Subway protection area foundation pit steel support supporting structure

By introducing a rapid positioning component into the steel support structure of the foundation pit, the problems of low installation efficiency and positioning deviation in the existing technology are solved, realizing rapid and accurate positioning of the support steel pipe and the positioning base, and improving the efficiency and safety of foundation pit construction in the subway protection zone.

CN224997600UActive Publication Date: 2026-11-20CHINA CONSTR FIRST DIV GROUP CONSTR & DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522771758.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-27
Publication Date
2026-11-20
Estimated Expiration
2035-12-27

AI Technical Summary

Technical Problem

The existing steel support structure for the foundation pit in the subway protection zone lacks a rapid positioning structure during installation, which requires crane operators to make repeated adjustments, reducing construction efficiency and positioning accuracy.

Method used

The system employs a rapid positioning component, including a first rapid positioning block and a second rapid positioning block. Through the cooperation of the rapid positioning groove and the protrusion, combined with the pre-positioning guide block and the positioning docking plate, the support steel pipe and the positioning base are positioned quickly and accurately.

Benefits of technology

It significantly improved the installation efficiency and accuracy of the steel support structure for the foundation pit, reduced errors caused by manual command, shortened the installation time, and met the requirements for construction accuracy and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997600U_ABST
    Figure CN224997600U_ABST
Patent Text Reader

Abstract

The utility model relates to a foundation pit support technical field especially relates to a subway protection area foundation pit steel support support structure. Through quick positioning structure, the installation efficiency of steel support support structure has been improved. The structure includes support steel pipe, positioning base, and the positioning base is located in support steel pipe one end, and the support steel pipe is equipped with quick positioning assembly, and the quick positioning assembly includes first quick positioning block, second quick positioning block, and the first quick positioning block is located in support steel pipe one end, and the second quick positioning block is located in the positioning base one side to support steel pipe, and the second quick positioning block one side to first quick positioning block is equipped with quick positioning recess, and first quick positioning block one side to quick positioning recess is equipped with quick positioning lug, and quick positioning lug is embedded in quick positioning recess, and quick positioning recess is equipped with quick guide inclined plane for the quick positioning lug to enter. Both solve the problem of low installation efficiency, and satisfy the safety requirement of the surrounding structure of subway protection area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of foundation pit support technology, and in particular to a steel support structure for foundation pits in subway protection zones. Background Technology

[0002] The steel support structure for foundation pits in subway protection zones is a support system specifically designed for foundation pit projects within subway protection zones. It is mainly made of steel and consists of steel support pipes, steel walers, and other components installed inside the foundation pit to balance soil and water pressure, ensuring the stability of the foundation pit sidewalls while protecting the safety of the surrounding subway structures.

[0003] Due to the large volume and weight of the supporting steel pipes within the steel support structure, hoisting is required for installation. However, in existing technologies, most supporting steel pipes lack a rapid positioning structure. The installation process relies on visual observation and manual signaling by operators, causing crane operators to spend time making repeated adjustments and making it difficult to quickly position the supporting steel pipes for installation. This not only increases the operational difficulty of structural installation but also significantly reduces overall construction efficiency. Utility Model Content

[0004] The main purpose of this utility model is to provide a steel support structure for the foundation pit of a subway protection zone, which improves the installation efficiency of the steel support structure through a rapid positioning structure.

[0005] The technical solution of this utility model is as follows:

[0006] A steel support structure for a subway protection zone foundation pit includes a supporting steel pipe and a positioning base. The positioning base is located at one end of the supporting steel pipe, and the supporting steel pipe is equipped with a quick positioning assembly.

[0007] The rapid positioning component includes a first rapid positioning block and a second rapid positioning block. The first rapid positioning block is located at one end of the supporting steel pipe, and the second rapid positioning block is located on the side of the positioning base facing the supporting steel pipe. The side of the second rapid positioning block facing the first rapid positioning block is provided with a rapid positioning groove, and the side of the first rapid positioning block facing the rapid positioning groove is provided with a rapid positioning protrusion. The rapid positioning protrusion is embedded in the rapid positioning groove, and the rapid positioning groove is also provided with a rapid guide slope to facilitate the entry of the rapid positioning protrusion.

[0008] In one possible implementation, the rapid positioning assembly further includes a pre-positioning guide block and a positioning docking plate to facilitate observation of the positioning position by hoisting personnel. The pre-positioning guide block is located on the side of the positioning base away from the ground, and the positioning docking plate is located on the side of the supporting steel pipe away from the ground. The positioning guide block abuts against the positioning docking plate, and the longitudinal section of both the pre-positioning guide block and the positioning docking plate is a triangular structure.

