Concrete paver
By combining the tracked walking mechanism, belt conveyor mechanism, and screed mechanism of the small concrete paver, the problem of high cost of traditional paver equipment is solved, and paving operations with wider widths and construction reliability are achieved.
Patent Information
- Application Number
- CN202522563704.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-02
AI Technical Summary
Traditional concrete pavers have high requirements for loading capacity and power during the paving process, resulting in high equipment costs, and large pavers are required to achieve paving operations with a wide width.
A small concrete paver was designed, which adopts a combination of crawler walking mechanism, belt conveyor mechanism, hopper and screed mechanism. The paving and re-paving of concrete are realized through skirts and screed structure, reducing the load-bearing weight and power requirements of the equipment.
This technology enables small concrete pavers to operate in wider paving areas, reducing equipment costs and requirements for overall machine power and chassis strength, while improving paving width and construction reliability.
Smart Images

Figure CN224997366U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of road construction machinery technology, and in particular to a concrete paver. Background Technology
[0002] Concrete pavers are equipment used for road construction and pavement maintenance. Their function is to evenly spread mixed concrete onto the construction surface. Traditionally, during concrete paving, the mixed concrete material is unloaded at the front of the paver, collected in a hopper, and then transported to the rear of the paver via a conveyor system. However, because concrete is very heavy, all the concrete to be paved must be transported from front to back through the paver's conveyor system. This places very high demands on the paver's loading capacity, which in turn increases the requirements for the paver's chassis strength, power, and track width. Therefore, large pavers are often required for concrete paving, resulting in higher equipment costs. Utility Model Content
[0003] Therefore, it is necessary to provide a concrete paver that can achieve wide-width concrete paving operations using a small paver, thereby reducing equipment costs during concrete paving construction.
[0004] A concrete paver, comprising:
[0005] The tracked traveling mechanism has a front end and a rear end facing each other; the direction in which the front end and the rear end point towards each other is defined as a first direction; the tracked traveling mechanism includes a base frame and two track assemblies spaced apart on the base frame along a second direction perpendicular to the first direction;
[0006] A belt conveyor mechanism is mounted on the base frame and located between the two track assemblies; the feed end of the belt conveyor mechanism is located at the front end, and the discharge end is located at the rear end.
[0007] The hopper includes two side plates and a skirt plate connected between the two side plates; one end of each of the two side plates is connected to the feed end of the belt conveyor mechanism, and they are spaced apart along the second direction to form a material collection channel; the width of the material collection channel in the second direction gradually decreases along the direction from the front end to the rear end; one end of the skirt plate is connected to the feed end of the belt conveyor mechanism, and the other end is inclined downward.
[0008] An ironing mechanism includes a traction arm, an ironing structure, and two baffles; one end of the traction arm is connected to the base frame, and the other end is connected to the ironing structure, with the ironing structure arranged along a second direction; the two baffles are spaced apart on both sides of the ironing structure along the second direction; the distance between the two baffles is greater than or equal to the distance between the outer edges of the two track assemblies.
[0009] In a third direction perpendicular to the first and second directions respectively, the height of the end of the skirt away from the belt conveyor is higher than the bottom surface height of each track assembly, and the distance between the end of the skirt away from the belt conveyor and the bottom surface of the track assembly is greater than the distance between the ironing structure and the bottom surface of the track assembly.
[0010] In the aforementioned concrete paver, the end of the skirt away from the belt conveyor is higher than the bottom surface of the track assembly, creating a distance between the skirt and the work surface. During operation, concrete material in front of the hopper continuously enters the hopper as the paver moves forward. Part of the concrete in the hopper is spread directly onto the work surface below the skirt, forming a concrete paving strip between the two track assemblies. The other part is fed along the skirt onto the belt conveyor, which then transports it to the work surface behind the underframe. This portion of concrete is then distributed to the area behind the two track assemblies by its own weight or by other transverse conveying mechanisms, spreading on both sides of the concrete paving strip formed between the two track assemblies. Finally, a screed is used to further spread and compact these three concrete paving layers. Therefore, when the above-mentioned concrete paver is used for concrete paving, the portion between the two track assemblies and the portion behind and / or outside the track assemblies are paved separately. This not only increases the paving width of the concrete paver, but also reduces the load-bearing weight of the concrete paver during paving. It also reduces the requirements for the overall power and chassis strength of the concrete paver during concrete paving operations. Even with a small concrete paver with a smaller overall power, a wider concrete paving operation can be achieved, thus reducing the equipment cost during concrete paving operations. Attached Figure Description
[0011] Figure 1 This is a structural schematic diagram of a concrete paver from one perspective in one embodiment of the present invention;
[0012] Figure 2 This is a structural schematic diagram of a concrete paver from another perspective in one embodiment of the present invention;
[0013] Figure 3 for Figure 1 and Figure 2A top view of the concrete paver shown.
