An aircraft slide rail sleeve based on additive manufacturing design
By using additive manufacturing to design aircraft slide rail sleeves, the problem of difficult docking between the slide rail sleeve and the drain pipe is solved by the cooperation of the sleeve body, drain pipe and spring, etc., realizing rapid connection and sealing, and improving maintenance efficiency.
Patent Information
- Application Number
- CN202522766256.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-26
AI Technical Summary
In existing technologies, it is difficult to easily connect aircraft slide rail sleeves with drainage pipes, which affects maintenance efficiency.
The aircraft slide rail sleeve, designed using additive manufacturing, achieves rapid connection and sealing between the connecting pipe and the drain pipe through the cooperation of the sleeve body, drain pipe, spring, sliding sleeve, sliding groove, and limit ball, requiring only a simple insertion and removal action.
Pipelines can be connected and disconnected in confined spaces without tools or complicated operations, greatly improving maintenance efficiency and convenience.
Smart Images

Figure CN224994996U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of additive manufacturing technology, and more specifically, to a large-tonnage aircraft slide rail sleeve based on additive manufacturing design. Background Technology
[0002] SLM (Solid Melting Laser) is a major technique in additive manufacturing of metal materials. This technology uses a laser as the energy source, scanning layer by layer through a bed of metal powder according to a pre-planned path in a 3D CAD slicing model. The scanned metal powder melts and solidifies to achieve a metallurgical bond, ultimately yielding the designed metal part. SLM technology overcomes the challenges of manufacturing complex-shaped metal parts using traditional techniques. It can directly form nearly fully dense metal parts with excellent mechanical properties.
[0003] In existing aircraft slide rail sleeves, to achieve zero liquid accumulation, reduce corrosion risk, and extend product life, the slide rail sleeve typically needs to be connected to the drain pipe. However, since the drain pipe is a fixed structure, maintenance personnel cannot find a suitable angle and space to tighten screws, install clamps, or connect pipes within the confined and complex space of an aircraft, affecting maintenance efficiency. To address these issues, we provide an aircraft slide rail sleeve based on additive manufacturing design. Utility Model Content
[0004] The main objective of this application is to provide an aircraft slide rail sleeve based on additive manufacturing design to solve the problem of inconvenient docking with drainage pipes in the prior art.
[0005] To achieve the above objectives, in a first aspect, this application provides an aircraft slide rail sleeve based on additive manufacturing design, including a sleeve body, a liquid outlet disposed on the sleeve body, and a drain pipe fixedly disposed at the liquid outlet. A first spring is fixedly connected to the outer surface of the drain pipe, and a sliding sleeve is fixedly connected to the end of the first spring away from the drain pipe. The inner side of the sliding sleeve is slidably connected to the outer surface of the drain pipe. A sliding groove is formed on the inner side of the drain pipe, and a limit ball is slidably connected to the inner side of the sliding groove. A first fixing plate is fixedly connected to the inner side of the drain pipe, and a first sliding column is slidably connected to the inner wall of the first fixing plate. A first sealing block is fixedly connected to one end of the first sliding column, and a second spring is fixedly connected to one side of the first sealing block. The end of the second spring away from the first sealing block is fixedly connected to one side of the first fixing plate.
[0006] Optionally, a limit ring is fixedly connected to the outer surface of the drain pipe, a sealing gasket is fixedly connected to the inner side of the drain pipe, and the outer surface of the first sealing block is slidably connected to the inner side of the drain pipe.
[0007] Optionally, a connecting pipe is inserted into the inner side of the drain pipe, and the outer surface of the connecting pipe is engaged with a limiting ball.
[0008] Optionally, a second fixing plate is fixedly connected to the inner side of the connecting pipe, and a second sliding column is slidably connected to the inner wall of the second fixing plate.
[0009] Optionally, a second sealing block is fixedly connected to one end of the second sliding column, and a third spring is fixedly connected to one side of the second sealing block.
[0010] Optionally, the end of the second spring away from the sealing block is fixedly connected to one side of the second fixed plate, and the outer surface of the second sealing block is slidably connected to the inner side of the connecting pipe.
