A device for positioning the exposed end of a slope anchor rod flush
By setting positioning bars and clamps in the slope body and forming a linear positioning benchmark with the positioning line, the problem of uneven height of the exposed ends of the anchor rods was solved, and uniform control of the exposed ends of the anchor rods was achieved, improving construction quality and safety.
Patent Information
- Application Number
- CN202522778830.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-29
AI Technical Summary
In the support engineering of rock or soil-rock composite slopes, it is difficult to unify the height of the exposed end of the anchor bolt, resulting in poor installation quality of components such as anchor plates and waist beams, which affects the stress performance and safety of the support structure.
A combination structure of positioning bars, clamps, and positioning lines is adopted. Positioning bars are embedded in the slope and movable clamps are fitted on their outer sides. Positioning lines are used to form a linear positioning benchmark at the same elevation, so as to achieve unified calibration and control of the exposed ends of multiple anchor rods.
It improves the flatness and consistency of the exposed ends of the anchor bolts, simplifies the construction process, reduces material waste and construction costs, and improves the stress uniformity and safety of the support structure.
Smart Images

Figure CN224997567U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of auxiliary devices for slope support construction, and in particular to a device for aligning and positioning the exposed end of a slope anchor bolt. Background Technology
[0002] In the support engineering of rock slopes or soil-rock composite slopes, anchor bolts or anchor cables are commonly used reinforcement components. They are usually arranged in rows or columns according to the design elevation. The uniformity of their exposed end heights directly affects the installation quality of subsequent anchor plates, tie beams, and other components, as well as the overall load-bearing performance of the support structure. In actual construction, due to the complex and irregular shape of the slope surface, coupled with the limited accuracy of the initial slope trimming, errors in hole positioning, and the influence of rock joints, fissures, or alternating layers of soft and hard rock during drilling, the angle and depth of anchor bolt drilling are often difficult to be completely consistent. At the same time, during the anchor bolt installation and grouting stages, the bolt body is prone to axial displacement due to factors such as insufficient support stability or grout impact disturbance. This results in uneven exposed end heights of anchor bolts in the same row or within the same elevation range, making it difficult to form a uniform plane.
[0003] Current construction techniques typically control the position and exposed length of anchor bolts using methods such as manual measurement, spray marking, or setting temporary baselines. However, these methods rely heavily on the experience of construction workers and lack a stable, adjustable physical positioning structure as a height reference. When slope surfaces are uneven, relying solely on the slope surface or spray markings makes it difficult to accurately and uniformly control the height of the exposed anchor bolt ends. This can easily lead to accumulated local deviations, affecting not only the fit and uniformity of subsequent support components but also potentially causing localized stress concentrations during long-term service, reducing the overall safety and durability of the slope support structure. Therefore, there is an urgent need for a positioning device that is simple in structure, highly adjustable, and capable of uniformly controlling the height of the exposed ends of multiple anchor bolts under complex slope conditions, in order to improve the construction quality of slope anchor bolts and the reliability of the support project. Utility Model Content
[0004] In view of the above-mentioned defects of the existing technical solutions, the main purpose of this utility model is to develop a slope anchor bolt exposed end leveling positioning device, which achieves uniform calibration and reliable positioning of the height of multiple anchor bolt exposed ends by setting positioning bars, clamps, locking components and positioning lines.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: A slope anchor bolt exposed end flush positioning device, comprising: Positioning bars are installed in the slope body, with one end fixed inside the slope body and the other end exposed outside the slope surface; A clamp is fitted on the outside of the positioning rib, and the clamp can move along the axial direction of the positioning rib. The clamp is provided with a wire hole. A locking component, disposed on the clamp, is used to fix the clamp to the positioning rib after the clamp has moved to the target height position; The positioning line is threaded through the thread hole; Among them, the clamps on multiple positioning bars form a linear positioning reference at the same elevation through the positioning line, so that the exposed end length of multiple anchor rods located within the elevation range is calibrated based on the positioning line, thereby achieving the alignment control of the exposed ends of multiple anchor rods.
[0006] Preferably, the locking component is a locking bolt, and a bolt hole is provided on one side of the clamp. The locking bolt passes through the bolt hole and fixes the position of the clamp after being tightened.
[0007] Preferably, the positioning line is a flexible linear component.
[0008] Preferably, the flexible linear component is a steel wire rope or a fishing line.
[0009] Preferably, the positioning reinforcement is a steel bar or a metal rod, and its embedment depth and exposed length are set according to the slope conditions.
[0010] Preferably, the hole depth of the positioning rib is 0.5m, and the exposed length is 0.5-1m.
[0011] Preferably, the reinforcing bar is a 16mm plain round reinforcing bar.
[0012] Preferably, the anchor rod is made of threaded steel bars, fiber reinforcement, or steel strand.
