Concrete cofferdam pouring bin for inland waterway construction

By combining precast concrete blocks with positioning holes, positioning pipes, and underwater tie bars, the sequential and segmented pouring of underwater concrete cofferdams was achieved, solving the problems of long underwater formwork operation time and high construction difficulty in traditional concrete cofferdam construction, and improving construction efficiency and adaptability.

CN224997617UActive Publication Date: 2026-11-20NANJING CHANGJIANG WATERWAY ENG BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522790011.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-20
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

Traditional concrete cofferdam construction involves long underwater formwork operations, high construction difficulty, and the water depth of the waterway does not meet the conditions for the entry of large-scale water machinery.

Method used

The system employs a combination of precast concrete blocks, positioning holes, positioning pipes, and underwater tie bars to form underwater concrete pouring in sequence and compartments. This creates underwater unit frames that adapt to any specific terrain and hydrodynamic field, reducing the amount of concrete poured at one time and improving construction efficiency.

Benefits of technology

It greatly reduces the time and difficulty of underwater formwork operation, improves the efficiency of underwater concrete construction, and adapts to different terrains and hydrodynamic conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997617U_ABST
    Figure CN224997617U_ABST
Patent Text Reader

Abstract

The utility model belongs to the river construction technical field, concretely is a kind of concrete cofferdam pouring storehouse for inland waterway construction, including river body, the inside of river body is evenly provided with a group of precast concrete block in both sides, the opposite face of two groups precast concrete block is provided with water formwork structure in upper side, a pair of positioning hole is opened in the vertical position of precast concrete block, and three pull holes are opened in the horizontal position of precast concrete block, underwater unit frame that adapts arbitrary specific terrain and hydrodynamic field is spliced into by using pull reinforcing steel bar and underwater steel pipe pile to the precast concrete component, underwater concrete is poured in cell to form cofferdam overall structure, formwork is exempted from demolition, pouring is carried out by underwater sequence, and it greatly avoids the problems, such as long duration, great construction difficulty of using conventional formwork underwater operation, while reducing single pouring amount, improve the construction efficiency of underwater concrete.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of river construction technology, specifically a concrete cofferdam casting silo for inland waterway construction. Background Technology

[0002] A concrete cofferdam is a temporary water-retaining structure made primarily of concrete. It is mainly used for diversion during water conservancy construction. It features strong erosion and seepage resistance, small cross-section, and high water head. The top of the cofferdam can overflow. It is mostly built on a rock foundation and is used to intercept water flow during construction, creating dry conditions for the construction of structures.

[0003] Traditional concrete cofferdams still have some problems in use. Traditional concrete cofferdam construction treats the cofferdam body as a whole and uses methods such as setting up molds to pour the cofferdam as a whole. This leads to problems such as long underwater formwork operation time and high construction difficulty. At the same time, during the waterway construction stage, the water depth of the waterway does not meet the conditions for the entry of large water machinery. Therefore, in order to address the above problems, a concrete cofferdam pouring chamber for inland waterway construction is proposed. Utility Model Content

[0004] To overcome the shortcomings of existing technologies, traditional concrete cofferdam construction treats the cofferdam body as a whole and pours it as a whole by setting up molds and other methods. This results in problems such as long underwater formwork operation time and high construction difficulty. At the same time, during the waterway construction stage, the water depth of the waterway does not meet the conditions for the entry of large water machinery. This utility model proposes a concrete cofferdam pouring silo for inland waterway construction.

[0005] The technical solution adopted by this utility model to solve its technical problem is as follows: The concrete cofferdam casting chamber for inland waterway construction of this utility model includes a waterway body. A set of precast concrete blocks is set on both sides of the interior of the waterway body. An underwater template structure is set on the upper side of the opposite face of the two sets of precast concrete blocks. A pair of positioning holes are opened at the vertical position of the precast concrete blocks, and three tie holes are opened at the horizontal position of the precast concrete blocks. Baffles are fixedly connected to both ends of the opposite face of the two sets of precast concrete blocks, and an underwater base is set in the middle of the opposite face of the two sets of precast concrete blocks and the two baffles.

[0006] Preferably, the underwater formwork structure includes several steel formworks, with several horizontal I-beams fixedly connected to the outside of the steel formworks, and an underwater base is provided inside the steel formworks. Several underwater tie bars are installed through the inside of the steel formworks, and vertical I-beams are fixedly connected to the outside of the horizontal I-beams.

[0007] Preferably, the precast concrete blocks are staggered, and the surfaces of two adjacent precast concrete blocks are in contact.

[0008] Preferably, a positioning tube is provided through the interior of several positioning holes located in the same vertical direction, and an underwater tie bar is provided through the interior of two tie holes located in the same horizontal position.

[0009] Preferably, the steel template is located on the top surface of the underwater base, and angle steel is fixedly connected to the outer side of the vertically adjacent steel template.

[0010] Preferably, a construction platform is fixedly connected to the top surface of the water-based base, and a protective fence is fixedly connected to the top surface of the construction platform.

