A stress isolation structure based on a composite foundation

By using the stress isolation design of the composite foundation structure, the problem of dynamic stress transmission under complex geological conditions in traditional deep foundation schemes is solved, thereby improving the safety and economy of equipment foundations.

CN224997627UActive Publication Date: 2026-11-20DATANG HANCHENG NO 2 POWER GENERATION +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522651503.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-15
Publication Date
2026-11-20
Estimated Expiration
2035-12-15

AI Technical Summary

Technical Problem

Traditional deep foundation schemes fail to effectively utilize the bearing potential of shallow soil layers under complex geological conditions and lack stress isolation mechanisms. This leads to the downward transmission of dynamic stress during equipment vibration, causing settlement of collapsible soil layers and affecting equipment safety and construction efficiency.

Method used

A composite foundation structure is adopted, including a composite subgrade, a stress isolation layer and a stress foundation layer. By combining reinforced piles, strengthening members and cushion layer members, a stress dispersion and energy dissipation mechanism is formed to block the downward transmission of dynamic stress and make full use of the bearing capacity of shallow soil layers.

Benefits of technology

It effectively prevents subsidence and settlement, simplifies construction procedures, reduces project costs, and improves equipment operation safety and construction economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997627U_ABST
    Figure CN224997627U_ABST
Patent Text Reader

Abstract

The utility model relates to a device foundation technology field especially relates to a stress isolation structure based on composite foundation, and the structure comprises composite foundation layer, stress isolation layer and stress base layer from bottom to top in proper order, wherein the composite foundation layer contains reinforced pile body and soil between piles, the stress isolation layer is constituted by reinforcing member and cushion piece, and stress base layer is used for bearing and transmitting load, preferably being equipped with stress diffusion subassembly that penetrates the isolation layer, and the stress diffusion subassembly comprises diffusion frame and diffusion piece, the utility model aims at solving the technical problem that the existing foundation structure is difficult to realize effective stress isolation and is easy to cause the technical problem of collapse settlement, through the flexible buffering of stress isolation layer and the rigid shunt cooperation of diffusion subassembly, effectively cutting off the transmission path of dynamic stress to deep collapsible soil layer, simultaneously using composite foundation to fully mobilize the bearing capacity of shallow soil body, the structure does not need additional collapsible protection, simplifies the procedure and reduces the cost, and remarkably improves equipment operation safety and construction economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of equipment foundation technology, and in particular to a stress isolation structure based on a composite foundation. Background Technology

[0002] In the site selection of industrial parks or energy buildings, due to the coupled development of economic centers and water resources, construction often needs to be carried out in areas near rivers and with complex geological conditions. Taking the construction of large equipment foundations in deep and complex strata as an example, the engineering community has traditionally relied on long pile foundations (such as bored piles) as the most commonly used and reliable form of deep foundation. The core idea of ​​this approach is to adopt a strategy of "bypassing problem soil layers," that is, to transfer the equipment load directly to the deep, stable, non-collapseable strata through the pile body, thereby completely avoiding all risks brought about by shallow collapsible soil layers.

[0003] However, this traditional deep foundation approach presents significant technical challenges. Taking a specific geological condition as an example, the geological structure may consist of alluvial deposits of secondary loess, collapsible soil, and a multi-layered structure. Traditional pile foundations, acting alone, fail to effectively utilize the bearing potential of the shallow soil layers. Furthermore, due to the lack of an effective stress isolation mechanism, when the upper equipment experiences vibrations, impacts, or other dynamic loads, the dynamic stress may still be transmitted downwards, potentially triggering collapsibility in the lower soil layers under certain conditions. This can not only lead to additional foundation settlement, affecting the long-term operational safety of the equipment, but also, due to the complexity and long timeframe of traditional construction procedures, and the need for additional measures to prevent collapsibility, indirect costs increase, failing to achieve the economic efficiency and effectiveness of collapsible soil layer treatment. Utility Model Content

[0004] The main objective of this invention is to provide a stress isolation structure based on a composite foundation, aiming to solve the technical problem that existing foundation structures are difficult to achieve stress isolation.

[0005] To achieve the above objectives, this utility model provides a stress isolation structure based on a composite foundation. The structure includes a composite base layer, a stress isolation layer, and a stress foundation layer arranged sequentially from bottom to top. The composite base layer is disposed in the foundation soil layer and includes soil between piles and reinforcing piles disposed within the soil between piles. The stress isolation layer includes reinforcing members and cushion members. The cushion members are disposed on the upper and lower end faces of the reinforcing members. The stress foundation layer is used to bear the equipment load and transfer the equipment load to the stress isolation layer.

