Quickly installed flood control sandbag stacking frame
By introducing monitoring and stacking components into the flood control sandbag stacking rack, the problems of insufficient water level monitoring and poor sandbag positioning were solved, achieving real-time water level monitoring and sandbag regularity, and improving the stability and safety of flood control facilities.
Patent Information
- Application Number
- CN202522826023.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-31
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-31
AI Technical Summary
The existing flood control sandbag stacking racks lack water level monitoring functions, which may cause the flood control facilities to be washed away when the flood changes; the sandbags are not well restrained and are easy to scatter, which may lead to the collapse of the waterproof structure.
A flood control sandbag stacking rack was designed, which includes a monitoring component and a stacking component. The monitoring component consists of a placement frame, a fixing frame, a monitoring tube, and a water level monitoring ring, and is used to monitor the flood level in real time. The stacking component supports the sandbags through an inclined plate, a positioning ring, and a fixing cone to ensure the regularity of the sandbags.
It enables real-time monitoring of flood levels, prevents sandbags from scattering, and enhances the stability and safety of flood control facilities.
Smart Images

Figure CN224997494U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of flood control technology, specifically a quick-installation flood control sandbag stacking rack. Background Technology
[0002] The flood control sandbag stacking rack is a modular mechanical device used in emergency flood control scenarios. Its core function is to replace the traditional method of manually and disorderly stacking sandbags. It quickly builds stable flood barriers (such as retaining walls and dikes) through standardized structures, achieving the goals of "rapid assembly, high load-bearing capacity, and reusability".
[0003] A flood control device for water conservancy projects disclosed in CN215758818U includes a flood-resistant plate assembly for flood control. One side of the flood-resistant plate assembly is provided with a snap-fit component for quick positioning after erection. By alternately erecting the base frame and the anti-impact frame, and then pulling the slider out from the inside of the support frame, the locking joint is sleeved on the slider and positioned by the snap-fit of the locking block, a quick erection and installation is achieved, thereby effectively improving convenience. Then, by setting up the bottom flood control sandbag in the placement cavity and placing the conical flood control sandbag on the top of the bottom flood control sandbag, the anti-impact frame is supported by the bottom flood control sandbag and the conical flood control sandbag, thus improving the overall weight.
[0004] However, this quick-installation flood control sandbag stacking rack has the following disadvantages: 1. The existing quick-installation flood control sandbag stacking racks have weak monitoring capabilities. When carrying out flood control, the device lacks the function of monitoring the water level in the flood area. Due to the unpredictable changes in floodwaters, the flood control facilities may be washed away by sudden rises.
[0005] 2. Existing quick-installation flood control sandbag stacking racks have a weak effect in limiting the stacking. The device uses baffles to resist the impact of water flow, and the sandbags increase the weight of the baffles, which may cause the sandbags to be washed away and scattered, leading to the collapse of the waterproof structure. Utility Model Content
[0006] (a) Technical problems to be solved To address the shortcomings of existing technologies, this invention provides a quick-installation flood control sandbag stacking rack to solve the problems mentioned in the background section.
[0007] (II) Technical Solution To achieve the above objectives, this utility model is implemented through the following technical solution: a quick-installation flood control sandbag stacking frame, comprising a monitoring component and a stacking component. The monitoring component consists of a placement frame, a fixing frame, a monitoring tube, and a water level monitoring ring. One end of the placement frame is fixedly connected to the fixing frame, the inner wall of the fixing frame is fixedly connected to the monitoring tube, and the top of the inner side wall of the monitoring tube is fixedly connected to the water level monitoring ring. The stacking assembly consists of an inclined plate, a positioning ring, a fixing cone, and sandbags fixed to one end of the top of the placement frame. Sandbags are placed at the other end of the top of the placement frame. Positioning rings are provided at both ends of the top of the placement frame, and fixing cones are engaged with the inner walls of the positioning rings.
[0008] Preferably, the bottom of the monitoring tube is provided with a fixing groove, and a filter screen is fixedly connected to the inner wall of the fixing groove. The filter screen installed at the bottom of the monitoring tube can prevent debris from entering the monitoring tube and affecting the monitoring effect.
[0009] Preferably, a reinforcing groove is provided on the back of the inclined plate, and a reinforcing frame is fixedly connected to the inner wall of the reinforcing groove. The reinforcing frame is installed on the back of the inclined plate to improve the compressive strength of the inclined plate.
[0010] Preferably, the top edge of the placement rack is provided with a mounting groove, the inner wall of the mounting groove is fixedly connected to one bottom end of the reinforcing rack, and the bottom of the reinforcing rack is installed at the top edge of the placement rack.
[0011] Preferably, the inclined plate has a positioning groove on its front side, and a buffer pad is fixedly connected to the inner wall of the positioning groove. The buffer pad on the inclined plate can reduce the impact of sandbags carried by floods on the inclined plate.
[0012] Preferably, the bottom of the positioning ring is provided with a through groove, the inner wall of the through groove is engaged with the lower surface of the fixing cone, and the fixing cone passes through the positioning ring and enters the ground.
