High-speed rail cantilever concrete pouring automatic curing structure
By designing an automated high-speed rail cantilever concrete curing structure, the problems of immobile spraying equipment and unreasonable nozzle distribution during cantilever concrete construction were solved, enabling timely and efficient curing of concrete and improving concrete quality and structural durability.
Patent Information
- Application Number
- CN202521846486.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-28
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-08-28
AI Technical Summary
In existing cantilever concrete construction, the spraying equipment cannot move synchronously with the hanging basket, and the nozzles are not distributed reasonably, resulting in low curing efficiency. Newly poured concrete cannot be effectively cured in a timely manner, which affects the quality of the concrete.
An automatic curing structure for cantilevered concrete pouring in high-speed railways was designed, including a placement base, a water storage device, a control component, a water supply component, and a nozzle component. It adopts explosion-proof telescopic water pipes and swing-type nozzles to ensure that the equipment moves synchronously with the hanging basket, and achieves automated curing through a water level controller and a timer controller.
It improves the timeliness and efficiency of curing, ensures uniform coverage of all parts of the concrete, reduces the risk of cracking, reduces human intervention, and improves the durability of concrete structures and the overall curing efficiency.
Smart Images

Figure CN224997429U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of concrete curing equipment technology, and in particular to an automatic curing structure for cantilevered concrete pouring in high-speed railways. Background Technology
[0002] In high-speed rail construction, the cantilever cast-in-place beam construction technique is widely used. The rise of prestressed concrete continuous rigid frame bridges has made cantilever cast-in-place beams play an important role in high-speed railway projects. However, the curing process after cantilever concrete construction currently faces many challenges. Taking the common spray curing method as an example, existing spraying equipment not only struggles to move synchronously with the formwork during construction, but the distribution and placement of its nozzles are also unreasonable, resulting in low curing efficiency. In actual construction, the formwork moves continuously with the construction area, while traditional spraying equipment is fixed in position, making it impossible to cure newly constructed concrete sections in a timely manner. Furthermore, the traditional nozzles are scattered and have limited coverage, resulting in some areas being missed and requiring repeated spraying to ensure overall curing of the concrete. This prevents newly poured concrete from receiving sufficient and efficient moisture curing within the optimal timeframe, thus affecting the quality of the concrete. Manual curing not only has disadvantages such as arbitrary location and poor continuity, but also suffers from low curing efficiency due to the inability of traditional fixed spraying equipment to follow the movement of the hanging basket and unreasonable distribution of spray nozzles. This further leads to inadequate curing of the concrete segments of the cantilever cast-in-place box girder, which can easily cause surface cracks of varying degrees. In severe cases, deep cracks may even appear, affecting the structural stress and reducing the service life of the concrete structure.
[0003] To address this issue, an automatic curing structure for cantilevered concrete pouring in high-speed railways has been invented to solve the problems mentioned in the background technology. Utility Model Content
[0004] The purpose of this utility model is to provide an automatic curing structure for cantilever concrete pouring in high-speed railways, in order to solve the technical problems in the prior art where the cantilever concrete curing equipment cannot move synchronously with the hanging basket, and the unreasonable distribution and setting of the nozzles leads to low curing efficiency and the inability of newly poured concrete to be effectively and efficiently cured in a timely manner.
[0005] This application provides an automatic curing structure for cantilevered concrete pouring in high-speed railways, employing the following technical solution: including: The mounting base is located at the top of the cantilever. A water storage device, installed on the base, is used to store water for health preservation. The control component is located on the placement seat on one side of the water storage device and is connected to the water storage device, and is used to control the spray curing process; The water delivery component, connected to the drain end of the control component, is used to deliver water to the concrete curing location; The water supply assembly includes a curing water pipe and an explosion-proof telescopic water pipe. The explosion-proof telescopic water pipe is connected to the drain end of the control assembly. One end of the explosion-proof telescopic water pipe is connected to the curing water pipe, and the other end of the curing water pipe is used to extend to the concrete curing position. The nozzle assembly is located on one end of the curing water pipe near the curing position and is used to spray the water delivered by the water supply assembly onto the concrete surface. The construction hanging basket is set on the cantilever to be constructed and can be moved with the construction area; Furthermore, both the water delivery assembly and the nozzle assembly are configured to move synchronously with the hanging basket; The placement base is equipped with a winding winch, and the explosion-proof telescopic water pipe is wound on the winding winch. The health-preserving water pipe includes an outer water pipe and an inner water pipe. A hanging basket frame is provided on the cantilever web. The outer water pipe is set on the hanging basket frame and arranged in a mountain shape on both sides of the cantilever web. A drainage hole is opened at the top of the web. The inner water pipe is connected to the outer water pipe through the drainage hole. An inner crossbeam connected to the hanging basket frame is provided on the inner side of the cantilever web. The inner water pipe is fixed on the inner crossbeam. The nozzle assembly includes a swing nozzle, which is positioned at a corresponding health maintenance location on the health maintenance water pipe.
