Water-rich roadbed resistance-displacement coordination three-dimensional waterproof structure
By setting up water-blocking and drainage components and deep reinforcement components in the water-rich roadbed, a synergistic waterproof structure is formed, which solves the problems of roadbed subsidence and bearing capacity reduction in water-rich soft strata, and achieves effective waterproofing and reinforcement.
Patent Information
- Application Number
- CN202522785871.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-29
AI Technical Summary
Existing technologies have failed to effectively address the issues of water-impermeable drainage and structural synergy in road construction in water-rich and soft soil areas, leading to softening of the subgrade soil, reduced bearing capacity, and resulting in subsidence and pavement cracking.
The water-rich roadbed adopts a three-dimensional waterproof structure that combines water blocking and drainage, including roadbed tunnels, water blocking and drainage components, and deep reinforcement components. By setting up components such as collection pipes, drainage pipes, permeable geotextiles, and friction short piles, a synergistic system of water blocking, drainage, and reinforcement is formed to prevent surface water infiltration and enhance the bottom support.
It achieves a synergistic effect of water blocking and drainage with deep reinforcement, preventing roadbed settlement, improving the waterproof performance and bearing capacity of the roadbed, and reducing the probability of settlement.
Smart Images

Figure CN224997352U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of road construction technology, specifically a three-dimensional waterproof structure for water-rich roadbeds that combines resistance and drainage. Background Technology
[0002] With the deepening of my country's new urbanization strategy, urban scale continues to expand, and road networks are undergoing large-scale densification, expansion, and upgrading. As the "lifeblood" of cities, the service performance of roads is directly related to people's travel, economic operation safety, and urban disaster resilience. However, when constructing roads in water-rich and soft strata areas with high groundwater levels, such as along rivers and lakes, they often face long-term immersion in high-level groundwater, leading to softening of the roadbed soil, reduced bearing capacity, and recurring problems such as roadbed subsidence and pavement cracking. This not only results in high maintenance and repair costs but also seriously affects the service life of roads and traffic safety.
[0003] Research on the treatment and splicing technology of water-rich soft subgrades has yielded numerous solutions and technical approaches tailored to practical engineering challenges, focusing on the core difficulties of high water content, low bearing capacity, and susceptibility to differential settlement. For example, Ai Yingbo proposed the application of vacuum preloading reinforcement technology in water-rich soft subgrades in ports. Coastal port road construction often faces the challenge of deep, silty, water-rich soft subgrades. These subgrades naturally have high water content and high compressibility, making direct construction prone to excessive settlement later on, affecting road safety. Vacuum preloading accelerates soil drainage and consolidation through vacuuming, effectively improving the bearing capacity of the foundation. Fu Guangqi and Ai Yingbo proposed a practical design method for combined vacuum-surcharge preloading, which addresses the challenge of treating water-rich soft subgrades on highways. The combination of these two methods can achieve a synergistic effect: vacuum preloading accelerates initial drainage, while surcharge enhances later bearing capacity. Based on a soft soil foundation project for a highway, the original single-stacking treatment resulted in excessively rapid settlement. After optimization to a combined vacuum-stacking scheme, the preloading time and stacking stages were adjusted by monitoring changes in pore water pressure on-site. Ultimately, the post-construction settlement of the roadbed met the requirements for highway use. Research on the treatment and splicing technology of water-rich soft roadbeds in my country has mostly focused on single drainage consolidation and reinforcement, without simultaneously studying the water-resistant drainage and structural synergy in water-rich areas.
[0004] Now, a novel three-dimensional waterproof structure with "blocking-drainage synergy" for water-rich roadbeds is proposed to solve the above problems. Utility Model Content
[0005] The purpose of this invention is to provide a three-dimensional waterproof structure for water-rich roadbeds that combines water resistance and drainage, in order to address the problem mentioned in the background art that existing research does not focus enough on the synergy between water-resistant drainage and structural design in water-rich areas.
[0006] To achieve the above objectives, this utility model provides the following technical solution: a three-dimensional waterproof structure for water-rich roadbed with coordinated water blocking and drainage, including a roadbed tunnel, a water blocking and drainage component, and a deep reinforcement component. The interior of the roadbed tunnel is filled with a graded crushed stone layer, and a cement-stabilized crushed stone road base is provided on top of the graded crushed stone layer.
[0007] The water-blocking and drainage assembly includes multiple sets of collection pipes, which are horizontally arranged inside the graded crushed stone layer. Multiple sets of water inlet holes are opened at the top of the collection pipes. Drainage pipes are fixedly connected to the left and right sides of the collection pipes respectively. The top of the collection pipes is covered with permeable geotextile. Multiple layers of sodium bentonite waterproof blankets are laid on the top of the graded crushed stone layer. Roadbed fill is filled and compacted between each pair of sodium bentonite waterproof blankets.
[0008] As a further technical solution of this utility model, the internal parts of the collection pipe and the drain pipe are connected, and the outlet of the drain pipe is obliquely downward.
[0009] As a further technical solution of this utility model, the water inlet holes are arranged at equal intervals, and the permeable geotextile completely covers the water inlet holes.
