Construction device for steel pipe composite pile foundation of cross-sea bridge
By using a combination of steel frame and positioning guide wheel in the construction of steel pipe piles for cross-sea bridges, the problem of insufficient accuracy in driving and connecting steel pipe piles was solved, achieving efficient and safe construction results.
Patent Information
- Application Number
- CN202521905098.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-04
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-09-04
AI Technical Summary
Existing technologies for driving and extending steel pipe piles for cross-sea bridges suffer from insufficient precision, low construction efficiency, and high safety risks.
The system employs a pile foundation positioning device and a steel pipe pile extension device, including a steel frame, positioning guide wheels, and V-shaped rubber rings. The positioning guide wheels precisely adjust the clamping force between the nylon wheel and the outer wall of the steel pipe pile, ensuring the verticality and sealing of the steel pipe pile and reducing friction and water ingress risks during construction.
It improved the accuracy of steel pipe pile driving and splicing, reduced construction difficulty and safety risks, and improved construction efficiency and quality.
Smart Images

Figure CN224997574U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology in complex sea areas, and in particular to a construction device for steel pipe composite pile foundation of cross-sea bridge. Background Technology
[0002] Steel-pipe composite pile foundation cross-sea bridges are crucial infrastructure for national economic and social development, and a comprehensive embodiment of the concentrated application and innovation of new technologies in the transportation industry. Due to the influence of natural factors such as wind, waves, and currents in the marine environment, bridge construction conditions are becoming increasingly complex, and technical requirements are becoming increasingly stringent. The successful development of cross-sea bridge construction technology will build a high-end platform for the development of bridge and civil engineering technologies in my country. Cross-sea bridges are often characterized by long routes and massive engineering projects. If conventional construction methods are used, a large number of personnel, temporary facilities, and ship and machinery equipment will be deployed to the offshore construction site, and the time spent on the water will be long. Furthermore, the bridges are far from the coastline, and the construction environment is affected by typhoons and waves, posing significant safety risks.
[0003] To improve the accuracy of steel pipe pile driving and splicing, reduce the tediousness of manual operation, and improve construction quality and efficiency, there is an urgent need for a highly efficient and accurate driving, positioning, and splicing device. Utility Model Content
[0004] The purpose of this application is to provide a construction device for steel pipe composite pile foundations for cross-sea bridges, addressing the existing problems in the accuracy of steel pipe pile driving and splicing.
[0005] The technical solution adopted to achieve the purpose of this application is:
[0006] A construction device for steel pipe composite pile foundation of cross-sea bridge includes a pile foundation positioning device and a steel pipe pile extension device.
[0007] The pile foundation positioning device includes a steel frame and multiple positioning guide wheels. The steel frame includes four steel sections, with the ends of adjacent steel sections connected perpendicularly to each other. Each steel section is fixedly equipped with a positioning guide wheel.
[0008] The positioning guide wheel includes a nylon wheel and a pushing mechanism. The nylon wheel is fixedly installed at the front end of the pushing mechanism. The pushing mechanism includes a mounting cylinder, a lead screw, a push block, and a pair of opposing thrust bearings. The nylon wheel is installed at the front end of the push block. A left end seat and a right end seat are installed at both ends of the mounting cylinder. A channel is provided along the axis at the center of the left end seat, and the channel of the left end seat forms a through channel for the push block. The lead screw is threadedly connected to the push block. A channel is also provided along the axis at the center of the right end seat. A first fixed cover plate is fixed to one end of the channel of the right end seat by bolts, and a second fixed cover plate is fixed to the other end of the right end seat by bolts. Both the first and second fixed cover plates have through holes, and the lead screw passes through the through holes of the first and second fixed cover plates. An expansion diameter is provided on the lead screw. A second thrust bearing is installed between the first fixed cover plate and the expansion diameter, and a first thrust bearing is installed between the second fixed cover plate and the expansion diameter. A crank handle is provided at the tail end of the lead screw.
