A long-acting repair composite structure for crack disease

By combining a layered gradient repair mechanism with a slope transition joint and sealing mechanism, the problem of insufficient anti-reflective cracking and anti-rutting ability in the repair of cracked surfaces is solved, achieving a highly efficient road repair effect, preventing rainwater leakage and secondary cracking, and improving the service life and comfort of the road surface.

CN224997356UActive Publication Date: 2026-11-20BEIJING ROAD&BRIDGE FANGZHOU TRAFFIC SCI TECH DEVELO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522767576.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-11-20
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

In existing technologies, the repair methods for cracking cannot simultaneously address both anti-reflective cracking and rutting load resistance. Furthermore, the joint treatment at the junction of new and old pavements is not robust, which can easily lead to rainwater leakage and secondary cracking.

Method used

A layered gradient repair mechanism consisting of a lower asphalt concrete layer, an asphalt bonding layer, and an upper asphalt concrete layer is adopted, combined with a slope transition joint and sealing mechanism to form a high-strength connection, smooth transition, and long-lasting seal.

Benefits of technology

It achieves a flexible lower layer to absorb base layer stress, a rigid upper layer to resist vehicle loads, a smooth transition between old and new road surfaces, prevents rainwater leakage, extends the life of the repaired structure, and improves driving comfort and shear strength.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997356U_ABST
    Figure CN224997356U_ABST
Patent Text Reader

Abstract

The utility model discloses a long -term repair composite structure of crack disease relates to road engineering repair technical field. Including the repair surface, old road surface, repair mechanism, slope transition joint and sealing mechanism. Repair mechanism sets up at the top of repair surface, is the stratified composite structure, from below to above includes asphalt concrete lower layer, asphalt bonding layer and asphalt concrete upper layer, forms the gradient modulus structure of lower soft upper rigid. The slope transition joint is fixed in the top of old road surface, has the vertical connecting surface and the flow guide slope surface. The sealing mechanism is by the connecting layer and asphalt sealing paste constitutes, and is fixed between the vertical connecting surface of repair mechanism side wall and the slope transition joint. The utility model discloses through the slope transition joint and eliminate the height difference, and through the sealing mechanism flexible waterproof simultaneously, solved the repair structure easy secondary cracking, the joint tightness and the transition unevenness of poor of prior art, effectively promoted the durability of repair and the road surface quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of road engineering maintenance and repair technology, and in particular to a composite structure for long-term repair of cracked skin. Background Technology

[0002] Asphalt pavement, as the main paving form for modern urban roads and highways, is highly susceptible to cracking due to the combined effects of repeated vehicle loads, environmental temperature changes, and rainwater erosion. Cracking not only affects the smoothness of the pavement and driving comfort, but if not repaired promptly, it can also lead to surface water infiltration, softening the roadbed and causing more serious pavement collapse or structural damage.

[0003] Currently, the conventional repair method for cracked pavement is to directly cut off the affected area and then backfill it with a single-mix asphalt mixture. While this "window-opening" method is simple to operate, it has significant structural defects: First, the properties of the newly filled repair material differ greatly from those of the old pavement material, and a single mixture is unlikely to simultaneously meet the contradictory requirements of crack resistance in the base layer and compressive strength in the surface layer, leading to the reappearance of reflective cracks shortly after repair. Second, the joint treatment at the junction of the new and old pavement is often quite rough, usually involving only a simple butt joint, making a smooth transition difficult. The impact force generated by vehicles bouncing over the joint accelerates its deterioration. Therefore, a long-term composite structure for repairing cracked pavement is proposed to address these issues. Utility Model Content

[0004] In view of the problem that the single repair material in the existing composite structure for long-term repair of cracking disease cannot effectively take into account both the anti-reflective cracking and anti-rutting load capacity, the present invention aims to provide a composite structure for long-term repair of cracking disease with improved structure that can effectively solve the above problems.

[0005] This utility model provides a long-term repair composite structure for cracked surfaces, including a repair surface and an old road surface; a repair mechanism disposed on top of the repair surface, a slope transition joint fixedly installed on top of the old road surface, and a sealing mechanism disposed at the interface between the repair mechanism and the slope transition joint.

[0006] The repair mechanism is a layered composite structure, consisting of a lower asphalt concrete layer, an asphalt bonding layer, and an upper asphalt concrete layer from bottom to top. The lower asphalt concrete layer is laid and compacted to the top surface of the repair surface. The asphalt bonding layer is evenly applied to the top surface of the lower asphalt concrete layer. The upper asphalt concrete layer is laid and fixed to the top surface of the bonding layer. The lower and upper asphalt concrete layers form a gradient modulus structure with a flexible lower layer and a rigid upper layer through the asphalt bonding layer, which can collaboratively resist base layer stress and vehicle loads.

