water-stopping wall

Through innovative design of support pipes and connectors, combined with waterstop strips and grouting units, the problem of insufficient adaptability and anti-overturning properties of waterstop walls in construction space is solved, achieving a highly efficient and stable water-stopping effect suitable for various construction environments.

CN224997622UActive Publication Date: 2026-11-20AVIC GEOTECHN ENG INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522551386.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-01
Publication Date
2026-11-20
Estimated Expiration
2035-12-01

AI Technical Summary

Technical Problem

Existing waterstop walls are insufficient in terms of adaptability to construction space and resistance to overturning, making it difficult to balance construction impact and overall stability.

Method used

The design employs a support pipe, a first connector, and a second connector. The support pipe is made of a round tube of low alloy steel. The first connector and the second connector are distributed at an angle to form a groove and a notch. Adjacent water-stop structures seal the notch through a second connecting plate. Combined with the water-stop strip and grouting unit, a continuous and reliable water-stop barrier is formed.

Benefits of technology

It improves the construction efficiency and overall stability of the waterstop wall, enhances its anti-overturning ability, reduces the risk of leakage, adapts to various construction spaces, and protects cultural relics and limited building environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997622U_ABST
    Figure CN224997622U_ABST
Patent Text Reader

Abstract

The application provides a water stop wall, comprising a plurality of water stop structures, the water stop structure comprising a support pipe, a first connecting piece and a second connecting piece, the steel pipe can independently bear complex external forces such as lateral earth pressure, water pressure and construction load, the overall stability of the water stop structure is ensured, the first connecting piece is designed by first connecting plates and second connecting plates which are at an angle with each other, the angle structure can disperse stress, when the stratum produces a small displacement, the second connecting plate can be adjusted in the slot, the defect that the rigid connection is easy to crack is avoided, and the long-term stability of the connection is ensured, the second connecting piece and the support pipe form a slot, and a gap which is communicated with the slot is arranged, the second connecting plate of the adjacent water stop structure can be inserted into the slot and block the gap, the overall adhesion of the embedded part is realized, there is no splicing gap, and a continuous and reliable water stop barrier is formed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of foundation pit construction technology, and in particular to a water-stop wall. Background Technology

[0002] Currently, the main structural forms used for foundation pit support that combine water stopping and retaining include high-pressure jet grouting piles, cement-soil mixing piles, and steel sheet piles.

[0003] However, most of the related technologies have poor adaptability to construction space, rely on large equipment and complex components, and some waterstops have low requirements for construction space, but poor overall overturning resistance. In other words, waterstops cannot take into account both construction and overturning resistance. Utility Model Content

[0004] This application provides a waterstop wall that can solve the problem in related technologies where waterstop walls are difficult to balance construction impact and overturning resistance.

[0005] This application provides a water-stopping wall, including multiple water-stopping structures, wherein the water-stopping structures include: Support tube; The first connector includes a first connecting plate and a second connecting plate that are connected to each other and form an angle. The first connecting plate is connected to the support tube, and the second connecting plate is located at the end of the first connecting plate away from the support tube. The second connector is connected to the support tube and is distributed circumferentially with the first connector on the support tube. The second connector and the support tube enclose each other to form a groove, and the second connector forms a notch that communicates with the groove. The second connecting plate of one of the water-stop structures is located within the groove of the adjacent water-stop structure and seals the gap.

[0006] In some embodiments, the water-stopping structure further includes a water-stopping strip disposed between the second connecting plate and the second connecting member, and connecting the second connecting plate and the second connecting member.

[0007] In some embodiments, the waterstop strip is an adhesive component and has adhesive properties; Alternatively, the waterstop strip may be bonded to the second connector.

[0008] In some embodiments, the second connector includes two sub-connectors, each sub-connector including a third connecting plate and a fourth connecting plate at an angle, one end of the third connecting plate being connected to the support tube, and the other end of the third connecting plate being connected to the fourth connecting plate. The groove is formed between the third connecting plate and the fourth connecting plate of the two sub-connectors and the support tube. The fourth connecting plates of the two sub-connectors are spaced apart to form the notch. The second connecting plate of one of the water-stopping structures is located in the adjacent groove of the other, and connects the two fourth connecting plates to seal the gap.

[0009] In some embodiments, the support tube is a circular tube, and the two sub-connectors are distributed about a first axis of symmetry, which is parallel to one diameter of the support tube.

