Fluorite ore flotation tailings high-efficiency conveying and filling device

By combining a grading screen, a spiral dewatering machine, and a multi-stage pressurization tank, the blockage and sealing problems in the conveying process of fluorite flotation tailings were solved, and efficient filling operations were achieved.

CN224995984UActive Publication Date: 2026-11-20ZIXING XIBEN MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522764093.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-11-20
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

During the backfilling and transportation of fluorite flotation tailings in the goaf, problems such as pipeline blockage, unstable pressure, and slurry sedimentation are prone to occur. Existing equipment lacks multi-stage pressurization design and has insufficient sealing performance, resulting in low transportation efficiency.

Method used

The design employs a combination of grading screen, spiral dewatering machine, multi-stage pressure tank, and sealing connectors. The transmission pressure is increased through a primary pressure tank, a first pressure pipe, a secondary pressure tank, and a second pressure pipe. The piston rod and air bladder are used to reduce the flange gap and enhance the sealing effect.

Benefits of technology

It improved the conveying efficiency of fluorite flotation tailings, reduced pipeline blockage and leakage, and ensured the stability and continuity of backfilling operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224995984U_ABST
    Figure CN224995984U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of fluorite ore flotation tailings high-efficient conveying filling devices, it is related to mine tailings processing technical field;Including primary booster tank, the central position at the bottom end of primary booster tank is fixedly installed with second booster pipe, the other side of second booster pipe is fixedly installed with secondary booster tank, the central position at the bottom end of secondary booster tank is fixedly installed with discharge pipe, the junction of first booster pipe, second booster pipe, primary booster tank and secondary booster tank is respectively provided with sealing connector;By setting primary booster tank, first booster pipe, secondary booster tank and second booster pipe to increase the pressure when fluorite ore flotation tailings transmission, by setting sealing connector, when first flange plate and second flange plate are connected, gas generated by piston rod sliding towards piston cylinder inner cavity depth enters balloon inside through communicating pipe to make it swell and reduce the gap between first flange plate and second flange plate, strengthen sealing effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tailings treatment technology in mining, specifically to a high-efficiency conveying and filling device for fluorite ore flotation tailings. Background Technology

[0002] Fluorite ore flotation tailings, due to their fine particles, high moisture content, and poor fluidity, are prone to problems such as pipeline blockage, unstable conveying pressure, and slurry sedimentation during backfilling and transportation in mined-out areas, resulting in low conveying efficiency and long backfilling operation cycles. Existing tailings conveying devices mostly use single-pump conveying, lacking multi-stage pressurization designs tailings specific to their characteristics. Furthermore, the sealing performance at pipeline connections is insufficient, leading to wear and leakage over long-term use. To address these issues, a high-efficiency conveying and backfilling device for fluorite ore flotation tailings is proposed. Utility Model Content

[0003] To solve the above technical problems, this utility model adopts the following technical solution: a high-efficiency conveying and filling device for fluorite ore flotation tailings, including a classifying screen, a discharge frame fixedly installed at the bottom of one side of the classifying screen, a guide pipe fixedly installed at the center of the bottom of the discharge frame, a spiral dewatering machine fixedly installed on the other side of the guide pipe, a first pressure boosting pipe fixedly installed at the center of the bottom of the spiral dewatering machine, a primary pressure boosting tank fixedly installed on the other side of the first pressure boosting pipe, a second pressure boosting pipe fixedly installed at the center of the bottom of the primary pressure boosting tank, and a secondary pressure boosting tank fixedly installed on the other side of the second pressure boosting pipe. A discharge pipe is fixedly installed at the center of the bottom of the secondary booster tank. Sealing connectors are respectively provided at the junctions of the first booster pipe, the second booster pipe, the primary booster tank, and the secondary booster tank. The sealing connectors include a first flange and a second flange. A plurality of piston rods are arranged in a circumferential array on one side of the first flange. A plurality of mounting grooves are arranged in a circumferential array on one side of the second flange. A piston cylinder is fixedly installed inside the mounting groove. A circular groove is opened on the side of the second flange near the center. An air bladder is fixedly installed inside the circular groove. A connecting pipe is fixedly installed between the piston cylinder and the air bladder.

[0004] Preferably, the surface of the first flange is detachably provided with bolts, and the first flange and the second flange are connected by bolts.

[0005] Preferably, a waste rack is fixedly installed at the top of the other side of the grading screen, a waste collection pipe is fixedly installed at the center of the bottom of the waste rack, and a waste collection box is fixedly installed on the other side of the waste collection pipe.