[0009] In one possible implementation, the first and second quick positioning blocks are both semi-annular structures with equal outer and inner diameters. The first and second quick positioning blocks are respectively fitted onto the supporting steel pipe and the positioning base. The diameter sides of the first and second quick positioning blocks abut against each other to form a closed annular structure. The diameter sides of the first and second quick positioning blocks are parallel to the installation direction of this structure. The quick positioning groove is located on the side of the second quick positioning block away from the ground.

[0010] In one possible implementation, the first quick positioning block is fixedly connected to a first fixing ring on the side away from the positioning base, the second quick positioning block is fixedly connected to a second fixing ring on the side away from the supporting steel pipe, the pre-positioning guide block is located on the side of the second fixing ring away from the ground, and the second fixing ring is bolted to the first fixing ring.

[0011] In one possible implementation, both the quick positioning groove and the quick positioning protrusion have arc-shaped longitudinal sections, and the projection surface of the quick positioning protrusion falls into the projection surface of the quick positioning groove.

[0012] The working principle and beneficial effects of this utility model are as follows:

[0013] The crane lifts the supporting steel pipe. The hoisting personnel observe and align the pre-positioning guide block on the positioning base with the positioning docking plate of the supporting steel pipe, and make initial adjustments to the crane position to complete the pre-positioning. The crane is then fine-tuned to bring the first quick positioning block of the supporting steel pipe closer to the second quick positioning block. With the help of the quick guide ramp of the quick positioning groove, the quick positioning protrusion is guided to accurately embed into the groove, and the hoisting is completed.

[0014] The rapid positioning component significantly improves the efficiency and accuracy of steel support installation in subway protection zone foundation pits. The pre-positioning guide block and positioning docking plate facilitate quick observation and alignment by hoisting personnel, reducing errors caused by manual commands. The rapid guide ramp guides the rapid positioning protrusion into the groove quickly, avoiding repeated adjustments and significantly shortening installation time. This solution addresses both low installation efficiency and positioning deviations while meeting the precision requirements of subway protection zones and the safety requirements of surrounding structures, combining practicality and safety. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on the structures shown in these drawings without creative effort.

[0016] Figure 1This is a schematic diagram of the structure of this embodiment;

[0017] Figure 2 This is a schematic diagram of the structure of this embodiment;

[0018] Figure 3 A schematic diagram of the positioning base and the rapid positioning component;

[0019] Figure 4 This is a cross-sectional view used in this embodiment to illustrate the quick positioning groove and the quick positioning protrusion;

[0020] Figure 5 A schematic diagram of the structure supporting the steel pipe and the quick positioning assembly.

[0021] Explanation of icon numbers:

[0022] 1. Supporting steel pipe; 2. Positioning base; 3. Quick positioning assembly; 31. First quick positioning block; 311. Quick positioning protrusion; 312. First fixing ring; 32. Second quick positioning block; 321. Quick positioning groove; 3211. Quick guide slope; 322. Guide arc slope; 323. Second fixing ring; 33. Pre-positioning guide block; 34. Positioning docking plate; 35. Dock slope.

[0023] The realization of the purpose, functional features and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0024] The technical solutions of this utility model will be clearly and completely described below with reference to the embodiments of this utility model. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of this utility model.

[0025] like Figures 1-5 As shown in the figure, this embodiment proposes a steel support structure for the foundation pit of a subway protection zone, including a support steel pipe 1 and a positioning base 2. The positioning base 2 is located at one end of the support steel pipe 1, which meets the basic requirements of the subway protection zone for the rigidity of the support structure.

[0026] The supporting steel pipe 1 is equipped with a quick positioning assembly 3, providing a structural foundation for rapid positioning and docking. The quick positioning assembly 3 includes a first quick positioning block 31 and a second quick positioning block 32. The first quick positioning block 31 is located at one end of the supporting steel pipe 1, and the second quick positioning block 32 is located on the side of the positioning base 2 facing the supporting steel pipe 1, preventing interference between the positioning function and the main structure. The side of the second quick positioning block 32 facing the first quick positioning block 31 has a quick positioning groove 321, and the side of the first quick positioning block 31 facing the quick positioning groove 321 has a quick positioning protrusion 311. The quick positioning protrusion 311 is embedded in the quick positioning groove 321. Through the cooperation of the groove and the groove, the supporting steel pipe 1 and the positioning base 2 are quickly and accurately positioned, reducing docking errors. At the same time, the quick positioning groove 321 is also provided with a quick guide ramp 3211 to facilitate the entry of the quick positioning protrusion 311. The ramp quickly guides the protrusion into the groove, reducing the number of adjustments during hoisting, reducing the difficulty of operation, and improving the construction efficiency of this embodiment.

