Bridge construction installation positioning indication device
By installing positioning indicators during bridge construction, the safety hazards of manual high-altitude operations and the difficulty in controlling construction quality in traditional bridge construction have been solved, achieving high-efficiency and safe positioning accuracy and improved construction efficiency.
Patent Information
- Application Number
- CN202522560501.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-02
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-02
AI Technical Summary
In traditional bridge construction, the installation and positioning of piers, cap beams, and precast T-beams rely on manual operation, which poses risks of falls from heights, high labor costs, and difficulty in controlling construction quality.
A bridge construction and installation positioning indicator device is adopted, including a fixing mechanism, a first adjustment mechanism and a laser indicator. The adjustment mechanism is used to accurately align with the installation axis of the precast T-beam, reducing manual high-altitude work and improving positioning accuracy and efficiency.
It significantly reduces the risk of falls from heights, saves labor costs, improves construction efficiency and quality, is easy to operate, and is suitable for widespread use on construction sites.
Smart Images

Figure CN224997408U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology, specifically to a bridge construction and installation positioning indicator device. Background Technology
[0002] In traditional bridge construction, the installation and positioning of piers, cap beams, and prestressed concrete T-beams (referred to as precast T-beams) typically rely on manual operation. Specifically, professional surveyors need to mark crosshairs on each abutment and pier as installation baselines. This method has several drawbacks: First, the construction surfaces for piers and other structures are usually narrow and involve working at heights, posing a risk of falls. Second, this process requires at least two professional construction workers, resulting in high labor costs. Finally, manual marking is limited by the operator's skill level and the site environment, leading to low efficiency and difficulty in consistently and accurately controlling construction quality. Therefore, there is an urgent need for a specialized device that can improve efficiency, ensure safety, and enhance positioning accuracy. Utility Model Content
[0003] The purpose of this utility model is to provide a bridge construction and installation positioning indicator device to solve the technical problems of existing technologies, such as safety hazards, high labor costs, low work efficiency, and difficulty in achieving stable and precise control of construction quality.
[0004] To achieve the above objectives, this utility model provides a bridge construction and installation positioning indicator device, comprising: Fixed mechanism; The first adjustment mechanism, connected to the fixed mechanism, is used to provide adjustment freedom along the first direction; The second regulating mechanism is connected to the first regulating mechanism; A laser pointer is mounted on the second adjustment mechanism; The first and second adjustment mechanisms work together to ensure that the laser beam emitted by the laser pointer is aligned with the installation axis of the precast T-beam.
[0005] Preferably, the fixing mechanism includes a guide rail groove and a first fixing member for fixing the guide rail groove.
[0006] Preferably, the first adjustment mechanism is a guide rail that is slidably installed in the guide rail groove, and the guide rail can be locked at a predetermined position in the guide rail groove.
[0007] Preferably, the second adjustment mechanism is a laser pointer bracket that is rotatably connected to the guide rail. The laser pointer is mounted on the laser pointer bracket, and the laser pointer bracket can be locked at any angle when rotated.
[0008] Preferably, the fixing mechanism includes two parallel guide rail grooves; the first adjustment mechanism includes two corresponding guide rails, and the two ends of the laser pointer bracket are respectively fixed on the two guide rails.
[0009] Preferably, the first fastener is an expansion bolt.
[0010] Preferably, both the guide rail groove and the guide rail are made of aluminum alloy.
[0011] The beneficial effects of this invention are as follows: First, high safety: Construction workers no longer need to perform tedious and dangerous high-altitude line-marking operations on each pier and abutment, significantly reducing the safety risk of falls from heights. Second, improved efficiency: Once the indicating device is installed once, it can provide a continuous positioning benchmark for the subsequent installation of multiple T-beams, avoiding repeated measurements and line marking, greatly improving work efficiency and saving labor costs. Third, controllable precision: Through the precise coordination of the first adjustment mechanism (up and down sliding) and the second adjustment mechanism, the laser beam can be quickly and accurately aligned with the design axis, effectively ensuring construction quality. Fourth, simple operation: The device has a simple structure, is easy to adjust, reduces the dependence on the operator's technical skills, and is easy to promote and use on construction sites. Attached Figure Description
[0012] One or more embodiments are illustrated by way of example with reference numerals in the accompanying drawings. These illustrations do not constitute a limitation on the embodiments. Elements with the same reference numerals in the drawings are denoted as similar elements. Unless otherwise stated, the figures in the drawings are not to be limited by scale.
[0013] Figure 1 This is a schematic diagram of the structure of a bridge construction and installation positioning indicator according to an embodiment of the present invention.
[0014] In the diagram: 1- Guide rail groove; 2- Guide rail; 3- First fixing component; 4- Laser pointer bracket; 5- Laser pointer. Detailed Implementation
[0015] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the various embodiments of this utility model will be described in detail below with reference to the accompanying drawings. However, those skilled in the art will understand that many technical details have been provided in the various embodiments of this utility model to enable readers to better understand this utility model. However, the technical solutions claimed by this utility model can be implemented even without these technical details and with various changes and modifications based on the following embodiments.
[0016] This utility model provides a bridge construction and installation positioning indicator device, for reference. Figure 1The system includes: a fixing mechanism, a first adjusting mechanism, a second adjusting mechanism, and a laser pointer; the fixing mechanism is used to securely fix the pointer to the bridge structure; the first adjusting mechanism is connected to the fixing mechanism and is used to provide an adjustment degree of freedom in the first direction (vertical); the second adjusting mechanism is connected to the first adjusting mechanism and is used to provide an adjustment degree of freedom in the pitch direction; the laser pointer is mounted on the second adjusting mechanism; wherein, the height of the laser pointer is adjusted by the first adjusting mechanism and the second adjusting mechanism, and the laser beam emitted by the laser pointer is used to mark the transverse axis position of the precast T-beam installation.