[0006] Preferably, the inner annular surfaces of the first and second booster tubes are fitted with ceramic wear-resistant tubes.

[0007] Preferably, the surface of the airbag is adhered with a wear-resistant layer.

[0008] Compared with the prior art, the beneficial effects of this utility model are as follows:

[0009] The pressure during the transport of fluorite ore flotation tailings is increased by setting up a primary pressure tank, a first pressure pipe, a secondary pressure tank, and a second pressure pipe. Through the setting of a sealing connector, when the first flange and the second flange are connected, the gas generated by the piston rod sliding towards the inner cavity of the piston cylinder enters the air bladder through the connecting pipe, causing it to expand and reduce the gap between the first flange and the second flange, thereby enhancing the sealing effect. Attached Figure Description

[0010] Figure 1 This is a schematic diagram of the structure of this utility model;

[0011] Figure 2 This is a bottom view of the present invention;

[0012] Figure 3 This is a schematic diagram of the first flange structure in this utility model;

[0013] Figure 4 This is a schematic diagram of the second flange structure in this utility model;

[0014] Figure 5 This is a cross-sectional view of the second flange structure in this utility model.

[0015] In the diagram: 1. Grading screen; 2. Waste rack; 3. Waste collection pipe; 4. Waste collection box; 6. Spiral dewatering machine; 7. First pressurizing pipe; 8. Primary pressurizing tank; 9. Second pressurizing pipe; 10. Secondary pressurizing tank; 11. Discharge rack; 12. Guide pipe; 14. First flange; 15. Second flange; 16. Bolt; 17. Piston rod; 18. Piston cylinder; 19. Connecting pipe; 20. Circular groove; 21. Airbag. Detailed Implementation

[0016] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention.

[0017] Example: Figures 1-5As shown, this utility model provides an efficient conveying and filling device for fluorite ore flotation tailings, including a classifying screen 1. A discharge rack 11 is fixedly installed at the bottom of one side of the classifying screen 1, and a guide pipe 12 is fixedly installed at the center of the bottom of the discharge rack 11. The fluorite ore flotation tailings after classification by the classifying screen 1 enter the spiral dewatering machine 6 through the discharge rack 11 and the guide pipe 12 for dewatering. The spiral dewatering machine 6 is fixedly installed on the other side of the guide pipe 12, and a guide pipe 12 is fixedly installed at the center of the bottom of the spiral dewatering machine 6. A first pressurizing pipe 7 is installed, and a primary pressurizing tank 8 is fixedly installed on the other side of the first pressurizing pipe 7. A second pressurizing pipe 9 is fixedly installed at the center of the bottom end of the primary pressurizing tank 8. A secondary pressurizing tank 10 is fixedly installed on the other side of the second pressurizing pipe 9. A discharge pipe is fixedly installed at the center of the bottom end of the secondary pressurizing tank 10. Sealing connectors are provided at the junctions of the first pressurizing pipe 7, the second pressurizing pipe 9, the primary pressurizing tank 8, and the secondary pressurizing tank 10. The inner annular surfaces of the first pressurizing pipe 7 and the second pressurizing pipe 9 are fitted with... The fluorite ore flotation tailings, after dewatering, are pressurized and transmitted through a first pressurization pipe 7, a second pressurization pipe 9, a primary pressurization tank 8, and a secondary pressurization tank 10 via ceramic wear-resistant pipes. The sealing connection includes a first flange 14 and a second flange 15. A plurality of piston rods 17 are arranged in a circumferential array on one side of the first flange 14, and a plurality of mounting grooves are arranged in a circumferential array on one side of the second flange 15. A piston cylinder 18 is fixedly installed inside the mounting grooves. When the first flange 14 and the second flange 15 are fitted together, the piston rods 17 slide towards the depth of the piston cylinder 18. It is worth noting that the piston rods 17 compress gas during the sliding process, causing the gas to enter the air bladder 21 through a connecting pipe 19, causing it to expand and tightly adhere to the surface of the first flange 14. A circular groove 20 is opened on the side of the second flange 15 near the center, and an air bladder 21 is fixedly installed inside the circular groove 20. A wear-resistant layer is adhered to the surface of the air bladder 21. A connecting pipe 19 is fixedly installed between the piston cylinder 18 and the air bladder 21.

[0018] The surface of the first flange 14 is detachably provided with bolts 16, and the first flange 14 and the second flange 15 are connected by bolts 16.