[0027] In this embodiment, the longitudinal section of the quick-positioning protrusion 311 is an isosceles trapezoidal structure, and its inclined surface has multiple guiding functions, facilitating the rapid embedding of the protrusion into the groove. Simultaneously, the isosceles structure ensures consistent left-right guiding accuracy, reduces unilateral offset, and guarantees stability during the positioning process. To further improve the positioning speed, the projection surface of the quick-positioning protrusion 311 falls within the projection surface of the quick-positioning groove 321, ensuring that the groove can be completely embedded and accommodating minor deviations during hoisting, thus improving the positioning error tolerance.

[0028] In this embodiment, the first quick positioning block 31 and the second quick positioning block 32 are respectively sleeved on the supporting steel pipe 1 and the positioning base 2, achieving coaxial fixation and placing the structure externally to reduce positioning difficulty. To ensure the structural integrity of the supporting steel pipe 1 and the positioning base 2 after installation, the longitudinal sections of the first quick positioning block 31 and the second quick positioning block 32 are both semi-annular structures with equal outer and inner diameters, which can adapt to the cylindrical shape of the supporting steel pipe 1 and the positioning base 2. At the same time, the diameter sides of the first quick positioning block 31 and the second quick positioning block 32 abut against each other, forming a closed annular structure, creating a full-circumferential positioning constraint, ensuring the precise alignment of the quick positioning protrusion 311 and the quick positioning groove 321.

[0029] To further improve the smoothness and speed of the docking operation, the diameter sides of the first quick positioning block 31 and the second quick positioning block 32 are parallel to the installation direction of this structure, ensuring that the quick positioning blocks can smoothly fit and dock during the installation process. At the same time, the parallel arrangement ensures that the contact surface is evenly stressed, reducing local stress concentration and indirectly improving the service life of this embodiment.

[0030] In this embodiment, the rapid positioning component 3 also includes a pre-positioning guide block 33, a positioning docking plate 34, and a docking ramp 35. Through these visual positioning components, hoisting personnel can quickly determine the docking status. The pre-positioning guide block 33 is located on the side of the positioning base 2 away from the ground, and the positioning docking plate 34 is located on the side of the supporting steel pipe 1 away from the ground. Furthermore, both the pre-positioning guide block 33 and the positioning docking plate 34 have docking ramps 35 on their sides away from the ground and parallel to the installation direction of the device. The design away from the ground makes it easier for hoisting personnel to observe, allowing them to quickly adjust the position based on the alignment status of each component. Moreover, compared to a right angle, the design of the docking ramp 35 obstructs the view less, providing a more intuitive display of the docking status of the pre-positioning guide block 33 and the positioning docking plate 34, thus improving the installation efficiency of this embodiment. During hoisting, the pre-positioning guide block 33 abuts against the positioning docking plate 34, forming a preliminary positioning constraint and reducing positional swaying during hoisting.

[0031] Since the quick positioning groove 321 is located on the side of the second quick positioning block 32 away from the ground, the hoisting personnel can judge the cooperation status of the first quick positioning block 31 and the second quick positioning block 32 by observing the cooperation status of the pre-positioning guide block 33 and the positioning docking plate 34, thereby achieving quick adjustment and installation. This improves the installation efficiency of this embodiment and also enhances the positioning reliability of this embodiment through dual positioning.

[0032] In this embodiment, the angle and size of the mating bevel 35 can be adjusted according to actual installation requirements, which will not be elaborated further in this embodiment.

[0033] After the support steel pipe 1 is hoisted above the positioning base 2, the operator slowly lowers the support steel pipe 1 so that the first positioning block of the support steel pipe 1 gradually approaches and abuts the pre-positioning guide block 33. Then, the height of the support steel pipe 1 is lowered and the first positioning block is adjusted so that it gradually approaches the top of the second positioning block. After reaching the top, the height of the support steel pipe 1 only needs to be lowered further, and the quick positioning protrusion 311 can automatically slide into the quick positioning groove 321 along the guide arc slope 322.

[0034] By determining the overlap between the positioning guide block and the positioning docking plate 34, it can be determined whether the quick positioning protrusion 311 is engaged with the quick positioning groove 321, which significantly improves the hoisting positioning efficiency and accuracy in the subway protection zone pit scenario.

