (401). The heave chamber (2) is located below the column structure (4), and the heave chamber (2) includes a first flange, which is connected to the column structure (4).
2. The floating offshore wind power structure foundation according to claim 1, characterized in that: The offshore wind power structural foundation includes a column structure (1), which includes a column body structure (4) and several first prestressed steel bars (6). The column body structure (4) includes several first sleeves (46). In the axial direction of the column body structure (4), the first sleeves (46) are fixedly connected to the first end plate (43) and the second end plate (44). The first sleeves (46) include a first cavity (461), and the first end plate (43) includes a first hole (431). The second end plate (44) includes a second hole (441), the first cavity (461) connects the first hole (431) and the second hole (441), the first prestressed steel bar (6) passes through the first hole (431) and the second hole (441), and a portion of the first concrete (45) is located in the first hole (431), the first cavity (461) and the second hole (441), or a portion of the first concrete (45) is located in the first hole (431) and the first cavity (461).
3. The floating offshore wind power structure foundation according to claim 1, characterized in that: The offshore wind power structure foundation includes a first bolt assembly (5), the column structure (4) is located on the first flange (21), the first end plate (43) is in the shape of a circular plate, the first bolt assembly (5) is located inside the annular cavity (401), the heave chamber (2) includes a first flange (21), and the column structure (4) is connected to the first flange (21) through the first bolt assembly (5).
4. The floating offshore wind power structure foundation according to claim 1, characterized in that: The first end plate (43) is circular, and the first end plate (43) is welded and fixed to the first steel pipe (41). The first end plate (43) is welded and fixed to the second steel pipe (42). The second end plate (44) is circular, and the second end plate (44) is welded and fixed to the first steel pipe (41). The second end plate (44) is welded and fixed to the second steel pipe (42). A first cavity (402) is included between the second steel pipe (42), the first end plate (43) and the second end plate (44).
5. A floating offshore wind power structure foundation according to claim 4, characterized in that: The column structure (4) includes a first steel plate (48) and a stiffening rib (49). The first steel plate (48) extends along the axial direction of the column structure (4). The first steel plate (48) is fixedly connected to the inner wall of the first end plate (43) and the inner wall of the second end plate (44). The first steel plate (48) is also fixedly connected to the inner wall of the second steel pipe (42). The stiffening rib (49) extends along the circumferential direction of the column structure (4). The stiffening rib (49) is fixedly connected to the inner wall of the second steel pipe (42). The stiffening rib (49) is also fixedly connected to the first steel plate (48).
6. A floating offshore wind power structure foundation according to claim 1, characterized in that: The offshore wind power structure foundation includes a column structure (1), the column structure (1) includes the column structure (4), a first rubber pad group (11) and a second rubber pad group (12), the number of the column structure (4) is greater than or equal to two, the upper column structure (4) is located on the second end plate (44) of the lower column structure (4), and the first end plate (43) of the upper layer is fixedly connected to the second end plate (44) of the lower layer; The first rubber pad assembly (11) is located below the first steel pipe (41), and the second rubber pad assembly (12) is located below the second steel pipe (42). In the axial direction of the column structure (4), the two ends of the first rubber pad assembly (11) abut against the heave chamber (2) and the first end plate (43) respectively, and the other end of the first rubber pad assembly (11) abuts against the heave chamber (2). In the axial direction of the column structure (4), the two ends of the second rubber pad assembly (12) abut against the heave chamber (2) and the first end plate (43) respectively.
7. A floating offshore wind power structure foundation according to claim 1, characterized in that: The offshore wind power structure foundation includes a connecting beam (3), the heave chamber (2) includes a second flange (22), the connecting beam (3) is connected to the second flange (22) in the radial direction of the column structure (4), the connecting beam (3) includes a third steel pipe (31), a fourth steel pipe (33) and a second concrete (34), the third steel pipe (31) is sleeved on the fourth steel pipe (33), a filling cavity (301) is included between the third steel pipe (31) and the fourth steel pipe (33), and the second concrete (34) is at least partially located in the filling cavity (301).
8. A floating offshore wind power structure foundation according to claim 7, characterized in that: The connecting beam (3) includes several second prestressed steel bars (7) and several second sleeves (35). The second sleeves (35) are located in the filling cavity (301). The second sleeves (35) extend axially along the third steel pipe (31). The second prestressed steel bars (7) are located in the second cavity (351) of the second sleeves (35). The second prestressed steel bars (7) extend axially along the third steel pipe (31). A portion of the second concrete (34) is located in the second cavity (351).
9. A floating offshore wind power structure foundation according to claim 7, characterized in that: The number of the heave chambers (2) is set to at least three, the number of the connecting beams (3) is set to at least three, and at least three of the heave chambers (2) are arranged at intervals along the axial direction of the column structure (4), and the connecting beams (3) are connected to the heave chambers (2) on both sides. The connecting beam (3) includes a third rubber pad group and a fourth rubber pad group. The two ends of the third rubber pad group abut against the third steel pipe (31) and the second flange (22) respectively. The fourth rubber pad group is between the fourth steel pipe (33) and the second flange (22).