Multi-point dust ash pneumatic conveying and centralized treatment device

By using a multi-point dust collection pneumatic conveying and centralized processing device, problems such as dust dispersion and high manual labor intensity have been solved, and centralized processing of dust and recycling of solid waste have been achieved, ensuring the stable operation of the production line.

CN224995977UActive Publication Date: 2026-11-20XINJIANG ZHONGTAI MINING & METALLURGY CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522779208.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-20
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

Existing dust removal methods suffer from problems such as dust emission pollution, high labor intensity, and impact on the stable operation of production lines.

Method used

A multi-point dust collection pneumatic conveying and centralized treatment device is adopted. The dust from each dust collector's ash hopper is directly conveyed to the centralized hopper through the nitrogen main pipe and supporting pipelines. Combined with the material level sensor and electric control valve, the device achieves automated control, avoiding manual operation and dust escape.

Benefits of technology

It has enabled centralized treatment of dust, improved the environment, reduced labor intensity, ensured stable operation of the production line, and achieved solid waste recycling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224995977U_ABST
    Figure CN224995977U_ABST
Patent Text Reader

Abstract

The utility model relates to industrial dust ash treatment technical field, is a kind of multi-point dust ash pneumatic conveying and centralized processing device, it includes gas source storage tank, several lime kiln main dust collector ash bin and several lime kiln scattered point dust collector ash bin.The utility model is reasonable and compact in structure, convenient to use, the raw material dust collection point of each main dust collector ash bin and each scattered point dust collector ash bin in large-scale lime kiln production line is collected, nitrogen main pipe and supporting pipeline are set, dust in each main dust collector ash bin and scattered point dust collector ash bin is directly conveyed to raw material dust centralized bin by pneumatic conveying, centralized processing, eliminates each dust removal point separate discharge, realizes the dust of multiple points and reaches the purpose of centralized processing, improves the scene environment, reduces the personnel labor quantity, raw material dust can be sent to subsequent as the raw material of cement production, realizes solid waste recycling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of industrial dust removal and ash treatment technology, and is a multi-point dust removal pneumatic conveying and centralized treatment device. Background Technology

[0002] In the industrial production of bulk raw materials such as lime, dust-containing gases are generated in the production of raw materials. In order to meet increasingly stringent emission standards, enterprises are equipped with high-efficiency dust removal equipment, such as lime kiln main dust collectors and lime kiln scattered dust collectors.

[0003] Taking a large-scale lime kiln production line with an annual output of 300,000 tons or 600,000 tons as an example, it typically includes up to twenty dust collection points, such as a main dust collector and scattered dust collectors. Currently, the treatment of this dust involves manually or semi-automatically opening the ash discharge valves in the ash bins of each dust collector after the accumulated ash reaches a certain level. The ash collected in the ash bins is then discharged into ton bags or small containers. Subsequently, forklifts or manual labor are used to transport these loaded ton bags or small containers to a designated storage point, where trucks or other transport vehicles then haul them away for further processing or landfill.

[0004] However, the existing treatment methods have some problems: (1) During the unloading, bagging and transfer of ash, the dust is easily dispersed into the atmosphere, causing serious dust pollution; (2) The treatment involves a lot of manual operation, resulting in high labor intensity and a harsh working environment; (3) The dust removal system is not running smoothly due to untimely dust removal, which affects the stable operation of the main production line. Summary of the Invention

[0005] This utility model provides a multi-point dust collection pneumatic conveying and centralized treatment device, which overcomes the shortcomings of the above-mentioned prior art. It can effectively solve the problems of existing multiple dust collection point treatment methods that are prone to causing secondary pollution to the environment, high labor intensity, and affecting the stable operation of normal production lines.