[0035] In this embodiment, the first quick positioning block 31 is fixedly connected to the side away from the positioning base 2 with a first fixing ring 312, and the second quick positioning block 32 is fixedly connected to the side away from the supporting steel pipe 1 with a second fixing ring 323. The second fixing ring 323 is bolted to the first fixing ring 312. The ring structure can ensure that the bolt tightening force can be evenly distributed, and the bolt connection has strong tightness, which can withstand the soil pressure and water pressure during the foundation pit support process, ensuring the long-term stable connection between the supporting steel pipe 1 and the positioning base 2.

[0036] Meanwhile, the prepositioning guide block 33 is located on the side of the second fixing ring 323 away from the ground, which prevents interference between components. The rigidity of the second fixing ring 323 can improve the stability of the prepositioning guide block 33 and ensure the reliability of the operation of this embodiment.

[0037] In the accompanying drawings of this embodiment, the same or similar reference numerals correspond to the same or similar components. In the description of this application, it should be understood that if terms such as "upper," "lower," "left," and "right" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, they are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms used to describe positional relationships in the accompanying drawings are only for illustrative purposes and should not be construed as limiting this patent. For those skilled in the art, the specific meaning of the above terms can be understood according to the specific circumstances.

[0038] The above are merely preferred embodiments of this application and are not intended to limit this application. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this application should be included within the protection scope of this application.

Claims

1. A steel support structure for a subway protection zone foundation pit, comprising a supporting steel pipe (1) and a positioning base (2), wherein the positioning base (2) is disposed at one end of the supporting steel pipe (1), characterized in that, The supporting steel pipe (1) is equipped with a quick positioning assembly (3). The quick positioning component (3) includes a first quick positioning block (31) and a second quick positioning block (32). The first quick positioning block (31) is located at one end of the supporting steel pipe (1), and the second quick positioning block (32) is located on the side of the positioning base (2) facing the supporting steel pipe (1). The second quick positioning block (32) has a quick positioning groove (321) on the side facing the first quick positioning block (31), and the first quick positioning block (31) has a quick positioning protrusion (311) on the side facing the quick positioning groove (321). The quick positioning protrusion (311) is embedded in the quick positioning groove (321), and the quick positioning groove (321) is also provided with a quick guide slope (3211) to facilitate the entry of the quick positioning protrusion (311).

2. The steel support structure for a subway protection zone foundation pit according to claim 1, characterized in that, The rapid positioning component (3) also includes a pre-positioning guide block (33) and a positioning docking plate (34) to facilitate the hoisting personnel to observe the positioning position. The pre-positioning guide block (33) is located on the side of the positioning base (2) away from the ground, and the positioning docking plate (34) is located on the side of the supporting steel pipe (1) away from the ground. The positioning guide block and the positioning docking plate (34) abut against each other. Both the pre-positioning guide block (33) and the positioning docking plate (34) are provided with docking slopes (35) on the side away from the ground to facilitate the hoisting personnel to confirm the docking status.

3. The steel support structure for a subway protection zone foundation pit according to claim 2, characterized in that, The first quick positioning block (31) and the second quick positioning block (32) are both semi-circular structures with equal outer and inner diameters in their longitudinal sections. The first quick positioning block (31) and the second quick positioning block (32) are respectively fitted onto the supporting steel pipe (1) and the positioning base (2). The diameter sides of the first quick positioning block (31) and the second quick positioning block (32) abut against each other to form a closed ring structure. The diameter sides of the first quick positioning block (31) and the second quick positioning block (32) are parallel to the installation direction of this structure. The quick positioning groove (321) is located on the side of the second quick positioning block (32) away from the ground.

4. The steel support structure for a subway protection zone foundation pit according to claim 3, characterized in that, The first quick positioning block (31) is fixedly connected to a first fixing ring (312) on the side away from the positioning base (2), and the second quick positioning block (32) is fixedly connected to a second fixing ring (323) on the side away from the supporting steel pipe (1). The pre-positioning guide block (33) is located on the side of the second fixing ring (323) away from the ground, and the second fixing ring (323) is bolted to the first fixing ring (312).

5. The steel support structure for a subway protection zone foundation pit according to claim 4, characterized in that, Both the quick positioning groove (321) and the quick positioning protrusion (311) have isosceles trapezoidal cross sections, and the projection surface of the quick positioning protrusion (311) falls into the projection surface of the quick positioning groove (321).