[0013] (III) Beneficial Effects This utility model provides a quick-installation flood control sandbag stacking rack, which has the following beneficial effects: 1. This quick-installation flood control sandbag stacking rack, through the setup of a placement rack, a fixing rack, a monitoring tube, and water level monitoring rings, allows the fixed rack at one end of the placement rack to suspend in the monitoring area of the flood after it is installed in the flood control zone. The monitoring tube is inserted into the flood, and as the flood rises, it moves along the inner wall of the monitoring tube, continuously passing through the various water level monitoring rings distributed within the monitoring tube. The water level monitoring rings transmit the monitored data to external equipment. This setup can help staff carry out flood control operations and monitor the flood level in real time.
[0014] 2. This quick-installation flood control sandbag stacking rack, through the setup of the rack, inclined plate, positioning ring, fixing cone, and sandbags, allows workers to place the rack at the edge of the flood zone, insert the fixing cone into the positioning ring on the rack, and insert the bottom of the fixing cone into the ground to position the rack. The sandbags are then placed on the rack, and the inclined plate supports and limits their position. This setup ensures the neatness of the sandbags and prevents them from being scattered by the flood due to a lack of connection between them. Attached Figure Description
[0015] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the monitoring tube structure of this utility model; Figure 3 This is a schematic diagram of the placement rack structure of this utility model; Figure 4 This is a schematic diagram of the reinforcement frame structure of this utility model.
[0016] In the diagram: 1. Monitoring component; 101. Placement rack; 102. Fixing rack; 103. Monitoring tube; 104. Water level monitoring ring; 2. Stacking component; 201. Inclined plate; 202. Positioning ring; 203. Fixing cone; 204. Sandbag; 3. Filter screen; 4. Reinforcing frame; 5. Buffer pad. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0018] Please see Figures 1-4As shown, this utility model provides a technical solution: a quick-installation flood control sandbag stacking frame, including a monitoring component 1 and a stacking component 2. The monitoring component 1 consists of a placement frame 101, a fixing frame 102, a monitoring tube 103, and a water level monitoring ring 104. One end of the placement frame 101 is fixedly connected to the fixing frame 102, the inner wall of the fixing frame 102 is fixedly connected to the monitoring tube 103, and the top of the inner side wall of the monitoring tube 103 is fixedly connected to the water level monitoring ring 104. Through the arrangement of the placement frame 101, fixing frame 102, monitoring tube 103, and water level monitoring ring 104, when the placement frame 101 is installed in the flood control area, the fixing frame 102 at one end of the placement frame 101 will be suspended in the monitoring area of the flood, and the monitoring tube 103 will be inserted into the flood. When the flood rises, the water level monitoring ring 104 will rise along the monitoring tube 103. The device moves along the inner wall, continuously passing through the various water level monitoring rings 104 distributed within the monitoring tube 103. The water level monitoring rings 104 transmit the monitored data to external devices. This setup helps staff in flood control operations by enabling real-time monitoring of flood levels. The placement frame 101 is made of Q235B hot-rolled channel steel, the fixing frame 102 is made of 304 stainless steel pipe, and the monitoring tube 103 is made of UPVC rigid polyvinyl chloride pipe. The water level monitoring rings 104 are model HWL-100IP68, and the external device is a LoRa wireless transmission module (model: SX1278), suitable for long-distance outdoor transmission scenarios. It is connected to each water level monitoring ring 104 via wires (a cable tray is reserved inside the monitoring tube), collecting water level data from all sensors and transmitting it to the terminal device via wireless signals. The stacking assembly 2 consists of an inclined plate 201 fixed to one end of the top of the placement frame 101, a positioning ring 202, a fixing cone 203, and sandbags 204. Sandbags 204 are placed at the other end of the top of the placement frame 101. Positioning rings 202 are located at both ends of the top of the placement frame 101, and fixing cones 203 are engaged with the inner walls of the positioning rings 202. Through the arrangement of the placement frame 101, inclined plate 201, positioning rings 202, fixing cones 203, and sandbags 204, during use, workers place the placement frame 101 on the edge of the flood area, securing the sandbags 204. The fixed cone 203 is inserted into the positioning ring 202 on the placement frame 101, and the bottom of the fixed cone 203 is inserted into the ground to position the placement frame 101. The sandbags 204 are placed on the placement frame 101. The sandbags 204 are supported and limited by the inclined plate 201. This setting can ensure the neatness of the sandbags 204 and prevent the sandbags 204 from being scattered due to lack of connection. The inclined plate 201 is made of Q235B steel plate with epoxy resin coating, the positioning ring 202 is made of No. 45 steel, and the fixed cone 203 is made of 65Mn spring steel. A fixing groove is provided at the bottom of the monitoring tube 103, and a filter screen 3 is fixedly connected to the inner wall of the fixing groove. With the setting of the monitoring tube 103 and the filter screen 3, the filter screen 3 installed at the bottom of the monitoring tube 103 can prevent debris from entering the monitoring tube 103 and affecting the monitoring effect during use. A reinforcing groove is provided on the back of the inclined plate 201, and a reinforcing frame 4 is fixedly connected to the inner wall of the reinforcing groove. With the setting of the inclined plate 201 and the reinforcing frame 4, the reinforcing frame 4 is installed on the back of the inclined plate 201 during use to improve the compressive strength of the inclined plate 201. The top edge of the placement rack 101 is provided with a mounting groove, and the inner wall of the mounting groove is fixedly connected to one end of the bottom of the reinforcing rack 4. With the placement rack 101 and the reinforcing rack 4, the bottom of the reinforcing rack 4 is installed at the top edge of the placement rack 101 during use. The front of the inclined plate 201 is provided with a positioning groove, and a buffer pad 5 is fixedly connected to the inner wall of the positioning groove. With the setting of the inclined plate 201 and the buffer pad 5, the buffer pad 5 on the inclined plate 201 can reduce the impact of the sandbag 204 on the inclined plate 201 when the flood is in use. The bottom of the positioning ring 202 is provided with a through groove, and the inner wall of the through groove is engaged with the lower surface of the fixing cone 203. Through the setting of the positioning ring 202 and the fixing cone 203, the fixing cone 203 passes through the positioning ring 202 and enters the ground during use.
