Ecological slope protection drainage structure
By introducing a three-stage drainage system and planting troughs into the slope protection structure, the problems of poor rainwater drainage and insufficient ecological protection in traditional slope protection structures are solved, achieving the dual functions of efficient drainage and ecological restoration, and reducing the risk of slope instability.
Patent Information
- Application Number
- CN202522174307.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-14
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-10-14
AI Technical Summary
Traditional slope protection structures suffer from poor rainwater drainage and insufficient ecological protection, which can easily lead to soil saturation and instability during heavy rain.
An ecological slope protection and drainage structure is designed, including an inclined slope protection body, a waterproof board, a planting platform, a diversion channel, a water collection channel, and a filter screen, forming a three-level drainage system. Through the cooperation of the diversion channel and the planting channel, rainwater is intercepted, diverted, and centrally discharged. Combined with the plant root system in the planting channel, a three-dimensional soil stabilization network is formed, which improves drainage efficiency and reduces the risk of slope instability.
It improves drainage efficiency, avoids slope runoff erosion, reduces the risk of slope instability, achieves synergistic effects of ecological protection and water-saving irrigation, and enhances the structure's anti-sliding stability and vegetation coverage.
Smart Images

Figure CN224997606U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of slope protection technology, specifically to an ecological slope protection and drainage structure. Background Technology
[0002] Ecological slope protection generally refers to the process of planting vegetation on a slope after it has been excavated, utilizing the interaction between the vegetation and the soil and rock to protect and reinforce the slope, thereby restoring the damaged natural ecological environment while meeting the requirements for the stability of the slope surface.
[0003] To reduce soil erosion along riverbanks and slopes, slope protection techniques are typically employed. These techniques involve creating a vegetation layer or constructing concrete structures on the riverbank slopes to form a hydraulic ecological slope protection structure, thereby protecting the slope. To further protect the slope, drainage ditches are usually installed on the surface of the slope protection to prevent rainwater from eroding the soil.
[0004] In the field of slope engineering, traditional slope protection structures often focus on a single function of reinforcement or greening, resulting in problems such as poor rainwater drainage and insufficient ecological protection. For example, rainwater can easily runoff and erode slopes covered with vegetation. Although simple vegetation slope protection has ecological benefits, it lacks a systematic drainage design, and during heavy rain, water accumulation can easily lead to soil saturation and instability.
[0005] Therefore, there is an urgent need for an ecological slope protection and drainage structure to address the shortcomings of traditional technologies. Utility Model Content
[0006] (a) Technical problems to be solved
[0007] To address the shortcomings of existing technologies, this utility model provides an ecological slope protection drainage structure that improves drainage efficiency, prevents slope runoff erosion, reduces the risk of slope instability, and solves the problems of traditional slope protection structures, which often focus on single functions such as reinforcement or greening, resulting in poor rainwater drainage and insufficient ecological protection. For example, rainwater easily forms runoff erosion on slopes covered with vegetation. While simple vegetation slope protection has ecological benefits, it lacks a systematic drainage design, and during heavy rains, water accumulation can easily lead to soil saturation and instability.
[0008] (II) Technical Solution
[0009] The technical solution of this utility model to solve the above-mentioned technical problems is as follows: An ecological slope protection and drainage structure, characterized in that: it includes a slope protection body with an inclined slope on the outside, waterproof plates are installed on both sides of the slope protection body, a first planting platform is fixed at the upper end of the slope protection body, a number of second planting platforms are arranged at equal intervals along the inclined slope on the outside of the slope protection body, and a water collection trough is arranged at the lower end of the inclined slope on the outside of the slope protection body, with a drainage outlet on one side of the water collection trough;
[0010] The slope of the main body of the slope protection is provided with drainage channels on both sides. The lower end of the drainage channel is located on the water collection channel. The first water outlet is provided at equal intervals on one inner end of the first planting platform. Several sets of second water outlets are provided at equal intervals on the lower inner end of the second planting platform. Planting troughs are provided on the top of both the first and second planting platforms.
[0011] Based on the above technical solution, the present invention can be further improved as follows.
[0012] Furthermore, a steel reinforcement layer is fixed at the lower end of the slope protection body on the side away from the sloping surface, and the upper end of the waterproof membrane is higher than the surface of the slope protection body.