[0014] Figure 4 for Figure 1 and Figure 2 A schematic diagram of the structure of the second baffle in the concrete paver shown;
[0015] Figure 5 for Figure 3 A magnified view of a portion of the concrete paver shown.
[0016] Reference numerals: 100, Concrete paver; 110, Tracked walking mechanism; 111, Front end; 112, Rear end; 113, Underframe; 114, Track assembly; 120, Belt conveyor mechanism; 130, Hopper; 131, Side plate; 132, Skirt; 133, Material collection channel; 134, Connecting plate; 140, Screw mechanism; 141, Traction arm; 142, Screw structure; 143, Baffle plate; 1431, Edge guard strip; 150, Baffle structure; 151, First baffle plate; 152, Second baffle plate; 1521, Material chute; 160, Protective plate; 170, Spiral material distribution device; 171, Inlet; 180, Material bin; 181, First material plate; 182, Second material plate; 10, First direction; 20, Second direction; 30, Third direction. Detailed Implementation
[0017] To facilitate understanding of this utility model, a more complete description will be given below with reference to the accompanying drawings. Preferred embodiments of this utility model are shown in the drawings. However, this utility model can be implemented in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of the disclosure of this utility model.
[0018] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains. The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0019] When describing positional relationships, unless otherwise specified, when an element is referred to as being "on" another element, it may be directly on the other element or there may be intermediate elements. It is also understood that when an element is referred to as being "between" two elements, it may be the only one between the two elements, or there may be one or more intermediate elements.
[0020] When using the terms “including,” “having,” and “comprising” as described herein, another component may be added unless explicitly qualifying terms such as “only,” “consisting of,” etc. are used. Unless otherwise stated, singular terms may include plural forms and should not be construed as having a quantity of one.
[0021] Appendix Figure 1 and Figure 2 The accompanying drawings illustrate the structure of a concrete paver in one embodiment of the present invention. For ease of explanation, the drawings only show structures relevant to embodiments of the present invention.
[0022] Please see Figure 1 and Figure 2 The concrete paver 100 in the preferred embodiment of this utility model includes a tracked walking mechanism 110, a belt conveyor mechanism 120, a hopper 130, and a screeding mechanism 140.
[0023] The tracked traveling mechanism 110 has a front end 111 and a rear end 112 facing each other. The direction in which the front end 111 and the rear end 112 point towards each other is defined as a first direction 10. The tracked traveling mechanism 110 includes a base frame 113 and two track assemblies 114 spaced apart on the base frame 113 along a second direction 20 perpendicular to the first direction 10. The front end 111 and the rear end 112 are the head end and tail end of the concrete tracked machine, respectively, and the direction in which the rear end 112 points towards the front end 111 is the forward direction of the tracked traveling mechanism 110.
[0024] The belt conveyor mechanism 120 is mounted on the base frame 113 and located between the two track assemblies 114. The feed end of the belt conveyor mechanism 120 is located at the front end 111, and the discharge end is located at the rear end 112.
[0025] Please refer to the following: Figure 3 The hopper 130 includes two side plates 131 and a skirt plate 132 connecting the two side plates 131. One end of each side plate 131 is connected to the feed end of the belt conveyor mechanism 120, and they are spaced apart along the second direction 20 to form a material collection channel 133. The width of the material collection channel 133 in the second direction 20 gradually decreases from the front end 111 to the rear end 112. One end of the skirt plate 132 is connected to the feed end of the belt conveyor mechanism 120, and the other end is inclined downward.