[0006] Optionally, the water storage device includes a water tank, which is placed on a base, and a water level controller is installed inside the water tank. The water level controller is electrically connected to an external water pump. When the water level in the water storage device is lower than a preset water level line, the water level controller controls the water pump to start replenishing water.
[0007] Optionally, the control component includes a power distribution box, a timer controller, and a drainage pump. The timer controller is installed inside the power distribution box, and the drainage pump is located on one side of the control component. The timer controller is electrically connected to the drainage pump so that the power distribution box controls the timer controller, and the timer controller controls the start and stop of the drainage pump.
[0008] In summary, this application includes the following beneficial technical effects: Improving the timeliness and efficiency of curing: The water supply components and nozzle components can move synchronously with the hanging basket, enabling curing of new areas immediately after concrete pouring; at the same time, the mountain-shaped arrangement of the outer water pipes and the corresponding inner water pipes with nozzle distribution, combined with the expanding spray range of the swing nozzles, achieves comprehensive coverage of all parts of the concrete, increases the curing area per unit time, effectively avoids concrete quality problems caused by untimely and inefficient curing, reduces the risk of cracking, and greatly improves the durability of concrete structures.
[0009] Automated control is achieved: The water level controller automatically controls the water pump to replenish water, and the timer controller controls the start and stop of the drainage pump, thus automating the entire health maintenance process, reducing manual intervention and labor costs, while ensuring the continuity and stability of health maintenance and avoiding the arbitrariness of manual maintenance. Combined with the high-efficiency nozzle settings, the overall health maintenance efficiency is further improved.
[0010] A well-designed water supply and spraying system: The combination of explosion-proof telescopic water pipes and curing water pipes, along with the design of the inner and outer sides of the curing water pipes and the installation of oscillating sprinklers, not only ensures that water is sprayed evenly onto the concrete surface, but also improves curing efficiency through optimized sprinkler distribution and oscillation function, ensuring that all parts of the concrete receive sufficient and efficient curing. The winch for storing the explosion-proof telescopic water pipes facilitates the use of the equipment during the movement of the hanging basket, making the overall equipment layout more rational and easier to operate.
[0011] Sturdy structure and easy installation: The mounting base is set at the top of the cantilever, providing stable support for the entire equipment. The components are tightly connected and easy to install. It is suitable for the complex environment of high-speed railway cantilever concrete construction. The stable structure ensures the efficient operation of the equipment. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the overall structure of the device. Figure I ; Figure 2 This is a schematic diagram of the overall structure of the device. Figure II ; Figure 3 This is a top view of the device; Figure 4 This is the front view of the device; Figure 5 This is a side view of the device; Figure 6 This is a cross-sectional schematic diagram of the overall structure of this device; The components include: 1. Placement base; 2. Water storage device; 3. Control components; 4. Water supply components; 5. Sprinkler assembly; 6. Construction hanging basket frame; 7. Water bucket; 8. Distribution box; 9. Drainage pump; 10. Curing water pipe; 11. Explosion-proof telescopic water pipe; 12. Winding winch; 13. Outer water pipe; 14. Inner water pipe; 15. Drain hole; 16. Inner crossbeam; and 17. Swinging sprinkler head. Detailed Implementation
[0013] The present application will be further described in detail below with reference to the accompanying drawings. In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on the present utility model.
