A sectional long pile foundation reinforcement cage framework

By using the internal support mechanism and end connection mechanism of the segmented long pile foundation steel cage, the deformation problem of the long pile foundation steel cage during transportation and storage is solved, achieving fast and reliable connection and overall stress consistency, thus improving construction efficiency and quality.

CN224997555UActive Publication Date: 2026-11-20CHINA COMM SOUTH ROAD & BRIDGE CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522795783.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-20
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

In the existing technology, long pile foundation steel cages are prone to bending or radial deformation during transportation and storage, and the segmented connection structure has low alignment efficiency and insufficient connection stability during assembly, which affects the overall stress consistency of the steel cage.

Method used

A segmented long pile foundation steel cage framework is adopted, comprising several frame bodies, an internal support mechanism, and an end connection mechanism. The internal support mechanism provides radial support inside the frame body through a first semicircular and a second semicircular internal support frame, and the end connection mechanism achieves quick and reliable connection through first and second connecting rings and fasteners.

Benefits of technology

It improves the overall stiffness and structural stability of the steel cage, reduces the risk of deformation, enhances assembly reliability and construction adaptability, and ensures the consistency of the overall stress performance of the steel cage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997555U_ABST
    Figure CN224997555U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction discloses a sectional long pile foundation reinforcement cage framework, including a plurality of framework body, for constituting the reinforcement cage body structure of sectional setting, inner bracing mechanism is located the inside of framework body, is used to support framework body in the transportation and storage process, the end connecting mechanism is arranged between two framework bodies, and the adjacent framework body is connected into an organic whole, and the framework body includes a plurality of main reinforcement and a plurality of annular stirrup, a plurality of main reinforcement is annular arrangement, and is connected with end connecting mechanism, annular stirrup is used for connecting a plurality of main reinforcement and keeping the ring spacing of main reinforcement. The utility model can transport, store and on -the -spot assemble under the premise of satisfying long pile foundation stress and length requirement in sectional form, effectively solved the problem that whole long reinforcement cage forms difficultly, inconveniently carries and easily deforms, under the transportation and storage state, improved the overall rigidity and structural stability of reinforcement cage framework.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, specifically to a segmented long pile foundation steel cage skeleton. Background Technology

[0002] Long pile foundation engineering is widely used in the construction of cross-river bridges and large structures. Its reinforcing cages are typically characterized by large length, large diameter, and heavy weight. In existing technologies, to ensure the overall load-bearing performance of the pile foundation, the reinforcing cages are mostly integral structures or assembled on-site to form a single structure. However, during the integral forming, transportation, and storage of the reinforcing cage, the following problems often arise: due to their long length and insufficient rigidity, the entire long reinforcing cage is prone to bending or radial deformation under its own weight or external factors during transportation and storage, affecting the quality of subsequent construction.

[0003] To facilitate transportation and on-site assembly, existing technologies have also developed solutions that involve segmenting the reinforcing cage and connecting it on-site. However, these solutions still have shortcomings in practical applications.

[0004] 1. During transportation and storage, the sectioned steel cage lacks an effective supporting structure and is still prone to local deformation, especially circumferential deformation.

[0005] 2. The existing segmented connection structure has low alignment efficiency and insufficient connection stability during assembly, which easily leads to misalignment of the main reinforcement bars and affects the overall consistency of the stress on the steel cage.

[0006] There are currently no effective solutions to the problems in the relevant technologies. Utility Model Content

[0007] In view of the problems in the related technologies, this utility model proposes a segmented long pile foundation steel cage to overcome the above-mentioned technical problems existing in the existing related technologies.

[0008] Therefore, the specific technical solution adopted by this utility model is as follows:

[0009] A segmented long pile foundation steel cage frame, comprising:

[0010] Several skeletons are used to form a segmented steel cage body structure; an internal support mechanism is located inside the skeleton to support the skeleton during transportation and storage; an end connection mechanism is provided between two skeletons to connect adjacent skeletons into a whole; the skeleton includes several main bars and several annular stirrups, the main bars are arranged in a ring and connected to the end connection mechanism, and the annular stirrups are used to connect the main bars and maintain the circumferential spacing of the main bars; the number of main bars is at least six.

