Sand control structure combining grass checkerboard and spray seeding layer

By combining a multi-layered nested grass grid with a hydroseeding layer and an HDPE mesh layer, the problem of insufficient synergy between sand fixation and water retention in existing technologies is solved. This achieves effective sand fixation and moisture retention in high wind speed environments, enhancing wind resistance and interlayer bonding strength.

CN224997539UActive Publication Date: 2026-11-20新疆交通科学研究院有限责任公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522590712.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-05
Publication Date
2026-11-20
Estimated Expiration
2035-12-05

AI Technical Summary

Technical Problem

In existing desertification control technologies, the synergy between sand fixation and water conservation of straw checkerboard is insufficient. The single structure is easily damaged in high wind speed environments, leading to a decline in sand fixation effect. Furthermore, the interlayer connection strength is insufficient, making it difficult to continuously lock in the moisture of the sand layer.

Method used

The system employs a multi-layered nested structure, including grass squares and a hydroseeding layer, combined with an HDPE mesh layer, forming multiple layers of physical nesting to enhance wind resistance. It utilizes the three-dimensional network of plant fibers to retain water, and through the staggered laying of grass squares and hydroseeding layers and the fixing of the mesh layer, multiple protective layers are formed.

Benefits of technology

It enhances the synergy between sand fixation and water conservation, effectively locking in moisture in the sand layer under high wind speeds, strengthening wind resistance, preventing sand and soil loss, and extending the durability and protective effect of the sand control structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997539U_ABST
    Figure CN224997539U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of sand control structure of joint grass square and spray layer, it is related to highway sand control technical field.Structure includes first layer grass square, first layer spray layer covers first layer grass square and fills therein;First layer spray layer upper surface covers first mesh cover layer, first mesh cover layer upper side is provided with second layer grass square, and the base portion of second layer grass square is embedded in first spray layer through first mesh cover layer;Second layer spray layer covers second layer grass square and fills therein;Second layer spray layer upper surface covers second mesh cover layer, second mesh cover layer upper side is provided with third layer grass square, and the base portion of third layer grass square is embedded in second spray layer through second mesh cover layer, and the recessed area of third layer grass square is filled with third layer spray layer.First layer grass square anchors roadbed and forms impact-resistant skeleton, and the base portion of second layer grass square and third layer grass square is embedded in the spray layer below through mesh cover layer respectively;Multiple structures jointly promote wind resistance, and prevent sand loss below sand control structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of highway desertification control technology, and in particular to a desertification control structure that combines grass checkerboard and hydroseeding layer. Background Technology

[0002] Desert highway slopes (especially those with aeolian sand as roadbed fill) have long faced a dual threat: on the one hand, the structure of the accumulated sand is loose and easily damaged by wind; on the other hand, the high wind speed and intense sandstorms in the natural environment can easily damage the accumulated sand.

[0003] Current remediation solutions primarily rely on straw checkerboard mats. While dead straw checkerboard mats initially block shifting sand, and living straw checkerboard mats combine ecological and productive functions, their synergistic effect in sand fixation and water conservation is insufficient. Furthermore, the degradation cycle of a single dead straw checkerboard mat is only 2-3 years, making it difficult to continuously retain moisture in the sand layer. Living straw checkerboard mats have low seedling emergence rates and weak wind erosion resistance. Under the influence of sudden strong winds, the shifting sand between the checkerboard mats is stirred up, causing deformation and damage, thus diminishing the sand-fixing effect. Moreover, living straw checkerboard mats are mostly laid out flat or simply stacked, lacking a physical nesting structure and insufficient interlayer bonding strength, easily leading to delamination of the repair structure and loss of protective effect. Durable HDPE or biodegradable PP checkerboard mesh has been used in the production of ecological straw mats for slope protection, but its windproof effect is poor, making it difficult to cope with wind damage to the contents of the ecological straw mats. Utility Model Content

[0004] To address the shortcomings of existing technologies, the purpose of this invention is to provide a sand control structure that combines straw checkerboard and hydroseeding layers. Based on straw checkerboard sand fixation, a hydroseeding layer and a netting layer are set on top. The physical nesting effect of multiple hydroseeding layers and multiple straw checkerboard layers enhances the windbreak and sand fixation effect, and can continuously lock in the moisture of the sand layer, thus making up for the deficiencies of existing technologies.