[0006] The technical solution of this utility model is achieved through the following measures: a multi-point dust collector pneumatic conveying and centralized treatment device, comprising an air source storage tank, several lime kiln main dust collector ash silos, and several lime kiln scattered dust collector ash silos. Each lime kiln main dust collector ash silo and each lime kiln scattered dust collector ash silo is equipped with a silo pump at its bottom. A nitrogen inlet pipeline is fixedly connected to the air inlet of the air source storage tank, and a nitrogen main pipeline is fixedly connected to the outlet of the air source storage tank. The nitrogen main pipeline is fixedly connected to the inlet of the silo pump in each lime kiln main dust collector ash silo. The system is equipped with a main dust removal pneumatic conveying branch pipe. The nitrogen main pipe is fixedly connected to the silo pump inlet of each lime kiln scattered dust collector silo, and the raw material dust collection silo inlet is fixedly connected to the raw material dust accumulation conveying main pipe. The raw material dust accumulation conveying main pipe is fixedly connected to the silo pump outlet of each lime kiln main dust collector silo, and the raw material dust accumulation conveying main pipe is fixedly connected to the silo pump outlet of each lime kiln scattered dust collector silo, and the scattered dust accumulation conveying branch pipe is fixedly connected to the silo pump outlet of each lime kiln scattered dust collector silo.

[0007] The following are further optimizations and / or improvements to the above-mentioned utility model technical solution: The above also includes several drying kiln bottom ash silos. Each drying kiln bottom ash silo is equipped with a silo pump at the bottom. A first nitrogen branch pipe is fixedly connected to the nitrogen main pipe. A bottom ash pneumatic conveying branch pipe is fixedly connected between the first nitrogen branch pipe and the silo pump inlet of each drying kiln bottom ash silo. The bottom ash accumulation conveying main pipe is fixedly connected to the raw material dust collection silo inlet. A bottom ash accumulation conveying main pipe is fixedly connected to the silo pump outlet of each drying kiln bottom ash silo.

[0008] The above also includes several finished product dust collection silos and finished product dust collection silos in the screening building. Each finished product dust collection silo in the screening building is equipped with a silo pump at the bottom. A second nitrogen branch pipe is fixedly connected to the first nitrogen branch pipe. The second nitrogen branch pipe is fixedly connected to the inlet of the silo pump in each finished product dust collection silo in the screening building via a finished product dust pneumatic conveying branch pipe. The inlet of the finished product dust collection silo is fixedly connected to the finished product dust accumulation conveying main pipe. The finished product dust accumulation conveying main pipe is fixedly connected to the outlet of the silo pump in each finished product dust collection silo in the screening building via a finished product dust accumulation conveying branch pipe.

[0009] The above also includes several lime transfer station ash silos, each ash silo is equipped with a silo pump at the bottom, the second nitrogen branch pipe is fixedly connected to the silo pump inlet of each lime transfer station ash silo via a lime transfer station pneumatic conveying branch pipe, and the finished product dust accumulation conveying main pipe is fixedly connected to the silo pump outlet of each lime transfer station ash silo via a lime transfer station ash accumulation conveying branch pipe.

[0010] The above also includes a controller. Each lime kiln main dust collector has a first level sensor installed on the outer side of the upper part of the ash hopper. A first electric control valve is installed on each main dust collector pneumatic conveying branch pipe. The controller is electrically connected to each first level sensor and each first electric control valve. Each lime kiln scattered dust collector has a second level sensor installed on the outer side of the upper part of the ash hopper. A second electric control valve is installed on each scattered dust collector pneumatic conveying branch pipe. The controller is electrically connected to each second level sensor and each second electric control valve.

[0011] Each of the above-mentioned drying kiln bottom ash silos is equipped with a third level sensor on the upper outer side, and a third electric control valve is installed on each bottom ash pneumatic conveying branch pipe. The controller is electrically connected to each third level sensor and each third electric control valve. Each screening tower finished product dust removal ash silo is equipped with a fourth level sensor on the upper outer side, and a fourth electric control valve is installed on each finished product dust pneumatic conveying branch pipe. The controller is electrically connected to each fourth level sensor and each fourth electric control valve. Each lime transfer station ash silo is equipped with a fifth level sensor on the upper outer side, and a fifth electric control valve is installed on each lime transfer station pneumatic conveying branch pipe. The controller is electrically connected to each fifth level sensor and each fifth electric control valve.