[0009] The steel pipe pile extension device includes a replacement section of steel pipe pile and a rubber ring, with the rubber ring positioned at the joint between the replacement section of steel pipe pile and the solid steel pipe pile.
[0010] In the above technical solution, the positioning guide wheel is fixedly installed at the middle position on the top of the steel profile.
[0011] In the above technical solution, the nylon wheel is fixedly installed at the front end of the jacking mechanism by a mounting bracket.
[0012] In the above technical solution, the nylon wheel includes a wheel core, the wheel core is wrapped with nylon, and a heavy-duty rolling bearing is installed inside the wheel core of the nylon wheel.
[0013] In the above technical solution, the left end seat and the right end seat are fixedly connected by multiple connecting rods. Multiple mounting holes are symmetrically arranged on the left end seat and the right end seat. The two ends of the connecting rods are inserted into the mounting holes and fixed by nuts.
[0014] In the above technical solution, the bottoms of the left end seat and the right end seat are respectively welded to the mounting plate, and the bottom of the mounting plate is welded to the structural steel.
[0015] In the above technical solution, the rubber ring is a V-shaped rubber ring, and its cross-section is "V" shaped.
[0016] In the above technical solution, the replacement steel pipe pile includes a replacement steel pipe pile and a socket guide plate, and the socket guide plate is installed on the inner wall of the replacement steel pipe pile through a pad.
[0017] In the above technical solution, the pad plate and the inner side of the replacement steel pipe pile are connected in an arc shape, and the connection position is fully welded; the socket guide plate and the inner side of the pad plate are connected in an arc shape, and the connection position is fully welded.
[0018] In the above technical solution, the replacement steel pipe pile is provided with four lifting lugs, which are symmetrically arranged in pairs at both ends of the outer wall of the replacement steel pipe pile. The main hook of the hoisting equipment is connected to two lifting lugs at one end of the outer wall of the replacement steel pipe pile through a hoisting rope assembly, and the auxiliary hook of the hoisting equipment is connected to two lifting lugs at the other end of the outer wall of the replacement steel pipe pile through a hoisting rope assembly.
[0019] The beneficial effects of this utility model are as follows:
[0020] 1. The construction device for cross-sea bridge steel pipe composite pile foundation of this utility model has a positioning guide wheel welded on each steel section of the steel frame. Multiple positioning guide wheels can adapt to steel pipe piles of different diameters. By adjusting the distance between the nylon wheel and the outer wall of the steel pipe pile, the clamping force of the nylon wheel on the outer wall of the steel pipe pile can be precisely adjusted to ensure that the steel pipe pile can be effectively constrained without getting stuck.
[0021] 2. The connection between the replacement steel pipe pile and the solid steel pipe pile of this utility model is sealed by a V-shaped rubber ring, which can ensure good verticality of the steel pipe pile connection, avoid water entering the steel pipe during the driving process, reduce the large amount of welding caused by welding connection and the impact of moisture, and greatly improve the on-site construction efficiency and construction quality.
[0022] 3. The dimensions of the steel frame of this utility model take into account the space for installing the positioning nylon wheel, while also leaving sufficient operating space for the vibratory hammer and impact hammer to facilitate the insertion and adjustment of the steel pipe pile. Attached Figure Description
[0023] To more clearly illustrate the technical solutions in this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0024] Figure 1 This is a top view of the cross-sea bridge steel pipe composite pile foundation construction device described in this utility model.
[0025] Figure 2 This is a schematic diagram of the positioning guide wheel structure described in this utility model.
[0026] Figure 3 This is a schematic cross-sectional view of the positioning guide wheel described in this utility model.
[0027] Figure 4 This is a cross-sectional view of the connection between the replacement steel pipe pile and the actual steel pipe pile described in this utility model.