[0014] Reference Figure 1 One embodiment shown is as follows: The automatic curing equipment for cantilever concrete in high-speed railways includes a placement base 1, a water storage device 2, a control component 3, a water delivery component 4, a nozzle component 5, and a construction hanging basket 6. In this embodiment, the placement base 1 is bolted to the middle position of the top of the cantilever, and the upper surface of the placement base 1 remains horizontal; the water storage device 2 is welded to the left side of the upper surface of the placement base 1, and the bottom of the water storage device 2 is tightly fitted to the upper surface of the placement base 1; the control component 3 is bolted to the upper surface of the placement base 1 located to the right of the water storage device 2, and the water inlet of the control component 3 is sealed to the drain outlet of the water storage device 2 through a pipe, with sealing gaskets provided at the connection points between the pipe and the water storage device 2 and the control component 3; one end of the water delivery component 4 is sealed to the drain outlet of the control component 3 through a flange. The water supply component 4 is sealed, with the other end extending towards the concrete curing position. The nozzle component 5 is installed on the curing water pipe 10 near the curing position via a threaded connection, and the inlet of the nozzle component 5 is connected to the inside of the curing water pipe 10. The construction basket is connected to the outer wall of the cantilever to be constructed via a sliding track, and the construction basket can move left and right along the sliding track with the construction area. The end of the water supply component 4 away from the control component 3 is fixedly connected to the construction basket via a snap fastener, and the nozzle component 5 is welded to the side of the construction basket facing the concrete curing position via a bracket, so that the water supply component 4 and the nozzle component 5 can move synchronously with the basket.
[0015] The implementation principle of the above embodiment is as follows: The placement base 1 provides a stable support foundation for the entire equipment, and is fixed to the top of the cantilever with bolts, ensuring the overall stability of the equipment during operation. The water storage device 2 is fixed on the placement base 1 to store sufficient curing water, providing a water source for spray curing. The control component 3 is located on one side of the water storage device 2 and is connected to it, enabling control over the start / stop and timing of the spraying, thereby achieving precise control over the spray curing process. The water delivery component 4 is connected to the drain end of the control component 3, guiding the water delivered by the control component 3 to the concrete curing position. The nozzle assembly 5 is installed at the end of the water delivery component 4 near the curing position, spraying the water delivered by the water delivery component 4 onto the concrete surface in a suitable manner to achieve the curing effect. The construction basket can move with the construction area, and the water delivery component 4 and nozzle assembly 5 move synchronously with it, ensuring that when the construction area changes, the new concrete area can be cured in a timely manner, guaranteeing the continuity and timeliness of curing.
[0016] Reference Figure 3 , Figure 4 One embodiment shown is as follows: The water storage device 2 includes a water tank 7 and a water level controller. In this embodiment, the water tank 7 is fixedly connected to the left side of the upper surface of the placement base 1 by welding. The bottom of the water tank 7 is in complete contact with the upper surface of the placement base 1, and the top of the water tank 7 has an opening. The water level controller is a float-type water level controller of model SLW-15, which is fixedly connected to the side wall inside the water tank 7 by screws. The water level controller is located at the middle of the internal height of the water tank 7, and the sensing probe of the water level controller faces the bottom of the water tank 7. This model of water level controller has the characteristics of high sensitivity and corrosion resistance, and can adapt to the water environment inside the water tank 7 to accurately monitor water level changes. The water level controller is electrically connected to the control terminal of an external water pump through a wire. The external water pump is a pipeline centrifugal pump of model ISG50-160. The wire passes through the side wall of the water tank 7, and a waterproof sleeve is provided at the exit point. The outlet pipe of the external water pump is sealed to the inlet of the water tank 7 through a pipe.
[0017] The implementation principle of the above embodiment is as follows: A water bucket 7 is fixed on the placement base 1 and used to store health-preserving water. Its large volume ensures a sufficient water supply for a certain period. A water level controller is installed inside the water bucket 7, which can monitor the water level in the bucket 7 in real time. When the water level is lower than the preset water level line, the water level controller sends an electrical signal to an external water pump, controlling the pump to start and replenish water into the water bucket 7 through the pipeline. When the water level reaches the preset water level line, the water level controller sends another signal to control the water pump to stop replenishing water. This automatic water replenishment method ensures that the water storage device 2 always has sufficient health-preserving water, avoiding interruptions in health preservation due to water shortage, and improving the automation level and reliability of the equipment.