[0013] Furthermore, a water baffle is fixedly connected to one side of the upper end of the first planting platform, and the height of the water baffle is higher than the height of the first planting platform.
[0014] Furthermore, the upper end of the water collection tank is provided with opening slots on both sides, a first filter screen is installed on the opening slot, a second filter screen is installed on one side of the water collection tank, and a sealing plate is connected to the upper end of the second filter screen. The opening slots and the diversion slots are positioned correspondingly.
[0015] Furthermore, the cross-sectional shape of the inclined slope can be a single slope, a bend, or a steep sill structure, and the surface roughness of the inclined slope is between 0.01 and 0.017.
[0016] This utility model provides an ecological slope protection and drainage structure, which has the following advantages:
[0017] 1. A three-stage drainage system of "interception-diversion-concentration" is formed by the diversion channel, the water outlet of the planting trough, and the water collection trough on the main slope surface of the slope protection. The water baffle guides the rainwater at the top to enter the planting trough first, and the excess water is diverted to the slope through the water outlet. The water outlet of the planting trough further disperses the runoff and finally flows into the water collection trough through the diversion channel, and is quickly discharged through the drainage outlet. The drainage efficiency is improved, the slope runoff is avoided and the risk of slope instability is reduced.
[0018] Second, native plants are planted in the planting troughs, and their root systems form a three-dimensional soil-stabilizing network. Rainwater is intercepted and collected in the planting troughs for irrigation, while excess water is discharged through the outlet. High vegetation coverage reduces soil erosion and saves irrigation water, creating a synergistic ecosystem of "protection-greening-water conservation".
[0019] 3. The steel reinforcement layer embedded inside the slope enhances the overall pull-out resistance; the filter screen of the water collection trough filters rainwater from the diversion channel and external impurities, and the sealing plate prevents foreign objects from entering. The structural anti-sliding stability is improved, and the filter screen interception rate is increased. 4. The waterproof membrane is higher than the surface of the main slope protection to block lateral rainwater infiltration. Attached Figure Description
[0020] Figure 1 This is a schematic diagram of the structure of this utility model;
[0021] Figure 2 This is a schematic diagram of the exploded structure of this utility model;
[0022] Figure 3 This is a schematic diagram of the first planting trough structure of this utility model;
[0023] Figure 4 This is a schematic diagram of the second planting trough structure of this utility model;
[0024] Figure 5 This is a schematic diagram of the main structure of the slope protection system of this utility model;
[0025] Figure 6 This is a schematic diagram of the water collection tank structure of this utility model.
[0026] Figure 7 This is a structural schematic diagram from another perspective of the present invention.
[0027] In the diagram: 1. Main slope protection structure; 101. Drainage channel; 11. Waterproofing membrane; 12. Reinforcing steel layer; 2. Water collection trough; 201. Opening trough; 202. First filter screen; 21. Sealing plate; 22. Second filter screen; 3. Second planting platform; 31. Second water outlet; 4. First planting platform; 401. First water outlet; 41. Water baffle. Detailed Implementation
[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0029] Example 1:
[0030] Please see Figure 1-6 This utility model provides an ecological slope protection drainage structure, including a slope protection body 1 with an external inclined slope, waterproof plates 11 installed on both sides of the slope protection body 1, a first planting platform 4 fixed at the upper end of the slope protection body 1, several sets of second planting platforms 3 located at the inclined slope and equidistantly arranged along its surface on the outside of the slope protection body 1, and a water collection trough 2 arranged at the lower end of the inclined slope on the outside of the slope protection body 1, with a drainage outlet on one side of the water collection trough 2.
[0031] The slope protection body 1 is provided with drainage channels 101 on both sides of the inclined slope surface. The lower end of the drainage channel 101 is located on the water collection channel 2. The first water outlet 401 is provided at equal intervals on one inner end of the first planting platform 4. Several sets of second water outlets 31 are provided at equal intervals on the lower inner end of the second planting platform 3. Planting troughs are provided on the top of both the first planting platform 4 and the second planting platform 3.
[0032] The diversion channel 101 serves to guide the flow, allowing water from the top to flow smoothly down the slope protection body 1 from the diversion channel 101 to the collection channel 2.
[0033] Excess rainwater flows downwards through the first outlet 401 within the first planting platform 4, and after irrigating the plants within the second planting platform 3, it flows downwards through the second outlet 31.