[0010] In some embodiments, the support tube is a circular tube, and the second connecting plate includes two sub-connecting plates, which are located on opposite sides of the first connecting plate and are symmetrically distributed about the first connecting plate. The width direction of the first connecting plate is parallel to the extension direction of one diameter of the support tube.

[0011] In some embodiments, the plurality of water-stopping structures include a first water-stopping structure, wherein the first connector and the second connector in the first water-stopping structure are located on opposite sides of the support pipe.

[0012] In some embodiments, the first connecting plate and the second connecting plate are integrally formed.

[0013] In some embodiments, the outer surface of the support tube is a closed curved surface with a smooth transition.

[0014] In some embodiments, both the first connector and the second connector extend along the length of the support tube and are flush with both ends of the support tube along the length of the support tube.

[0015] Based on the embodiments of this application, the waterstop wall can independently bear complex external forces such as deep stratum pressure and construction load through steel pipes, ensuring the overall stability of the waterstop structure. The first connector adopts a design of a first connecting plate and a second connecting plate that are angled to each other. The angled structure can disperse stress. When the stratum undergoes slight displacement, the second connecting plate can be slightly adjusted in the groove, avoiding the defect of easy cracking of rigid connection and ensuring the long-term stability of connection. The second connector and the support pipe enclose to form a groove, and there is a notch communicating with the groove. The second connecting plate of the adjacent waterstop structure can be inserted into the groove and seal the notch, realizing full fit at the joint without splicing gap, forming a continuous and reliable waterstop barrier. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the structure of the waterstop wall provided in the embodiments of this application; Figure 2 yes Figure 1 A structural schematic diagram of the waterstop wall from another perspective; Figure 3 This is a flowchart of the construction method for the waterstop wall provided in the embodiments of this application; Figure 4 This is a structural schematic diagram of the waterstop wall under construction conditions provided in the embodiments of this application; Figure 5 yes Figure 1 The diagram shows a structural schematic from another perspective during the construction of the waterstop wall. Figure 6 yes Figure 5 A schematic diagram of the cross-sectional structure at point AA.

[0017] Explanation of reference numerals in the attached figures: 1. Water-stop wall; 11. Water-stopping structure; 10. Support pipe; 20. First connector; 21. First connecting plate; 22. Second connecting plate; 30. Second connector; 30a. Groove; 30b. Notch; 31. Sub-connector; 311. Third connecting plate; 312. Fourth connecting plate; 40. Water stop strip; 2. Partition board; 3. Positioning block; 301. Main body; 301a. First abutment surface; 301b. Second abutment surface; 302. Fixing plate; 303. Positioning pin. Detailed Implementation

[0018] The technical solutions in this application will be clearly and thoroughly described below with reference to the accompanying drawings. In the description of the embodiments of this application, unless otherwise stated, " / " means "or," for example, A / B can mean A or B. "And / or" in the text is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Furthermore, in the description of the embodiments of this application, "multiple" refers to two or more than two.

[0019] Hereinafter, the terms "first" and "second" are used for descriptive purposes only and should not be construed as implying or suggesting relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.

[0020] In related technologies, most waterstop walls have poor adaptability to construction space and rely on large equipment and complex components. Some waterstop walls have low requirements for construction space, but poor overall overturning resistance. In other words, waterstop walls cannot take into account both construction and overturning resistance.

[0021] To address the aforementioned problems, this application provides a water-stop wall 1, comprising multiple water-stop structures 11. Each water-stop structure 11 includes a support pipe 10, a first connector 20, and a second connector 30. The following will describe... Figures 1 to 2 The support tube 10, the first connector 20, and the second connector 30 are further described.

[0022] The support pipe 10 can be made of low alloy steel round pipe. The mechanical properties of the steel pipe itself (bending resistance, shear resistance, and extrusion resistance) are far superior to those of plate-shaped components or other non-metallic materials. It can independently bear complex external forces such as deep stratum pressure and construction loads, ensuring the overall stability of the water-stop structure 11.

[0023] The first connecting member 20 includes a first connecting plate 21 and a second connecting plate 22 that are connected to each other and form an angle. Both can be made of steel to ensure structural rigidity. The first connecting plate 21 is connected to the support pipe 10, and the second connecting plate 22 is located at the end of the first connecting plate 21 that is away from the support pipe 10.