[0007] Preferably, the slope transition joint has a vertical connecting surface on the side facing the repair mechanism, and a sloped surface sloping downwards to the old road surface on the side away from the repair mechanism. The sealing mechanism is clamped and fixed between the side wall of the repair mechanism and the vertical connecting surface of the slope transition joint, serving to connect the repair mechanism and the slope transition joint and continuously prevent external liquid leakage. Through the combination of the repair mechanism, the slope transition joint, and the sealing mechanism, the composite structure achieves high-strength connection, smooth transition, and long-lasting sealing.

[0008] Preferably, the sealing mechanism consists of a connecting layer and an asphalt sealant. The connecting layer is attached and fixed to the vertical connecting surface of the slope transition joint, and the asphalt sealant fills and adheres to the gap formed between the connecting layer and the side wall of the repair mechanism. This double-layer flexible sealing structure effectively compensates for the slight deformation caused by the temperature difference between the new and old materials, ensuring the long-term waterproof performance of the joint.

[0009] Preferably, the material of the asphalt concrete sublayer is medium-grained recycled asphalt concrete with a structural density greater than or equal to 92%. The asphalt concrete sublayer has a low modulus and good flexibility, and can effectively serve as a stress-absorbing layer.

[0010] Preferably, the asphalt bonding layer is made of styrene-butadiene-styrene modified emulsified asphalt, wherein the modifier content is 5%, and the amount of asphalt bonding layer sprayed on the surface of the asphalt concrete is set to 0.6 kg per square meter. The precise proportion and spraying amount ensure that the interlayer has extremely high bonding strength and shear resistance.

[0011] Preferably, the material of the asphalt concrete upper layer is a fine-grained asphalt mastic aggregate mixture. The asphalt concrete upper layer has a high modulus and excellent rutting resistance. The maximum nominal particle size of the aggregate inside the asphalt concrete upper layer is 13.2 mm, and the internal structure of the asphalt concrete upper layer has a designed porosity of 3% to 4%. This high density limit enables it to withstand heavy loads for a long time.

[0012] Preferably, the main body of the slope transition joint is a right-angled trapezoidal columnar structure, and the top surface of the asphalt concrete upper layer of the repair mechanism is flush with the highest point of the slope transition joint. The two form a continuous and smooth transition structure on the top surface, which completely eliminates the impact force caused by the difference in vehicle height.

[0013] This utility model has the following beneficial effects: 1. This utility model solves the problem that existing single repair materials cannot simultaneously take into account the ability to resist reflective cracks and the ability to resist rutting loads by setting up a layered gradient repair mechanism consisting of a lower layer of asphalt concrete, an asphalt bonding layer and an upper layer of asphalt concrete. It achieves a combination of rigidity and flexibility, with the lower layer using low modulus flexible characteristics to absorb the reflective stress of the base layer and the upper layer using high modulus rigid characteristics to resist vehicle load deformation, thus significantly extending the overall service life of the repair structure.

[0014] 2. This utility model solves the problem of vehicle bouncing and impact damage to the repair edge caused by the height difference at the junction of the old and new road surfaces by setting a sloping transition joint at the top of the old road surface and making the top surface of the repair mechanism flush with the highest point of the sloping transition joint. It achieves the technical effects of smooth transition between the old and new road surfaces, improved driving comfort, and protection of the joint structure from impact damage.

[0015] 3. This utility model solves the problem of weak bonding and easy rainwater leakage leading to roadbed water damage at traditional cold joints by setting a sealing mechanism consisting of a connecting layer and asphalt sealant between the repair mechanism and the slope transition joint. It achieves the technical effect of using flexible sealing materials to adapt to joint deformation, effectively blocking surface water infiltration, and preventing the road surface from cracking again due to water damage.