[0005] To achieve the above objectives, this utility model is implemented through the following technical solution: A desertification control structure combining grass checkerboard and hydroseeding layers includes a first layer of grass checkerboard, a first layer of hydroseeding layer covering and filling the first layer of grass checkerboard; a first mesh cover layer covering the upper surface of the first layer of hydroseeding layer, a second layer of grass checkerboard above the first mesh cover layer, the base of the second layer of grass checkerboard passing through the first mesh cover layer and embedded in the first layer of hydroseeding layer; a second layer of hydroseeding layer covering the upper surface of the second layer of hydroseeding layer, a second mesh cover layer covering the upper surface of the second layer of hydroseeding layer, a third layer of grass checkerboard above the second mesh cover layer, the base of the third layer of grass checkerboard passing through the second mesh cover layer and embedded in the second layer of hydroseeding layer, and the third layer of grass checkerboard being filled with the third layer of hydroseeding layer.

[0006] Optionally, the side lengths of the first, second, and third layers of grass grids are 0.5m to 1.5m, respectively.

[0007] Optionally, in semi-humid areas, the side length of the grid is 0.5 m to 1.0 m, and in semi-arid areas, the side length is 1.0 m to 1.5 m. The side length of the grass grid and the size of the concave areas are adjusted according to rainfall to regulate the proportion of the hydroseeding layer. In semi-humid areas, due to abundant rainfall, small grids are used to enhance sand fixation, enabling rapid and stable protection through synergy with vegetation. In semi-arid areas, due to scarce rainfall, large grids are used to ensure water infiltration, which, combined with a cotton stalk layer for water retention, improves vegetation efficiency, balancing sand fixation and long-term effectiveness. This design precisely addresses the deficiency of insufficient synergy between sand fixation and water retention in existing technologies, ensuring that the parameters of the grass grid layer are adapted to regional climatic conditions and maximizing the desertification control effect.

[0008] Optionally, the first mesh layer and the second mesh layer are both made of HDPE material, and the layup directions of the first mesh layer and the second mesh layer differ by 45°.

[0009] Optionally, reinforcing strips are provided on the first mesh layer and the second mesh layer respectively, and the reinforcing strip area has no mesh holes and forms an interlaced grid.

[0010] Optionally, the first mesh layer and the second mesh layer are fixed to the ground by ground nails, the spacing between the ground nails being the same as the side length of the grid; and the ground nails of the first mesh layer and the second mesh layer are arranged in a staggered manner.

[0011] Optionally, the first and second mesh layers extend beyond the edges of the grass grid to the highway shoulder, and the edges of the first and second mesh layers are respectively fixed to the highway shoulder by anchor bolts.

[0012] Optionally, a slow-release fertilizer layer may be provided above the first mesh layer and the second mesh layer, respectively.

[0013] Optionally, a baffle is included, which is disposed at the edge of the sand control structure of the combined grass square and the hydroseeding layer, and is higher than the third layer of grass square.

[0014] Optionally, the first layer of grass grid, the second layer of grass grid, and the third layer of grass grid each include a grid that is horizontally intersecting in a "well" shape, and the grid positions of the first layer of grass grid, the second layer of grass grid, and the third layer of grass grid overlap vertically.