[0012] This utility model has a reasonable and compact structure and is easy to use. It connects the raw material ash collection points of the main dust collector ash silos and scattered dust collector ash silos in a large lime kiln production line with a nitrogen main pipe and supporting pipelines. Through pneumatic conveying, the dust in the main dust collector ash silos and scattered dust collector ash silos is directly transported to the raw material dust collection silo for centralized treatment, eliminating the problem of individual emissions from each dust collection point. It achieves the goal of multi-point dust collection and centralized treatment, improves the on-site environment, reduces the workload of personnel, and the raw material dust can be sent to subsequent cement production as raw material, realizing solid waste recycling. It completely replaces the existing open or multi-point exposed treatment method of ash silo-ton bag-transport vehicle, effectively avoiding the secondary dust pollution caused by dust escaping into the atmosphere during ash unloading, bagging, transportation and stacking. Attached Figure Description

[0013] Appendix Figure 1 This is a schematic diagram of the process flow of this utility model.

[0014] Appendix Figure 1The codes in the diagram are as follows: 1 for gas source storage tank, 2 for lime kiln main dust collector ash silo, 3 for lime kiln scattered dust collector ash silo, 4 for raw material dust collection silo, 5 for silo pump, 6 for nitrogen inlet pipeline, 7 for nitrogen main pipeline, 8 for main dust collector pneumatic conveying branch pipe, 9 for scattered dust collector pneumatic conveying branch pipe, 10 for raw material dust accumulation conveying main pipeline, 11 for main dust collector accumulation conveying branch pipe, 12 for scattered dust collector accumulation conveying branch pipe, 13 for drying kiln bottom ash silo, 14 for first nitrogen branch pipe, 15 for bottom ash pneumatic conveying branch pipe, 16 for bottom ash accumulation conveying main pipeline, 17 for bottom ash accumulation conveying branch pipe, and 18 for finished product dust from screening tower. 19 is the finished product dust collection silo; 20 is the second nitrogen branch pipe; 21 is the finished product dust pneumatic conveying branch pipe; 22 is the finished product dust ash collection main pipe; 23 is the finished product dust ash collection branch pipe; 24 is the lime transfer station ash silo; 25 is the lime transfer station pneumatic conveying branch pipe; 26 is the lime transfer station ash collection branch pipe; 27 is the first material level sensor; 28 is the first electric control valve; 29 is the second material level sensor; 30 is the second electric control valve; 31 is the third material level sensor; 32 is the third electric control valve; 33 is the fourth material level sensor; 34 is the fourth electric control valve; 35 is the fifth material level sensor; and 36 is the fifth electric control valve. Detailed Implementation

[0015] This utility model is not limited to the following embodiments, and the specific implementation method can be determined according to the technical solution of this utility model and the actual situation.

[0016] Unless otherwise specified, all equipment and devices used in this invention are existing, publicly known, and commonly used equipment and devices in the field. For example, the gas source storage tank 1, the first level sensor 27, the first electric control valve 28, the second level sensor 29, the second electric control valve 30, the third level sensor 31, the third electric control valve 32, the fourth level sensor 33, the fourth electric control valve 34, the fifth level sensor 35, and the fifth electric control valve 36 are existing, publicly known, and commonly used devices.

[0017] In this utility model, for ease of description, the description of the relative positions of the components is based on the appendix to the specification. Figure 1 The layout is described using a diagrammatic method, such as the positional relationships of front, back, top, bottom, left, and right, which are based on the instructions attached. Figure 1 The orientation of the layout is determined by the direction of the map.