[0028] In the diagram: 1-Pile foundation positioning device, 101-Steel frame, 111-Steel section, 102-Positioning guide wheel, 121-Nylon wheel, 122-Mounting bracket, 123-Pushing mechanism, 1231-Mounting cylinder, 1232-Screw screw, 1233-Push block, 1234-Thrust bearing, 1235-Left end seat, 1236-Right end seat, 1237-External thread, 1238-Groove, 1239-Limiting position Plate, 1240-First fixed cover plate, 1241-Second fixed cover plate, 1242-Expanded diameter, 1243-Handle, 1244-Connecting rod, 1245-Mounting plate, 1246-First thrust bearing, 1247-Second thrust bearing, 2-Steel pipe pile extension device, 201-Replacement steel pipe pile, 211-Replacement steel pipe pile, 212-Padded plate, 213-Socket guide plate, 3-Solid steel pipe pile. Detailed Implementation
[0029] To enable those skilled in the art to better understand the present invention, the technical solution of the present invention will be further described below with reference to specific embodiments.
[0030] A construction device for steel pipe composite pile foundations of cross-sea bridges, see [link / reference]. Figure 1 It includes: a pile foundation positioning device 1 and a steel pipe pile extension device 2, wherein:
[0031] The pile foundation positioning device 1 includes a steel frame 101 and multiple positioning guide wheels 102 (in this embodiment, the number of positioning guide wheels 102 is 4). The steel frame 101 includes four steel sections 111, with the ends of adjacent steel sections 111 connected perpendicularly to each other. The steel sections 111 are connected by full welding. Each steel section 111 is fixedly installed with a positioning guide wheel 102. The positioning guide wheel 102 is fixedly installed at the middle position of the top of the steel section 111 to limit the swaying and possible jumping of the steel pipe pile in the vertical direction and to help control the verticality. Each section steel 111 is a double-section H400 steel, and the double-section H400 steel is joined by intermittent welding with a weld length of 5cm and skip welding every 20cm. The length of each section steel 111 is 3.0-3.2m, preferably 3.1m. The four sections steel 111 are connected end to end to form a 2.7m×2.7m space for the driving of steel pipe piles and the passage of impact hammers (YC12 type impact hammers). The steel frame 101 has reserved positions to ensure that the steel pipe piles and driving devices can pass through, and at the same time, it can also serve as a support and force transmission function for the positioning guide wheel 102.
[0032] The specific structure of the positioning guide wheel 102 is described in detail below.
[0033] See Figure 2 , Figure 3 Each positioning guide wheel 102 includes a nylon wheel 121 and a jacking mechanism 123. The nylon wheel 121 is fixedly mounted on the front end of the jacking mechanism 123 via a mounting bracket 122. The distance between the nylon wheel 121 and the outer wall of the steel pipe pile is adjusted by the jacking mechanism 123. The nylon wheel 121 includes a wheel core, the outside of which is wrapped with nylon to prevent damage to the coating of the steel pipe pile. The wheel core is made of high-strength, wear-resistant 42CrMo alloy steel, and the length of the nylon is 5-8 cm. The length of the jacking mechanism 123 is 48-52 cm, preferably 50 cm.
[0034] Furthermore, the nylon wheel 121 is equipped with a heavy-duty rolling bearing inside its wheel core to ensure that the nylon wheel 121 rotates flexibly and reduces frictional resistance when the steel pipe pile is driven by a vibratory hammer.