[0013] Preferably, the exposed ends of multiple anchor rods located within the same positioning line elevation range extend beyond the positioning line by the same length.
[0014] Preferably, multiple positioning lines are provided along the height direction of the slope.
[0015] Compared with the prior art, the beneficial effects of this utility model are as follows: This invention breaks through the traditional extensive construction method that relies on rock surface spraying or manual measurement to create a linear positioning benchmark at the same elevation. It achieves precise control of the exposed height of the anchor bolts from a structural perspective, solving the common construction problems of uneven and misaligned exposed anchor bolt ends. The positioning ribs are installed in the slope body, and their embedding depth and exposed length effectively adapt to the uneven slope surface, ensuring structural stability while providing sufficient margin for height adjustment. The clamps are fixed by locking components. Once the target height is reached, the positioning line can be stably confined within a uniform plane. This allows multiple anchor bolts to be cut and installed using the positioning line as a reference for the height of their exposed ends, avoiding the cumulative deviations caused by traditional methods that rely on experience to estimate the exposed length. Furthermore, this device is tightly integrated with existing processes such as drilling, anchor bolt installation, and grouting, without interfering with each other. It significantly improves the flatness and consistency of the exposed ends of the anchor bolts without significantly increasing construction complexity. This is beneficial for the accurate installation and uniform stress distribution of subsequent support components such as anchor plates and girders, thereby reducing rework and material waste, lowering construction costs, and effectively reducing the time spent working at height and the safety risks caused by local stress concentration in the support structure. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 This is a top view of the slope anchor bolt exposed end flush positioning device of this utility model installed on the slope. Figure 2 This is a front view of the positioning rib and clamp of this utility model. Figure 3 This is a top view of the positioning rib and clamp of this utility model.
[0018] Explanation of reference numerals in the attached diagram: 1-positioning rib; 2-clamp; 21-threading hole; 22-bolt hole; 3-locking assembly; 4-positioning line; 5-anchor rod. Detailed Implementation
[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model belong to the present utility model.
[0020] Furthermore, the described features, structures, or characteristics can be combined in any suitable manner in one or more embodiments. Numerous specific details are provided in the following description to give a thorough understanding of embodiments of this application. However, those skilled in the art will recognize that the technical solutions of this application can be practiced without one or more of the specific details, or other methods, components, apparatuses, steps, etc., can be employed. In other instances, well-known methods, apparatuses, implementations, or operations are not shown or described in detail to avoid obscuring various aspects of this application.
[0021] Please see Figure 1-3 This embodiment discloses a slope anchor bolt exposed end flush positioning device, including: Positioning bar 1 is installed in the slope body, with one end fixed inside the slope body and the other end exposed outside the slope surface. Positioning bar 1 is embedded in the slope body as a reference component for height positioning. Its exposed part is used to provide a visible and stable spatial reference point, which can adapt to the uneven construction conditions of the slope surface and provide a reliable reference for subsequent height control of the exposed end.
[0022] The clamp 2 is sleeved on the outside of the positioning bar 1. The clamp 2 can move along the axial direction of the positioning bar 1. The clamp 2 is provided with a wire hole 21. The clamp 2 cooperates with the positioning bar 1 by sleeve. In the unlocked state, the position can be adjusted up and down along the positioning bar 1, so as to flexibly adjust the height according to the actual shape of the slope.
[0023] The locking component 3 is mounted on the clamp 2 and is used to fix the clamp 2 to the positioning rib 1 after it has moved to the target height position.
[0024] Positioning line 4 is inserted into the thread hole 21. Positioning line 4 is a flexible linear component with a certain tensile strength. It is continuously arranged between multiple clamps 2 on adjacent positioning ribs 1 to form a linear positioning reference at the same elevation.
[0025] Among them, the clamps 2 on multiple positioning bars 1 form a linear positioning reference at the same elevation through the positioning line 4, so that the exposed end length of multiple anchor rods 5 within the same elevation range is calibrated based on the positioning line 4, thereby achieving the alignment control of the exposed ends of multiple anchor rods 5. During the installation and cutting of anchor rods 5, the exposed ends of multiple anchor rods 5 within the same elevation range of the positioning line 4 extend beyond the positioning line 4 by the same length. Through the unified linear height reference, multiple anchor rods 5 form a neat and consistent exposed end plane after installation, effectively avoiding the problem of uneven exposed end height caused by slope undulation or construction errors, which facilitates the subsequent installation of anchor plates or waist beams.
[0026] Please see Figure 2-3 In some embodiments, the locking component 3 is a locking bolt. A bolt hole 22 is provided on one side of the clamp 2, and the locking bolt passes through the bolt hole 22. After the locking bolt is tightened, it fixes the position of the clamp 2. The locking bolt clamps the positioning rib 1 by engaging with the thread of the bolt hole 22 during the tightening process, thereby making the clamp 2 stably fixed at the target height position, avoiding axial slippage during the subsequent installation of the anchor rod 5 and construction disturbance, and ensuring the stability of the linear positioning reference.