[0011] Optionally, a mounting plate is fixedly connected to one end of the sleeve body, and a limit block is fixedly connected to the outer surface of the connecting pipe.
[0012] This utility model provides an aircraft slide rail sleeve based on additive manufacturing design. Compared with the prior art, its advantages are as follows: The aircraft slide rail sleeve, through the cooperative use of the sleeve body, drain pipe, first spring, sliding sleeve, sliding groove, limiting ball, limiting ring, first fixing plate, second spring, first sliding column and first sealing block, realizes the rapid connection and sealing of the connecting pipe and the drain pipe. In the confined space of the aircraft, no tools or complicated operations are required. The connection and separation of the pipeline can be completed by simply inserting and pulling, which greatly improves the maintenance efficiency and convenience.
[0013] The aircraft slide rail sleeve, through the coordinated use of the connecting pipe, limiting block, second fixing plate, third spring, second sealing block, second sliding column and mounting plate, realizes the quick connection and sealing of the connecting pipe and the drain pipe. In the confined space of the aircraft, no tools or complicated operations are required. The connection and separation of the pipeline can be completed by simply inserting and pulling, which greatly improves maintenance efficiency and convenience. Attached Figure Description
[0014] The accompanying drawings, which form part of this application, are used to provide a further understanding of the application and to make other features, objects, and advantages of the application more apparent. The illustrative embodiments and descriptions of this application are used to explain the application and do not constitute an undue limitation of the application. In the drawings: Figure 1 This is a schematic diagram of the overall three-dimensional structure of this utility model; Figure 2 This is a schematic diagram of the overall cross-sectional three-dimensional structure of this utility model; Figure 3 This is a cross-sectional three-dimensional structural diagram of the docking device of this utility model; Figure 4 This is an exploded structural diagram of the docking device of this utility model.
[0015] The components are: 1. Sleeve body; 2. Drain pipe; 3. First spring; 4. Sliding sleeve; 5. Sliding groove; 6. Limiting ball; 7. Limiting ring; 8. First fixing plate; 9. Second spring; 10. First sliding column; 11. First sealing block; 12. Sealing gasket; 13. Connecting pipe; 14. Limiting block; 15. Second fixing plate; 16. Third spring; 17. Second sealing block; 18. Second sliding column; 19. Mounting plate. Detailed Implementation
[0016] To enable those skilled in the art to better understand the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present application, and not all embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative effort should fall within the scope of protection of the present application.
[0017] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this application are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. It should be understood that such data can be interchanged where appropriate for the embodiments of this application described herein. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion; for example, a process, method, system, product, or apparatus that comprises a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to such processes, methods, products, or apparatus.
[0018] In this application, the terms "upper," "lower," "left," "right," "front," "rear," "top," "bottom," "inner," "outer," "middle," "vertical," "horizontal," "lateral," and "longitudinal" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. These terms are primarily for the purpose of better describing this application and its embodiments, and are not intended to limit the indicated device, element, or component to having a specific orientation, or to be constructed and operated in a specific orientation.
[0019] Furthermore, in addition to indicating location or positional relationship, some of the aforementioned terms may also have other meanings. For example, the term "above" may also be used in some cases to indicate a certain dependency or connection relationship. Those skilled in the art can understand the specific meaning of these terms in this application based on the specific circumstances.
[0020] In addition, the term "multiple" should mean two or more.
[0021] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. This application will now be described in detail with reference to the accompanying drawings and embodiments.
[0022] like Figure 1 and Figure 2 As shown in the figure, an aircraft slide rail sleeve based on additive manufacturing design according to an embodiment of the present invention includes a sleeve body 1. One end of the sleeve body 1 is fixedly connected to a mounting plate 19. A limiting block 14 is fixedly connected to the outer surface of the connecting pipe 13. The mounting plate 19 is installed on the sleeve body 1, thereby fixing the sleeve body 1 and playing a fixing role. The limiting block 14 is installed on the connecting pipe 13 and plays a limiting role, preventing the connecting pipe 13 from being inserted too deeply into the drain pipe 2. The outlet of the sleeve body 1 is fixedly connected to the drain pipe 2. The connecting pipe 13 is inserted into the inner side of the drain pipe 2. A second fixing plate 15 is fixedly connected to the inner side of the connecting pipe 13. A second sliding column 18 is slidably connected to the inner wall of the second fixing plate 15. The second fixing plate 15 is installed in the connecting pipe 13. The second fixing plate 15 can fix the second sliding column 18 and prevent the second sliding column 18 from falling off during sliding, thus playing a fixing role.