[0016] 4. This utility model solves the problem of insufficient interlayer bonding force in multi-layer repair structures, which easily leads to shear slip or delamination, by using styrene-butadiene-modified emulsified asphalt as interlayer bonding material, thereby achieving the technical effect of enhancing the overall structure of the upper and lower layers and improving shear strength. Attached Figure Description

[0017] Figure 1 This is a three-dimensional schematic diagram of a composite structure for long-term repair of cracked skin proposed in this utility model; Figure 2 This is a schematic diagram of the asphalt concrete upper layer of a composite structure for long-term repair of cracking defects proposed in this utility model. Figure 3 This is a schematic diagram of the asphalt bonding layer of a composite structure for long-term repair of cracked skin proposed in this utility model; Figure 4 This is a schematic diagram of the sloping transition joint of a composite structure for long-term repair of cracked skin proposed in this utility model. Figure 5 This is a schematic diagram of the asphalt sealant with a long-lasting composite structure for repairing cracked skin, as proposed in this utility model.

[0018] Legend: 1. Repair surface; 2. Old road surface; 3. Repair mechanism; 31. Lower layer of asphalt concrete; 32. Asphalt bonding layer; 33. Upper layer of asphalt concrete; 4. Slope transition joint; 5. Sealing mechanism; 51. Connecting layer; 52. Asphalt sealant. Detailed Implementation

[0019] The following combination Figures 1-5 This application will be described in further detail below.

[0020] Reference Figures 1 to 5 This utility model provides a composite structure for long-term repair of cracked road surface defects, which aims to solve the structural defects in existing road repair technologies, such as stress concentration at the junction of new and old road surfaces leading to secondary cracking and poor joint sealing causing water damage to the roadbed.

[0021] A composite structure for long-term repair of cracked surfaces includes a repair surface 1 and an old road surface 2 located on the side of the repair surface 1. It also includes a repair mechanism 3 laid on top of the repair surface 1, a slope transition joint 4 fixedly installed on top of the old road surface 2, and a sealing mechanism 5 set at the interface between the repair mechanism 3 and the slope transition joint 4. The repair surface 1 serves as the base interface after the pothole has been excavated and cleaned, and is used to support the repair material above. The old road surface 2 is located outside the repair area and serves as the main part of the original road structure.

[0022] The bottom surface of the ramp transition joint 4 is fixedly connected to the top surface of the old road surface 2 near the edge of the repair surface 1. It is used to provide a smooth height difference transition between the old and new road surfaces and prevent vehicles from bouncing. The ramp transition joint 4 has a vertical connecting surface on the side facing the repair mechanism 3. The vertical connecting surface is a planar structure and is used to dock with the repair mechanism 3. The ramp transition joint 4 has a slope that slopes down to the surface of the old road surface 2 on the side away from the repair mechanism 3. The slope serves to guide the flow and allow vehicles to enter smoothly.

[0023] The sealing mechanism 5 is clamped and fixed between the side wall of the repair mechanism 3 and the vertical connection surface of the slope transition joint 4. It is used to connect the repair mechanism 3 and the slope transition joint 4 and prevent liquid leakage. The sealing mechanism 5 can not only compensate for the slight deformation between the repair mechanism 3 and the slope transition joint 4, but also prevent rainwater from seeping down the joint to the repair surface 1, thereby protecting the roadbed structure from water damage. Through the coordinated cooperation of the repair mechanism 3, the slope transition joint 4 and the sealing mechanism 5, the composite structure achieves long-term repair of cracking disease.

[0024] The repair mechanism 3 is located directly above the repair surface 1 and is used to fill potholes and restore the road surface bearing capacity. The repair mechanism 3 has a layered composite structure, which includes, from bottom to top, a lower asphalt concrete layer 31, an asphalt bonding layer 32, and an upper asphalt concrete layer 33. The lower asphalt concrete layer 31 is laid on the bottom surface and compacted and fixed to the top surface of the repair surface 1. It absorbs the reflected stress of the base layer cracks by utilizing its own low modulus characteristics. The asphalt bonding layer 32 is uniformly coated on the top surface of the lower asphalt concrete layer 31 to provide interlayer bonding force. The upper asphalt concrete layer 33 is laid and fixed on the top surface of the asphalt bonding layer 32. It provides rutting resistance and bearing capacity by utilizing its high modulus characteristics. The lower asphalt concrete layer 31 and the upper asphalt concrete layer 33 form a gradient modulus structure with soft and hard bonding through the asphalt bonding layer 32.

[0025] The repair mechanism 3 is a rectangular stacked structure, and its main body is composed of three material layers with different physical properties. The asphalt concrete lower layer 31 is the bottom layer and is directly covered on the repair surface 1. The material of the asphalt concrete lower layer 31 is medium-grained recycled asphalt concrete. Its internal aggregate particle size is moderate, and the density of the layer structure is strictly controlled to be greater than or equal to 92%. The density parameter ensures that the asphalt concrete lower layer 31 has sufficient load-bearing capacity, while retaining a low modulus and good flexibility, so as to effectively absorb the stress from the bottom layer and reduce the upward transmission of cracks.