[0034] More specifically, the waterproofing board 11 on the outside of the main slope 1 serves a waterproofing function, the slope serves a drainage function, and the green plants planted in the first planting platform 4 and the second planting platform 3 serve an ecological protection function against soil erosion and also serve an aesthetic function. The water flowing down the main slope 1 enters the water collection trough 2 through the slope surface or flows out directly, and finally is discharged through the drainage outlet.
[0035] In this embodiment, a water baffle 41 is fixedly connected to one side of the upper end of the first planting platform 4, and the height of the water baffle 41 is higher than the height of the first planting platform 4.
[0036] Specifically, the water baffle 41 at the top prevents rainwater from entering the first planting platform 4, thereby collecting rainwater to irrigate the green plants, and excess rainwater flows downwards within the first planting platform 4.
[0037] In this embodiment, the upper ends of the water collection tank 2 are provided with opening slots 201 on both sides, a first filter screen 202 is installed on the opening slots 201, a second filter screen 22 is installed on one side of the water collection tank 2, and a sealing plate 21 is connected to the upper end of the second filter screen 22. The opening slots 201 and the diversion channel 101 are positioned correspondingly.
[0038] The specific function of the above scheme is that the rainwater flowing into the diversion channel 101 enters the opening channel 201, passes through the first filter screen 202 to filter impurities such as mud, sand, and leaves, and then enters the water collection tank 2. The second filter screen 22 prevents impurities such as mud, sand, and leaves from entering the outside of the water collection tank 2.
[0039] Specifically, the second filter screen 22 and the sealing plate 21 are integrally formed and are installed on the water collection tank 2 by bolts;
[0040] Rainwater will only flow out through the second filter screen 22 at the top when the accumulated rainwater level exceeds the lower sealing plate 21. This design allows some rainwater to be collected in the water collection tank 2, which not only reduces the speed of water discharge after collection, but also allows rainwater to be collected in the water collection tank 2 for use in the next irrigation.
[0041] Several planting troughs are laid with permeable geotextile and graded crushed stone cushion layer to form a filter layer to prevent soil loss.
[0042] Meanwhile, in this embodiment, the structure of the above solution can specifically adopt the following scheme:
[0043] The main body of the slope protection 1 (2m high, 30° slope angle) is made of C30 concrete. 5mm thick HDPE waterproof membrane 11 is embedded on both sides (10cm higher than the surface of the main body of the slope protection). Φ16mm threaded steel bar layer 12 (1.5m long, 30cm spaced) is horizontally inserted into the soil slope at the bottom.
[0044] The first planting platform 4 (1.2m long × 0.5m wide × 0.4m deep) is located at the top of the main slope protection structure and contains nutrient soil and alfalfa. Three sets of second planting platforms 3 (0.8m long × 0.4m wide × 0.3m deep) are evenly arranged on the slope surface and planted with bermudagrass and Virginia creeper. The planting troughs are filled with improved planting soil (containing 30% humus).
[0045] Two drainage channels 101 (15cm wide × 8cm deep, 5° slope) are opened on both sides of the main slope of the slope protection, and the lower end connects to the opening channel 201 of the water collection channel 2 (2m long × 0.5m wide × 0.3m deep); a double-layer filter screen is installed in the water collection channel (the first filter screen 202 is a 10-mesh stainless steel mesh, and the second filter screen 22 is a 20-mesh nylon mesh), and a DN100 drainage outlet is provided at the end to connect to the municipal rainwater pipe.
[0046] The first planting platform 4 has a concrete water-retaining plate 41 (0.6m high) poured at its edge, and three Φ5cm first water outlets 401 are opened on the inside of the trough; the second planting platform 3 has two Φ3cm second water outlets 31 at its bottom, and the top of the water collection trough 2 is covered with a sealing plate 21 (2cm thick).
[0047] Each protection unit covers a slope area of 10㎡, the water storage capacity of the planting trough is ≥50L, the drainage flow rate of the diversion trough 101 is ≥20L / min, and the filter screen interception efficiency is ≥95% (for impurities with a particle size ≥2mm).