[0024] The first connecting plate 21 is directly welded to the outer peripheral side wall of the support pipe 10, realizing an integrated connection with the support pipe 10, avoiding the risk of loosening caused by later splicing, and strengthening the overall load-bearing and water-stopping performance of the water-stopping structure 11.

[0025] The second connector 30 is connected to the support tube 10 and is distributed circumferentially with the first connector 20 in the support tube 10. The second connector 30 can also be made of steel to ensure its structural rigidity. The second connector 30 and the support tube 10 enclose each other to form a groove 30a, and the second connector 30 forms a notch 30b that communicates with the groove 30a. The second connecting plate 22 of one of the water-stop structures 11 is located in the groove 30a of the adjacent water-stop structure 11 and seals the gap 30b, achieving a full fit at the fitting point and forming a continuous and reliable water-stop barrier.

[0026] In this embodiment, the second connecting plate 22 is designed to fit the groove 30a of the second connecting member 30, and can be directly inserted into the groove 30a of the adjacent water-stop structure 11. The fitting operation is simple, no complex alignment is required, and the construction efficiency is improved.

[0027] The first connecting plate 21 and the second connecting plate 22 are designed at an angle to each other. The angle structure can disperse stress. When the stratum undergoes a small displacement, the first connecting plate 21 can move slightly within the notch 30b, and the second connecting plate 22 can be slightly adjusted within the groove 30a. This avoids the defect of rigid connection being prone to cracking and ensures the long-term stability of the connection.

[0028] It is understood that in this embodiment of the application, the second connector 30 and the first connector 20 are distributed circumferentially around the support pipe 10, which not only ensures the number of fitting interfaces of each water-stop structure 11 (which can realize multi-directional adjacency), but also optimizes the structural stress through reasonable spatial layout and improves the overall stability.

[0029] When multiple water-stop structures 11 are distributed along the first direction, the multiple water-stop structures 11 include a first water-stop structure. The first connector 20 and the second connector 30 in the first water-stop structure are located on opposite sides of the support pipe 10. For a rectangular foundation pit, at the corner, i.e. at the right-angle bend, the multiple water-stop structures 11 include a second water-stop structure. The water-stop structure 11 located at the corner is defined as the second water-stop structure. At this time, the first connector 20 and the second connector 30 are distributed at right angles.

[0030] It is also understandable that the distribution of the first connector 20 and the second connector 30 is set according to the shape of the foundation pit, and no restrictions are imposed here.

[0031] In some of these embodiments, please refer to Figure 2 The second connector 30 includes two sub-connectors 31. Each sub-connector 31 includes a third connecting plate 311 and a fourth connecting plate 312 at an angle. One end of the third connecting plate 311 is connected to the support tube 10, and the other end of the third connecting plate 311 is connected to the fourth connecting plate 312. The third connecting plate 311 and the fourth connecting plate 312 in the two sub-connectors 31 form a groove 30a between them and the support tube 10. The fourth connecting plates 312 in the two sub-connectors 31 are spaced apart to form a notch 30b. The second connecting plate 22 of one of the water-stopping structures 11 is located in an adjacent groove 30a and connects two fourth connecting plates 312 to seal the gap 30b.

[0032] Two sub-connectors 31 are symmetrically distributed and together with the support pipe 10 form a groove 30a. When the second connecting plate 22 of the adjacent water-stop structure 11 is inserted into the groove 30a, it needs to be connected to the two fourth connecting plates 312 at the same time. Compared with the single-sided contact of a single connecting plate and the groove 30a, the double contact point can evenly distribute the force to the two sub-connectors 31, avoid the loosening of the fit caused by single-point force, and significantly improve the connection stability of the adjacent water-stop structure 11.

[0033] The third connecting plate 311 and the fourth connecting plate 312 are designed at an angle. When the third connecting plate 311 and the fourth connecting plate 312 are an integral structure, they can form an angle steel, which together with the support pipe 10 constitutes a triangular support structure. The triangular structure has natural stability and can effectively resist the deformation of the fourth connecting plate 312 caused by the fitting force or the pressure of the stratum, avoiding the expansion of the notch 30b caused by the deformation of the connecting piece 31 due to the groove 30a factor, and always maintaining a tight fit with the second connecting plate 22, ensuring long-term reliable connection.