[0027] Furthermore, the flexible linear component is a steel wire rope or a fishing line. Steel wire rope has high tensile strength and durability, making it suitable for long-term or high-intensity construction scenarios. Fishing line is lightweight and flexible in deployment, making it suitable for temporary positioning or short-cycle construction needs.
[0028] The positioning reinforcement 1 is a steel bar or metal rod. Its embedment depth and exposed length are set according to the slope conditions. By reasonably controlling the embedment length of the positioning reinforcement 1, its stability in the slope is ensured. At the same time, the exposed length provides sufficient stroke for the height adjustment of the clamp 2, thereby adapting to slope conditions with different undulations. Specifically, the hole depth of the positioning reinforcement 1 is 0.5m, and the exposed length is 0.5-1m. Within this size range, the positioning reinforcement 1 can maintain good stability in common rock or soil-rock composite slopes, while meeting the positioning requirements of multiple elevations. In some embodiments, the steel bar is a plain round steel bar with a diameter of 16mm. This specification of steel bar has moderate strength, is convenient to construct, easy to drill and embed, and easy to adjust on site, which can meet the structural strength and durability requirements of the positioning reinforcement 1 during construction.
[0029] In this embodiment, the anchor rod 5 is made of threaded steel bars, fiber reinforcement, or steel strand. Different types of rods can be selected according to the slope support design requirements, and all can work with the positioning line 4 to achieve uniform control of the exposed end height. Multiple positioning lines 4 are set along the slope height direction, and positioning lines 4 at different height positions correspond to anchor rods 5 within different elevation ranges, thereby achieving layered and zoned alignment control of the exposed ends of multiple rows of anchor rods 5 along the slope height direction.
[0030] In this embodiment, the construction process of the slope anchor bolt exposed end leveling positioning device follows the conventional anchor bolt support process. Without changing the existing drilling, installation, and grouting operations, a linear height positioning benchmark composed of positioning reinforcement 1, clamp 2, and positioning line 4 is introduced to achieve uniform control of the exposed end height of the anchor bolt 5. During construction, positioning reinforcement 1 is first set in the slope body. Positioning reinforcement 1 is set at the lateral position of the designed hole position of the anchor bolt 5. Positioning reinforcement 1 is buried in the slope body by drilling. Positioning reinforcement 1 is made of steel bars or metal rods. The burial depth and exposed length are adjusted according to the unevenness of the slope. In this embodiment, the hole depth of positioning reinforcement 1 is 0.5m, and the exposed length is 0.5-1m to ensure its stability and provide sufficient stroke for height adjustment. This step is independent of the conventional anchor bolt drilling process and does not affect the normal construction of the subsequent anchor bolt 5.
[0031] After the positioning rib 1 is installed, a clamp 2 is fitted onto the outside of the positioning rib 1, and the clamp 2 is made adjustable by the locking component 3. The clamp 2 is moved axially along the positioning rib 1 to the target height position according to the actual shape of the slope, and then the clamp 2 is fixed to the positioning rib 1 by the locking component 3. The clamps 2 on multiple positioning ribs 1 are connected by positioning lines 4 passing through the wire holes 21, so that the positioning lines 4 form a linear positioning reference at the same elevation in space. This step is the key difference between this embodiment and the prior art; by establishing a unified height reference through a physical structure, the uncertainty of height control relying on slope markings or manual measurement is avoided. After the positioning lines 4 are laid out, they can be directly used as the height reference for the exposed end of the anchor rod 5, and the length of the exposed end of the anchor rod 5 can be determined without repeated measurements.
[0032] After setting the height benchmark, drilling for anchor bolts 5 is carried out in the slope body according to the design requirements. During drilling, care should be taken to avoid the location of the positioning reinforcement 1 to prevent disturbance. Anchor bolts 5 are cut and installed according to the exposed end length and drilling depth determined by the positioning line 4. The anchor bolt body can be made of threaded steel bars, fiber reinforcement, or steel strand. After the anchor bolts 5 are installed, grouting is carried out. Grouting adopts the bottom return grouting method. The grouting pipe is inserted into the bottom of the hole, and grout is slowly injected until the grout overflows from the hole and no air bubbles are discharged. If grout leakage occurs at the hole, it should be sealed and grout replenished in time. For high slopes or soft rock conditions, a second high-pressure grouting can be carried out after the initial grouting has set to enhance the bonding performance of the anchoring section. The above grouting steps are consistent with the conventional anchor bolt construction method.