[0048] The first filter screen 202 is installed in the opening slot 201 with clips and can be disassembled and cleaned periodically (e.g., weekly). The second filter screen 22 is fixed with bolts and can be inspected and cleaned periodically (e.g., monthly) to ensure long-term filtration efficiency. Several sets of planting troughs contain native plants that are tolerant of poor soil and have well-developed root systems (such as alfalfa and bermudagrass), combined with slow-release fertilizer (nutrient release cycle of 3 months) in the planting troughs to achieve self-sustaining ecosystem and reduce manual maintenance costs.
[0049] Please see Figure 7 The second embodiment, based on the first embodiment, makes the following adjustments:
[0050] In this embodiment, a steel reinforcement layer 12 is fixed at the lower end of the slope protection body 1 on the side away from the inclined slope, and the upper end of the waterproof board 11 is higher than the surface of the slope protection body 1.
[0051] More specifically, the steel reinforcement layer 12 is laid and fixed to the inside of the slope during installation, which can play a role in reinforcing the structure. The waterproof board 11 is higher than the main body of the slope protection 1, so that rainwater from the outside will not enter the upper part of the main body of the slope protection 1 through the waterproof board 11, but will be blocked on both sides.
[0052] In this embodiment, the cross-sectional shape of the inclined slope can be a single slope, a bend, or a steep sill structure, and the surface roughness of the inclined slope is between 0.01 and 0.017.
[0053] Meanwhile, in this embodiment, the structure of the above solution can specifically adopt the following scheme:
[0054] Based on the engineering practice and structural design principles of landslide dammed lake diversion channels, drainage efficiency can be optimized from three aspects: longitudinal slope, cross-sectional shape, and construction adaptability.
[0055] I. Dynamic Adjustment of Longitudinal Section Slope
[0056] Based on drainage requirements and construction window, select differentiated slope design:
[0057] Short window period (8-12 days): Adopt a uniform steep slope structure, that is, the inclined slope is set as a single slope, the longitudinal slope is set to 0.1-0.3, the water flow is accelerated by gravity, and the flow capacity is increased to 20-30L / (s·m), which is suitable for rapid drainage scenarios;
[0058] Medium to long window period (12-16 days): adopt a zigzag slope with a gentle slope at the beginning and a steep slope at the end, that is, the sloping surface is set as a bend, the slope of the upstream section is 0.05-0.1 (gentle slope section) to reduce erosion, and the slope of the downstream section is 0.1-0.3 (steep slope section) to accelerate drainage. The slope change point is located at 1 / 2 of the total length, taking into account both stability and efficiency.
[0059] Ultra-long window period (16-40 days): The inclined slope is set with a 3-5m high steep sill structure to enhance the water flow energy by using the waterfall effect and increase the local drainage rate to more than 50L / (s·m), which is suitable for high water level difference scenarios.
[0060] II. Cross-section and flow area optimization
[0061] Width-to-depth ratio design: A wide and gently sloping trapezoidal cross-section (bottom width 1-1.5m, side slope ratio 1:1.5) is adopted, increasing the flow area by 20%-30% compared to a rectangular cross-section, reducing the risk of siltation. Roughness control: The trench walls are made of cast-in-place C30 concrete (surface roughness 0.014-0.017), or covered with HDPE geomembrane (roughness 0.010-0.012), reducing head loss along the trench.
[0062] III. Balancing Construction Adaptability and Efficiency
[0063] Excavation work volume matching: Based on the on-site equipment capacity (such as excavator bucket capacity), the cross-sectional dimensions are dynamically adjusted according to the formula "excavation time = safety factor × water storage time" to ensure that construction is completed before the rainy season and to avoid drainage obstruction due to incomplete construction. Axis layout optimization: The diversion channel axis is arranged along the original water flow direction to reduce head loss at bends; priority is given to arranging diversion channels in easily excavated areas such as mountain passes and fine-grained soil layers to shorten the construction period and ensure timely effectiveness of the drainage function.
[0064] The above measures can improve the drainage efficiency of the diversion channel by 40%-60%, while taking into account structural stability and construction feasibility, and are applicable to various scenarios such as civil construction protection and slope drainage.
[0065] It is worth mentioning that, based on the impact of slope on load distribution, water flow velocity, and soil stability, structural adjustment strategies for different slope gradients need to be dynamically adjusted from four aspects: the main frame of the slope protection, the drainage system, the support structure, and the design of the planting troughs, as detailed below:
[0066] 1. Gentle slope (slope ≤ 15°)
[0067] The core problem is that slow water flow leads to siltation, and the structure's own weight causes foundation settlement.