[0018] Reference Figure 1 , Figure 4 , Figure 5 One embodiment shown is as follows: the device includes a distribution box 8, a timer controller, and a drainage pump 9. In this embodiment, the distribution box 8 is a power distribution box of model XL-21, which is fixedly connected to the upper surface of the placement base 1 on the right side of the control component 3 by bolts. The bottom of the distribution box 8 is tightly fitted to the upper surface of the placement base 1. This distribution box 8 has good protective performance and can protect the internal electrical components from the influence of the external environment. The timer controller is a microcomputer time control switch of model KG316T, which is fixedly installed in the middle position inside the distribution box 8 by a snap-fit. The wiring terminals of the timer controller face the back of the distribution box 8. This model of timer controller can set multiple sets of switching times. The system offers high control precision, meeting the requirements for spray time control. The drainage pump 9 is a submersible sewage pump of model WQ15-15-1.5, which is bolted to the upper surface of the mounting base 1 in front of the control component 3. The inlet of the drainage pump 9 is sealed to the water storage device 2 through a pipe, and the outlet of the drainage pump 9 is sealed to the inlet of the control component 3 through a pipe. The output of the timer controller is electrically connected to the control end of the drainage pump 9 through a wire, and the distribution box 8 is electrically connected to the input end of the timer controller through a wire. All wire connection points are equipped with insulating protective sleeves.
[0019] The implementation principle of the above embodiment is as follows: the distribution box 8 provides space for the installation and protection of the timer controller, and also serves as a circuit distribution unit. The timer controller is installed inside the distribution box 8 and can preset the spraying time and interval. The distribution box 8 provides power to the timer controller and controls it. When the preset spraying time is reached, the timer controller sends an electrical signal to start the drainage pump 9, pumping water from the water storage device 2 to the control component 3; when the preset stop time is reached, the timer controller controls the drainage pump 9 to stop working. In this way, precise control of the spraying curing time is achieved, ensuring that the concrete is cured within the appropriate time, improving the curing effect, and saving water resources.
[0020] Reference Figure 1 , Figure 2 One embodiment shown is as follows: the water supply component 4 includes a curing water pipe 10 and an explosion-proof telescopic water pipe 11. In this embodiment, one end of the explosion-proof telescopic water pipe 11 is sealed and connected to the drain end of the control component 3 via a threaded connection, and the other end of the explosion-proof telescopic water pipe 11 is sealed and connected to one end of the curing water pipe 10 via a flange; the curing water pipe 10 is a rigid pipe, and its end away from the explosion-proof telescopic water pipe 11 extends towards the concrete curing position. During the extension process, it is fixed to the side wall of the cantilever by a bracket, the bracket is connected to the side wall of the cantilever by bolts, and the curing water pipe 10 is fixed to the bracket by a snap fastener.
[0021] The implementation principle of the above embodiment is as follows: The explosion-proof telescopic water pipe 11 has good flexibility and explosion-proof performance. It is connected to the drainage end of the control component 3, which can adapt to position changes during construction and facilitate the movement of the water supply component 4 with the hanging basket. The explosion-proof telescopic water pipe 11 is connected to the curing water pipe 10, transferring the water supplied by the control component 3 to the curing water pipe 10. The curing water pipe 10 is made of rigid pipe, which can ensure the stability of water during transportation. It extends to the concrete curing position, providing a stable water source transportation channel for the nozzle component 5, ensuring that water can be accurately delivered to the concrete surface that needs curing.
[0022] Reference Figure 1 , Figure 2 One embodiment shown is as follows: The device includes a winding winch 12. In this embodiment, the winding winch 12 is connected to the upper surface of the placement base 1 at a position between the water storage device 2 and the control component 3 via a bearing seat. The rotating shaft of the winding winch 12 is rotatably connected to the bearing seat. The middle part of the explosion-proof telescopic water pipe 11 is wound on the drum of the winding winch 12. The two ends of the explosion-proof telescopic water pipe 11 are respectively led out from both sides of the winding winch 12. One end is connected to the drain end of the control component 3, and the other end is connected to the maintenance water pipe 10. A braking device is provided on the winding winch 12, which can fix the explosion-proof telescopic water pipe 11 when it is stretched to a suitable length.