[0018] The present invention will be further described below with reference to the embodiments and accompanying drawings: Example 1: As shown in the attached document Figure 1As shown, the multi-point dust collection pneumatic conveying and centralized treatment device includes an air source storage tank 1, several lime kiln main dust collector ash silos 2, several lime kiln scattered dust collector ash silos 3, and a raw material dust collection silo 4. Each lime kiln main dust collector ash silo 2 and each lime kiln scattered dust collector ash silo 3 is equipped with a silo pump 5 at its bottom. The air inlet of the air source storage tank 1 is fixedly connected to a nitrogen inlet pipeline 6, and the outlet of the air source storage tank 1 is fixedly connected to a nitrogen main pipeline 7. The nitrogen main pipeline 7 is fixedly connected to the inlet of the silo pump 5 of each lime kiln main dust collector ash silo 2 via a main dust collection pneumatic conveying system. Branch pipe 8, nitrogen main pipe 7, and the inlet of the silo pump 5 of each lime kiln scattered dust collector silo 3 are all fixedly connected to scattered dust collector pneumatic conveying branch pipe 9. The inlet of the raw material dust collection silo 4 is fixedly connected to the raw material dust accumulation conveying main pipe 10. The raw material dust accumulation conveying main pipe 10 and the outlet of the silo pump 5 of each lime kiln main dust collector silo 2 are all fixedly connected to the main dust collector ash accumulation conveying branch pipe 11. The raw material dust accumulation conveying main pipe 10 and the outlet of the silo pump 5 of each lime kiln scattered dust collector silo 3 are all fixedly connected to the scattered dust accumulation conveying branch pipe 12.

[0019] This invention addresses the issue of raw material dust collection points in large-scale lime kiln production lines. By installing a nitrogen main pipe 7 and supporting pipelines, dust from the main dust collector silos 2 and scattered dust collector silos 3 is directly transported via pneumatic conveying to the raw material dust collection silo 4 for centralized treatment. This eliminates individual emissions from each dust collection point, achieving multi-point dust collection and centralized treatment. It improves the on-site environment, reduces labor intensity, and allows the raw material dust to be used as raw material for cement production, realizing solid waste recycling. This completely replaces the existing open or multi-point exposed treatment method of silos-ton bags-transport vehicles, effectively preventing dust from escaping into the atmosphere and causing secondary dust pollution during unloading, bagging, transportation, and stacking.

[0020] The above-mentioned multi-point dust collection pneumatic conveying and centralized treatment device can be further optimized and / or improved according to actual needs: Example 2: Its difference from Example 1 is as follows: (See attached) Figure 1 As shown, it also includes several drying kiln bottom ash silos 13. Each drying kiln bottom ash silo 13 is equipped with a silo pump 5 at the bottom. A first nitrogen branch pipe 14 is fixedly connected to the nitrogen main pipe 7. A bottom ash pneumatic conveying branch pipe 15 is fixedly connected between the first nitrogen branch pipe 14 and the inlet of the silo pump 5 of each drying kiln bottom ash silo 13. A bottom ash accumulation conveying main pipe 16 is fixedly connected to the inlet of the raw material dust collection silo 4. A bottom ash accumulation conveying main pipe 16 is fixedly connected to the bottom ash accumulation conveying branch pipe 17 of each drying kiln bottom ash silo 13.

[0021] During operation, the entire lime kiln production line also includes a bottom ash collection point for the drying kiln bottom ash silo 13 (there are 4 drying kiln bottom ash silos 13 in actual production). Similarly, by adding a first nitrogen branch pipe 14 and supporting pipelines, the bottom ash from several drying kiln bottom ash silos 13 is pneumatically conveyed to the subsequent raw material dust collection silo 4, and then transferred to the raw material that can be used as urea fertilizer.

[0022] Example 3: Its difference from Examples 1 to 2 is as follows: (See attached) Figure 1 As shown, it also includes several finished product dust collection silos 18 and finished product dust collection silos 19 in the screening building. Each finished product dust collection silo 18 in the screening building is equipped with a silo pump 5 at the bottom. A second nitrogen branch pipe 20 is fixedly connected to the first nitrogen branch pipe 14. The second nitrogen branch pipe 20 is fixedly connected to the inlet of the silo pump 5 in each finished product dust collection silo 18 in the screening building via a finished product dust pneumatic conveying branch pipe 21. The inlet of the finished product dust collection silo 19 is fixedly connected to the finished product dust accumulation conveying main pipe 22. The finished product dust accumulation conveying main pipe 22 is fixedly connected to the outlet of the silo pump 5 in each finished product dust collection silo 18 in the screening building via a finished product dust accumulation conveying branch pipe 23.