[0011] Furthermore, to provide radial support for the frame during transportation and storage, the internal support mechanism includes a first semi-circular internal support frame located at the bottom of the frame. A first support rod is located in the middle of the first semi-circular internal support frame, and a square hole is located inside the first support rod. Cylinders are located at both ends of the top of the first semi-circular internal support frame, with adjusting bolts threaded into the cylinders. A lifting plate is located at the top of the adjusting bolts. A second semi-circular internal support frame is located above the first semi-circular internal support frame. A second support rod is located in the middle of the second semi-circular internal support frame, and a square rod is located at the bottom of the second support rod, with the bottom of the square rod located within the square hole. The bottom of the second semi-circular internal support frame is located at the top of the lifting plate. Several reinforcing rods are located inside both the first and second semi-circular internal support frames. The arc surfaces of the first and second semi-circular internal support frames contact the inner wall of the frame. At least two fixing blocks are located at both ends of the first semi-circular internal support frame, and through holes are located within the fixing blocks.

[0012] Furthermore, in order to achieve reliable connection and rapid assembly of multi-segment skeletons, the end connection mechanism includes a first connecting ring and a second connecting ring disposed between two adjacent skeletons, and the first connecting ring and the second connecting ring are connected by fasteners; the first connecting ring is provided with a plurality of positioning grooves, and the second connecting ring is provided with a positioning block on the side close to the first connecting ring and located in the positioning groove; the fasteners include bolts inserted between the first connecting ring and the second connecting ring, and the bolts and nuts cooperate to connect the first connecting ring and the second connecting ring.

[0013] The beneficial effects of this utility model are as follows:

[0014] 1. This utility model consists of several segmented skeletons, and adjacent skeletons are reliably connected into a whole by end connection mechanisms. It can be transported, stored and assembled on site in segments while meeting the stress and length requirements of long pile foundations. This effectively solves the problems of difficulty in forming whole long steel cages, inconvenience in handling and easy deformation. In the transportation and storage state, it improves the overall rigidity and structural stability of the steel cage skeleton, reduces the risk of radial deformation of the skeleton due to its own weight or external forces, and improves the assembly reliability and construction adaptability of the steel cage skeleton.

[0015] 2. By having the internal support mechanism in close contact with the inner wall of the skeleton, the radial support effect of the internal support mechanism on the skeleton is effectively improved.

[0016] 3. By setting a first connecting ring and a second connecting ring at the ends of two adjacent skeleton bodies and using fasteners to reliably connect the two, rapid assembly between the skeleton bodies is achieved; through the positioning structure, the assembly efficiency and connection reliability of the segmented long pile foundation steel cage skeleton during on-site splicing are improved, ensuring the consistency of the overall stress performance of the steel cage. Attached Figure Description

[0017] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 This is a structural schematic diagram of a segmented long pile foundation steel cage according to an embodiment of the present utility model;

[0019] Figure 2 yes Figure 1 A magnified view is available at point A in the middle;

[0020] Figure 3 yes Figure 1 A magnified view is available at point B in the middle;

[0021] Figure 4 This is a schematic diagram of the structure of the first connecting ring in a segmented long pile foundation steel cage according to an embodiment of the present utility model;

[0022] Figure 5 This is a structural schematic diagram of the internal support mechanism in a segmented long pile foundation steel cage according to an embodiment of the present utility model;

[0023] Figure 6 This is a schematic diagram of the structure of adjusting bolts and lifting plate in a segmented long pile foundation steel cage according to an embodiment of the present utility model.

[0024] In the picture:

[0025] 1. Skeleton; 101. Main reinforcement; 102. Circular stirrup; 2. Internal support mechanism; 201. First semi-circular internal support frame; 202. First support rod; 203. Square hole; 204. Cylinder; 205. Adjusting bolt; 206. Lifting plate; 207. Second semi-circular internal support frame; 208. Second support rod; 209. Square rod; 210. Reinforcing rod; 211. Fixing block; 212. Through hole; 3. End connection mechanism; 301. First connecting ring; 302. Second connecting ring; 303. Fastener; 3031. Bolt; 3032. Nut; 304. Positioning groove; 305. Positioning block. Detailed Implementation

[0026] To further illustrate the various embodiments, the present invention provides accompanying drawings, which are part of the disclosure of the present invention. These drawings are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, those skilled in the art should be able to understand other possible implementation methods and the advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are usually used to represent similar components.

[0027] According to an embodiment of the present invention, a segmented long pile foundation steel cage skeleton is provided.