[0006] Optionally, the reinforced pile penetrates the stress isolation layer and connects to the stress foundation layer.

[0007] Optionally, the stress base layer includes a raft slab and a grouting layer.

[0008] Optionally, the structure further includes a stress diffusion component, which is disposed between the reinforcing piles and is connected to the composite subbase and stress foundation layer after penetrating the stress isolation layer.

[0009] Optionally, the stress diffusion assembly includes a diffusion frame, a diffusion rod, and a diffusion element. The diffusion frame is horizontally connected between two adjacent reinforced piles, the diffusion rod is vertically mounted on the diffusion frame, and the diffusion element is located at the bottom of the diffusion rod and extends into the composite subgrade.

[0010] Optionally, the diffuser includes a diffuser seat and a plurality of stress plates, the diffuser seat being fixedly disposed with the diffuser rod, and the plurality of stress plates being evenly distributed on the diffuser seat at intervals.

[0011] Optionally, the reinforcement includes a geogrid.

[0012] Optionally, the cushioning element includes a crushed stone cushioning layer.

[0013] Optionally, a soil pressure cell is provided inside the cushion layer.

[0014] Optionally, the diffuser frame is a frame structure, and both ends of the diffuser frame are respectively anchored to two adjacent reinforcing piles to form a connecting beam between the piles.

[0015] The beneficial effects that this utility model can achieve are as follows: This invention utilizes the synergistic effect of the reinforcing members and cushioning components of the stress isolation layer to achieve stress dispersion and energy dissipation, effectively cutting off the downward transmission path of dynamic stress and preventing it from penetrating into collapsible soil layers and causing collapsible settlement. Simultaneously, the composite subgrade fully mobilizes the bearing capacity of the shallow soil through the interaction between the soil between piles and the reinforced piles, reducing reliance on deep, stable strata. Specifically, this design not only avoids the low bearing efficiency caused by traditional long pile foundations completely bypassing problematic soil layers, but also significantly reduces the risk of collapsible settlement by specifically blocking the transmission of dynamic stress through a layered structure. Furthermore, the construction process is simplified, eliminating the need for additional collapsible protection measures, thereby shortening the construction period and reducing project costs, ultimately improving the operational safety of the equipment foundation and optimizing construction economy. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the stress isolation structure in an embodiment of the present invention; Figure 2 This is a schematic diagram of the stress diffusion component in an embodiment of the present invention.

[0017] Figure label: 1-Composite base course, 2-Stress isolation layer, 3-Stress foundation layer, 4-Stress diffusion component, 5-Earth pressure cell; 11-Soil between piles; 12-Reinforcing pile body; 21-Reinforcing component, 22-Support layer component; 31-Raft foundation, 32-Grouting layer; 41-Diffusion frame, 42-Diffusion rod, 43-Diffusion element; 431-Diffusion seat, 432-Stress plate.

[0018] The realization of the purpose, functional features and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation

[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0020] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in this utility model embodiment are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.

[0021] In this utility model, unless otherwise explicitly specified and limited, the terms "connection," "fixing," etc., should be interpreted broadly. For example, "fixing" can mean a fixed connection, a detachable connection, or an integral part; it can mean a mechanical connection or an electrical connection; it can mean a direct connection or an indirect connection through an intermediate medium; it can mean the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.

[0022] Furthermore, if the embodiments of this utility model involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the meaning of "and / or" throughout the text includes three parallel solutions; for example, "A and / or B" includes solution A, solution B, or a solution where both A and B are satisfied simultaneously. Furthermore, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. When the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this utility model.

[0023] Example: As attached Figure 1 With appendix Figure 2 As shown, this embodiment provides a stress isolation structure based on a composite foundation. The structure includes a composite base layer 1, a stress isolation layer 2, and a stress foundation layer 3 arranged sequentially from bottom to top. The composite base layer 1 is disposed in the foundation soil layer and includes pile-intercalation soil 11 and reinforcing piles 12 disposed within the pile-intercalation soil 11. The stress isolation layer 2 includes reinforcing members 21 and cushion members 22. The cushion members 22 are disposed on the upper and lower end faces of the reinforcing members 21. The stress foundation layer 3 is used to bear the equipment load and transfer the equipment load to the stress isolation layer 2.