[0035] The pushing mechanism 123 includes a mounting cylinder 1231, a lead screw 1232, a push block 1233, and a pair of opposing thrust bearings 1234 (the thrust bearings 1234 include a first thrust bearing 1246 and a second thrust bearing 1247). The nylon wheel 121 is fixedly mounted on the front end of the push block 1233 via a mounting bracket 122. A left end seat 1235 and a right end seat 1236 are mounted on both ends of the mounting cylinder 1231. A channel is provided along the axis at the center of the left end seat 1235, and the channel of the left end seat 1235 constitutes the through channel of the push block 1233. The lead screw 1232 has an external thread 1237 at its front end, and the push block 1233 has an internal thread. The lead screw 1232 and the push block 1233 are threadedly connected. The outer wall of the push block 1233 has a groove 1238, and the left end seat 1235 is inserted into the groove 1238. Under the action of the lead screw 1232, the push block 1233 moves back and forth along the horizontal direction of the mounting cylinder 1231 within the through channel of the left end seat 1235, providing a forward thrust or a backward pull to the nylon wheel 121, thereby adjusting the distance between the nylon wheel 121 and the steel pipe pile. Furthermore, the tail end of the push block 1233 is fixedly installed with a limit plate 1239 by bolts to prevent the left end seat 1235 from sliding out of the groove 1238.
[0036] The right end seat 1236 also has a channel along its axis at its center. One end of the channel of the right end seat 1236 is fixed to a first fixing cover plate 1240 by bolts, and the other end of the channel of the right end seat 1236 is fixed to a second fixing cover plate 1241 by bolts. Both the first fixing cover plate 1240 and the second fixing cover plate 1241 have through holes. The through holes of the first fixing cover plate 1240 and the second fixing cover plate 1241 are coaxially arranged. The lead screw 1232 passes through the through holes of the first fixing cover plate 1240 and the second fixing cover plate 1241. The lead screw 1232 is provided with an expanded diameter 1242. A second thrust bearing 1247 is installed between the first fixing cover plate 1240 and the expanded diameter 1242, and a first thrust bearing 1246 is installed between the second fixing cover plate 1241 and the expanded diameter 1242. A crank handle 1243 is provided at the tail end of the lead screw 1232 for rotating the lead screw 1232. Specifically, during the clockwise hand cranking of the handle 1243, the lead screw 1232 rotates clockwise, and the first thrust bearing 1246 provides support force to the lead screw 1232 and applies an axial force to the lead screw 1232; during the counterclockwise hand cranking of the handle 1243, the lead screw 1232 rotates counterclockwise, and the second thrust bearing 1247 provides support force to the lead screw 1232 and applies an axial force to the lead screw 1232, so that when the lead screw 1232 applies a forward pushing force or a backward pulling force to the push block 1233 during rotation, the lead screw 1232 will not move along the horizontal direction of the mounting cylinder 1231.
[0037] Furthermore, the left end seat 1235 and the right end seat 1236 are fixedly connected by multiple connecting rods 1244. Multiple mounting holes are symmetrically provided on the left end seat 1235 and the right end seat 1236 respectively. The two ends of the connecting rods 1244 are inserted into the mounting holes and fixed by nuts.
[0038] Furthermore, the diameter of the lead screw 1232 is smaller than the diameter of the through hole on the first fixed cover plate 1240, the diameter of the through hole on the second fixed cover plate 1241, and the diameter of the through hole on the limiting plate 1239, so that the lead screw 1232 can rotate inside the mounting cylinder 1231 after the hand crank handle 1243 is turned, thereby causing the push block 1233 to move horizontally along the mounting cylinder 1231.
[0039] In order to fix the positioning guide wheel 102 on the top of the steel profile 111, the bottom of the left end seat 1235 and the right end seat 1236 are respectively welded to the mounting plate 1245, and the bottom of the mounting plate 1245 is welded to the steel profile 111, so as to fix the positioning guide wheel 102 on the steel profile frame 101.
[0040] The steel pipe pile extension device 2 includes a replacement steel pipe pile 201 and a rubber ring. The replacement steel pipe pile 201 is connected to the main steel pipe pile 3 (main pile) via a hoisting device (crawler crane). The rubber ring is installed at the connection point between the replacement steel pipe pile 201 and the main steel pipe pile 3 for sealing installation. It is used to compensate for slight wear, eccentricity, ellipticity, or axial / radial runout of the sealing surface, thus providing a good water-stopping effect. The rubber ring is a V-shaped rubber ring with a "V" shaped cross-section. The rubber ring is 5cm thick and is made of high-elasticity nitrile rubber (NBR), ethylene propylene diene monomer (EPDM), and other rubber materials.