[0028] The present invention will now be further described in conjunction with the accompanying drawings and specific embodiments, such as... Figures 1-6 As shown, the segmented long pile foundation steel cage frame according to an embodiment of this utility model includes: several frame bodies 1, used to form a segmented steel cage body structure; an internal support mechanism 2, located inside the frame body 1, used to support the frame body 1 during transportation and storage; an end connection mechanism 3 is provided between two frame bodies 1 to connect adjacent frame bodies 1 into a whole; the frame body 1 includes several main bars 101 and several annular stirrups 102, the main bars 101 are arranged in a ring and connected to the end connection mechanism 3, the annular stirrups 102 are used to connect the main bars 101 and maintain the circumferential spacing of the main bars 101; the number of main bars 101 is at least six; the frame body 1 is also provided with lifting points, including lifting rings, lifting lugs or connecting holes, used to cooperate with lifting equipment to realize the lifting and transportation of the frame body 1. The lifting points are set according to the length and weight specifications of the frame body 1. Frame bodies 1 with a length of less than 6m are provided with 2 lifting points, and those with a length greater than 6m are provided with 1-2 additional lifting points.

[0029] Using the above-mentioned solution, this utility model is composed of several segmented skeleton bodies 1, and adjacent skeleton bodies 1 are reliably connected into a whole by end connecting mechanisms 3. Under the premise of meeting the stress and length requirements of long pile foundations, it can be transported, stored and assembled on site in a segmented form, which effectively solves the problems of difficulty in forming a whole long steel cage, inconvenience in handling and easy deformation. By setting an internal support mechanism 2 inside the skeleton body 1, the skeleton body 1 is internally supported during transportation and storage, which improves the overall rigidity and structural stability of the steel cage skeleton, reduces the risk of radial deformation of the skeleton body 1 due to its own weight or external force, and improves the assembly reliability and construction adaptability of the steel cage skeleton.

[0030] In one embodiment, the inner support mechanism 2 includes a first semi-circular inner support frame 201 disposed at the bottom of the inner side of the frame body 1, a first support rod 202 disposed in the middle of the first semi-circular inner support frame 201, a square hole 203 disposed inside the first support rod 202, and cylinders 204 disposed at both ends of the top of the first semi-circular inner support frame 201, with adjusting bolts 205 internally threaded onto the cylinders 204, and a lifting plate 206 disposed at the top of the adjusting bolts 205. A second semicircular inner support frame 207 is provided above the first semicircular inner support frame 201. A second support rod 208 is provided in the middle of the second semicircular inner support frame 207. A square rod 209 is provided at the bottom end of the second support rod 208, and the bottom of the square rod 209 is located in the square hole 203. The bottom end of the second semicircular inner support frame 207 is located at the top end of the lifting plate 206. The number of adjusting bolts 205 and lifting plate 206 is at least two sets, which need to be set according to the overall diameter of the steel cage frame. Several reinforcing rods 210 are provided inside the first semicircular inner support frame 201 and the second semicircular inner support frame 207. The arc surfaces of the first semicircular inner support frame 201 and the second semicircular inner support frame 207 are in contact with the inner wall of the frame body 1. At least two fixing blocks 211 are provided at both ends of the first semicircular inner support frame 201, and through holes 212 are provided in the fixing blocks 211. In practical applications, a flexible connector, such as a rope, is installed inside the perforation 212, and the other end of the flexible connector is connected to the skeleton body 1. It should be noted that the flexible connector only plays a role in restraining and stabilizing the internal support mechanism 2 during the transportation and storage of the steel cage skeleton. Before construction assembly or before the overall lowering of the steel cage, the flexible connector can be released or removed as needed to avoid affecting subsequent processes.

[0031] By setting an adjustable support structure inside the skeleton body 1, consisting of a first semi-circular inner support frame 201 and a second semi-circular inner support frame 207, the height of the second semi-circular inner support frame 207 can be adjusted according to the inner diameter of the skeleton body 1. This ensures that the arc surfaces of the first and second semi-circular inner support frames 201 and 207 are always in close contact with the inner wall of the skeleton body 1, effectively improving the radial support effect of the inner support mechanism 2 on the skeleton body 1. Furthermore, by connecting the inner support mechanism 2 to the skeleton body 1 using perforations 212 and flexible connectors, the swaying and displacement of the inner support mechanism 2 can be limited during transportation and storage, improving the stability and safety of the inner support mechanism 2 in the segmented long pile foundation steel cage skeleton.