[0034] When the stratum is subjected to lateral pressure due to construction disturbance or groundwater dewatering, the pressure will act on the fitting of the water-stop structure 11. If it is a single fourth connecting plate 312, it is easy to bend and deform due to excessive force on one side. However, the fourth connecting plate 312 of the two sub-connectors 31 can share the pressure in both directions and transmit the external force evenly to the support pipe 10 through the third connecting plate 311, so as to avoid deformation of the groove 30a or detachment of the second connecting plate 22 caused by local stress concentration, and improve the overall structure's resistance to compression.

[0035] Both the third connecting plate 311 and the fourth connecting plate 312 are flat plates. The notch 30b formed by the fourth connecting plate 312 in the two sub-connectors 31 is not only the insertion channel of the second connecting plate 22, but also plays a guiding and positioning role. During construction, there is no need for complicated alignment. The second connecting plate 22 can be directly inserted into the groove 30a simply by aligning it with the notch 30b. Since the second connecting plate 22 is also flat, in a narrow construction space, there is no need for large auxiliary equipment to adjust the angle. The second connecting plate 22 can be attached to the two fourth connecting plates 312, which greatly simplifies the fitting operation and improves construction efficiency.

[0036] After the second connecting plate 22 is inserted into the groove 30a, it needs to be simultaneously fitted with the two fourth connecting plates 312 to form two sealing interfaces. Compared with a single sealing interface, the double sealing interface can significantly reduce the probability of leakage. Even if one interface has a gap due to a small error, the other interface can still block groundwater seepage, thereby further reducing the risk of leakage at the joint.

[0037] Following the above, when the support tube 10 is a circular tube, the two sub-connectors 31 are distributed about the first axis of symmetry, which is parallel to one of the diameters of the support tube 10.

[0038] Even if the symmetrically distributed sub-connectors 31 are exactly located in the direction of the diameter of the support pipe 10 under stress, when the stratum pressure and construction load act on the fourth connecting plate 312, the force will be directly transmitted to the support pipe 10 along the axis of symmetry through the two sub-connectors 31, and then evenly distributed to the whole along the circumference of the circular pipe. Compared with asymmetrical distribution (such as unilateral offset), this can greatly reduce the problem of bending of the sub-connectors 31 caused by excessive force on one side, especially resisting the lateral compression of complex strata, protecting the structural integrity of the sub-connectors 31 and the support pipe 10, and extending the service life.

[0039] The two sub-connectors 31 are about the axis of symmetry (one diameter of the support tube 10), that is, the third connecting plate 311 and the fourth connecting plate 312 are unlikely to be deformed by uneven force, resulting in one side being stretched and the other side being compressed. On the other hand, the stress state of the triangular support structure is basically the same, which can prevent one of the sub-connectors 31 from being damaged prematurely due to overload, ensuring that the groove 30a maintains a stable shape for a long time and does not affect the fitting effect of the two adjacent water-stop structures 11.

[0040] In one embodiment of this application, the water-stopping structure 11 further includes a water-stopping strip 40, which is disposed between the second connecting plate 22 and the second connecting member 30 and connects the second connecting plate 22 and the second connecting member 30.

[0041] The waterstop strip 40 (also known as the water-blocking strip) can be made of water-swellable rubber, elastic rubber, or other materials. It can fill the gaps on the surface of the second connecting plate 22 and the second connecting piece 30 caused by processing errors, or the tiny gaps that may appear at the joint due to construction errors or long-term stratum deformation, thus preventing water seepage channels from being left because "the surfaces cannot be completely fitted".

[0042] When the stratum experiences slight settlement or lateral displacement, the waterstop strip 40 (such as water-swellable rubber) has a certain elasticity or expansibility, and can deform with the slight movement of the waterstop structure 11. It will not break or detach due to the misalignment of the waterstop structure 11, and will always maintain close contact with the second connecting plate 22 and the second connecting piece 30.

[0043] In addition, the waterstop strip 40 has a certain degree of elasticity and can serve as an elastic buffer layer. It can isolate the direct rigid contact between the second connecting plate 22 and the second connecting piece 30, avoid structural damage caused by metal friction and stress concentration during construction or ground displacement, and extend the service life of the waterstop structure 11.