[0023] The implementation principle of the above embodiment is as follows: The winding winch 12 is installed on the placement base 1 and is used to wind and store the explosion-proof telescopic water pipe 11. When the construction basket moves, the explosion-proof telescopic water pipe 11 will be stretched or contracted. The winding winch 12 can automatically release or retract the explosion-proof telescopic water pipe 11 as the basket moves, preventing the explosion-proof telescopic water pipe 11 from falling and being damaged, and also making the layout of the equipment more neat and orderly. The braking device can fix the explosion-proof telescopic water pipe 11 when it reaches a suitable length, ensuring the stability of the water transportation process.
[0024] Reference Figure 1 , Figure 3 , Figure 4 , Figure 6One embodiment shown is as follows: the health water pipe 10 includes an outer water pipe 13 and an inner water pipe 14, and also includes a hanging basket frame and an inner crossbeam 16. In this embodiment, the basket frame is fixedly connected to the outer wall of the cantilever web by bolts, and the basket frame is distributed along the length of the cantilever web; the outer water pipe 13 is fixedly connected to the basket frame by clips, and the outer water pipe 13 is arranged in a mountain shape on both sides of the cantilever web, with the three vertices of the mountain shape corresponding to the upper, middle and lower positions on the outer side of the cantilever web respectively; the drainage hole 15 at the top of the web is a circular through hole, and the edge of the drainage hole 15 is polished; one end of the inner water pipe 14 passes through the drainage hole 15 and is sealed to the outer water pipe 13, and a sealing gasket is provided between the pipe and the drainage hole 15; one end of the inner crossbeam 16 is connected to the end of the basket frame facing the inner side of the cantilever web by welding, and the other end of the inner crossbeam 16 extends towards the inner side of the cantilever web and is fixed to the inner wall of the cantilever web by bolts; the inner water pipe 14 is fixedly connected to the upper surface of the inner crossbeam 16 by clips, and the inner water pipe 14 is arranged along the length of the inner crossbeam 16.
[0025] The implementation principle of the above embodiment is as follows: The hanging basket provides installation support for the outer water pipe 13, which is arranged in a mountain-shaped pattern on both sides of the cantilever web, fully covering the outer surface of the cantilever web and ensuring that the concrete in all outer parts is cured. The drainage hole 15 provides a channel for the connection between the inner water pipe 14 and the outer water pipe 13. The inner water pipe 14 is connected to the outer water pipe 13 through the drainage hole 15, which can deliver water to the inner side of the cantilever web. The inner crossbeam 16 connects the hanging basket and the inner side of the cantilever web, providing an installation position for the inner water pipe 14. The inner water pipe 14 is fixed on the inner crossbeam 16, which can stably deliver water to the concrete on the inner side of the cantilever web, ensuring that the inner concrete is fully cured. This arrangement of inner and outer water pipes 13 achieves all-round curing coverage of the cantilever concrete.
[0026] Reference Figure 2 , Figure 4 One embodiment shown is as follows: the nozzle assembly 5 includes a swing nozzle 17. In this embodiment, the swing nozzle 17 is a PY15 irrigation-type swing nozzle, which is evenly installed on the curing water pipe 10 at the corresponding curing positions via a threaded connection. The inlet of each swing nozzle 17 is connected to the interior of the curing water pipe 10. The swing angle of this nozzle can be adjusted from 0 to 360 degrees to meet the coverage requirements of different curing areas. The spraying direction of the swing nozzle 17 is towards the concrete surface. A locking nut is provided at the connection between the swing nozzle 17 and the curing water pipe 10 to fix the swing nozzle 17 at a preset angle.
[0027] The implementation principle of the above embodiment is as follows: the swing nozzle 17 is installed on the curing water pipe 10 at the corresponding curing position, and a threaded connection ensures a tight connection with the curing water pipe 10. The locking nut can fix it at a suitable angle. When water is delivered from the curing water pipe 10 to the swing nozzle 17, the swing nozzle 17 can swing left and right under the action of the water flow, expanding the spraying range so that every part of the concrete surface can be sprayed evenly, improving the uniformity and efficiency of curing, and ensuring that the concrete curing effect reaches the optimal state.