[0023] A second sealing block 17 is fixedly connected to one end of the second sliding column 18, and a third spring 16 is fixedly connected to one side of the second sealing block 17. The second sealing block 17 is installed on the second sliding column 18. When the connecting pipe 13 is pulled out, the second sealing block 17 can be pushed into the connecting pipe 13 under the action of the third spring 16, which can seal the connecting pipe 13 and prevent liquid leakage. The outer surface of the connecting pipe 13 is engaged with the limiting ball 6. The connecting pipe 13 is installed in the drain pipe 2, so that the liquid in the sleeve body 1 can flow out from the drain pipe 2. When the connecting pipe 13 is inserted into the drain pipe 2, the limiting ball 6 can fix the connecting pipe 13, which plays a fixing role.
[0024] like Figure 3As shown, a limiting ring 7 is fixedly connected to the outer surface of the drain pipe 2, and a sealing gasket 12 is fixedly connected to the inner side of the drain pipe 2. The outer surface of the first sealing block 11 is slidably connected to the inner side of the drain pipe 2. The limiting ring 7 is installed on the drain pipe 2, and can restrict the sliding sleeve 4 through the limiting ring 7, thus playing a restrictive role. The sealing gasket 12 is installed inside the drain pipe 2, and can seal the connecting pipe 13 through the sealing gasket 12 to prevent liquid leakage. The first sealing block 11 is installed inside the drain pipe 2, and the first sealing block 11 can be used inside the drain pipe 2. The outer surface of the drain pipe 2 is fixedly connected to a first spring 3. The end of the first spring 3 away from the drain pipe 2 is fixedly connected to a sliding sleeve 4. The inner side of the sliding sleeve 4 is slidably connected to the outer surface of the drain pipe 2. A sliding groove 5 is opened on the inner side of the drain pipe 2. A limiting ball 6 is slidably connected to the inner side of the sliding groove 5. The drain pipe 2 is installed on the sleeve body 1. The liquid inside the sleeve body 1 can be discharged through the drain pipe 2. When the sliding sleeve 4 slides, it can restrict and release the limiting ball 6, thereby facilitating the insertion and removal of the connecting pipe 13.
[0025] like Figure 4 As shown, a first fixing plate 8 is fixedly connected to the inner side of the drain pipe 2. A first sliding column 10 is slidably connected to the inner wall of the first fixing plate 8. A first sealing block 11 is fixedly connected to one end of the first sliding column 10. A second spring 9 is fixedly connected to one side of the first sealing block 11. The end of the second spring 9 away from the sealing block is fixedly connected to one side of the second fixing plate 15. The outer surface of the second sealing block 17 is slidably connected to the inner side of the connecting pipe 13. The second spring 9 is installed on the second fixing plate 15. Under the action of the second spring 9, the first sealing block 11 can be supported, thus providing support. The second sealing block 17 is installed inside the connecting pipe 13. 17 can slide within the connecting pipe 13, thereby sealing the connecting pipe 13 and preventing liquid leakage. The end of the second spring 9 away from the first sealing block 11 is fixedly connected to one side of the first fixing plate 8. When the connecting pipe 13 is pulled out, under the action of the second spring 9, the first sealing block 11 can be pushed to lock into the drain pipe 2, which can prevent the liquid inside the sleeve body 1 from leaking and play a sealing role. When the connecting pipe 13 is inserted into the drain pipe 2, the first sealing block 11 can be pushed backward by the extension column provided on the second sealing block 17, thereby releasing the seal on the drain pipe 2 and facilitating the liquid to flow out through the gap.