[0044] like Figure 2As shown, the second connector 30 includes a sub-connector 31, and the sub-connector 31 includes a third connecting plate 311 and a fourth connecting plate 312. Each water-stop structure 11 can be provided with two water-stop strips 40, which are respectively attached to the third connecting plate 311 and the fourth connecting plate 312. In this way, a reinforced double seal can be formed, thereby further reducing the risk of water leakage.

[0045] Following the above, when the waterstop strip 40 is made of rubber, it functions as an adhesive component and possesses adhesive properties. Therefore, the adhesive waterstop strip 40 does not require additional fasteners (such as bolts or clips) and can directly and quickly adhere to the surface of the second connector 30, i.e., the fourth connecting plate 312, through its own adhesion. Especially in confined construction spaces (such as corners of foundation pits or compact areas around the support pipe 10), it eliminates the need for drilling and welding, reduces tool reliance, and allows for positioning and adhesion by a single person, significantly shortening installation time and further improving overall construction efficiency.

[0046] Alternatively, the waterstop strip 40 can be directly bonded to the second connector 30 with adhesive. There are no restrictions on this. Based on the material of the waterstop strip 40 itself, the waterstop strip 40 has a large friction force. After the second connecting plate 22 is inserted into the groove 30a, it can achieve a relatively stable connection with the second connecting plate 22, ensuring the stability of the entire waterstop wall 1.

[0047] Understandably, based on the splicing of adjacent waterstop structures 11 by inserting the second connecting plate 22 into the groove 30a, during the construction phase, the adjacent second connecting plates 22 need to be aligned with the notch 30b and inserted, and then fixed by fitting pressure. However, during the insertion process, if there is slight vibration in the stratum or operational error by the construction personnel, the second connecting plate 22 may wobble slightly within the groove 30a, causing misalignment. The adhesiveness of the adhesive waterstop strip 40 can generate an adsorption force at the moment of contact between the second connecting plate 22 and the second connecting piece 30, temporarily sticking the two together and playing a pre-fixing role. This pre-fixing can reduce relative displacement during construction, help to quickly and accurately complete the alignment, and play the function of assisting in connecting the two adjacent waterstop structures 11.

[0048] On the other hand, since the two adjacent water-stop structures 11 do not require drilling, and there is no need to process or damage the water-stop structure 11, the structural rigidity of the water-stop structure 11 can be completely preserved.

[0049] In one embodiment of this application, please refer to Figure 2 The second connecting plate 22 includes two sub-connecting plates, which are located on opposite sides of the first connecting plate 21 and are symmetrically distributed about the first connecting plate 21. Assuming the support tube 10 is a circular tube, the width direction of the first connecting plate 21 is parallel to the extension direction of one diameter of the support tube 10.

[0050] The width direction of the first connecting plate 21 is parallel to the extension direction of one diameter of the support pipe 10, which means that the force transmission path along the sub-connecting plate, the first connecting plate 21, and the support pipe 10 is consistent with the force direction along the diameter of the support pipe 10. The mechanical properties of a circular pipe determine that the force along the diameter direction can be evenly distributed around the circumference. That is, when the circular pipe is subjected to compression, the force in the diameter direction can be quickly transmitted to the entire pipe wall. This design can directly guide the external force borne by the sub-connecting plate into the support pipe 10 along the diameter direction, avoiding local stress concentration caused by the deviation of the force transmission path.

[0051] Both sub-connecting plates are attached to the second connecting piece 30 to form a double interlocking interface. Compared with the single-sided contact of a single connecting plate, the contact area is doubled, and the friction and interlocking force are significantly improved. This can more effectively resist the relative displacement of adjacent water-stopping structures 11, such as vertical displacement caused by ground subsidence and horizontal displacement caused by lateral compression.

[0052] Furthermore, in one embodiment of this application, the first connecting plate 21 and the second connecting plate 22 are integrally formed structures. Specifically, they are formed by heating steel billets and rolling them in one go through a rolling mill, resulting in a product with strong integrity and no splicing gaps.

[0053] That is, the first connector 20 can withstand greater bending, shearing and tensile loads. In particular, when the ground pressure is transmitted to the first connector 21 through the second connector 22, the force can be transmitted directly along the continuous metal matrix, avoiding local fractures caused by splicing defects, greatly improving the resistance to damage of the first connector 20, and matching the high strength load-bearing characteristics of the support pipe 10.