[0026] The screeding mechanism 140 includes a traction arm 141, a screeding structure 142, and two baffles 143. One end of the traction arm 141 is connected to the underframe 113, and the other end is connected to the screeding structure 142, with the screeding structure 142 positioned along a second direction 20. That is, the screeding structure 142 is positioned along the left-right direction of the concrete paver 100. The two baffles 143 are spaced apart on both sides of the screeding structure 142 along the second direction 20. The distance between the two baffles 143 is greater than or equal to the distance between the outer edges of the two track assemblies 114.
[0027] In a third direction 30, perpendicular to the first direction 10 and the second direction 20 respectively, the height of the end of the skirt plate 132 furthest from the belt conveyor mechanism 120 is higher than the bottom surface height of each track assembly 114. The distance between the end of the skirt plate 132 furthest from the belt conveyor mechanism 120 and the bottom surface of the track assembly 114 is greater than the distance between the screed structure 142 and the bottom surface of the track assembly 114. During the operation of the concrete paver 100, the track assembly 114 travels on the construction surface, hence there is a certain distance between the skirt plate 132 and the construction surface.
[0028] When the concrete paver 100 is located on a horizontal plane, the first direction 10 and the second direction 20 are mutually perpendicular horizontal directions. The first direction 10 is the front-to-back direction of the concrete paver 100, the second direction 20 is the left-to-right direction of the concrete paver 100, and the third direction 30 is the vertical direction.
[0029] In operation, the concrete paver 100 described above continuously feeds into the hopper 130 as it moves forward, guided by the two side plates 131 and concentrated between the two track assemblies 114. A portion of the concrete in the hopper 130 is spread directly onto the construction surface using the skirt 132, forming a concrete paving strip between the two track assemblies 114. The remaining portion is spread along the skirt 132. The upper surface of 32 is fed onto the belt conveyor 120 and transported by the belt conveyor 120 to the construction surface behind the base frame 113. The concrete is distributed to the position behind the two track assemblies 114 by sliding under its own weight or by using other transverse belt conveyors 120. That is, the concrete is spread on both sides of the concrete paving strip formed between the two track assemblies 114. Then, the screed structure 142 is used to spread and compact the three concrete paving layers again. Therefore, when the concrete paver 100 is used for concrete paving, the portion between the two track assemblies 114 and the portion behind and / or outside the track assembly 114 are paved separately. This not only increases the paving width of the concrete paver 100, but also reduces the load-bearing weight of the concrete paver 100 during paving. This reduces the requirements for the overall power and chassis strength of the concrete paver 100 during concrete paving operations. Even if a small concrete paver 100 with a smaller overall power is used, a wider concrete paving operation can be achieved, thus reducing the equipment cost during concrete paving.
[0030] In some embodiments, one end of the side plate 131 and the belt conveyor mechanism 120 both extend between the two track assemblies 114. The hopper 130 also includes two connecting plates 134. One end of each connecting plate 134 is connected to one end of the two side plates 131 away from the belt conveyor mechanism 120, and the other end is connected to the outer side of each of the two track assemblies 114.
[0031] Thus, during concrete paving, even if the width of the concrete material in front of the hopper 130 is greater than the opening at the end of the two side plates 131 furthest from the belt conveyor mechanism 120, the connecting plate 134 and the side plates 131 connected to it can push the excess concrete material to the outside of the connecting plate 134, avoiding affecting the movement of the track assembly 114 on the construction surface and improving the reliability of concrete construction. At the same time, the setting of the connecting plate 134 can also improve the connection strength of the side plates 131 and the structural stability of the hopper 130.
[0032] Furthermore, in some embodiments, the concrete paver 100 also includes a retaining structure 150. The retaining structure 150 includes two first baffles 151 and a second baffle 152 connected between the two first baffles 151. The second baffle 152 is located above the conveyor belt of the belt conveyor mechanism 120. Both the first baffles 151 and the second baffle 152 are connected to the frame of the belt conveyor mechanism 120. The two first baffles 151 are spaced apart along a second direction 20 and are located on both sides of the conveyor belt of the belt conveyor mechanism 120. Along the second direction 20, the distance between the two first baffles 151 gradually decreases from the front end 111 to the rear end 112. The ends of the two first baffles 151 away from the second baffle 152 are respectively connected to the ends of the two side plates 131 connected to skirts 132.