[0026] The asphalt bonding layer 32 is located between the lower asphalt concrete layer 31 and the upper asphalt concrete layer 33. The material of the asphalt bonding layer 32 is styrene-butadiene styrene modified emulsified asphalt, and the modifier content in the styrene-butadiene styrene modified emulsified asphalt is 5%. During construction, the amount of asphalt bonding layer 32 sprayed on the surface of the lower asphalt concrete layer 31 is set to 0.6 kg per square meter. The specific ratio and spraying amount make the asphalt bonding layer 32 not only have extremely strong bonding performance, which can firmly lock the upper and lower asphalt concrete layers and prevent interlayer slippage, but also have excellent shear resistance and waterproofing ability, playing a key role as an intermediate medium layer.

[0027] The asphalt concrete upper layer 33, as the top layer of the repair mechanism 3, directly bears the vehicle load. Its material is a fine-grained asphalt mastic aggregate mixture, with a maximum nominal particle size of 13.2 mm for the aggregate inside the material. The internal structure of the asphalt concrete upper layer 33 has a designed porosity of 3% to 4%. This high density and fine particle size material characteristic gives the asphalt concrete upper layer 33 a high modulus and excellent rutting resistance, enabling it to withstand repeated traffic loads for a long time without easily undergoing plastic deformation.

[0028] It can be seen that after the asphalt concrete lower layer 31 and the asphalt concrete upper layer 33 are connected by the asphalt bonding layer 32, a gradient modulus structure with a flexible lower layer and a rigid upper layer is formed. This structure can use the flexibility of the lower layer to adapt to the deformation of the old roadbed and the rigidity of the upper layer to resist the rolling of the wheels. The two work together to significantly improve the durability and service life of the repair structure.

[0029] In a preferred embodiment, the sealing mechanism 5 is composed of a connecting layer 51 and an asphalt sealant 52. The connecting layer 51 is made of high-viscosity modified emulsified asphalt or other polymer adhesive materials and is attached and fixed to the vertical connecting surface of the slope transition joint 4 to enhance the interfacial bonding force between the subsequent materials and the slope transition joint 4. The asphalt sealant 52 is a modified asphalt-based filler material with good elasticity and ductility, which fills and bonds the tiny gaps formed between the connecting layer 51 and the sidewall of the repair mechanism 3. The combined structure can not only effectively bond the two heterogeneous interfaces, but also utilize the self-healing properties of the asphalt sealant 52 to automatically fill the micro-cracks when they occur, maintaining a long-lasting sealing effect.

[0030] As a preferred embodiment, in order to achieve a smooth transition between the old and new road surfaces and prevent vehicles from bouncing and impacting the repair structure, the main body of the slope transition joint 4 is a right-angled trapezoidal column structure. Its right-angled surface is attached to one side of the repair mechanism 3, and its inclined surface is away from the repair mechanism 3. The bottom surface of the slope transition joint 4 is fixedly connected to the top surface of the old road surface 2 near the edge of the repair surface 1 by hot-melt asphalt or high-strength adhesive. The top surface of the asphalt concrete upper layer 33 of the repair mechanism 3 is flush with the highest point of the slope transition joint 4. The two form a continuous and smooth driving surface on the top surface. This design eliminates the height difference at the joint, so that when vehicles pass through the repair area, it is as if they are driving on a continuous road surface, which greatly reduces the impact damage to the repair edge.

[0031] The implementation principle of this application embodiment is as follows: When repairing cracked pavement, the damaged area must first be excavated and cleaned to form a clean and load-bearing repair surface 1. Subsequently, medium-grained recycled asphalt concrete is laid on the repair surface 1, and its density is increased to more than 92% through a specific compaction process, forming the asphalt concrete sublayer 31. At this time, the asphalt concrete sublayer 31, with its low modulus and good flexibility, can adapt to the small deformations of the old roadbed and effectively absorb and dissipate the reflected crack stress from the bottom layer, preventing the cracks from propagating upwards.