[0041] The replacement steel pipe pile 201 includes a replacement steel pipe pile 211 and a socket guide plate 213. The socket guide plate 213 is installed on the inner wall of the replacement steel pipe pile 211 through a pad 212 to guide the replacement steel pipe pile 201 during the docking process with the solid steel pipe pile 3, so as to avoid problems such as pile jamming or deflection of the replacement steel pipe pile 201 during the docking process.
[0042] The replacement steel pipe pile 211 is made of steel plate with a thickness of 2cm-3cm, and the height of the replacement steel pipe pile 211 is 7-9m, preferably 8m; the pad plate 212 is a steel plate with a thickness of 0.8-1.2cm, and the thickness of the pad plate 212 is preferably 1cm; the height of the pad plate 212 is 7-9cm, preferably 8cm; the distance between the pad plate 212 and the bottom of the replacement steel pipe pile 211 is 2cm; the pad plate 212 and the inner side of the replacement steel pipe pile 211 are connected in an arc shape, and the connection position is fully welded (penetrating weld) to ensure a tight fit with the replacement steel pipe pile 211 during installation; the socket guide plate 213 is connected in an arc shape to the inner side of the pad plate 212, and the connection position is fully welded (penetrating weld) to maintain a tight fit with the pad plate 212 during installation; (the socket guide plate 213 is a steel plate with a thickness of 2cm and a length of 30cm). The top of the socket guide plate 213 and the top of the pad plate 212 are on the same horizontal line.
[0043] To facilitate the hoisting and transportation of the replacement steel pipe pile 211, four lifting lugs are provided on the replacement steel pipe pile 211. The four lifting lugs are symmetrically arranged in pairs at both ends of the outer wall of the replacement steel pipe pile 211. The main hook of the hoisting equipment is connected to two lifting lugs at one end of the outer wall of the replacement steel pipe pile 211 through a lifting rope assembly, and the auxiliary hook of the hoisting equipment is connected to two lifting lugs at the other end of the outer wall of the replacement steel pipe pile 211 through a lifting rope assembly.
[0044] See below. Figure 1 , Figure 4 A construction method based on a steel pipe composite pile foundation construction device for cross-sea bridges includes the following steps:
[0045] Step 1: Install the steel frame 101 at the reserved position on the trestle, and fix a positioning guide wheel 102 at the middle position of the top of each steel section 111 of the steel frame 101.
[0046] Step 2: The solid steel pipe pile 3 slowly enters through the top opening of the guide frame and is stabilized (the rolled solid steel pipe pile 3 is hoisted to the top of the guide frame using hoisting equipment to facilitate its entry through the top opening). The distance between the nylon wheel 121 of the positioning guide wheel 102 and the outer wall of the solid steel pipe pile 3 is adjusted so that the nylon wheel 121 contacts and presses against the outer wall of the solid steel pipe pile 3. The solid steel pipe pile 3 is then vibrated to a pre-set standard height (the solid steel pipe pile 3 is vibrated using a vibratory hammer). The distance between the nylon wheel 121 and the outer wall of the solid steel pipe pile 3 is then adjusted so that the nylon wheel 121 no longer contacts the outer wall of the solid steel pipe pile 3.
[0047] The connection between the hoisting equipment and the solid steel pipe pile 3 is as follows: the main hook of the hoisting equipment (crawler crane) is connected to the lifting lug at one end of the outer wall of the solid steel pipe pile 3 through the lifting rope assembly, and the auxiliary hook of the hoisting equipment is connected to the lifting lug at the other end of the outer wall of the solid steel pipe pile 3 through the lifting rope assembly.