[0011] The advantages of this utility model are: 1. This utility model uses positioning tubes and positioning holes to position precast concrete blocks. Underwater tie bars and tie holes are used to reinforce the precast concrete blocks. Then, two sets of precast concrete blocks are combined to complete the underwater precast concrete component assembly. The position between the two sets of precast concrete blocks and the two baffles is the underwater concrete pouring area. This application uses tie bars and underwater steel pipe piles to splice precast concrete components into underwater unit frames that adapt to any specific terrain and hydrodynamic field. Underwater concrete is poured in the unit cells to form the overall structure of the cofferdam. The formwork does not need to be removed. Underwater sequential and segmented pouring is adopted, which greatly avoids the problems of long underwater operation time and high construction difficulty when using conventional formwork. At the same time, it reduces the amount of water poured at one time and improves the construction efficiency of underwater concrete. Attached Figure Description

[0012] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0013] Figure 1 This is a three-dimensional structural diagram of the present invention; Figure 2 This is a schematic diagram of the structure of the precast concrete block of this utility model; Figure 3 This is a schematic diagram of the underwater base of this utility model; Figure 4 This is a schematic diagram of the structure of the waterborne base of this utility model.

[0014] In the diagram: 1. Riverbed; 2. Precast concrete block; 3. Surface formwork structure; 4. Surface construction platform; 5. Positioning hole; 6. Tie hole; 7. Positioning pipe; 8. Underwater tie bar; 9. Baffle; 10. Underwater base; 11. Horizontal I-beam; 12. Surface tie bar; 13. Surface base; 14. Vertical I-beam; 15. Angle steel; 16. Steel formwork. Detailed Implementation

[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0016] Please see Figures 1-4 As shown, a concrete cofferdam casting chamber for inland waterway construction includes a waterway body 1. Inside the waterway body 1, a set of precast concrete blocks 2 are set on both sides. A water-based formwork structure 3 is set on the upper part of the opposite face of the two sets of precast concrete blocks 2. A pair of positioning holes 5 are opened at the vertical position of the precast concrete blocks 2, and three tie holes 6 are opened at the horizontal position of the precast concrete blocks 2. Baffles 9 are fixedly connected to both ends of the opposite face of the two sets of precast concrete blocks 2, and an underwater base 10 is set in the middle of the opposite face of the two sets of precast concrete blocks 2 and the two baffles 9. In traditional concrete cofferdam construction, the cofferdam body is treated as a whole and poured as a whole by setting up molds. This results in problems such as long underwater formwork operation and high construction difficulty. By directly placing large-volume precast components underwater using precast concrete blocks 2, the placed precast concrete components will serve as concrete formwork and concrete cofferdam body in subsequent construction, which greatly improves construction efficiency.

[0017] Furthermore, the water-based formwork structure 3 includes several steel formworks 16, several horizontal I-beams 11 are fixedly connected to the outside of the steel formworks 16, and a water-based base 13 is provided inside the steel formworks 16. Several water-based tie bars 12 are installed through the inside of the steel formworks 16, and vertical I-beams 14 are fixedly connected to the outside of the horizontal I-beams 11. During operation, after the underwater base 10 is constructed, a 6.0m×4.0m×2.4m template structure is assembled using 1.5m×1.2m steel templates 16, and the template is then hoisted to the top surface of the underwater base 10 using hoisting equipment.

[0018] Furthermore, several precast concrete blocks 2 are staggered, and the surfaces of two adjacent precast concrete blocks 2 are in contact. During operation, a fixed number of precast concrete blocks 2 are arranged in a line along the direction of water flow inside the riverbed body 1. The positioning tube 7 is inserted into the positioning hole 5 on the upper side of the precast concrete block 2. After the first row of underwater precast components on one side is completed, the subsequent precast concrete blocks 2 are staggered and placed on the first layer through the positioning hole 5 along the positioning tube 7 to complete the second row of precast components on one side. The above operation is repeated to complete the third and fourth layers in sequence. After the underwater precast components on the other side are completed, underwater tie bars 8 are placed between the two sets of precast concrete blocks 2. A baffle 9 is placed in the upstream and downstream areas between the two sets of precast concrete blocks 2 to complete the underwater concrete precast component assembly. The position between the two sets of precast concrete blocks 2 and the two baffles 9 is the underwater concrete pouring area.

[0019] Furthermore, positioning tubes 7 are installed through the interior of several positioning holes 5 located in the same vertical direction, and underwater tie bars 8 are installed through the interior of two tie holes 6 located in the same horizontal position. During operation, underwater drilling and rock blasting are carried out at the designated location, and the positioning pipe 7 is buried inside the bedrock of the river body 1. The upper end of the positioning pipe 7 can always be above the water surface of the river under any hydrological conditions, which facilitates the subsequent positioning and placement of the precast concrete blocks 2.

