Railway walkway board mounting structure
By using channel steel support beams and lightweight composite materials to make the walking slabs, combined with a locking mechanism and insert design, the risks of insufficient overlap and detachment of the walking slabs are solved, achieving convenient installation and a high-strength walking slab structure, thus improving safety and durability.
Patent Information
- Application Number
- CN202522787357.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-29
AI Technical Summary
The existing railway walkway slabs have insufficient overlap due to their fixed length, posing a risk of falling off. They are also heavy and inconvenient to transport, have poor cold resistance and insufficient durability, and the concrete slabs are prone to loosening due to vibration, affecting safety.
The walkway is made of lightweight, high-strength composite material and uses channel steel as the supporting beam. It is connected to the channel steel through a locking mechanism, and is equipped with a spring anti-loosening structure. The insert body fits with the notch to increase stability, and drainage grooves are provided on the surface of the board.
It solves the problem of insufficient overlap caused by the fixed length of the walkway slabs, improves installation flexibility and safety, reduces weight and transportation difficulty, extends service life, and enhances stability and drainage capacity.
Smart Images

Figure CN224997398U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of railway construction technology, specifically to a railway pedestrian walkway installation structure. Background Technology
[0002] Existing railway paving slabs are typically made from precast concrete paving slab components, with concrete then filling the spaces between the slabs. Chinese patent CN201776828U discloses a precast paving slab component, which is formed by adding materials such as concrete into a mold, followed by vibration, compaction, curing, and demolding; several precast components are then spliced and paved to form paving slabs of the required size.
[0003] Existing paving slabs have the following drawbacks:
[0004] 1. Precast walkway slabs are typically installed in single-span configurations. In practice, due to varying spacing between bridge supports and complex working conditions, coupled with the fixed length of the precast walkway slabs, insufficient overlap between the slab ends and the bridge supports can occur, posing a risk of slab detachment. Furthermore, external factors such as railway vibrations can loosen and dislodge the concrete filling between the slabs, posing a safety threat to pedestrians and vehicles below the railway. Simultaneously, the severe vibrations from moving trains can further exacerbate the slab movement, increasing the risk of detachment and creating a significant safety hazard.
[0005] 2. Each square meter of concrete walkway slab weighs up to 190 kilograms, making it inconvenient to transport and difficult to work at heights. Furthermore, the walkway slabs place a great load-bearing pressure on the hollow piers and bridge supports of the bridge, affecting the bridge's lifespan and maintenance costs.
[0006] 3. Concrete walkway slabs have poor cold resistance and will crack after freezing and severe cold. They usually have a service life of only 5 years.
[0007] 4. Due to technological defects, concrete paving slabs cannot achieve high ventilation rates and will affect load-bearing capacity. Utility Model Content
[0008] To address the shortcomings of existing technologies, this utility model provides a railway pedestrian walkway installation structure. This structure is lightweight, making it easy to transport and install. It also features a locking mechanism that ensures a stable connection with the channel steel, preventing the pedestrian walkway from being shaken off or lifted, which could cause safety accidents.
[0009] A railway pedestrian walkway installation structure includes two channel steels distributed in a left-right direction and several walkway panels laid on the channel steels in a front-back direction. The channel steels are installed on several railway supports. Each walkway panel has a locking mounting hole on its left and right sides. A locking mechanism is installed on each locking mounting hole. The two locking mechanisms can lock the walkway panel onto the two channel steels respectively.
[0010] Preferably, the channel steel includes side plates and a top plate and a bottom plate connected to the side plates, both of which extend in a direction away from the other channel steel.
[0011] Preferably, the channel steel is connected to the railway support by U-bolts. The horizontal part of the U-bolt contacts the bottom wall of the top plate of the railway support. The two vertical parts of the U-bolt are located on the left and right sides of the railway support, respectively. The vertical part passes through the bottom plate and has threads. A nut is threaded onto the vertical part. When locked, the nut contacts the top wall of the bottom plate.
[0012] Preferably, the side plates of the channel steel have through holes, and the through-core screw passes through the through holes on the two side plates and is threaded to the through holes. Both ends of the through-core screw are connected to screw nuts, and the two screw nuts are respectively pressed against the two side plates.
[0013] Preferably, the locking mounting hole includes an upper part, a middle part, and a lower part with successively decreasing diameters.
[0014] The locking mechanism includes a bolt, a locking tongue, a spring, an anti-loosening cap, and a locking nut. The bolt head is connected to the top of the bolt. The spring is sleeved on the bolt. The bolt passes through the middle and lower parts. The bolt head is placed on the upper bottom wall. The bottom end of the spring contacts the middle bottom wall, and the top end of the spring contacts the bottom wall of the bolt head. The locking tongue is threaded to the bolt and contacts the bottom wall of the base plate. The locking nut is threaded to the bolt and contacts the locking tongue, pressing the locking tongue against the base plate. The anti-loosening cap is fixed inside the upper part and presses down on the bolt head.