[0068] Adjustment measures: A shallow-buried foundation is adopted: the embedment depth of the support feet is reduced to 0.5m (compared to the conventional 1m), and a 10cm thick graded crushed stone cushion layer is added at the bottom to reduce disturbance to the original soil; the width of the main slope protection structure 1 is reduced by 10% (1.8m per unit) to reduce self-weight load. Adjacent units are connected by bolts (50cm spacing) to form an integrated anti-settlement system, adapting to the lateral deformation of the gentle slope soil. The width-to-depth ratio of the diversion channel is increased to 2:1 (compared to the conventional 1.5:1), with a 0.5% longitudinal slope inside the channel, and a bottom "U-shaped" guide rib (3cm high) to accelerate water flow (flow velocity increased to 0.4m / s), preventing siltation. A "pre-sedimentation zone" (0.3m in length) is added to the water collection tank 2, using a grid (5mm aperture) to initially intercept fine particles of silt, reducing the risk of filter clogging. The second planting trough 3 is tilted at the same angle as the slope (≤15°), and is filled with lightweight planting soil (density ≤1.2g / cm³). The bottom is covered with permeable geotextile to prevent soil loss.
[0069] II. Medium to steep slopes (15° < slope ≤ 30°)
[0070] The core problem: strong erosion from slope runoff, and easy structural slippage.
[0071] Adjustment measures: The support feet are changed to an inverted T-shaped structure: the burial depth is increased to 1.2m, the width of the transverse wing plates is 0.8m, and they form pull-out resistance (≥10kN / piece) after being embedded in the soil; "anchor rod-baffle" combinations (anchor rod length 2m, spacing 1.5m) are added to both sides of the main slope protection 1, anchored into the stable soil layer. The thickness is increased to 8mm (conventional 5mm), and a "gradual thickening" design is adopted (the bottom thickness is 1.5 times that of the top) to resist the normal pressure of the slope. A "interception channel" (20cm wide, 15cm deep) is set every 5m along the slope surface, forming a "grid" drainage system with the main diversion channel 101 to disperse the runoff (unit width flow rate ≤15L / s). A "high friction coefficient pad" (roughness 0.025) is laid in the diversion channel 101, combined with "toothed" guide sills (spacing 1m), to reduce the water flow velocity to 0.6m / s and avoid erosion of the channel wall. The second planting trough 3 has an "L-shaped retaining edge" (15cm high) on the outside. The soil inside the trough is fixed by a "honeycomb grid" structure (20cm deep). Plants with deep roots (such as Amorpha fruticosa, with a main root length ≥1m) are selected.
[0072] 3. Steep slopes (slope > 30°)
[0073] The core challenge lies in the high risk of structural overturning and the significant difficulty of construction.
[0074] Adjustment measures: A "stepped slope protection structure" is adopted: each step is 1.5m high, with a 0.8m wide platform between steps. Vertical connecting pins (20mm diameter) secure the upper and lower units, creating a "gravity retaining wall" effect. The reinforcing steel layer 12 is changed to a "grid type": Φ20mm steel bars are welded into a 1m×1m grid, embedded in the slope to a depth ≥3m, and cast integrally with the slope protection structure 1, achieving an anti-sliding stability coefficient ≥1.3. The diversion channel 101 is changed to a "spiral" path (3m radius of curvature), extending the water flow path to reduce the flow velocity (≤0.8m / s). The channel walls are sprayed with a polyurea waterproof layer (2mm thickness) to prevent erosion and leakage. The water collection channel 2 is located on the outside of each platform, and the open channel 201 is equipped with a "baffle-type inlet" (height adjustable, 0-10cm) to control the inflow and prevent overload overflow. The main body of the slope protection is made of "C40 lightweight concrete" (density ≤2.0g / cm³), which reduces the weight of a single unit by 25%; the protection unit is divided into 0.5m widths and hoisted for construction (avoiding manual handling on the slope).
[0075] IV. General Adjustment Principles
[0076] Ordinary concrete (C30) is used for slopes ≤15°, and fiber concrete (0.9kg / m³) is used for slopes >15° to improve crack resistance. Hydraulic calculations (open channel uniform flow formula) are used to ensure that the flow capacity of the diversion channel is ≥1.2 times the design flow rate under different slopes. An "tilt sensor" is installed on the top of the main slope protection structure 1 to monitor slope changes in real time (early warning threshold ±2°), and temporary supports are added when the limit is exceeded.