[0019] First step: The staff places the placement frame 101 in the flood edge area, inserts the fixing cone 203 into the positioning ring 202 on the placement frame 101, and inserts the bottom of the fixing cone 203 into the ground to position the placement frame 101. The sandbags 204 are placed on the placement frame 101. The sandbags 204 will be supported and limited by the inclined plate 201, so that the sandbags will not be washed away and the waterproof structure will not collapse due to the lack of limiting the sandbag stacking in the existing technology. The second step: After the placement frame 101 is installed in the flood control area, the fixed frame 102 at one end of the placement frame 101 will be suspended in the monitoring area in the flood. The monitoring tube 103 is inserted into the flood. When the flood rises, it will move along the inner wall of the monitoring tube 103 and continuously pass through the various water level monitoring rings 104 distributed in the monitoring tube 103. The water level monitoring rings 104 will transmit the monitored data to the external equipment. This will not cause safety hazards due to the fact that the existing technology only focuses on flood control operations and does not pay attention to flood data collection.
[0020] It should be noted that the device structure and accompanying drawings of this utility model mainly describe the principle of this utility model. In terms of the technical aspects of this design principle, the setting of the power mechanism, power supply system and control system of the device is not fully described. However, under the premise that those skilled in the art understand the principle of the above utility model, the specific details of its power mechanism, power supply system and control system can be clearly understood. The control method in the application document is automatic control through a controller. The control circuit of the controller can be implemented by those skilled in the art through simple programming. All standard parts used can be purchased from the market, and can be customized according to the instructions and drawings. The specific connection methods of each part adopt conventional methods such as bolts, rivets, and welding that are mature in the existing technology. The machinery, parts and equipment adopt conventional models in the existing technology, and the structure and principle of the components known to those skilled in the art can be known by those skilled in the art through technical manuals or conventional experimental methods.
Claims
1. A quick-installation flood control sandbag stacking rack, comprising a monitoring component (1) and a stacking component (2), characterized in that: The monitoring component (1) consists of a placement frame (101), a fixing frame (102), a monitoring tube (103), and a water level monitoring ring (104). One end of the placement frame (101) is fixedly connected to the fixing frame (102), the inner wall of the fixing frame (102) is fixedly connected to the monitoring tube (103), and the top of the inner side wall of the monitoring tube (103) is fixedly connected to the water level monitoring ring (104). The stacking assembly (2) consists of an inclined plate (201), a positioning ring (202), a fixing cone (203), and a sandbag (204) fixed to one end of the top of the placement frame (101). A sandbag (204) is placed at the other end of the top of the placement frame (101). Positioning rings (202) are provided at both ends of the top of the placement frame (101). The fixing cone (203) is engaged with the inner wall of the positioning ring (202).
2. The flood control sandbag stacking rack according to claim 1, characterized in that: The bottom of the monitoring tube (103) is provided with a fixing groove, and a filter screen (3) is fixedly connected to the inner wall of the fixing groove.
3. The flood control sandbag stacking rack according to claim 1, characterized in that: The inclined plate (201) has a reinforcing groove on its back side, and a reinforcing frame (4) is fixedly connected to the inner wall of the reinforcing groove.
4. The flood control sandbag stacking rack according to claim 1, characterized in that: The top edge of the placement rack (101) is provided with an installation groove, and the inner wall of the installation groove is fixedly connected to one bottom end of the reinforcement rack (4).
5. The flood control sandbag stacking rack according to claim 1, characterized in that: The inclined plate (201) has a positioning groove on its front side, and a buffer pad (5) is fixedly connected to the inner wall of the positioning groove.
6. The flood control sandbag stacking rack according to claim 1, characterized in that: The bottom of the positioning ring (202) is provided with a through groove, and the inner wall of the through groove is engaged with the lower surface of the fixing cone (203).