[0028] The working principle of this device is as follows: The placement seat 1 is fixed to the top of the cantilever, supporting components such as the water storage device 2. The water tank 7 of the water storage device 2 stores curing water. When the water level is lower than the preset line, the water level controller starts the external water pump to replenish water. In the control component 3, the timer controller in the distribution box 8 is controlled by the distribution box 8, which in turn controls the start and stop of the drainage pump 9 to achieve timed spraying. The explosion-proof telescopic water pipe 11 of the water delivery component 4 connects the control component 3 and the curing water pipe 10, and the winch 12 assists in its extension and retraction with the hanging basket. The curing water pipe 10 has an outer side and an inner side. The outer side is arranged in a mountain-shaped pattern on both sides of the cantilever web, and the inner side is connected to the outer side through the drainage hole 15 and fixed to the inner crossbeam 16. The swing-type sprinkler head 17 is installed at the corresponding position of the curing water pipe 10 to spray water evenly onto the concrete surface. The water delivery component 4 and the sprinkler head component 5 move synchronously with the hanging basket to ensure that the newly constructed concrete is cured in a timely manner.
[0029] The working principle of this device has been explained through the above embodiments. These embodiments only illustrate several implementation methods of this utility model, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this utility model, and these all fall within the protection scope of this utility model. Therefore, the protection scope of this utility model patent should be determined by the appended claims.
Claims
1. An automatic curing structure for cantilevered concrete casting in high-speed railways, characterized in that: include: Placement seat (1), set at the top of the cantilever; A water storage device (2) is installed on the placement base (1) for storing health-preserving water; The control component (3) is set on the placement seat (1) on one side of the water storage device (2) and connected to the water storage device (2) for controlling the spraying and curing process; The water delivery component (4) is connected to the drain end of the control component (3) and is used to deliver water to the concrete curing location; The water supply component (4) includes a curing water pipe (10) and an explosion-proof telescopic water pipe (11). The explosion-proof telescopic water pipe (11) is connected to the drain end of the control component (3). One end of the explosion-proof telescopic water pipe (11) is connected to the curing water pipe (10), and the other end of the curing water pipe (10) is used to extend to the concrete curing position. The nozzle assembly (5) is located on one end of the curing water pipe (10) near the curing position and is used to spray the water transported by the water transport assembly (4) onto the concrete surface. The construction hanging basket (6) is set on the cantilever to be constructed and can be moved with the construction area; Furthermore, both the water conveying assembly (4) and the nozzle assembly (5) are configured to move synchronously with the hanging basket; A winding winch (12) is provided on the placement seat (1), and the explosion-proof telescopic water pipe (11) is wound on the winding winch (12); The health water pipe (10) includes an outer water pipe (13) and an inner water pipe (14). A hanging basket frame is provided on the cantilever web. The outer water pipe (13) is set on the hanging basket frame and arranged in a mountain shape on both sides of the cantilever web. A drainage hole (15) is opened at the top of the web. The inner water pipe (14) is connected to the outer water pipe (13) through the drainage hole (15). An inner crossbeam (16) connected to the hanging basket frame is provided on the inner side of the web of the cantilever. The inner water pipe (14) is fixed on the inner crossbeam (16). The nozzle assembly (5) includes a swing nozzle (17), which is located at the corresponding health maintenance position on the health maintenance water pipe (10).
2. The automatic curing structure for cantilevered concrete casting in high-speed railways according to claim 1, characterized in that: The water storage device (2) includes a water bucket (7), which is placed on a base (1). The water bucket (7) is equipped with a water level controller, which is electrically connected to an external water pump. When the water level in the water storage device (2) is lower than the preset water level line, the water pump is started to replenish water by controlling the water level controller.
3. The automatic curing structure for cantilevered concrete casting in high-speed railways according to claim 2, characterized in that: The control component (3) includes a power distribution box (8), a timer controller, and a drainage pump (9). The power distribution box (8) is equipped with a timer controller. The drainage pump (9) is located on one side of the control component (3). The timer controller is electrically connected to the drainage pump (9) so that the timer controller can be controlled through the power distribution box (8), and then the timer controller can control the start and stop of the drainage pump (9).