[0015] Preferably, one end of the walking board has a notch, and the other end of the walking board is connected to an inserter. For two adjacent walking boards, the inserter on one walking board can be inserted into the notch of the other walking board.
[0016] Preferably, the bottom wall of the notch has a groove, and the bottom wall of the insert is connected to a protrusion. For two adjacent walking boards, the protrusion on one walking board can be inserted into the groove of the other walking board.
[0017] Preferably, the top wall of the walking board is provided with anti-slip patterns.
[0018] Preferably, the walking board is provided with drainage grooves.
[0019] Preferably, a support plate is connected to the middle of the bottom wall of the top plate of the railway support, and the horizontal part of the U-bolt passes through the support plate.
[0020] The beneficial effects of this utility model are reflected in:
[0021] Using channel steel as the support beam allows for adaptation to railway supports with different spans, solving the problem of insufficient overlap caused by the fixed length of existing pedestrian walkways, and providing high installation flexibility.
[0022] The walkway is securely connected to the channel steel via a locking mechanism and is equipped with springs and anti-loosening structures to effectively resist vibrations caused by train operation, prevent the walkway from loosening or falling off, and ensure high safety.
[0023] The pedestrian walkway is made of lightweight, high-strength composite material, which is much lighter than concrete slabs, making it easy to transport and work at heights, reducing the load on the bridge structure and extending the bridge's service life.
[0024] Composite material pedestrian treads have good weather resistance, corrosion resistance and freeze-cracking resistance, long service life and low maintenance cost.
[0025] The paving slabs are connected by notches and inserts, and grooves and protrusions are provided to enhance overall stability and laying efficiency. At the same time, drainage grooves are provided on the slab surface to improve drainage capacity. Attached Figure Description
[0026] To more clearly illustrate the specific embodiments of this utility model or the technical solutions in the prior art, the drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn to scale.
[0027] Figure 1 This is a top view of the present invention;
[0028] Figure 2 for Figure 1 Schematic diagram of the AA section;
[0029] Figure 3 for Figure 2 A magnified structural diagram of position A in the middle;
[0030] Figure 4 for Figure 3 A schematic diagram of the structure after the central locking mechanism has been removed;
[0031] Figure 5 This is a schematic diagram of the overall structure of the side portion of this utility model;
[0032] Figure 6 for Figure 5 A magnified structural diagram of position B in the middle;
[0033] Figure 7 This is a schematic diagram of the overall structure of the walking board at one angle in this utility model;
[0034] Figure 8This is a schematic diagram of the overall structure of the walking board from another angle in this utility model;
[0035] Figure 9 This is a schematic diagram of the overall structure of the railway support in this utility model.
[0036] In the attached diagram, 1-railway support, 2-channel steel, 3-walking plate, 4-locking mounting hole, 5-U-bolt, 6-nut, 7-through bolt, 8-bolt nut, 9-bolt, 10-bolt head, 11-locking tongue, 12-spring, 13-anti-loosening cap, 14-locking nut.
[0037] 201-Side panel, 202-Top panel, 203-Bottom panel
[0038] 301 - Notch, 302 - Insert, 303 - Groove, 304 - Protrusion
[0039] 401-upper part, 402-middle part, 403-lower part. Detailed Implementation
[0040] The embodiments of the present invention will now be described in detail with reference to the accompanying drawings. These embodiments are merely illustrative of the present invention and should not be construed as limiting the scope of protection of the present invention.
[0041] It should be noted that, unless otherwise stated, the technical or scientific terms used in this application shall have the ordinary meaning as understood by one of ordinary skill in the art to which this utility model pertains.
[0042] like Figures 1-9 As shown, this embodiment provides a railway pedestrian walkway installation structure, including two channel steels 2 distributed in the left-right direction and several pedestrian walkways 3 laid on the channel steels 2 in the front-back direction. The channel steels 2 are installed on several railway supports 1. The left and right sides of each pedestrian walkway 3 have locking mounting holes 4. Locking mechanisms are installed on the locking mounting holes 4. The two locking mechanisms can lock the pedestrian walkway 3 onto the two channel steels 2 respectively.
[0043] Specifically, in this embodiment, the walking board 3 is made of molded sheet SMC composite material or molded block BMC composite material. Two channel steels 2 are installed on several railway supports 1, the walking board 3 is laid on the two channel steels 2, and the walking board 3 is locked and fixed to the channel steels 2 to achieve the installation and fixation of the walking board 3.