[0033] Thus, during the concrete paving process, the concrete material that slides from the upper surface of the skirt plate 132 onto the belt conveyor mechanism 120 will be concentrated on the conveyor belt in the middle of the belt conveyor mechanism 120 under the guidance of the two first baffles 151. The setting of the second baffle 152 limits the height of the concrete material on the conveyor belt to reduce the probability of concrete spillage during the conveying process.
[0034] Please refer to the following: Figure 4 Furthermore, in some embodiments, the second baffle 152 has a chute 1521 on the side facing the conveyor belt of the belt conveyor mechanism 120. The width of the chute 1521 in the second direction 20 is less than or equal to the width of the conveyor belt in the belt conveyor mechanism 120. The chute 1521 can reduce the probability of concrete spillage during the conveying process while increasing the conveying capacity of the belt conveyor mechanism 120.
[0035] In some embodiments, the concrete paver 100 further includes two protective plates 160. The two protective plates 160 are respectively installed on the inner sides of the two track assemblies 114. In the third direction 30, the bottom edge height of the protective plate 160 is higher than the end height of the skirt 132 away from the belt conveyor mechanism 120, and lower than or equal to the height of the inner surface of the portion of the track in the track assembly 114 that directly contacts the work surface. The protective plates 160 protect the track assemblies 114, preventing concrete material from entering the track assemblies 114 when paving concrete on the work surface between the two track assemblies 114. This reduces the probability of the concrete paver 100 being affected by concrete material entering the track assemblies 114, and also reduces the probability of wear and tear on the track assemblies 114 caused by aggregates in the entering concrete, thus extending the service life of the track assemblies 114.
[0036] Please refer to the following: Figure 5In some embodiments, two baffle plates 143 are arranged parallel to each other along a second direction 20. The end of each baffle plate 143 away from the screed structure 142 is bent towards the other baffle plate 143 to form a side guard strip 1431. The end of each side guard strip 1431 facing the other baffle plate 143 extends to near the outer edge of the corresponding track assembly 114. The parallel arrangement of the two baffle plates 143 ensures a neat edge on the paved concrete layer, improving paving quality. The side guard strip, when the baffle plate 143 is located outside the corresponding track assembly 114, prevents excess concrete from being squeezed out of the gap between the baffle plate 143 and the outer edge of the corresponding track assembly 114 and entering the track assembly 114 under the pushing force of the screed structure 142. This protects the track assembly 114 and improves the reliability of the concrete paver 100.
[0037] In some embodiments, when the distance between the two baffle plates 143 is equal to the distance between the outer edges of the two track assemblies 114, the concrete paver 100 further includes a guide bin (not shown). The guide bin includes a first plate and a second plate spaced apart along a first direction 10, and two third plates spaced apart along a second direction 20. Each third plate has its two ends connected to the two first plates and the second plate, respectively. The first plate and the second plate are respectively connected to the two baffle plates 143. The first plate is located below the conveyor belt at the discharge end of the belt conveyor mechanism 120. One end of the second plate is connected to the screeding structure 142. In the third direction 30, the distance between the bottom ends of the first plate and the third plate and the bottom surface of the track assembly 114 is greater than the distance between the screeding structure 142 and the bottom surface of the track assembly 114.
[0038] When the distance between the two baffles 143 is equal to the distance between the outer edges of the two track assemblies 114, the concrete paver 100 can pave a concrete layer with a width consistent with the overall machine width. During the concrete paving operation, the concrete material at the discharge end of the belt conveyor 120 falls directly into the guide bin, and the concrete material in the guide bin automatically slides to both sides under its own gravity. The guide bin is designed to prevent the concrete material from sliding towards the front end 111 while sliding to both sides, thus avoiding the situation where it enters the area under the belt conveyor 120 and the track assembly 114. This ensures that as much concrete as possible from the discharge end of the belt conveyor 120 slides to the left and right sides, improving the paving effect on both sides.