[0054] The one-piece molding structure can ensure the accuracy and stability of the angle between the first connecting plate 21 and the second connecting plate 22. External force is smoothly transferred from the second connecting plate 22 to the first connecting plate 21 along the continuous metal structure, and then to the support tube 10, avoiding angle deviation or sudden change in node stiffness caused by splicing, thereby reducing stress concentration at the corner.

[0055] When the support pipe 10 is a circular pipe, in order to further ensure the structural strength of the support pipe 10, in this embodiment of the application, the outer surface of the support pipe 10 is a closed curved surface with a smooth transition. When the support pipe 10 is subjected to force, the force can be transmitted evenly along the circumference. The closed curved surface with a smooth transition has no openings or breaks, and the ground pressure can be completely dispersed through the circumference of the pipe wall without stress concentration points, thereby ensuring the structural strength of the entire support pipe 10 and also having stronger anti-overturning ability.

[0056] It is understood that, in this embodiment of the application, in order to form a continuous waterstop wall 1, the first connector 20 and the second connector 30 both extend along the length direction of the support pipe 10 and are flush with the two ends of the support pipe 10 along the length direction of the support pipe 10. In this way, the first connector 20, the support pipe 10 and the second connector 30 can form a continuous waterstop structure 11 and fit together with the adjacent waterstop structure 11 to form a continuous waterstop wall 1.

[0057] For example, if the seepage layer is located at one-half to three-quarters of the height of the support pipe 10, while the first connector 20 or the second connector 30 is only located at one-third of the height of the support pipe 10, then the first connector 20 and the second connector 30 will hardly be able to play a role in blocking water.

[0058] The first connector 20 and the second connector 30 cover the entire height of the support pipe 10 from the ground surface to the impermeable layer, forming a longitudinal, full-depth sealing with the adjacent water-stopping structure 11. When groundwater from the seepage layer comes into contact with the support pipe 10, it will be directly blocked by the corresponding height of the connector's mating surface and cannot bypass it. Even if there are multiple seepage layers, the sufficiently long first connector 20 and second connector 30 can simultaneously cover multiple seepage layers without additional adjustments, thus providing a good water-blocking function.

[0059] Please see Figure 3 This application embodiment also provides a construction method for implementing the above-described waterstop wall 1. Among the plurality of waterstop structures 11, at least two adjacent waterstop structures 11 constitute a grouting unit. The waterstop wall 1 includes a plurality of grouting units. The construction method includes: Step S02: Place the grouting unit in the construction section; Step S04: Isolate the notch 30b at the end of the grouting unit by using the partition plate 2; Step S06: Grouting is carried out in the construction area; Step S08, remove partition board 2; Step S10: Place the new grouting unit in the construction section and connect it with the grouting unit that has been grouted. Repeat steps S04, S06 and S08 above.

[0060] In this embodiment, three adjacent water-stopping structures 11 constitute a grouting unit, which is the smallest construction unit. There is no need to construct mixing piles first. The grouting unit can be placed directly in any construction section (pre-drilling is required), without being constrained by the feasibility of drilling mixing piles. It can be applied to foundation pit construction scenarios in the protection of immovable cultural relics and in limited building spaces.

[0061] In step S04, the partition plate 2 isolates the notch 30b at the end of the grouting unit, which ensures that the grouting material only fills the inside of the grouting unit and between the grouting unit and the borehole, and does not overflow outside the construction section.

[0062] Step S06: Grouting is performed on the construction section. The grout is a special cement mortar with low heat of hydration of the cement material and quartz sand. It will solidify with the support pipe 10, the first connector 20 and the second connector 30 into one, which not only fills the interlocking gaps, but also strengthens the connection of adjacent water-stopping structures 11, forming a composite water-stopping barrier of metal components and grouting entities.

[0063] In this embodiment of the application, after the grouting material in step S06 is cured, it will bond multiple water-stop structures 11 of the same grouting unit and adjacent grouting units into a continuous whole, so that the force is changed from the independent bearing of a single water-stop structure 11 to the collaborative bearing of the entire water-stop wall 1, which greatly improves the overturning resistance of the water-stop wall 1.

[0064] It should be understood that during the grouting process, mortar should first be injected into the support pipe 10 and the groove 30a to ensure the stability of the water-stop structure 11 and to avoid the overall collapse of the water-stop structure 11 due to uneven stress on the support pipe 10 when grouting into the hole first. Then, mortar should be injected into the borehole.