[0024] It should be noted that in the traditional site selection of existing industrial parks or energy buildings, due to the coupled development of economic centers and water resources, construction is often required in areas near rivers and with complex geological conditions. When constructing foundations for large equipment in deep and complex strata, the engineering community mainly relies on long pile foundations as a form of deep foundation. This approach uses a strategy of bypassing problematic soil layers to transfer equipment loads to deep, stable strata, thereby avoiding the risks of shallow collapsible soil layers. However, this approach fails to effectively utilize the bearing potential of shallow soil layers and lacks an effective stress isolation mechanism. Furthermore, when the upper equipment generates dynamic loads such as vibration or impact, the dynamic stress is transmitted downwards, which under certain conditions can trigger collapsibility in the lower soil layers, leading to foundation settlement and affecting the safe operation of the equipment. At the same time, the construction process is complex and time-consuming, requiring additional measures for collapsibility protection, thus increasing indirect costs.

[0025] Based on the above-mentioned problems, the structure provided in this embodiment includes, from bottom to top, a composite base layer 1, a stress isolation layer 2, and a stress foundation layer 3. The composite base layer 1 is set within the foundation soil layer and includes the inter-pile soil 11 and embedded reinforcing piles 12. The reinforcing piles 12 constrain the inter-pile soil 11, strengthening the overall stiffness and stability of the shallow soil, thereby actively utilizing the bearing potential of the shallow soil layer rather than passively avoiding problematic soil layers. The stress isolation layer 2 consists of reinforcing members 21 and cushioning members 22. The cushioning members 22 are arranged on the upper and lower end faces of the reinforcing members 21, forming a bidirectional stress buffer mechanism to disperse concentrated stress generated by equipment loads and absorb dynamic stress fluctuations caused by vibration or impact. The stress foundation layer 3 is used to bear the equipment load and smoothly transfer the load to the stress isolation layer 2, preventing the load from directly impacting the underlying soil.

[0026] Furthermore, in practical applications, the reinforcing piles 12 in the composite base course 1 can be specifically cast-in-place concrete piles, and the soil between the piles 11 is collapsible loess; the reinforcing members 21 in the stress isolation layer 2 can be specifically a grid structure made of polyester fiber, and the cushion layer 22 is made of graded crushed stone material; the stress foundation layer 3 can be specifically a reinforced concrete slab, the thickness of which is designed according to the load characteristics of the equipment. Thus, the vibration or impact loads generated during equipment operation are first received by the stress foundation layer 3, and stress dispersion and energy dissipation are achieved through the synergistic effect of the reinforcing members 21 and the cushion layer 22 in the stress isolation layer 2, effectively cutting off the downward transmission path of dynamic stress and preventing it from penetrating into the collapsible soil layer and causing collapsible settlement. At the same time, the composite base course 1 fully mobilizes the bearing capacity of the shallow soil through the interaction between the soil between the piles 11 and the reinforcing piles 12, reducing dependence on deep, stable strata. Specifically, this design not only avoids the low bearing efficiency caused by traditional long pile foundations completely bypassing problematic soil layers, but also significantly reduces the risk of collapse by specifically blocking the transmission of dynamic stress through a layered structure. In addition, the construction process is simplified, eliminating the need for additional collapse protection measures, thereby shortening the construction period and reducing project costs, ultimately improving the operational safety of the equipment foundation and optimizing construction economy.

[0027] In this embodiment, the reinforcing pile 12 penetrates the stress isolation layer 2 and connects to the stress foundation layer 3. By extending upwards from the composite base layer 1 and penetrating the stress isolation layer 2, the reinforcing pile 12 forms a direct connection with the stress foundation layer 3, creating a continuous vertical load transfer path. The stress isolation layer 2, located around the reinforcing pile 12, has material properties that buffer the dynamic load generated by equipment vibration, preventing dynamic stress from being directly transferred downwards to the deep soil layers. Simultaneously, due to the direct connection between the reinforcing pile 12 and the stress foundation layer 3, the equipment load is primarily transferred through the pile, reducing the dispersion path of the load through the soil between the piles 11, thereby effectively isolating the stress transfer process and preventing the risk of subsidence of the deep soil layers under dynamic loads.

[0028] In this embodiment, the stress foundation layer 3 includes a raft slab 31 and a grouting layer 32. The raft slab 31, through its extensible design, covers a wider foundation area, making the load transfer path smoother and thus significantly reducing the possibility of dynamic stress penetrating downwards. The grouting layer 32 fills the space between the raft slab 31 and the stress isolation layer 2, forming a uniform medium through the fluidity and curing properties of the grouting material, ensuring the stability of the stress diffusion path. Through the above design, the load transfer mechanism and structural integrity are optimized, effectively mitigating the defects of stress concentration and downward transmission of dynamic stress.

[0029] In this embodiment, the structure further includes a stress diffusion component 4, which is disposed between the reinforced piles 12 and is connected to the composite subbase 1 and the stress foundation layer 3 after penetrating the stress isolation layer 2.