[0033] After the grout reaches the design strength, the anchor plates are installed and tensioned. The anchor plates must fit snugly against the slope. If the slope is uneven, mortar can be used for leveling. The anchors are then tensioned step-by-step using jacks to reach the design tension value, and the anchor heads are locked after stabilization. Finally, the anchors are sealed by setting up templates around the anchor plates and pouring cement mortar or fine aggregate concrete to seal the anchors, forming an integral protective structure in the anchor head area. Through the above construction process, using the linear positioning reference formed by the positioning bars 1, clamps 2, and positioning lines 4, the height of the exposed ends of multiple anchor rods 5 is uniformly controlled without increasing the construction complexity, significantly improving the construction quality of slope anchor support.
[0034] In practical engineering applications, this utility model utilizes an exposed end height control structure comprised of positioning ribs 1, clamps 2, and positioning lines 4. This allows for the unified calibration of the exposed end height of anchor bolts 5 during the installation phase, effectively reducing secondary adjustments and rework caused by uneven exposed ends. Compared to traditional construction methods relying on slope marking and manual measurement, this structure ensures construction accuracy while reducing material waste and labor input, improving construction efficiency, and shortening the overall construction cycle. Furthermore, because the exposed end height of anchor bolts 5 is consistent, the fit of subsequent anchor plates and waist beams is significantly improved, resulting in more uniform stress distribution on the support structure and helping to reduce the risks associated with localized stress concentration. In addition, this utility model reduces repetitive high-altitude operations and secondary drilling and cutting processes, positively impacting operational risks and construction disturbances during construction. It also reduces waste materials and dust generation to some extent, demonstrating excellent engineering applicability and comprehensive application value.
[0035] In summary, this utility model achieves comprehensive effects of improving quality, reducing costs, and increasing efficiency through local structural optimization without changing the basic force-bearing principle of anchor bolt support. It is suitable for rock slopes and soil-rock composite slopes with different degrees of unevenness and can be widely used in slope anchor bolt support scenarios in highways, railways, mines, and construction projects. It is especially suitable for high and steep slopes and large-scale slope projects with high requirements for construction quality and schedule.
[0036] The above embodiments are only used to illustrate the technical solutions of this utility model, and are not intended to limit it. Under the concept of this utility model, the technical features of the above embodiments or different embodiments can also be combined, the steps can be implemented in any order, and there are many other variations of different aspects of this utility model as described above. For the sake of brevity, they are not provided in detail. Although this utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. These modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this utility model.
Claims
1. A slope anchor bolt exposed end flush positioning device, characterized in that, include: Positioning reinforcement (1) is set in the slope body, with one end fixed in the slope body and the other end exposed outside the slope surface; A clamp (2) is fitted on the outside of the positioning rib (1). The clamp (2) can move along the axial direction of the positioning rib (1). A wire hole (21) is provided on the clamp (2). A locking component (3) is provided on the clamp (2) and is used to fix the clamp (2) to the positioning rib (1) after the clamp (2) moves to the target height position; The positioning line (4) is threaded through the thread hole (21); Among them, the clamps (2) on multiple positioning bars (1) form a linear positioning reference at the same elevation through the positioning line (4), so that the exposed end length of multiple anchor rods (5) located within the elevation range is calibrated based on the positioning line (4), thereby realizing the flush control of the exposed ends of multiple anchor rods (5).
2. The slope anchor bolt exposed end flush positioning device according to claim 1, characterized in that, The locking component (3) is a locking bolt. A bolt hole (22) is provided on one side of the clamp (2). The locking bolt passes through the bolt hole (22) and fixes the position of the clamp (2) after tightening.
3. The slope anchor bolt exposed end flush positioning device according to claim 2, characterized in that, The positioning line (4) is a flexible linear component.
4. The slope anchor bolt exposed end flush positioning device according to claim 3, characterized in that, The flexible linear component is a steel wire rope or a fishing line.
5. The slope anchor bolt exposed end flush positioning device according to claim 1, characterized in that, The positioning bar (1) is a steel bar or metal rod, and its embedment depth and exposed length are set according to the slope conditions.
6. The slope anchor bolt exposed end flush positioning device according to claim 5, characterized in that, The hole depth of the positioning rib (1) is 0.5m, and the exposed depth is 0.5-1m.
7. The slope anchor bolt exposed end flush positioning device according to claim 5, characterized in that, The reinforcing bars are 16mm plain round steel bars.
8. The slope anchor bolt exposed end flush positioning device according to any one of claims 1-7, characterized in that, The anchor rod (5) is made of threaded steel bars, fiber reinforcement or steel strand.
9. The slope anchor bolt exposed end flush positioning device according to claim 8, characterized in that, The exposed ends of multiple anchor rods (5) located within the same elevation range of the positioning line (4) extend beyond the positioning line (4) by the same length.
10. The slope anchor bolt exposed end flush positioning device according to claim 9, characterized in that, The positioning lines (4) are set in multiple directions along the height of the slope.