[0044] The pedestrian slab is lightweight and high-strength, weighing approximately 25-35 kg per square meter, only about 1 / 6 the weight of traditional concrete pedestrian slabs. This makes it easy to transport and install at heights, reducing the load on the bridge structure. Furthermore, the pedestrian slab is highly cold-resistant, maintaining stable and reliable strength even in freezing and frigid environments, with a service life of over 30 years.
[0045] In this embodiment, the channel steel 2 includes a side plate 201 and a top plate 202 and a bottom plate 203 connected to the side plate 201. The top plate 202 and the bottom plate 203 both extend in a direction away from the other channel steel 2.
[0046] Specifically, in this embodiment, the channel steel 2 includes a side plate 201, a top plate 202, and a bottom plate 203, which serve as the basic structure of the channel steel 2 for the installation and fixing of the channel steel 2 with the railway support 1, as well as the installation and fixing of the walkway 3 with the channel steel 2.
[0047] In this embodiment, the channel steel 2 is connected to the railway support 1 by U-bolts 5. The horizontal part of the U-bolt 5 contacts the bottom wall of the top plate of the railway support 1. The two vertical parts of the U-bolt 5 are located on the left and right sides of the railway support 1, respectively. The vertical part passes through the bottom plate 203 and has threads. A nut 6 is threaded on the vertical part. When locked, the nut 6 contacts the top wall of the bottom plate 203.
[0048] Specifically, a support plate is connected to the middle of the bottom wall of the top plate of the railway support 1, and the horizontal part of the U-bolt 5 passes through the support plate.
[0049] In this embodiment, the horizontal part of the U-bolt 5 passes through the support plate to limit the left and right position, and the two vertical parts pass through the base plate 203 to limit the front and back displacement. The horizontal part contacts the bottom wall of the top plate of the railway support 1, while the nut 6 contacts the top wall of the base plate 203 to limit the vertical displacement. In this way, the U-bolt 5 is used to install and fix the channel steel 2 to the railway support 1.
[0050] In this embodiment, the side plates 201 of the channel steel 2 have through holes. A through-bolt 7 passes through the through holes on both side plates 201 and is threaded into the holes. Both ends of the through-bolt 7 are connected to bolt nuts 8, which are respectively tightened against the two side plates 201. In this embodiment, the two channel steels 2 are further connected by the through-bolt 7 and locked by the bolt nuts 8, further improving the stability of the channel steel 2.
[0051] In this embodiment, the locking mounting hole 4 includes an upper part 401, a middle part 402, and a lower part 403 with successively decreasing diameters.
[0052] The locking mechanism includes a bolt 9, a locking tongue 11, a spring 12, an anti-loosening cap 13, and a locking nut 14. The top of the bolt 9 is connected to a bolt head 10. The spring 12 is sleeved on the bolt 9. The bolt 9 passes through the middle part 402 and the lower part 403. The bolt head 10 is placed on the bottom wall of the upper part 401. The bottom end of the spring 12 contacts the bottom wall of the middle part 402, and the top end of the spring 12 contacts the bottom wall of the bolt head 10. The locking tongue 11 is threadedly connected to the bolt 9 and contacts the bottom wall of the base plate 203. The locking nut 14 is threadedly connected to the bolt 9 and contacts the locking tongue 11, pressing the locking tongue 11 against the base plate 203. The anti-loosening cap 13 is fixed inside the upper part 401 and presses down on the bolt head 10.
[0053] The specific locking principle is as follows: the walking plate 3 is laid on the channel steel 2, the bolt 9 passes through the middle part 402 and the lower part 403, the bolt head 10 is located on the bottom wall of the upper part 401, the locking tongue 11 is sleeved on the bolt 9, the locking nut 14 is threadedly connected to the bolt 9, the locking nut 14 abuts against the locking tongue 11, so that the locking tongue 11 contacts the bottom wall of the bottom plate 203 of the channel steel 2. In this way, the walking plate 3 and the locking tongue 11 contact the top and bottom of the channel steel 2 respectively, thereby clamping it on the channel steel 2 and fixing the walking plate 3. Furthermore, in this embodiment, a spring 12 is provided, which is sleeved on the bolt 9. The two ends of the spring 12 are in contact with the bottom wall of the middle part 402 and the bottom wall of the bolt head 10, respectively. The spring 12 is in a compressed state and has elastic restoring force. The spring 12 applies an upward elastic restoring force to the bolt head 10, thereby causing the bolt 9 and the locking tongue 11 to be subjected to an upward force, making the locking tongue 11 press more tightly against the bottom wall of the channel steel 2, and the locking strength is higher.
[0054] In this embodiment, an anti-loosening cap 13 is provided. The anti-loosening cap 13 is installed inside the upper part 401, pressing down the bolt head 10 to prevent the bolt 9 from rotating, thus playing an anti-loosening function. The anti-loosening cap 13 is fixed to the side wall of the upper part 401 by adhesive or interference fit.