[0048] The stabilization of the solid steel pipe pile 3 includes: using a total station to measure the plane coordinates of the surface of the solid steel pipe pile 3 at three different positions exposed on the guide frame and at the same elevation plane, and calculating the center coordinates of the solid steel pipe pile 3 based on the measured three plane coordinates and comparing them with the pre-set coordinates. If the center coordinates of the solid steel pipe pile 3 exceed the limit, the position of the solid steel pipe pile 3 is adjusted until it is qualified.
[0049] Step 3, see Figure 4 The replacement steel pipe pile 201 is then connected to the solid steel pipe pile 3 (using hoisting equipment to lift the replacement steel pipe pile 201 above the solid steel pipe pile 3 after vibration driving, facilitating the connection between the replacement steel pipe pile 201 and the solid steel pipe pile 3; and during the connection process, the socket guide plate 213 is used for guidance to avoid jamming or deflection during the connection process). A rubber ring is then used to seal the connection point between the replacement steel pipe pile 201 and the solid steel pipe pile 3. After obtaining the extended steel pipe pile, adjust the distance between the nylon wheel 121 of the positioning guide wheel 102 and the outer wall of the extended steel pipe pile so that the nylon wheel 121 contacts and presses against the outer wall of the extended steel pipe pile. Vibrate the extended steel pipe pile to the preset standard height (use a vibratory hammer to vibrate the extended steel pipe pile; when the penetration of the extended steel pipe pile is 0, replace the vibratory hammer with an impact hammer for re-driving). Adjust the distance between the nylon wheel 121 and the outer wall of the extended steel pipe pile so that the nylon wheel 121 no longer contacts the outer wall of the extended steel pipe pile.
[0050] Specifically, the principle for adjusting the distance between the nylon wheel 121 and the solid steel pipe pile 3 or the outer wall of the extended steel pipe pile includes:
[0051] When the hand crank 1243 is turned clockwise, the lead screw 1232 rotates clockwise. The first thrust bearing 1246 provides support for the lead screw 1232 and gives the lead screw 1232 an axial force, so that the lead screw 1232 gives the push block 1233 a forward thrust during rotation, thereby driving the nylon wheel 121 to move closer to the solid steel pipe pile 3 or the outer wall of the extended steel pipe pile, so that the nylon wheel 121 contacts and presses against the solid steel pipe pile 3 or the outer wall of the extended steel pipe pile;
[0052] When the hand crank 1243 is turned counterclockwise, the lead screw 1232 rotates counterclockwise. The second thrust bearing 1247 provides support for the lead screw 1232 and gives it an axial force. This causes the lead screw 1232 to exert a backward pulling force on the push block 1233 during rotation, thereby driving the nylon wheel 121 to move away from the solid steel pipe pile 3 or the outer wall of the extended steel pipe pile, so that the front end of the nylon wheel 121 no longer contacts the solid steel pipe pile 3 or the outer wall of the extended steel pipe pile.
[0053] Step 4: Repeat step 3 until the entire steel pipe composite pile construction is completed.
[0054] Furthermore, during the vibratory driving process of the solid steel pipe pile 3 or the extended steel pipe pile, a total station and a vertical ruler are used to measure the driving plane position and verticality of the solid steel pipe pile 3 or the extended steel pipe pile in real time. When the measured value exceeds the preset range, a vibratory hammer is used for correction to ensure that the driving plane position and verticality of the solid steel pipe pile 3 or the extended steel pipe pile are within the range required by the specifications.
[0055] For ease of explanation, spatial relative terms such as “up,” “down,” “left,” and “right” are used in the embodiments to describe the relationship of one element or feature shown in the figures relative to another element or feature. It should be understood that, in addition to the orientations shown in the figures, spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figures is inverted, an element described as being “down” of other elements or features would be positioned “up” of those other elements or features. Therefore, the exemplary term “down” can encompass both up and down orientations. The device may be positioned in other ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used herein will be interpreted accordingly.