[0015] The beneficial effects of this utility model are as follows: This invention addresses the problem of balancing stability and ecological benefits in existing desert highway slope restoration technologies by constructing a nested structure of grass checkerboard, hydroseeding layer, and netting layer. The first layer of grass checkerboard anchors the roadbed, forming an erosion-resistant framework. The bases of the second and third layers of grass checkerboard penetrate the netting layer and embed into the underlying hydroseeding layer. The hydroseeding layer relies on its three-dimensional network of plant fibers (85%-90% water holding capacity in 48 hours) for water retention and vegetation growth. The double-layered netting layer, laid at a 45° angle, can stagger and resist wind speeds of up to 20 m / s, solving the shortcomings of single-layer sand fixation. The multiple structures collectively enhance wind resistance and prevent sand loss beneath the sand control structure. The edges of the double-layered netting layer are anchored to the shoulder to prevent edge damage and avoid interlayer separation caused by edge breakage. Attached Figure Description

[0016] The accompanying drawings, which form part of this specification, are used to provide a further understanding of this utility model. The illustrative embodiments of this utility model and their descriptions are used to explain this utility model and do not constitute an improper limitation of this utility model.

[0017] Figure 1 This is a cross-sectional view of the sand control structure of the combined grass checkerboard and hydroseeding layer in Example 1 of the specific implementation method.

[0018] Figure 2 This is a top view of the sand control structure of the combined grass checkerboard and hydroseeding layer in Example 1 of the specific implementation method.

[0019] Figure 3 This is a schematic diagram of the edge position of the sand control structure of the combined grass grid and hydroseeding layer in Example 1 of the specific implementation method.

[0020] Figure 4 This is a schematic diagram of step S1 during the construction of the sand control structure combining grass checkerboard and hydroseeding layer in Example 1 of the specific implementation method.

[0021] Figure 5 This is a schematic diagram of step S2 in the construction process of the sand control structure combining grass checkerboard and hydroseeding layer in Example 1 of the specific implementation method.

[0022] Among them, 1. First layer of grass squares; 2. Second layer of grass squares; 3. Third layer of grass squares; 4. First layer of hydroseeding; 5. Second layer of hydroseeding; 6. Third layer of hydroseeding; 7. First layer of netting; 71. Reinforcing strip; 8. Second layer of netting; 9. Baffle; 10. Anchor bolt; 11. Recessed area; 12. Ground nail. Detailed Implementation

[0023] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0024] Example 1 A desertification control structure combining grass checkerboard and hydroseeding layer is designed for use in semi-humid areas with an annual precipitation of 400mm to 800mm.

[0025] like Figure 1 As shown, the system includes a first layer of straw grid 1, which consists of a horizontally intersecting grid of straw walls, with the area enclosed by adjacent straw walls forming a recessed area. A first layer of hydroseeding 4 covers the first layer of straw grid 1 from above and fills the recessed areas of the first layer of straw grid 1. A first net layer 7 covers the upper surface of the first layer of hydroseeding 4, and a second layer of straw grid 2 is placed above the first net layer 7. The base of the second layer of straw grid 2 passes through the first net layer 7 and is embedded in the first layer of hydroseeding 4. A second layer of hydroseeding 5 covers the second layer of straw grid 2 from above and fills the recessed areas of the second layer of straw grid 2. A second net layer 8 covers the upper surface of the second layer of hydroseeding 5, and a third layer of straw grid 3 is placed above the second net layer 8. The base of the third layer of straw grid 3 passes through the second net layer 8 and is embedded in the second layer of hydroseeding 5. The recessed areas of the third layer of straw grid 3 are filled with the third layer of hydroseeding 6.

[0026] The first spraying layer 4, the second spraying layer 5, and the third spraying layer consist of plant fibers and seed plants, which is a conventional setup in the field, and this invention does not improve upon it.

[0027] like Figure 2 As shown, the straw wall of the first layer of straw grid 1 is buried at a depth of 18±2cm and protrudes 7±2cm above the sand surface; between adjacent straw walls, there are square-shaped recessed areas 11, and the side length of the squares in the recessed areas 11 is 0.5 m.

[0028] like Figure 1 As shown, the grids of the first layer of grass squares 1, the second layer of grass squares 2, and the third layer of grass squares 3 overlap vertically. Figure 2 The position of the first layer of grass square 1 can indicate the position of the second layer of grass square 2 and the third layer of grass square 3.

[0029] The first mesh layer 7 and the second mesh layer 8 are made of HDPE material, with a mesh side length of 2.5cm. The layup directions of the first mesh layer 7 and the second mesh layer 8 differ by 45°, which improves wind resistance in multiple directions.