[0039] Furthermore, in some embodiments, the end of the second plate away from the screed structure 142 is inclined relative to the plane containing the first direction 10 and the second direction 20 in a direction away from the first plate. Thus, the second plate also serves as a material stop and catcher. Part of the concrete material delivered from the discharge end of the belt conveyor 120 is thrown out in a parabolic trajectory. This portion of concrete material can be caught by the inclined second plate and slid into the guide trough along the inclined surface of the second plate. This reduces the probability of concrete material spilling onto the screed structure 142 at the discharge end of the belt conveyor 120, reducing material waste during concrete paving and further reducing concrete paving costs. It also reduces the cleaning workload of the concrete paver 100.
[0040] In some embodiments, when the distance between the two baffles 143 is greater than the distance between the outer edges of the two track assemblies 114, the concrete paver 100 further includes a auger distributor 170. The auger distributor 170 is disposed between the track assembly 114 and the screed structure 142. An inlet 171 is provided on the top surface of the auger distributor 170. The inlet 171 is located below the discharge end of the belt conveyor 120 and is used to receive concrete material flowing out from the discharge end of the belt conveyor 120. Discharge ports (not shown) are provided at both ends of the bottom surface of the auger distributor 170. The auger distributor 170 is configured to separately deliver concrete material entering from the inlet 171 to the two discharge ports.
[0041] When the distance between the two baffle plates 143 is greater than the distance between the outer edges of the two track assemblies 114, the concrete paver 100 can pave a concrete layer with a width greater than the overall width of the machine. During the concrete paving process, the auger distribution device 170 can separately transport the concrete material delivered from the discharge end of the belt conveyor mechanism 120 to the two discharge ports, and distribute it to the left and right sides through the two discharge ports, improving the concrete paving effect behind and outside the track assembly 114, and effectively widening the concrete paving width.
[0042] Furthermore, in some embodiments, the concrete paver 100 also includes a retaining bin 180. The retaining bin 180 includes two first material plates 181 spaced apart along a second direction 20 and a second material plate 182 connected between the two first material plates 181. Both the first material plates 181 and the second material plate 182 are connected to the auger distributor 170, with the inlet 171 located between the two first material plates 181. The second material plate 182 is located on the side of the inlet 171 away from the hopper 130. The retaining bin 180 ensures that all the concrete material delivered from the discharge end of the belt conveyor 120 can enter the auger distributor 170 through the inlet 171, reducing the probability of concrete material spilling out of the inlet 171 from the discharge end of the belt conveyor 120, reducing material waste during the concrete paving process, and further reducing the cost of concrete paving. It also reduces the cleaning workload of the concrete paver 100.
[0043] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0044] The embodiments described above are merely illustrative of several implementations of this utility model, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this application, and these all fall within the protection scope of this utility model. Therefore, the protection scope of this utility model patent should be determined by the appended claims.
Claims
1. A concrete paver, characterized in that, include: The tracked traveling mechanism has a front end and a rear end facing each other; the direction in which the front end and the rear end point towards each other is defined as a first direction; the tracked traveling mechanism includes a base frame and two track assemblies spaced apart on the base frame along a second direction perpendicular to the first direction; A belt conveyor mechanism is mounted on the base frame and located between the two track assemblies; the feed end of the belt conveyor mechanism is located at the front end, and the discharge end is located at the rear end. The hopper includes two side plates and a skirt plate connected between the two side plates; one end of each of the two side plates is connected to the feed end of the belt conveyor mechanism, and they are spaced apart along the second direction to form a material collection channel; the width of the material collection channel in the second direction gradually decreases along the direction from the front end to the rear end; one end of the skirt plate is connected to the feed end of the belt conveyor mechanism, and the other end is inclined downward. An ironing mechanism includes a traction arm, an ironing structure, and two baffles; one end of the traction arm is connected to the base frame, and the other end is connected to the ironing structure, with the ironing structure arranged along a second direction; the two baffles are spaced apart on both sides of the ironing structure along the second direction; the distance between the two baffles is greater than or equal to the distance between the outer edges of the two track assemblies. In a third direction perpendicular to the first and second directions respectively, the height of the end of the skirt away from the belt conveyor is higher than the bottom surface height of each track assembly, and the distance between the end of the skirt away from the belt conveyor and the bottom surface of the track assembly is greater than the distance between the ironing structure and the bottom surface of the track assembly.