[0065] When exemplifying the use of the first grouting unit as the first grouting unit and the adjacent grouting unit as the second grouting unit, it should also be understood that, since the first grouting unit and the second grouting unit also form a continuous waterstop wall 1, in this embodiment, during grouting, the groove 30a at the end of the first grouting unit is not grouted. Figure 4 The orientation shown is for reference only. That is, the rightmost groove 30a is not grouted first. When the second grouting unit is grouted, the upper partition plate 2 is removed, and mortar is injected into the groove 30a in the first grouting unit and the support pipe 10 in the second grouting unit as well as into the groove 30a. However, it is understandable that the groove 30a at the end of the second grouting unit is not grouted at this time.

[0066] In this embodiment of the application, when the new grouting unit is connected to the grouting unit, even if there is a slight deviation in the insertion of the second connecting plate 22 into the groove 30a, the grouting material in the subsequent step S06 can fill the deviation gap, that is, strict alignment is not required, and the stability of the two adjacent water-stopping structures 11 can be guaranteed.

[0067] Furthermore, step S02 includes: S21, continuous drilling in the construction section; S22, each water-stopping structure 11 in the grouting unit is placed into the corresponding borehole in sequence, and the positioning block 3 is set to support the support pipe 10 simultaneously.

[0068] This involves directly cutting the strata in the construction section using high-penetration drilling equipment, forming a linear continuous hole along the construction section. After the water-stop structure 11 is placed, the gap between adjacent holes can be completely filled by grouting, avoiding the risk of water seepage caused by excessive interlocking gaps.

[0069] In addition, continuous drilling can complete the drilling of the entire construction section in one go, and the time for subsequent water-stopping structure 11 can be controlled independently. Even if the work is temporarily stopped after drilling, it will not cause the hole position to fail.

[0070] In this embodiment, continuous drilling and sequential placement of the water-stopping structure 11 are achieved without the need for drilling mixing piles using a mixing pile machine (large equipment generates significant vibration and strong ground disturbance, which can easily lead to settlement of the cultural relic foundation). Continuous drilling can be completed using small drilling equipment, greatly reducing the vibration amplitude, which is far below the disturbance threshold allowed for the protection of cultural relics. The water-stopping structure 11 is an independent modular unit with small size and controllable weight. It can be moved in a small area around the cultural relic by small hoisting equipment (such as a manual hoist), without occupying a large area of ​​the cultural relic protection area. This avoids damaging the surrounding terrain, vegetation or ancillary facilities, thus meeting the core principle of "minimal intervention" in the field of geotechnical engineering for cultural relic protection.

[0071] The positioning block 3 is set synchronously with the water-stop structure 11, directly supporting the outer wall of the support pipe 10, and can calibrate the verticality of the support pipe 10 in real time. In this embodiment, when each water-stop structure 11 is placed, two positioning blocks 3 are set, and the two positioning blocks 3 are arranged in a cross shape with the first connector 20 and the second connector 30.

[0072] In the embodiments of this application, please refer to Figure 5 as well as Figure 6 The positioning block 3 includes a main body 301 and a fixing plate 302 at the end. The main body 301 has a first abutting surface 301a and a second abutting surface 301b spaced apart. The first abutting surface 301a fits against the side wall of the support pipe 10, and the second abutting surface 301b fits against the inner side wall of the drilled hole. The fixing plate 302 protrudes from the second abutting surface 301b. A plurality of positioning nails 303 protrude from the side of the fixing plate 302 facing the main body 301. The positioning nails 303 can be inserted into the soil where no hole has been drilled.

[0073] The first contact surface 301a forcibly restricts the radial displacement of the support tube 10, ensuring that the support tube 10 always maintains a preset posture, such as being perpendicular to the bottom wall of the borehole. The second contact surface 301b is in close contact with the borehole wall, further locking the support tube 10 in the center position of the borehole.

[0074] The fixing plate 302 protrudes from the second abutment surface 301b, which can further expand the contact area with the borehole wall, disperse the radial pressure transmitted by the support tube 10, prevent the positioning block 3 from sinking into the borehole wall due to excessive pressure, and supplement the fixing strength of the abutment surface. The positioning nail 303 protrudes from the side of the fixing plate 302 facing the main body 301 and can be directly inserted into the original soil around the borehole. It can provide strong anchoring force for the positioning nail 303 and form a rigid connection between the positioning block 3 and the surrounding original soil. In this way, the position of the water-stop structure 11 can be prevented from shifting when grouting. However, it is understandable that after the grouting in the support pipe 10 is completed, the positioning block 3 needs to be removed simultaneously when grouting the borehole.