[0010] As a further technical solution of this utility model, the collection tube is divided into upper and lower layers, and the collection tubes are arranged at equal intervals.
[0011] As a further technical solution of this utility model, the sodium-based bentonite waterproof blanket and the roadbed fill are located between the graded crushed stone layer and the cement-stabilized crushed stone road base, and a layer of non-woven geotextile and medium-coarse sand is laid between the sodium-based bentonite waterproof blanket, the roadbed fill and the cement-stabilized crushed stone road base.
[0012] As a further technical solution of this utility model, the deep reinforcement component includes multiple sets of friction short piles, which are set at the bottom of the roadbed tunnel, and a rubble replacement layer is uniformly laid at the bottom of the roadbed tunnel.
[0013] As a further technical solution of this utility model, the two sides inside the roadbed tunnel are stepped, and the top of the friction short pile is flush with the bottom of the roadbed tunnel.
[0014] As a further technical solution of this utility model, the friction short piles are arranged at equal intervals, and the top of the friction short piles supports the rubble replacement layer.
[0015] Compared with the prior art, the beneficial effects of this utility model are: the three-dimensional waterproof structure of the water-rich roadbed with combined blocking and drainage not only realizes the function of three-dimensional waterproofing with combined blocking and drainage, but also realizes the function of deep pile network reinforcement. (1) By setting up water-blocking and drainage components, when in use, the graded crushed stone layer is evenly laid and compacted in the roadbed tunnel, forming a support at the bottom of the cement-stabilized crushed stone road base. The composite waterproof layer formed by the superposition of sodium-based bentonite waterproof blanket and roadbed fill layer can prevent surface water from seeping down. The non-woven geotextile and medium-coarse sand laid on top can prevent the water-proof layer from being punctured during the construction of the upper road base. Water intruding from the side enters the graded crushed stone layer. The water enters along the water inlet hole at the top of the collection pipe. After being collected by the collection pipe, it is discharged through the drainage pipes on both sides. The permeable geotextile can prevent the water inlet hole from being blocked, thus realizing the function of three-dimensional waterproofing with blocking and drainage synergy. (2) By setting up deep reinforcement components, when in use, the two sides of the roadbed tunnel are stepped, and combined with the friction short piles and rubble replacement layer, a collaborative system of "vertical reinforcement - horizontal replacement - interface interlocking" is formed, which enhances the bottom support force, further reduces the probability of roadbed settlement, and realizes the deep pile network reinforcement function. Attached Figure Description
[0016] Figure 1 This is a frontal cross-sectional view of the present invention. Figure 2 This is a top view of the collection tube structure of this utility model; Figure 3 For the present utility model Figure 1 Enlarged cross-sectional view of point A in the middle; Figure 4 This is a top view of a partial cross-sectional structure of the sodium-based bentonite waterproof blanket of this utility model.
[0017] In the diagram: 1. Roadbed tunnel; 2. Graded crushed stone layer; 3. Water-blocking and drainage components; 301. Collection pipe; 302. Water inlet; 303. Drainage pipe; 304. Permeable geotextile; 305. Sodium-based bentonite waterproof blanket; 306. Roadbed fill; 4. Cement-stabilized crushed stone road base; 5. Deep reinforcement components; 501. Friction short pile; 502. Rubble replacement layer. Detailed Implementation
[0018] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0019] Example: Please refer to Figure 1-4The three-dimensional waterproof structure of the water-rich roadbed with coordinated blocking and drainage includes a roadbed tunnel 1, a water blocking and drainage component 3 and a deep reinforcement component 5. The interior of the roadbed tunnel 1 is filled with a graded crushed stone layer 2, and a cement-stabilized crushed stone road base 4 is set on top of the graded crushed stone layer 2. Please see Figure 1-4 The three-dimensional waterproof structure of the water-rich roadbed with "blocking-drainage synergy" also includes a water-blocking and drainage component 3. The water-blocking and drainage component 3 includes multiple sets of collection pipes 301, which are horizontally arranged inside the graded crushed stone layer 2. Multiple sets of water inlet holes 302 are opened at the top of the collection pipes 301. Drainage pipes 303 are fixedly connected to the left and right sides of the collection pipes 301 respectively. The top of the collection pipes 301 is covered with a permeable geotextile 304. Multiple layers of sodium bentonite waterproof blankets 305 are laid on the top of the graded crushed stone layer 2. Roadbed fill soil 306 is filled and compacted between each pair of sodium bentonite waterproof blankets 305. The internal structures of the collection pipe 301 and the drainage pipe 303 are connected. The outlet of the drainage pipe 303 is angled downwards. The water inlet holes 302 are arranged at equal intervals. The permeable geotextile 304 completely covers the water inlet holes 302. The collection pipe 301 is divided into upper and lower layers and is arranged at equal intervals. The sodium bentonite waterproof blanket 305 and the roadbed fill 306 are located between the graded crushed stone layer 2 and the cement-stabilized crushed stone road base layer 4. A layer of non-woven geotextile and medium-coarse sand is laid between the sodium bentonite waterproof blanket 305, the roadbed fill 306 and the cement-stabilized crushed stone road base layer 4. The combination of water blocking and drainage greatly improves the waterproof performance. Specifically, such as Figure 1 , Figure 2 and Figure 4 As shown, the composite waterproof layer formed by the superposition and pressing of sodium-based bentonite waterproof blanket 305 and roadbed fill 306 can prevent surface water from seeping into the ground. The non-woven geotextile and medium-coarse sand laid on top can prevent the waterproof layer from being punctured during the construction of the upper road base. Water intruding from the side enters the graded crushed stone layer 2. The water enters through the water inlet 302 at the top of the collection pipe 301, and after being collected by the collection pipe 301, it is discharged through the drainage pipes 303 on both sides. The permeable geotextile 304 can prevent the water inlet 302 from being blocked.