[0030] like Figure 2 As shown, the coverage area of ​​the first mesh layer 7 extends beyond the edge of the first layer of grass grid 1 and onto the highway shoulder. The edge of the first mesh layer 7 is fixed to the highway shoulder by anchor bolts 10. Since the coverage area of ​​the second mesh layer 8 is the same as that of the first mesh layer, Figure 2 The edge position of the first mesh layer 7 can indicate the position of the second mesh layer 8.

[0031] like Figure 3As shown, the first mesh layer 7 is provided with reinforcing strips 71 along the direction of the straw squares. The reinforcing strips 71 have no mesh openings. The reinforcing strips 71, which are distributed longitudinally and laterally on the first mesh layer 7, form a grid of intersecting "well" shapes, which can improve the strength of the first mesh layer 7. The reinforcing strips 71 are located in the same position as the straw wall of the straw squares. The first mesh layer 7 is provided with anchor rods 10 in the internal area. The anchor rods 12 on the reinforcing strips 71 are fixed to the ground. The reinforcing strips 71 can enhance the wind resistance of the first mesh layer 7 and also enhance the connection strength between the anchor rods 12 and the first mesh layer 7. The spacing of the anchor rods 12 is the same as the side length of the straw squares. The second mesh layer 8 is also provided with reinforcing strips and anchor rods 12 are provided on the reinforcing strips. The anchor rods 12 on the first mesh layer 7 and the anchor rods 12 on the second mesh layer 8 are staggered to avoid damaging the underlying structure.

[0032] Slow-release fertilizer layers are respectively set above the first net layer 7 and the second net layer 8 to provide nutrients for the seedlings in the first spray layer 4, the second spray layer 5 and the third spray layer 6, thereby improving the germination rate.

[0033] like Figure 2 As shown, baffles 9 are set at the edges of the sand control structure combining grass squares and hydroseeding layers. The height of baffles 9 is higher than that of the third layer of grass squares 3 to prevent lateral wind damage. Baffles 9 are set on the side of the sand control structure away from the road surface. The direction without baffles 9 is an area without wind and sand threat or with alternative protection.

[0034] The construction method of the sand control structure combining grass checkerboard and hydroseeding layer in this embodiment includes the following steps.

[0035] S1, such as Figure 4 As shown, straw walls are set up in a grid pattern on the roadside slope in a "well" shape to form the first layer of straw squares 1. The seams between adjacent squares are tied with straw. Then, a first layer of hydroseeding 4 is placed on top of the first layer of straw squares 1, filling the recessed areas of the first layer of straw squares 1 and extending 4 ± 1 cm above the first layer of straw squares 1. Finally, a first layer of netting 7 is placed on top of the first layer of hydroseeding 4. Figure 3 As shown, the first mesh layer 7 is fixed to the ground with ground stakes 12, and the edge of the laid first mesh layer 7 extends from the edge of the first grass grid 1 to the road shoulder; and as shown... Figure 2 As shown, the anchor bolts 10 are used to fix the road shoulder; then, slow-release fertilizer is spread on the surface of the first mesh layer 7 to form a slow-release fertilizer layer.

[0036] S2, such as Figure 5As shown, a second layer of straw grids 2 is formed above the first layer of netting 7, following the position of the first layer of straw grids 1. The base of the second layer of straw grids 2 passes through the first layer of netting 7 and embeds into the first layer of hydroseeding 4. Because the first layer of netting 7 has a large number of mesh holes, the straw in the second layer of straw grids 2 can pass through the mesh holes and embed into the first layer of hydroseeding 4 below without damaging the first layer of netting 7. According to construction requirements, if the straw in the second layer of straw grids is embedded to a greater depth, it can also be embedded into the height range of the first layer of straw grids 1, so that the first layer of straw grids 1 and the second layer of straw grids 2 are connected together, forming a three-dimensional structure together with the first layer of netting 7. The process involves dividing the first hydroseeding layer 4 into multiple areas and wrapping them; then, a second hydroseeding layer 5 is placed on top of the second grass grid 2, filling the recessed areas of the second grass grid 2 and extending 3±1cm above it; next, a second netting layer 8 is placed on top of the second hydroseeding layer 5, with the laying direction of the second netting layer 8 differing from that of the first netting layer 7 by 45°; the second netting layer 8 is fixed to the ground using ground stakes 12 in the same manner, and the edges of the second netting layer 8 are fixed to the road shoulder using anchor bolts 10; finally, slow-release fertilizer is spread on the surface of the first netting layer 7 to form a slow-release fertilizer layer.