[0032] Next, styrene-butadiene-styrene modified emulsified asphalt is sprayed onto the compacted asphalt concrete lower layer 31 to form an asphalt bonding layer 32. This layer utilizes the high adhesion of the modified asphalt to firmly bond the subsequently laid fine-grained asphalt mastic aggregate mixture (i.e., the asphalt concrete upper layer 33) to the lower layer. Due to its high modulus and low porosity, the asphalt concrete upper layer 33 directly bears vehicle loads, exhibiting excellent resistance to rutting and abrasion, protecting the lower structure from direct damage. At this point, the repair mechanism 3 is completed, forming a gradient modulus structure that is flexible at the bottom and rigid at the top.

[0033] Finally, a sloping transition joint 4 is installed at the junction of the repair mechanism 3 and the old road surface 2. The sloping transition joint 4 utilizes its right-angled trapezoidal structure to connect with the repair mechanism 3 vertically and eliminate the height difference between the old and new road surfaces through its sloping surface, achieving a smooth transition. At the joint, a sealing mechanism 5 is constructed. First, a bonding layer 51 is applied to enhance the interface adhesion, and then asphalt sealant 52 is filled for flexible sealing. In this way, when the road surface undergoes slight displacement due to temperature changes or load, the asphalt sealant 52 can deform without cracking, continuously preventing rainwater infiltration and preventing further cracking at the joint due to water damage.

[0034] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A composite structure for long-term repair of cracked surface disease, comprising a repair surface (1) and an old road surface (2) located on the side of the repair surface (1); Its features are: The composite structure also includes a repair mechanism (3) laid on top of the repair surface (1), a slope transition joint (4) fixedly installed on top of the old road surface (2), and a sealing mechanism (5) set at the interface between the repair mechanism (3) and the slope transition joint (4). The repair mechanism (3) has a layered composite structure, which includes, from bottom to top, a lower layer of asphalt concrete (31), an asphalt bonding layer (32), and an upper layer of asphalt concrete (33). Among them, the bottom surface of the asphalt concrete lower layer (31) is laid and compacted and fixed to the top surface of the repair surface (1), the asphalt bonding layer (32) is uniformly coated on the top surface of the asphalt concrete lower layer (31), and the asphalt concrete upper layer (33) is laid and fixed on the top surface of the asphalt bonding layer (32). The asphalt concrete lower layer (31) and the asphalt concrete upper layer (33) form a gradient modulus structure through the asphalt bonding layer (32).

2. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The bottom surface of the slope transition joint (4) is fixedly connected to the top surface of the old road surface (2) near the edge of the repair surface (1). The slope transition joint (4) has a vertical connection surface on the side facing the repair mechanism (3) and a slope surface that slopes downward to the surface of the old road surface (2) on the side away from the repair mechanism (3). The sealing mechanism (5) is clamped and fixed between the side wall of the repair mechanism (3) and the vertical connection surface of the slope transition joint (4), and is used to connect the repair mechanism (3) and the slope transition joint (4) and prevent liquid leakage.

3. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The sealing mechanism (5) consists of a connecting layer (51) and an asphalt sealant (52). The connecting layer (51) is attached and fixed to the vertical connecting surface of the slope transition joint (4). The asphalt sealant (52) fills and adheres to the gap formed between the connecting layer (51) and the side wall of the repair mechanism (3).

4. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The material of the asphalt concrete lower layer (31) is medium-grained recycled asphalt concrete, and the density of the asphalt concrete lower layer (31) is greater than or equal to 92%, with low modulus and flexibility.

5. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The asphalt bonding layer (32) is made of styrene-butadiene styrene-modified emulsified asphalt, and the content of modifier in the styrene-butadiene styrene-modified emulsified asphalt is five percent.

6. The composite structure for long-term repair of cracked skin according to claim 5, characterized in that, The amount of the asphalt bonding layer (32) applied to the surface of the asphalt concrete sublayer (31) is set to 0.6 kg per square meter.

7. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The material of the upper layer (33) of the asphalt concrete is a fine-grained asphalt mastic aggregate mixture, which has a high modulus and resistance to rutting.

8. The composite structure for long-term repair of cracked skin according to claim 7, characterized in that, The maximum nominal particle size of the aggregate inside the upper layer (33) of the asphalt concrete is 13.2 mm.

9. The composite structure for long-term repair of cracked skin according to claim 7, characterized in that, The internal design void ratio of the asphalt concrete upper layer (33) structure is three to four percent.

10. The composite structure for long-term repair of cracked skin according to claim 1, characterized in that, The main body of the slope transition joint (4) is a right-angled trapezoidal column structure, and the top surface of the asphalt concrete upper layer (33) of the repair mechanism (3) is flush with the highest point of the slope transition joint (4), and the two work together to form a smooth transition road surface.