[0020] Furthermore, the steel formwork 16 is located on the top surface of the underwater base 10, and angle steel 15 is fixedly connected to the outer side of the vertically adjacent steel formwork 16; During construction, horizontal I-beams 11 are used to form horizontal ribs on the outside of the steel formwork 16, with a horizontal spacing of 54cm. Vertical I-beams 14 are used to form vertical ribs on the outside of the steel formwork 16, with a vertical spacing of 150cm. Angle steel 15 is used at the corners. The interior is reinforced with underwater tie bars 12 to ensure sufficient strength, rigidity and stability to withstand the gravity lateral pressure of the poured concrete and various loads that may be generated during construction.

[0021] Furthermore, a water-based construction platform 4 is fixedly connected to the top surface of the water-based base 13, and a protective fence is fixedly connected to the top surface of the water-based construction platform 4. During the operation, concrete is poured into the inside of the steel formwork 16 to form the water base 13. Finally, the water construction platform 4 is fixed on the top surface of the water base 13 to complete the concrete cofferdam pouring construction.

[0022] Working principle: Underwater drilling and rock blasting are carried out at a predetermined location, and the positioning pipe 7 is buried inside the bedrock of the river body 1. The upper end of the positioning pipe 7 can always be above the water surface under any hydrological conditions of the river, which facilitates the subsequent positioning and placement of precast concrete blocks 2. A fixed number of precast concrete blocks 2 are arranged in a line along the direction of water flow inside the river body 1, and the positioning pipe 7 is inserted into the positioning hole 5 on the upper side of the precast concrete block 2. After the first drainage of precast components on one side is completed, the subsequent precast concrete blocks 2 are placed through the positioning hole 5 along the positioning pipe 7. The precast components are staggered and placed on the first layer to complete the second row of precast components on one side. The above operation is repeated to complete the placement of the third and fourth layers in sequence. After the placement of the underwater precast components on the other side is completed, underwater tie bars 8 are placed between the two sets of precast concrete blocks 2. A baffle 9 is placed in the upstream and downstream areas between the two sets of precast concrete blocks 2 to complete the underwater concrete precast component assembly. The position between the two sets of precast concrete blocks 2 and the two baffles 9 is the underwater concrete pouring area. Then, underwater pouring is carried out to form the underwater base 10.

[0023] After the underwater base 10 is constructed, 1.5m×1.2m steel formwork 16 is assembled into a 6.0m×4.0m×2.4m formwork structure. The formwork is then hoisted to the top of the underwater base 10 using hoisting equipment. Horizontal I-beams 11 are used to form horizontal ribs on the outside of the steel formwork 16, with a horizontal spacing of 54cm. Vertical I-beams 14 are used to form vertical ribs on the outside of the steel formwork 16, with a vertical spacing of 150cm. Angle steel 15 is used at the corners. The interior is reinforced with underwater tie bars 12 to ensure sufficient strength, rigidity, and stability to withstand the gravity lateral pressure of the poured concrete and various loads that may be generated during construction. The interior of the steel formwork 16 is then poured underwater to form the underwater base 13. Finally, the underwater construction platform 4 is fixed to the top of the underwater base 13 to complete the concrete cofferdam pouring construction.

[0024] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, or similar improvements made within the theoretical and principle content of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A concrete cofferdam casting platform for inland waterway construction, comprising the waterway body (1), characterized in that: Inside the river body (1), a set of precast concrete blocks (2) is provided on both sides. A water formwork structure (3) is provided on the upper side of the opposite face of the two sets of precast concrete blocks (2). A pair of positioning holes (5) are opened in the vertical position of the precast concrete blocks (2), and three tie holes (6) are opened in the horizontal position of the precast concrete blocks (2). Baffles (9) are fixedly connected to both ends of the opposite face of the two sets of precast concrete blocks (2), and an underwater base (10) is provided in the middle of the opposite face of the two sets of precast concrete blocks (2) and the two baffles (9).

2. The concrete cofferdam casting silo for inland waterway construction according to claim 1, characterized in that: The above-water template structure (3) includes several steel templates (16), several horizontal I-beams (11) are fixedly connected to the outside of the steel templates (16), and an above-water base (13) is set inside the steel templates (16). Several above-water tie bars (12) are installed through the inside of the steel templates (16), and vertical I-beams (14) are fixedly connected to the outside of the horizontal I-beams (11).

3. A concrete cofferdam casting silo for inland waterway construction according to claim 1, characterized in that: Several of the precast concrete blocks (2) are staggered, and the surfaces of two adjacent precast concrete blocks (2) are in contact.

4. A concrete cofferdam casting silo for inland waterway construction according to claim 1, characterized in that: Positioning tubes (7) are installed inside several positioning holes (5) located in the same vertical direction, and underwater tie bars (8) are installed inside two tie holes (6) located in the same horizontal position.

5. A concrete cofferdam casting silo for inland waterway construction according to claim 2, characterized in that: The steel template (16) is located on the top surface of the underwater base (10), and angle steel (15) is fixedly connected to the outer side of the vertically adjacent steel template (16).

6. A concrete cofferdam casting silo for inland waterway construction according to claim 2, characterized in that: The top surface of the water-based base (13) is fixedly connected to a water-based construction platform (4), and the top surface of the water-based construction platform (4) is fixedly connected to a protective fence.