[0019] By adopting the above technical solution, a plurality of threaded holes are provided on the end face of the first flange 14, and bolts 16 are detachably mounted on its surface through the threaded holes; the second flange 15 is provided with a through hole adapted to the bolts 16 at the corresponding position, and the bolts 16 are screwed into the threaded holes of the first flange 14 after passing through the through holes of the second flange 15, thereby realizing the fastening connection between the first flange 14 and the second flange 15.

[0020] A waste rack 2 is fixedly installed at the top of the other side of the grading screen 1. A waste collection pipe 3 is fixedly installed at the center of the bottom of the waste rack 2. A waste collection box 4 is fixedly installed on the other side of the waste collection pipe 3.

[0021] By adopting the above technical solution, an inclined waste rack 2 is fixedly installed at the top of the other side of the grading screen 1. The bottom center of the waste rack 2 is integrally formed and connected to the waste collection pipe 3. The other end of the waste collection pipe 3 is fixedly connected to the inlet of the waste collection box 4, thereby forming a directional conveying and centralized collection channel for the waste after screening by the grading screen 1.

[0022] Working principle: The end face of the first flange 14 has several threaded holes, and bolts 16 can be detachably mounted on its surface through the threaded holes; the second flange 15 has a through hole adapted to the bolts 16 at the corresponding position. After the bolts 16 pass through the through holes of the second flange 15, they are screwed into the threaded holes of the first flange 14, thereby realizing the fastening connection between the first flange 14 and the second flange 15. When the first flange 14 and the second flange 15 are in contact, the piston rod 17 slides towards the depth of the inner cavity of the piston cylinder 18. It is worth noting that during the sliding process of the piston rod 17, it will compress the gas, so that the gas enters the interior of the air bladder 21 through the connecting pipe 19, causing it to expand and fit tightly against the surface of the first flange 14, thereby reducing the gap between the first flange 14 and the second flange 15.

Claims

1. A high-efficiency conveying and backfilling device for fluorite ore flotation tailings, comprising a classifying screen (1), characterized in that: A discharge rack (11) is fixedly installed at the bottom of one side of the grading screen (1). A guide pipe (12) is fixedly installed at the center of the bottom of the discharge rack (11). A spiral dewatering machine (6) is fixedly installed on the other side of the guide pipe (12). A first pressure-boosting pipe (7) is fixedly installed at the center of the bottom of the spiral dewatering machine (6). A first-stage pressure tank (8) is fixedly installed on the other side of the first pressure-boosting pipe (7). A second pressure-boosting pipe (9) is fixedly installed at the center of the bottom of the first-stage pressure tank (8). A second-stage pressure tank (10) is fixedly installed on the other side of the second pressure-boosting pipe (9). A discharge pipe is fixedly installed at the center of the bottom of the second-stage pressure tank (10). The first pressure-boosting pipe (11) is fixedly installed at the center of the bottom of the second-stage pressure tank (10). 7) Sealing connectors are provided at the junctions of the second pressurization pipe (9), the first-stage pressurization tank (8), and the second-stage pressurization tank (10); the sealing connectors include a first flange (14) and a second flange (15). A number of piston rods (17) are arranged in a circular array on one side of the first flange (14), and a number of mounting grooves are arranged in a circular array on one side of the second flange (15). A piston cylinder (18) is fixedly installed inside the mounting groove. A circular groove (20) is opened on the side of the second flange (15) near the center. An air bladder (21) is fixedly installed inside the circular groove (20). A connecting pipe (19) is fixedly installed between the piston cylinder (18) and the air bladder (21).

2. The high-efficiency conveying and backfilling device for fluorite ore flotation tailings as described in claim 1, characterized in that, The surface of the first flange (14) is detachably provided with bolts (16), and the first flange (14) and the second flange (15) are connected by bolts (16).

3. The high-efficiency conveying and backfilling device for fluorite ore flotation tailings as described in claim 2, characterized in that, A waste rack (2) is fixedly installed at the top of the other side of the grading screen (1), a waste collection pipe (3) is fixedly installed at the center of the bottom of the waste rack (2), and a waste collection box (4) is fixedly installed on the other side of the waste collection pipe (3).

4. The high-efficiency conveying and backfilling device for fluorite ore flotation tailings as described in claim 1, characterized in that, The inner ring surface of the first booster tube (7) and the second booster tube (9) is fitted with a ceramic wear-resistant tube.

5. The high-efficiency conveying and backfilling device for fluorite ore flotation tailings as described in claim 2, characterized in that, The surface of the airbag (21) is bonded with a wear-resistant layer.