[0032] The inner support mechanism 2 is pushed into the frame 1 as a whole. Under the lifting action of the adjusting bolt 205, the lifting plate 206 pushes the second semi-circular inner support frame 207 upward, causing the square rod 209 at the bottom of the second support rod 208 to move up and down along the square hole 203 in the first support rod 202, thereby realizing the height adjustment of the second semi-circular inner support frame 207 relative to the first semi-circular inner support frame 201. Through this adjustment process, the arc surfaces of the first semi-circular inner support frame 201 and the second semi-circular inner support frame 207 are always in close contact with the inner wall of the frame 1, forming a stable radial support. When the adjusting bolt 205 is rotated in the opposite direction and the lifting plate 206 is lowered, the second semi-circular inner support frame 207 is lowered under the action of gravity, which makes it convenient for the inner support mechanism 2 to be removed from the frame 1 as a whole. The main body of the inner support mechanism 2 is made of materials with high strength and low density, such as nylon reinforced fiber materials in high-strength engineering plastics, or aluminum alloy, thus achieving a lightweight design while meeting the support strength requirements. Meanwhile, steel is used for the load-bearing parts, allowing the inner support mechanism 2 to balance rigidity and lightweight. Specifically, key force-transmitting components such as the adjusting bolt 205, the first support rod 202, the second support rod 208, and the lifting plate 206 are all made of steel, which bears the axial lifting and locking functions. Non-steel materials mainly function in shape maintenance and surface contact force transmission, thereby achieving weight reduction while ensuring overall rigidity and stability.

[0033] In practical use, such as Figure 6 As shown, the lifting plate 206 is connected to the adjusting bolt 205 and is located at the bottom of the second semi-circular inner support frame 207. When the adjusting bolt 205 rotates in the opposite direction and descends, the lifting plate 206 descends accordingly. At this time, the second semi-circular inner support frame 207 is no longer supported and will automatically descend under the action of gravity, thereby reducing the relative height between the second semi-circular inner support frame 207 and the first semi-circular inner support frame 201. This releases the radial support of the inner support mechanism 2 on the skeleton body 1, making it easier to remove the inner support mechanism 2 as a whole.

[0034] In one embodiment, the end connection mechanism 3 includes a first connecting ring 301 and a second connecting ring 302 disposed between two adjacent skeleton bodies 1. The first connecting ring 301 and the second connecting ring 302 are connected by fasteners 303. The first connecting ring 301 has several positioning grooves 304, and the second connecting ring 302 has a positioning block 305 disposed on the side near the first connecting ring 301 and within the positioning grooves 304. The fasteners 303 include bolts 3031 inserted between the first connecting ring 301 and the second connecting ring 302. The bolts 3031 and nuts 3032 cooperate to connect the first connecting ring 301 and the second connecting ring 302. The end of the main rib 101 is welded and fixed to the first connecting ring 301 or the second connecting ring 302, with a weld length not less than 10 times the diameter of the main rib. After welding, during storage and transportation, it can be placed on a support plate adapted to the skeleton body 1 and the first connecting ring 301 or the skeleton body 1 and the second connecting ring 302 to maintain stability.

[0035] By setting a first connecting ring 301 and a second connecting ring 302 at the ends of two adjacent skeleton bodies 1, and reliably connecting them with fasteners 303, rapid assembly of the skeleton bodies 1 is achieved. Specifically, by setting a positioning groove 304 in the first connecting ring 301 and a positioning block 305 on the second connecting ring 302 that mates with the positioning groove 304, rapid alignment of adjacent skeleton bodies 1 can be automatically achieved during the connection process. This improves the assembly efficiency and connection reliability of the segmented long pile foundation steel cage skeleton during on-site splicing, ensuring the consistency of the overall stress performance of the steel cage.

[0036] During assembly, the second connecting ring 302 is brought close to the first connecting ring 301, and the positioning block 305 on the second connecting ring 302 is inserted into the corresponding positioning groove 304 in the first connecting ring 301 to complete the initial alignment and limiting between adjacent skeleton bodies 1; then the bolt 3031 is passed through the first connecting ring 301 and the second connecting ring 302 in sequence and tightened with the nut 3032, forming a reliable mechanical connection through the fastener 303, so that the adjacent skeleton bodies 1 remain stable and consistent in both the axial and circumferential directions.

[0037] To facilitate understanding of the above-mentioned technical solutions of this utility model, the working principle or operation method of this utility model in actual process will be described in detail below.

[0038] Based on the design length of the long pile foundation, the steel cage skeleton is divided into several skeleton bodies 1 and processed and formed separately. Each skeleton body 1 consists of several main bars 101 and several ring stirrups 102. The main bars 101 are arranged in a ring along the circumference and are connected and fixed by the ring stirrups 102 to form a stable segmented steel cage unit structure.

[0039] After the skeleton body 1 is formed, if the steel cage skeleton is in storage, the inner support mechanism 2 is installed inside the skeleton body 1 so that the support structure of the inner support mechanism 2 is in contact with the inner wall of the skeleton body 1, so as to provide internal support for the skeleton body 1 during transportation and storage.

[0040] If the steel cage is under construction, i.e. at the construction site, the adjacent cage bodies 1 are connected sequentially to form an integral steel cage through the end connection mechanism 3, thereby forming a segmented long pile foundation steel cage that meets the requirements of long pile foundation length and stress, realizing the complete workflow of steel cage from segmented transportation and storage to overall assembly.