[0056] Moreover, relational terms such as “first” and “second” are used merely to distinguish one component from another that has the same name, without necessarily requiring or implying any such actual relationship or order between the components.
[0057] The above description is only a preferred embodiment of the present utility model. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present utility model, and these improvements and modifications should also be considered within the protection scope of the present utility model.
Claims
1. A construction device for steel pipe composite pile foundations of cross-sea bridges, characterized in that, Includes pile foundation positioning devices and steel pipe pile extension devices; The pile foundation positioning device includes a steel frame and multiple positioning guide wheels. The steel frame includes four steel sections, with the ends of adjacent steel sections connected perpendicularly to each other. Each steel section is fixedly equipped with a positioning guide wheel. The positioning guide wheel includes a nylon wheel and a pushing mechanism. The nylon wheel is fixedly installed at the front end of the pushing mechanism. The pushing mechanism includes a mounting cylinder, a lead screw, a push block, and a pair of opposing thrust bearings. The nylon wheel is installed at the front end of the push block. A left end seat and a right end seat are installed at both ends of the mounting cylinder. A channel is provided along the axis at the center of the left end seat, and the channel of the left end seat forms a through channel for the push block. The lead screw is threadedly connected to the push block. A channel is also provided along the axis at the center of the right end seat. A first fixed cover plate is fixed to one end of the channel of the right end seat by bolts, and a second fixed cover plate is fixed to the other end of the right end seat by bolts. Both the first and second fixed cover plates have through holes, and the lead screw passes through the through holes of the first and second fixed cover plates. An expansion diameter is provided on the lead screw. A second thrust bearing is installed between the first fixed cover plate and the expansion diameter, and a first thrust bearing is installed between the second fixed cover plate and the expansion diameter. A crank handle is provided at the tail end of the lead screw. The steel pipe pile extension device includes a replacement section of steel pipe pile and a rubber ring, with the rubber ring positioned at the joint between the replacement section of steel pipe pile and the solid steel pipe pile.
2. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The positioning guide wheel is fixedly installed at the middle position on the top of the steel profile.
3. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The nylon wheel is fixedly mounted on the front end of the jacking mechanism via a mounting bracket.
4. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The nylon wheel includes a wheel core, the wheel core is wrapped with nylon, and a heavy-duty rolling bearing is installed inside the wheel core.
5. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The left end seat and the right end seat are fixedly connected by multiple connecting rods. Multiple mounting holes are symmetrically provided on the left end seat and the right end seat. The two ends of the connecting rods are inserted into the mounting holes and fixed by nuts.
6. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The bottoms of the left and right end seats are respectively welded to the mounting plate, and the bottom of the mounting plate is welded to the structural steel.
7. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The rubber ring is a V-shaped rubber ring, and its cross-section is "V" shaped.
8. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 1, characterized in that, The replacement steel pipe pile includes a replacement steel pipe pile and a socket guide plate, which is installed on the inner wall of the replacement steel pipe pile by means of a pad.
9. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 8, characterized in that, The pad plate is connected to the inner side of the replacement steel pipe pile in an arc shape, and the connection position is fully welded; the socket guide plate is connected to the inner side of the pad plate in an arc shape, and the connection position is fully welded.
10. The construction device for steel pipe composite pile foundation of cross-sea bridges according to claim 8, characterized in that, The replacement steel pipe pile is equipped with four lifting lugs, which are symmetrically arranged in pairs at both ends of the outer wall of the replacement steel pipe pile. The main hook of the hoisting equipment is connected to two lifting lugs at one end of the outer wall of the replacement steel pipe pile through a hoisting rope assembly, and the auxiliary hook of the hoisting equipment is connected to two lifting lugs at the other end of the outer wall of the replacement steel pipe pile through a hoisting rope assembly.