[0077] Structural adjustments should focus on the three key elements of "slope-load-drainage": gentle slopes should prioritize settlement control and drainage efficiency, medium and steep slopes should strengthen anti-sliding and scour protection, and steep slopes should balance safety and construction feasibility through graded anchoring and lightweight design, ultimately achieving synergistic optimization of "protection-ecology-drainage" functions under different slopes.
[0078] The working principle of ecological slope protection:
[0079] When rainwater falls to the top of the main slope protection 1, the water-blocking plate 41 intercepts and guides the water flow into the planting trough inside the first planting platform 4. After being absorbed by the soil and plant roots, excess rainwater is dispersed along the slope surface to the planting trough inside the second planting platform 3 through the first outlet 401 (flow velocity 0.3m / s). After the rainwater received by the second planting platform 3 irrigates the plants, the remaining water is discharged through the second outlet 31 (spaced 20cm apart) and flows into the diversion channels 101 on both sides along the slope surface to prevent slope runoff from eroding the soil. The diversion channels 101 guide the rainwater into the opening channel 201 of the water collection channel 2. After being filtered by the first filter screen 202 to remove mud, sand and fallen leaves, the water enters the channel and is finally discharged into the municipal pipe network through the drainage outlet. There is no water accumulation throughout the process. The plant root system in several groups of planting troughs reaches a depth of 0.3-0.5m, forming a three-dimensional root network. Combined with the steel reinforcement layer 12 (pull-out strength ≥15kN), the main slope protection 1 is firmly connected to the slope soil, improving the erosion resistance. HDPE waterproof membrane 11 blocks rainwater from seeping into the interior of the slope protection structure; sealing plate 21 and second filter 22 prevent external soil and insects from entering the water collection trough and avoid clogging of the drainage outlet.
[0080] Through a four-stage rainwater management process of "interception-infiltration-filtration-discharge", this structure not only achieves slope stability protection but also improves rainwater discharge efficiency, has a high vegetation coverage rate, and has the dual functions of engineering protection and ecological restoration.
[0081] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.
[0082] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. An ecological slope protection drainage structure, characterized in that: The structure includes a slope protection body (1) with an external inclined slope. Waterproof boards (11) are installed on both sides of the slope protection body (1). A first planting platform (4) is fixed at the upper end of the slope protection body (1). Several sets of second planting platforms (3) are located on the inclined slope and are equidistant from each other along its surface. A water collection trough (2) is arranged at the lower end of the inclined slope on the outside of the slope protection body (1). A drain outlet is provided on one side of the water collection trough (2). The slope protection body (1) is provided with drainage channels (101) on both sides of the inclined slope. The lower end of the drainage channel (101) is located on the water collection channel (2). The first planting platform (4) is provided with a first water outlet (401) at equal intervals on one side of its inner side. The second planting platform (3) is provided with a number of second water outlets (31) at equal intervals on the lower side of its inner side. The top of the first planting platform (4) and the second planting platform (3) are both provided with planting troughs.
2. The ecological slope protection drainage structure according to claim 1, characterized in that: The lower end of the slope protection body (1) away from the inclined slope is fixed with a steel reinforcement layer (12), and the upper end of the waterproof board (11) is higher than the surface of the slope protection body (1).
3. The ecological slope protection drainage structure according to claim 1, characterized in that: A water baffle (41) is fixedly connected to one side of the upper end of the first planting platform (4), and the height of the water baffle (41) is higher than the height of the first planting platform (4).
4. The ecological slope protection drainage structure according to claim 3, characterized in that: The upper end of the water collection tank (2) is provided with opening slots (201) on both sides. A first filter screen (202) is installed on the opening slot (201). A second filter screen (22) is installed on one side of the water collection tank (2). A sealing plate (21) is connected to the upper end of the second filter screen (22). The opening slot (201) and the diversion channel (101) are positioned correspondingly.
5. The ecological slope protection drainage structure according to claim 2, characterized in that: The cross-sectional shape of the inclined slope can be a single slope, a bend, or a steep sill structure, and the surface roughness of the inclined slope is between 0.01 and 0.017.