[0020] The deep reinforcement component 5 includes multiple sets of friction short piles 501, which are set at the bottom of the roadbed tunnel 1. The bottom of the roadbed tunnel 1 is uniformly covered with a rubble replacement layer 502. The two sides of the roadbed tunnel 1 are stepped. The top of the friction short piles 501 is flush with the bottom of the roadbed tunnel 1. The friction short piles 501 are arranged at equal intervals. The top of the friction short piles 501 supports the rubble replacement layer 502, enhances the bottom support force, and forms a collaborative support system. Specifically, such as Figure 1 and Figure 3As shown, the roadbed tunnel 1 has stepped sides, which, together with the friction short piles 501 and the rubble replacement layer 502, form a collaborative system of "vertical reinforcement - horizontal replacement - interface interlocking", which enhances the bottom support and further reduces the probability of roadbed settlement.
[0021] The principle of this application's structure is as follows: First, a graded crushed stone layer 2 is evenly laid and compacted inside the roadbed tunnel 1, forming support at the bottom of the cement-stabilized crushed stone road base 4. The composite waterproof layer formed by the overlapping of sodium-based bentonite waterproof blanket 305 and roadbed fill 306 can prevent surface water infiltration. The non-woven geotextile and medium-coarse sand laid on top can prevent the waterproof layer from being punctured during the construction of the upper road base. Water intruding from the side enters the graded crushed stone layer 2 and enters through the inlet hole 302 at the top of the collection pipe 301. After being collected by the collection pipe 301, the water is discharged through the drainage pipes 303 on both sides. The permeable geotextile 304 can prevent the inlet hole 302 from being blocked. The two sides of the roadbed tunnel 1 are stepped, which, together with the friction short piles 501 and the rubble replacement layer 502, forms a synergistic system of "vertical reinforcement - horizontal replacement - interface interlocking", which enhances the bottom support and further reduces the probability of roadbed settlement.
[0022] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.
Claims
1. A three-dimensional waterproof structure for water-rich roadbeds with coordinated water blocking and drainage, comprising a roadbed tunnel (1), a water blocking and drainage component (3), and a deep reinforcement component (5), characterized in that: The roadbed tunnel (1) is filled with a graded crushed stone layer (2), and a cement-stabilized crushed stone road base (4) is provided on top of the graded crushed stone layer (2). The water-blocking and drainage component (3) includes multiple sets of collection pipes (301), which are arranged laterally inside the graded crushed stone layer (2). Multiple sets of water inlet holes (302) are opened at the top of the collection pipes (301). Drainage pipes (303) are fixedly connected to the left and right sides of the collection pipes (301). The top of the collection pipes (301) is covered with a permeable geotextile (304). Multiple layers of sodium bentonite waterproof blankets (305) are laid on the top of the graded crushed stone layer (2). Roadbed fill soil (306) is filled and compacted between each pair of sodium bentonite waterproof blankets (305).
2. The three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 1, characterized in that: The collection pipe (301) and the drain pipe (303) are internally connected, and the outlet of the drain pipe (303) is obliquely downward.
3. The three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 1, characterized in that: The water inlet holes (302) are arranged at equal intervals, and the permeable geotextile (304) completely covers the water inlet holes (302).
4. The three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 1, characterized in that: The collection tube (301) is divided into upper and lower layers, and the collection tubes (301) are arranged at equal intervals.
5. A three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 1, characterized in that: The sodium-based bentonite waterproof blanket (305) and the roadbed fill (306) are located between the graded crushed stone layer (2) and the cement-stabilized crushed stone road base (4). A layer of non-woven geotextile and medium-coarse sand is laid between the sodium-based bentonite waterproof blanket (305), the roadbed fill (306) and the cement-stabilized crushed stone road base (4).
6. The three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 1, characterized in that: The deep reinforcement component (5) includes multiple sets of friction short piles (501), which are set at the bottom of the roadbed tunnel (1). The bottom of the roadbed tunnel (1) is uniformly covered with a rubble replacement layer (502).
7. A three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 6, characterized in that: The two sides inside the roadbed tunnel (1) are stepped, and the top of the friction short pile (501) is flush with the bottom of the roadbed tunnel (1).
8. A three-dimensional waterproof structure for water-rich roadbeds with coordinated resistance and drainage as described in claim 6, characterized in that: The friction short piles (501) are arranged at equal intervals, and the top of the friction short piles (501) supports the rubble replacement layer (502).