[0023] During operation, the entire lime kiln production line also includes a finished product dust collection point 18 in the screening tower (in actual production, there is one finished product dust collection silo 18 in the screening tower). Similarly, by adding a second nitrogen pipeline and supporting pipelines, the finished product dust (lime powder) in several finished product dust collection silos 18 in the screening tower is sent to the pulping station to make slurry.

[0024] Example 4: It differs from Example 3 in that, as shown in the attached document... Figure 1 As shown, it also includes several lime transfer station ash silos 24. Each lime transfer station ash silo 24 is equipped with a silo pump 5 at the bottom. The second nitrogen branch pipe 20 is fixedly connected to the inlet of the silo pump 5 of each lime transfer station ash silo 24 by a lime transfer station pneumatic conveying branch pipe 25. The finished product dust accumulation conveying main pipe 22 is fixedly connected to the outlet of the silo pump 5 of each lime transfer station ash silo 24 by a lime transfer station ash accumulation conveying branch pipe 26.

[0025] During operation, the entire lime kiln production line also includes lime transfer station ash silos 24 (in actual production, there are 2 lime transfer station ash silos 24) collection points. Similarly, through the added second nitrogen pipeline and supporting pipelines, the ash collected during the transfer of finished product dust in several lime transfer station ash silos 24 is sent to the subsequent pulping station to make slurry by pneumatic conveying.

[0026] Example 5: It differs from Examples 1 to 4 in that: as shown in the appendix Figure 1As shown, it also includes a controller. Each lime kiln main dust collector ash hopper 2 is equipped with a first material level sensor 27 on the upper outer side, and a first electric control valve 28 is provided on each main dust collector pneumatic conveying branch pipe 8. The controller is electrically connected to each first material level sensor 27 and each first electric control valve 28. Each lime kiln scattered dust collector ash hopper 3 is equipped with a second material level sensor 29 on the upper outer side, and a second electric control valve 30 is provided on each scattered dust collector pneumatic conveying branch pipe 9. The controller is electrically connected to each second material level sensor 29 and each second electric control valve 30.

[0027] During operation, the material level control process in the ash silo 2 of the main dust collector of the lime kiln is as follows: when the first material level sensor 27 in each ash silo 2 of the main dust collector of the lime kiln reaches a high material level, the first solenoid valve 28 on the corresponding main dust collector pneumatic conveying branch pipe 8 is opened. When the first material level sensor 27 in each ash silo 2 of the main dust collector of the lime kiln reaches a low material level, the first solenoid valve 28 on the corresponding main dust collector pneumatic conveying branch pipe 8 is closed to achieve automatic pneumatic conveying. The material level control process in the ash silo 3 of the scattered dust collector of the lime kiln is the same.

[0028] Example 6: The difference between Example 5 and Example 6 is that: a third level sensor 31 is provided on the upper outer side of each bottom ash silo 13 of the drying kiln, and a third electric control valve 32 is provided on each bottom ash pneumatic conveying branch pipe 15. The controller is electrically connected to each third level sensor 31 and each third electric control valve 32. A fourth level sensor 33 is provided on the upper outer side of each finished dust removal ash silo 18 of the screening building, and a fourth electric control valve 34 is provided on each finished dust pneumatic conveying branch pipe 21. The controller is electrically connected to each fourth level sensor 33 and each fourth electric control valve 34. A fifth level sensor 35 is provided on the upper outer side of each lime transfer station ash silo 24, and a fifth electric control valve 36 is provided on each lime transfer station pneumatic conveying branch pipe 25. The controller is electrically connected to each fifth level sensor 35 and each fifth electric control valve 36.