[0037] S3, such as Figure 1 As shown, following the method in S2, a third layer of grass squares 3 is set above the second net layer 8. The base of the third layer of grass squares 3 passes through the second net layer 8 and is embedded in the second layer of hydroseeding layer 5. Then, a third layer of hydroseeding layer 6 is set in the recessed area of ​​the third layer of grass squares 3 so that the third layer of hydroseeding layer 6 is flush with the third layer of grass squares 3.

[0038] S4. Set baffles 9 at the edge to complete the construction process of the sand control structure combining grass grids and hydroseeding layer in this embodiment.

[0039] Example 2 A desertification control structure combining grass checkerboard and hydroseeding layer differs from Example 1 in that it is set in a semi-arid area, with checkerboard side lengths of 1.0 m to 1.5 m.

[0040] The construction method is the same as in Example 1.

[0041] The above are merely preferred embodiments of this application and are not intended to limit this application. Various modifications and variations can be made to this application by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A desertification control structure combining straw checkerboard and hydroseeding layer, characterized in that, This includes a first layer of grass squares, and a first layer of hydroseeding that covers and fills the first layer of grass squares. The first layer of hydroseeding is covered with a first layer of netting. A second layer of grass grids is set above the first layer of netting. The base of the second layer of grass grids passes through the first layer of netting and is embedded in the first layer of hydroseeding. The second layer of hydroseeding covers and fills the second layer of grass grids. The second layer of hydroseeding is covered with a second net layer. A third layer of grass grids is set above the second net layer. The base of the third layer of grass grids passes through the second net layer and is embedded in the second layer of hydroseeding. The third layer of grass grids is filled with the third layer of hydroseeding.

2. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 1, characterized in that, The side lengths of the first, second, and third layers of grass grids are 0.5 m to 1.5 m, respectively.

3. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 2, characterized in that, In semi-humid regions, the side length of the grid is 0.5 m to 1.0 m, and in semi-arid regions, the side length of the grid is 1.0 m to 1.5 m.

4. The desertification control structure combining straw checkerboard and hydroseeding layer as described in claim 1, characterized in that, The first mesh layer and the second mesh layer are both made of HDPE material, and the layup directions of the first mesh layer and the second mesh layer are 45° apart.

5. The desertification control structure combining straw checkerboard and hydroseeding layer as described in claim 1, characterized in that, The first mesh layer and the second mesh layer are respectively provided with reinforcing strips, and the reinforcing strip areas are not provided with mesh holes, forming an interlaced grid.

6. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 1, characterized in that, The first and second mesh layers are fixed to the ground by ground nails, with the spacing between the nails being the same as the side length of the grid; and the ground nails of the first and second mesh layers are staggered.

7. The desertification control structure combining straw checkerboard and hydroseeding layer as described in claim 1, characterized in that, The first and second mesh layers extend beyond the edges of the grass grid to the highway shoulder, and the edges of the first and second mesh layers are respectively fixed to the highway shoulder by anchor bolts.

8. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 1, characterized in that, Slow-release fertilizer layers are respectively provided above the first mesh layer and the second mesh layer.

9. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 1, characterized in that, Includes a baffle, which is set at the edge of the sand control device consisting of the combined grass squares and the hydroseeding layer, and is higher than the third layer of grass squares.

10. The desertification control structure combining grass checkerboard and hydroseeding layer as described in claim 1, characterized in that, The first, second, and third layers of grass grids each consist of a horizontally intersecting grid in a "well" shape, and the grid positions of the first, second, and third layers of grass grids overlap vertically.