[0026] Working principle: When the connecting pipe 13 is not inserted into the drain pipe 2, the first sealing block 11, under the action of the second spring 9, tightly adheres to the inner side of the drain pipe 2, forming a seal to prevent liquid leakage from the sleeve body 1. Simultaneously, the second sealing block 17, under the action of the third spring 16, seals the inner side of the connecting pipe 13 to prevent external contamination. When the connecting pipe 13 is inserted into the drain pipe 2, during insertion, the end of the connecting pipe 13 pushes the first sealing block 11 backward, compressing the second spring 9 and opening the drain channel. Simultaneously, the structure inside the drain pipe 2 pushes the second sealing block 17 backward, compressing the third spring 16 and opening the channel of the connecting pipe 13. When the connecting pipe 13 is inserted to the designed position… The limiting ball 6 slides within the sliding groove 5 and engages with the groove or structure on the outer surface of the connecting pipe 13, achieving mechanical locking. At this time, the sliding sleeve 4 maintains pressure on the limiting ball 6 under the action of the first spring 3, enhancing the stability of the connection. The sealing gasket 12 ensures the interface between the drain pipe 2 and the connecting pipe 13 is sealed, preventing liquid leakage. Meanwhile, the first sealing block 11 and the second sealing block 17 remain open after connection, ensuring smooth liquid flow. Sliding the sliding sleeve 4 backward compresses the first spring 3, releasing the pressure on the limiting ball 6. The limiting ball 6 exits the groove of the connecting pipe 13, at which point the connecting pipe 13 can be easily pulled out. After being pulled out, each sealing block resets under the action of the spring, resealing the pipeline.
[0027] The above description is merely a preferred embodiment of this application and is not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.
Claims
1. An aircraft slide rail sleeve based on additive manufacturing design, characterized in that: The device includes a sleeve body, a liquid outlet disposed on the sleeve body, and a drain pipe fixedly disposed at the liquid outlet. A first spring is fixedly connected to the outer surface of the drain pipe. A sliding sleeve is fixedly connected to the end of the first spring away from the drain pipe. The inner side of the sliding sleeve is slidably connected to the outer surface of the drain pipe. A sliding groove is formed on the inner side of the drain pipe. A limit ball is slidably connected to the inner side of the sliding groove. A first fixing plate is fixedly connected to the inner side of the drain pipe. A first sliding column is slidably connected to the inner wall of the first fixing plate. A first sealing block is fixedly connected to one end of the first sliding column. A second spring is fixedly connected to one side of the first sealing block. The end of the second spring away from the first sealing block is fixedly connected to one side of the first fixing plate.
2. The aircraft slide rail sleeve based on additive manufacturing design according to claim 1, characterized in that: A limit ring is fixedly connected to the outer surface of the drain pipe, and a sealing gasket is fixedly connected to the inner side of the drain pipe. The outer surface of the first sealing block is slidably connected to the inner side of the drain pipe.
3. The aircraft slide rail sleeve based on additive manufacturing design according to claim 1, characterized in that: The drain pipe is connected to a connecting pipe on its inner side, and the outer surface of the connecting pipe is engaged with a limiting ball.
4. The aircraft slide rail sleeve based on additive manufacturing design according to claim 3, characterized in that: A second fixing plate is fixedly connected to the inner side of the connecting pipe, and a second sliding column is slidably connected to the inner wall of the second fixing plate.
5. An aircraft slide rail sleeve based on additive manufacturing design according to claim 4, characterized in that: A second sealing block is fixedly connected to one end of the second sliding column, and a third spring is fixedly connected to one side of the second sealing block.
6. The aircraft slide rail sleeve based on additive manufacturing design according to claim 5, characterized in that: The end of the second spring away from the sealing block is fixedly connected to one side of the second fixed plate, and the outer surface of the second sealing block is slidably connected to the inner side of the connecting pipe.
7. An aircraft slide rail sleeve based on additive manufacturing design according to claim 3, characterized in that: A mounting plate is fixedly connected to one end of the sleeve body, and a limit block is fixedly connected to the outer surface of the connecting pipe.