[0029] During operation, the controller monitors the control process within each drying kiln bottom ash silo 13: when the controller detects that the third level sensor 31 in each drying kiln bottom ash silo 13 reaches a high level, it controls the opening of the corresponding third solenoid valve 32 on the bottom ash pneumatic conveying branch pipe 15; when the controller detects that the third level sensor 31 in each drying kiln bottom ash silo 13 reaches a low level, it controls the closing of the corresponding third solenoid valve 32 on the bottom ash pneumatic conveying branch pipe 15. The level control process for each screening building finished product dust removal ash silo 18 and each lime transfer station ash silo 24 is similar.

[0030] Depending on the needs, the pipelines and equipment of this multi-point dust collection pneumatic conveying and centralized treatment device may also be equipped with conventional valves, thermometers, and pressure gauges known and commonly used in the field, according to production requirements. The controller is a PLC controller, and the PLC controller model can be GL-FJ-XL01. The Xinhua XDPS6000 DCS control system is installed in the PLC controller.

[0031] The above technical features constitute the embodiments of this utility model, which have strong adaptability and implementation effect. Unnecessary technical features can be added or removed according to actual needs to meet the needs of different situations.

[0032] The usage process of this utility model embodiment: When the controller detects that the first material level sensor 27 on the ash silo 2 of the main dust collector of each lime kiln has reached the high material level, it controls the first solenoid valve 28 on the pneumatic conveying branch pipe 8 of each main dust collector to open, and sends the raw material dust in the ash silo 2 of each main dust collector to the raw material dust collection silo 4 through the nitrogen main pipe 7 and the pneumatic conveying branch pipe 8 of each main dust collector via the main dust collection ash conveying branch pipe 11 and the raw material dust collection ash conveying main pipe 10. Similarly, when the controller detects that the second material level sensor 29 on the ash silo 3 of each lime kiln scattered dust collector reaches the high material level, it controls the second solenoid valve 30 on the pneumatic conveying branch pipe 9 of each scattered dust collector to open, and sends the raw material dust in the ash silo 3 of each lime kiln scattered dust collector through the nitrogen main pipe 7 and the pneumatic conveying branch pipe 9 of each scattered dust collector to the raw material dust collection silo 4 through the scattered dust collection ash conveying branch pipe 12 and the raw material dust ash conveying main pipe 10; Similarly, the same applies to the bottom ash silo 13 of the drying kiln, the finished product dust removal ash silo 18 of the screening building, and the ash silo 24 of the lime transfer station.

Claims

1. A multi-point dust collection pneumatic conveying and centralized treatment device, characterized in that... The system includes a gas source storage tank, several main dust collector ash silos for lime kilns, and several scattered dust collector ash silos for lime kilns. Each main dust collector ash silo and each scattered dust collector ash silo is equipped with a silo pump at the bottom. The gas source storage tank is fixedly connected to a nitrogen inlet pipeline at its inlet, and to a nitrogen main pipeline at its outlet. A main dust collection pneumatic conveying branch pipe is fixedly connected between the nitrogen main pipeline and the silo pump inlet of each main dust collector ash silo. A scattered dust collection pneumatic conveying branch pipe is fixedly connected between the nitrogen main pipeline and the silo pump inlet of each scattered dust collector ash silo. The raw material dust collection silo is fixedly connected to a raw material dust accumulation conveying main pipeline at its inlet. A main dust collection ash conveying branch pipe is fixedly connected between the raw material dust accumulation conveying main pipeline and the silo pump outlet of each main dust collector ash silo. A scattered dust collection ash conveying branch pipe is fixedly connected between the raw material dust accumulation conveying main pipeline and the silo pump outlet of each scattered dust collector ash silo.

2. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 1, characterized in that... It also includes several drying kiln bottom ash silos, each of which is equipped with a silo pump at the bottom. A first nitrogen branch pipe is fixedly connected to the nitrogen main pipe. The first nitrogen branch pipe is fixedly connected to the silo pump inlet of each drying kiln bottom ash silo via a bottom ash pneumatic conveying branch pipe. The inlet of the raw material dust collection silo is fixedly connected to the bottom ash accumulation conveying main pipe. The bottom ash accumulation conveying main pipe is fixedly connected to the silo pump outlet of each drying kiln bottom ash silo via a bottom ash accumulation conveying branch pipe.

3. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 1 or 2, characterized in that... It also includes several finished product dust collection silos in screening buildings and finished product dust collection silos. Each finished product dust collection silo in a screening building is equipped with a silo pump at the bottom. A second nitrogen branch pipe is fixedly connected to the first nitrogen branch pipe. The second nitrogen branch pipe is fixedly connected to the inlet of the silo pump in each finished product dust collection silo in a screening building via a finished product dust pneumatic conveying branch pipe. The inlet of the finished product dust collection silo is fixedly connected to the finished product dust accumulation conveying main pipe. The finished product dust accumulation conveying main pipe is fixedly connected to the outlet of the silo pump in each finished product dust collection silo in a screening building via a finished product dust accumulation conveying branch pipe.

4. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 3, characterized in that... It also includes several lime transfer station silos, each silo is equipped with a silo pump at the bottom, the second nitrogen branch pipe is fixedly connected to the silo pump inlet of each lime transfer station silo via a lime transfer station pneumatic conveying branch pipe, and the finished product dust accumulation conveying main pipe is fixedly connected to the silo pump outlet of each lime transfer station silo via a lime transfer station ash accumulation conveying branch pipe.

5. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 1, 2, or 4, characterized in that... It also includes a controller. Each lime kiln main dust collector has a first material level sensor on the outer side of the upper part of the ash hopper. Each main dust collector pneumatic conveying branch pipe has a first electric control valve. The controller is electrically connected to each first material level sensor and each first electric control valve. Each lime kiln scattered dust collector has a second material level sensor on the outer side of the upper part of the ash hopper. Each scattered dust collector pneumatic conveying branch pipe has a second electric control valve. The controller is electrically connected to each second material level sensor and each second electric control valve.

6. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 3, characterized in that... It also includes a controller. Each lime kiln main dust collector has a first material level sensor on the outer side of the upper part of the ash hopper. Each main dust collector pneumatic conveying branch pipe has a first electric control valve. The controller is electrically connected to each first material level sensor and each first electric control valve. Each lime kiln scattered dust collector has a second material level sensor on the outer side of the upper part of the ash hopper. Each scattered dust collector pneumatic conveying branch pipe has a second electric control valve. The controller is electrically connected to each second material level sensor and each second electric control valve.

7. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 5, characterized in that... Each drying kiln bottom ash silo is equipped with a third level sensor on the upper outer side, and a third electric control valve is installed on each bottom ash pneumatic conveying branch pipe. The controller is electrically connected to each third level sensor and each third electric control valve. Each screening tower finished product dust removal ash silo is equipped with a fourth level sensor on the upper outer side, and a fourth electric control valve is installed on each finished product dust pneumatic conveying branch pipe. The controller is electrically connected to each fourth level sensor and each fourth electric control valve. Each lime transfer station ash silo is equipped with a fifth level sensor on the upper outer side, and a fifth electric control valve is installed on each lime transfer station pneumatic conveying branch pipe. The controller is electrically connected to each fifth level sensor and each fifth electric control valve.

8. The multi-point dust collection pneumatic conveying and centralized treatment device according to claim 6, characterized in that... Each drying kiln bottom ash silo is equipped with a third level sensor on the upper outer side, and a third electric control valve is installed on each bottom ash pneumatic conveying branch pipe. The controller is electrically connected to each third level sensor and each third electric control valve. Each screening tower finished product dust removal ash silo is equipped with a fourth level sensor on the upper outer side, and a fourth electric control valve is installed on each finished product dust pneumatic conveying branch pipe. The controller is electrically connected to each fourth level sensor and each fourth electric control valve. Each lime transfer station ash silo is equipped with a fifth level sensor on the upper outer side, and a fifth electric control valve is installed on each lime transfer station pneumatic conveying branch pipe. The controller is electrically connected to each fifth level sensor and each fifth electric control valve.