[0017] In one specific embodiment, the fixing mechanism includes two parallel guide rail grooves and a first fixing member for fixing the two parallel guide rail grooves, the first fixing member being preferably an expansion bolt. The first adjusting mechanism consists of two corresponding guide rails slidably installed in the two parallel guide rail grooves. Both the guide rail grooves and the guide rails are made of aluminum alloy, possessing both lightweight and high strength characteristics.
[0018] Specifically, two parallel aluminum alloy guide rail grooves 1 are securely fixed to the upper part of the bridge back wall using the first fixing member 3 (preferably an expansion bolt). Then, two aluminum alloy guide rails 2 are inserted into their corresponding guide rail grooves 1. The guide rails 2 can slide up and down within the guide rail grooves 1, and a locking device is provided between the guide rails 2 and the guide rail grooves 1 to securely fix the guide rails 2 after adjustment, preventing accidental sliding. In this embodiment, the locking device consists of one or more threaded holes on the side wall of the aluminum alloy guide rail groove 1, with matching locking bolts. After the guide rails 2 are slid up and down to the target height, the locking bolts are tightened, and the end of the locking bolts abuts against the side of the guide rail 2, locking it through friction. In other embodiments, the locking device can be of other forms, as long as locking between the guide rails 2 and the guide rail grooves 1 is achieved. This part constitutes the first adjustment mechanism of the present invention, realizing the coarse adjustment and positioning of the present invention in the vertical (height direction).
[0019] In one specific embodiment, the second adjustment mechanism includes a laser pointer bracket that is rotatably connected to the guide rail, on which the laser pointer is mounted.
[0020] Specifically, the laser pointer bracket 4 is rotatably connected to the middle of two guide rails 2 via a rotating shaft structure. Rotating shafts are fixedly installed at both ends of the laser pointer bracket 4, and corresponding bushings are fixedly installed at corresponding positions on the two guide rails 2. The rotating shafts pass through the bushings, allowing the laser pointer bracket 4 to rotate about the rotating shafts. To achieve precise fixation at any tilt angle, a locking bolt is provided on the side of the bushing away from the rotating shaft. After rotating the locking bolt to the desired angle, tightening the locking bolt secures it against the rotating shaft, thus firmly locking the laser pointer bracket 4 and preventing its rotation. This laser pointer bracket 4 and locking structure constitute the second adjustment mechanism of the present invention. The laser pointer 5 is then reliably mounted on the bracket 4.
[0021] In use, firstly, according to the design elevation of the precast T-beam installation axis, loosen the locking device of the guide rail 2, slide the guide rail 2 up and down, and adjust the laser pointer 5 to the target height consistent with the precast T-beam installation reference, then lock the guide rail. This step ensures that the laser beam is emitted on the correct horizontal plane. Next, turn on the laser pointer 5, and tilt and rotate the laser pointer bracket 4 to fine-tune the irradiation position of the laser beam, making it precisely aligned with the specified precast T-beam installation elevation. The laser beam emitted by the laser pointer 5 marks a clear and continuous transverse axis for the precast T-beam installation in space. The hoisting operator only needs to manipulate the precast T-beam to align its edge or center mark with the laser beam to complete the precise positioning.
[0022] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model and are not intended to limit it. Although the embodiments of this utility model have been described in detail, those skilled in the art should understand that modifications or equivalent substitutions to the technical solutions of this utility model do not depart from the spirit and scope of the technical solutions of this utility model, and all such modifications and substitutions should be covered within the scope of protection of the claims of this utility model.
Claims
1. A bridge construction and installation positioning indicator device, characterized in that, include: Fixed mechanism; The first adjustment mechanism, connected to the fixed mechanism, is used to provide adjustment freedom along the first direction; The second adjustment mechanism is connected to the first adjustment mechanism; A laser pointer (5) is mounted on the second adjustment mechanism; In this process, by adjusting the first adjustment mechanism and the second adjustment mechanism, the laser beam emitted by the laser pointer (5) is aligned with the installation axis of the prestressed concrete T-beam.
2. The bridge construction and installation positioning indicator device according to claim 1, characterized in that, The fixing mechanism includes a guide rail groove (1) and a first fixing member (3) for fixing the guide rail groove (1).
3. The bridge construction and installation positioning indicator device according to claim 2, characterized in that, The first adjustment mechanism is a guide rail (2) that is slidably installed in the guide rail groove (1), and the guide rail (2) can be locked at a predetermined position in the guide rail groove (1).
4. The bridge construction and installation positioning indicator device according to claim 3, characterized in that, The second adjustment mechanism includes a laser pointer bracket (4) rotatably connected to the guide rail (2), the laser pointer (5) is mounted on the laser pointer bracket (4), and the laser pointer bracket (4) can be locked when rotated to any angle.
5. The bridge construction and installation positioning indicator device according to claim 4, characterized in that, The fixing mechanism includes two parallel guide rail grooves (1); the first adjustment mechanism includes two corresponding guide rails (2), and the two ends of the laser pointer bracket (4) are respectively fixed on the two guide rails (2).
6. The bridge construction and installation positioning indicator device according to any one of claims 2 to 5, characterized in that, The first fastener (3) is an expansion bolt.
7. The bridge construction and installation positioning indicator device according to any one of claims 2 to 5, characterized in that, Both the guide rail groove (1) and the guide rail (2) are made of aluminum alloy.