[0075] Between steps S21 and S22, the step of bonding a waterstop strip 40 to the second connector 30 of the waterstop structure 11 may also be included.

[0076] In other words, this application pre-attaches a waterstop strip 40 (such as water-swellable rubber or viscous elastic rubber) to the second connector 30. When the second connecting plate 22 is subsequently inserted into the adjacent groove 30a, the waterstop strip 40 directly fills the microscopic gap between the second connecting plate 22 and the inner wall of the groove 30a, including gaps caused by processing errors and surface unevenness, forming a double barrier of mechanical fitting and sealing by the waterstop strip 40.

[0077] In addition, the pre-bonded waterstop strip 40 can play a flexible buffering role. When the ground displacement causes the second connecting plate 22 and the adjacent groove 30a to make slight misalignment, the waterstop strip 40 can undergo elastic deformation with the displacement, or expand when exposed to water to fill the newly generated gap, and always maintain close contact with the inner wall of the second connecting plate 22 and the groove 30a.

[0078] During subsequent drilling, waterstop strips 40 can be directly bonded to the waterstop structure 11 to be drilled, thereby greatly improving construction efficiency.

[0079] The above-disclosed embodiments are merely preferred embodiments of this application and should not be construed as limiting the scope of this application. Therefore, any equivalent variations made in accordance with the claims of this application shall still fall within the scope of this application.

Claims

1. A water-stop wall, characterized in that, It includes multiple water-stopping structures, the water-stopping structures including: Support tube; The first connector includes a first connecting plate and a second connecting plate that are connected to each other and form an angle. The first connecting plate is connected to the support tube, and the second connecting plate is located at the end of the first connecting plate away from the support tube. The second connector is connected to the support tube and is distributed circumferentially with the first connector on the support tube. The second connector and the support tube enclose each other to form a groove, and the second connector forms a notch that communicates with the groove. The second connecting plate of one of the water-stop structures is located within the groove of the adjacent water-stop structure and seals the gap.

2. The water-stop wall according to claim 1, characterized in that, The water-stopping structure also includes a water-stopping strip, which is disposed between the second connecting plate and the second connecting member, and connects the second connecting plate and the second connecting member.

3. The water-stop wall according to claim 2, characterized in that, The waterstop strip is an adhesive component and has adhesive properties; Alternatively, the waterstop strip may be bonded to the second connector.

4. The water-stop wall according to claim 1, characterized in that, The second connector includes two sub-connectors, each sub-connector including a third connecting plate and a fourth connecting plate at an angle. One end of the third connecting plate is connected to the support tube, and the other end of the third connecting plate is connected to the fourth connecting plate. The third connecting plate and the fourth connecting plate in the two sub-connectors form the groove with the support tube. The fourth connecting plates in the two sub-connectors are spaced apart to form the notch. The second connecting plate of one of the water-stopping structures is located in the adjacent groove of the other, and connects the two fourth connecting plates to seal the gap.

5. The water-stop wall according to claim 4, characterized in that, The support tube is a circular tube, and the two sub-connectors are distributed about a first axis of symmetry, which is parallel to one of the diameters of the support tube.

6. The water-stop wall according to claim 1, characterized in that, The support tube is a circular tube, and the second connecting plate includes two sub-connecting plates. The two sub-connecting plates are located on opposite sides of the first connecting plate and are symmetrically distributed about the first connecting plate. The width direction of the first connecting plate is parallel to the extension direction of one diameter of the support tube.

7. The water-stop wall according to claim 1, characterized in that, The plurality of water-stopping structures include a first water-stopping structure, wherein the first connector and the second connector in the first water-stopping structure are located on opposite sides of the support pipe.

8. The water-stop wall according to claim 1, characterized in that, The first connecting plate and the second connecting plate are integrally formed.

9. The water-stop wall according to claim 1, characterized in that, The outer surface of the support tube is a closed curved surface with a smooth transition.

10. The water-stop wall according to claim 1, characterized in that, Both the first connector and the second connector extend along the length of the support tube and are flush with both ends of the support tube along the length of the support tube.