[0055] In this embodiment, the walking board 3 has a notch 301 at one end and an insert 302 connected to the other end. The insert 302 on one walking board 3 can be inserted into the notch 301 of the other walking board 3. Simultaneously, a groove 303 is formed on the bottom wall of the notch 301, and a protrusion 304 is connected to the bottom wall of the insert 302. The protrusion 304 on one walking board 3 can be inserted into the groove 303 of the other walking board 3.
[0056] In this embodiment, two adjacent walking slabs 3 are interlocked by inserting an insert 302 into a notch 301 and inserting a protrusion 304 into a groove 303, thereby improving the overall strength, further enhancing the stability of the walking slabs 3 after installation, and eliminating the screeching sound caused by strong winds passing through the joint.
[0057] In this embodiment, the top wall of the walking board 3 is provided with anti-slip patterns. This is to increase friction when people walk on it and reduce the chance of falling.
[0058] In this embodiment, the walking board 3 is provided with a drainage groove for draining water from the surface of the walking board 3.
[0059] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model, and they should all be covered within the scope of the claims and specification of this utility model.
Claims
1. A railway pedestrian walkway installation structure, characterized in that, It includes two channel steels (2) distributed in the left-right direction and several walking plates (3) laid on the channel steels (2) in the front-back direction. The channel steels (2) are installed on several railway supports (1). The walking plates (3) have locking mounting holes (4) on the left and right sides. Locking mechanisms are installed on the locking mounting holes (4). The two locking mechanisms can lock the walking plates (3) onto the two channel steels (2) respectively.
2. The railway pedestrian walkway installation structure according to claim 1, characterized in that, The channel steel (2) includes a side plate (201) and a top plate (202) and a bottom plate (203) connected to the side plate (201), the top plate (202) and the bottom plate (203) both extending in a direction away from the other channel steel (2).
3. The railway pedestrian walkway installation structure according to claim 2, characterized in that, The channel steel (2) is connected to the railway support (1) by U-bolts (5). The horizontal part of the U-bolt (5) is in contact with the bottom wall of the top plate of the railway support (1). The two vertical parts of the U-bolt (5) are located on the left and right sides of the railway support (1) respectively. The vertical part passes through the bottom plate (203). The vertical part has threads and a nut (6) is threaded on the vertical part. When locked, the nut (6) is in contact with the top wall of the bottom plate (203).
4. The railway pedestrian walkway installation structure according to claim 2, characterized in that, The channel steel (2) has through holes on its side plates (201). The through screw (7) passes through the through holes on the two side plates (201) and is threaded to the through holes. Both ends of the through screw (7) are connected to screw nuts (8). The two screw nuts (8) are respectively pressed against the two side plates (201).
5. The railway pedestrian walkway installation structure according to claim 2, characterized in that, The locking mounting hole (4) includes an upper part (401), a middle part (402), and a lower part (403) with successively decreasing diameters. The locking mechanism includes a bolt (9), a locking tongue (11), a spring (12), an anti-loosening cap (13), and a locking nut (14). The top of the bolt (9) is connected to a bolt head (10). The spring (12) is sleeved on the bolt (9). The bolt (9) passes through the middle part (402) and the lower part (403). The bolt head (10) is placed on the bottom wall of the upper part (401). The bottom end of the spring (12) contacts the bottom wall of the middle part (402). The top of the bolt head (10) contacts the bottom wall of the bolt head (9), the locking tongue (11) is threadedly connected to the bolt (9), the locking tongue (11) contacts the bottom wall of the base plate (203), the locking nut (14) is threadedly connected to the bolt (9), the locking nut (14) contacts the locking tongue (11) and presses the locking tongue (11) against the base plate (203), the anti-loosening cap (13) is fixed inside the upper part (401), and the anti-loosening cap (13) presses against the bolt head (10).
6. The railway pedestrian walkway installation structure according to claim 2, characterized in that, The walking board (3) has a notch (301) at one end and an insert (302) at the other end. The insert (302) on one walking board (3) can be inserted into the notch (301) of the other walking board (3).
7. The railway pedestrian walkway installation structure according to claim 6, characterized in that, The bottom wall of the notch (301) has a groove (303), and the bottom wall of the insert (302) is connected to a protrusion (304). The protrusion (304) on one of the two adjacent walking boards (3) can be inserted into the groove (303) of the other walking board (3).
8. The railway pedestrian walkway installation structure according to claim 1, characterized in that, The top wall of the walking board (3) is provided with anti-slip patterns.
9. The railway pedestrian walkway installation structure according to claim 1, characterized in that, The walking board (3) is provided with a drainage channel.
10. The railway pedestrian walkway installation structure according to claim 3, characterized in that, The railway support (1) has a support plate connected to the middle of the bottom wall of the top plate, and the horizontal part of the U-bolt (5) passes through the support plate.