2. The concrete paver according to claim 1, characterized in that, The side plate and one end of the belt conveyor both extend between the two track assemblies; the hopper also includes two connecting plates; one end of each of the two connecting plates is connected to the end of the two side plates away from the belt conveyor, and the other end is connected to the outer side of each of the two track assemblies.
3. The concrete paver according to claim 2, characterized in that, It also includes a baffle structure; the baffle structure includes two first baffles and a second baffle connected between the two first baffles; the second baffle is located above the conveyor belt of the belt conveyor mechanism; both the first baffle and the second baffle are connected to the frame of the belt conveyor mechanism; the two first baffles are spaced apart along the second direction and are respectively located on both sides of the conveyor belt of the belt conveyor mechanism; in the second direction, the distance between the two first baffles gradually decreases along the direction from the front end to the rear end; the ends of the two first baffles away from the second baffle are respectively connected to the ends of the two side plates connected to the skirts.
4. The concrete paver according to claim 3, characterized in that, The second baffle has a material passage chute on one side facing the conveyor belt of the belt conveyor mechanism; the width of the material passage chute in the second direction is less than or equal to the width of the conveyor belt in the belt conveyor mechanism.
5. The concrete paver according to claim 1, characterized in that, It also includes two protective plates; the two protective plates are respectively installed on the inner side of the two track assemblies in a one-to-one correspondence; in the third direction, the bottom edge height of the protective plate is higher than the end height of the skirt plate away from the belt conveyor mechanism, and lower than or equal to the height of the inner surface of the part of the track assembly that directly contacts the construction surface.
6. The concrete paver according to claim 1, characterized in that, The two baffles are arranged parallel to each other along the second direction; one end of each baffle away from the ironing structure is bent toward the other baffle to form a side guard strip; one end of each side guard strip toward the other baffle extends to the vicinity of the outer edge of the corresponding track assembly.
7. The concrete paver according to claim 1, characterized in that, When the distance between the two baffle plates is equal to the distance between the outer edges of the two track assemblies, the concrete paver further includes a guide bin; the guide bin includes a first plate and a second plate spaced apart along a first direction, and two third plates spaced apart along a second direction; each of the third plates is connected at both ends to the two first plates and the second plate respectively; the first plate and the second plate are respectively connected to the two baffle plates; It is connected between the first plate and the second plate; the first plate is located below the conveyor belt at the discharge end of the belt conveyor mechanism; one end of the second plate is connected to the ironing structure; in the third direction, the distance between the bottom ends of the first plate and the third plate and the bottom surface of the track assembly is greater than the distance between the ironing structure and the bottom surface of the track assembly.
8. The concrete paver according to claim 7, characterized in that, The end of the second plate away from the ironing structure is inclined relative to the plane containing the first direction and the second direction in a direction away from the first plate.
9. The concrete paver according to claim 1, characterized in that, When the distance between the two baffles is greater than the distance between the outer edges of the two track assemblies, the concrete paver further includes a auger distribution device; the auger distribution device is disposed between the track assembly and the screed structure; the top surface of the auger distribution device has an inlet; the inlet is located below the discharge end of the belt conveyor and is used to receive concrete material flowing out from the discharge end of the belt conveyor; both ends of the bottom surface of the auger distribution device have discharge outlets; the auger distribution device is configured to transport concrete material entering from the inlet to the two discharge outlets respectively.
10. The concrete paver according to claim 9, characterized in that, It also includes a baffle; the baffle includes two first material plates spaced apart along the second direction and a second material plate connected between the two first material plates; both the first material plates and the second material plate are connected to the spiral material distribution device, and the feed inlet is located between the two first material plates; the second material plate is located on the side of the feed inlet away from the hopper.