[0041] In summary, this utility model consists of several segmented skeleton bodies 1, which are reliably connected into a whole by end connecting mechanisms 3. This allows for segmented transportation, storage, and on-site assembly while meeting the stress and length requirements of long pile foundations. This effectively solves the problems of difficulty in forming a single long steel cage, inconvenient handling, and susceptibility to deformation. During transportation and storage, it improves the overall rigidity and structural stability of the steel cage skeleton, reduces the risk of radial deformation of the skeleton body 1 due to its own weight or external forces, and enhances the assembly reliability and construction adaptability of the steel cage skeleton. The close contact between the inner support mechanism 2 and the inner wall of the skeleton body 1 effectively improves the radial support effect of the inner support mechanism 2 on the skeleton body 1. By setting a first connecting ring 301 and a second connecting ring 302 at the ends of two adjacent skeleton bodies 1 and reliably connecting them with fasteners 303, rapid assembly between the skeleton bodies 1 is achieved. The positioning structure improves the assembly efficiency and connection reliability of the segmented long pile foundation steel cage skeleton during on-site splicing, ensuring the consistency of the overall stress performance of the steel cage.

[0042] In this utility model, unless otherwise explicitly specified and limited, the terms "installation", "setting", "connection", "fixing", "screw connection", etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal connection of two components or the interaction between two components. Unless otherwise explicitly limited, those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0043] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A segmented long pile foundation steel cage frame, characterized in that, include: Several skeleton bodies (1) are used to form a segmented steel cage body structure; An internal support mechanism (2) is located inside the skeleton (1) and is used to support the skeleton (1) during transportation and storage. An end connection mechanism (3) is provided between the two skeleton bodies (1) to connect the adjacent skeleton bodies (1) into one unit; The skeleton (1) includes a number of main bars (101) and a number of annular stirrups (102). The main bars (101) are arranged in annular shape and connected to the end connection mechanism (3). The annular stirrups (102) are used to connect the main bars (101) and maintain the circumferential spacing of the main bars (101).

2. The segmented long pile foundation steel cage according to claim 1, characterized in that, The number of main reinforcing bars (101) is at least six.

3. The segmented long pile foundation steel cage according to claim 1, characterized in that, The inner support mechanism (2) includes a first semi-circular inner support frame (201) disposed at the bottom of the inner part of the skeleton body (1). A first support rod (202) is disposed in the middle of the first semi-circular inner support frame (201). A square hole (203) is disposed inside the first support rod (202). A cylinder (204) is disposed at both ends of the top of the first semi-circular inner support frame (201). An adjusting bolt (205) is threaded into the cylinder (204). A lifting plate (206) is disposed at the top of the adjusting bolt (205). A second semicircular inner support frame (207) is provided above the first semicircular inner support frame (201). A second support rod (208) is provided in the middle of the second semicircular inner support frame (207). A square rod (209) is provided at the bottom end of the second support rod (208), and the bottom of the square rod (209) is located in the square hole (203). The bottom end of the second semicircular inner support frame (207) is located at the top end of the lifting plate (206).

4. The segmented long pile foundation steel cage according to claim 3, characterized in that, Both the first semi-circular inner support frame (201) and the second semi-circular inner support frame (207) are provided with several reinforcing rods (210).

5. A segmented long pile foundation steel cage according to claim 3, characterized in that, The arc surfaces of the first semi-circular inner support (201) and the second semi-circular inner support (207) are in contact with the inner wall of the skeleton (1).

6. A segmented long pile foundation steel cage according to claim 3, characterized in that, At least two fixing blocks (211) are provided at both ends of the first semi-circular inner support frame (201), and the fixing blocks (211) are provided with through holes (212).

7. A segmented long pile foundation steel cage according to claim 1, characterized in that, The end connection mechanism (3) includes a first connecting ring (301) and a second connecting ring (302) disposed between two adjacent skeleton bodies (1), and the first connecting ring (301) and the second connecting ring (302) are connected by fasteners (303); The first connecting ring (301) is provided with a plurality of positioning grooves (304), and the second connecting ring (302) is located on the side close to the first connecting ring (301) and is provided with a positioning block (305) in the positioning grooves (304).

8. A segmented long pile foundation steel cage according to claim 7, characterized in that, The fastener (303) includes a bolt (3031) that is inserted between the first connecting ring (301) and the second connecting ring (302), and the bolt (3031) cooperates with a nut (3032) to connect the first connecting ring (301) and the second connecting ring (302).