[0030] Understandably, the stress diffusion component 4 is positioned in the inter-pile area between the reinforced piles 12. Its main structure penetrates the stress isolation layer 2, with its upper end forming a stable connection with the stress foundation layer 3, and its lower end extending into and anchoring to the composite base layer 1. When equipment loads are applied to the stress foundation layer 3, part of the load is directly transferred to the composite base layer 1 through the stress diffusion component 4, avoiding excessive load concentration in the inter-pile soil layer 11. Simultaneously, the stress isolation layer 2 effectively blocks the downward transmission of vibration loads, preventing dynamic stress from causing subsidence. This design results in a more uniform stress distribution in the inter-pile area, fully utilizing the bearing capacity of the shallow soil layer and reducing reliance on deep, stable strata, thereby improving the overall structural stability and bearing efficiency.

[0031] In this embodiment, the stress diffusion assembly 4 includes a diffusion frame 41, a diffusion rod 42, and a diffusion element 43. The diffusion frame 41 is horizontally connected between two adjacent reinforced piles 12. The diffusion rod 42 is vertically disposed on the diffusion frame 41. The diffusion element 43 is disposed at the bottom of the diffusion rod 42 and extends into the composite subbase 1.

[0032] The above structure connects adjacent reinforced piles 12 horizontally via a diffuser frame 41, so that the stress generated by the equipment load is evenly distributed in the pile area, avoiding excessive local stress. The diffuser rod 42 is vertically set on the diffuser frame 41, which guides the uniformized stress along the vertical direction to prevent stress from accumulating or amplifying in the stress isolation layer 2. The diffuser element 43 is set at the bottom of the diffuser rod 42 and extends into the composite base layer 1, which disperses the transmitted stress to the deep soil, effectively blocking the path of dynamic stress to the collapsible soil layer, thus forming a complete stress diffusion and isolation mechanism.

[0033] In this embodiment, the diffuser 43 includes a diffuser seat 431 and a plurality of stress plates 432. The diffuser seat 431 is fixedly disposed with the diffuser rod 42, and the plurality of stress plates 432 are evenly distributed on the diffuser seat 431 at intervals.

[0034] Understandably, the fixed connection between the diffuser seat 431 and the diffuser rod 42 ensures the stable transmission of stress from the diffuser rod 42 to the diffuser 43, avoiding the interruption of stress transmission due to loose connection under dynamic load. The evenly distributed design of multiple stress plates 432 on the diffuser seat 431 allows stress to diffuse synchronously in multiple directions of the composite base course 1 according to the support platform of the diffuser seat 431, rather than being limited to a single contact point. This layout makes full use of the bearing potential of the shallow soil layer and significantly reduces the possibility of excessive local stress.

[0035] In this embodiment, the reinforcing member 21 includes a geogrid. By setting the geogrid as the reinforcing member 21 in the stress isolation layer 2, it works in conjunction with the cushion layer members 22 at the upper and lower ends to form a complete stress isolation system. When the equipment load is applied to the stress foundation layer 3, the grid structure of the geogrid will disperse the concentrated stress to a wider area, reducing the impact intensity on the lower soil layer. Under the action of vibration or impact load, the geogrid absorbs and redistributes the dynamic load by virtue of its tensile strength and grid effect, preventing the stress from being directly transmitted downward to the collapsible soil layer, ensuring that the stress is effectively confined within the isolation layer, thereby maintaining the stability of the composite base layer 1.

[0036] In this embodiment, the cushion layer 22 includes a crushed stone cushion layer. The porous granular structure of the crushed stone cushion layer dynamically absorbs vibration energy when bearing equipment loads, while its rigidity ensures that the load is uniformly distributed horizontally, thereby preventing localized stress peaks from being transmitted downwards to the composite subbase 1.

[0037] In this embodiment, a soil pressure box 5 is provided inside the cushion layer component 22.

[0038] Understandably, the earth pressure cell 5 refers to a sensing device used to measure the pressure state of the soil. It can be implemented using a vibrating wire sensor or a resistance strain gauge sensor. Its purpose is to acquire stress distribution data inside the cushion layer in real time, providing a basis for assessing the uniformity of load transfer.

[0039] It is also understandable that by integrating the earth pressure cell 5 into the cushion layer component 22, the sensing device can directly capture the changes in earth pressure borne by the cushion layer. Since the cushion layer component 22 is a key component of the stress isolation layer 2, located between the reinforcing member 21 and the stress foundation layer 3, the stress distribution inside it directly characterizes the transmission path and isolation effect of the equipment load. The monitoring data is fed back to the control system in real time, which facilitates the identification of stress concentration areas and triggers the early warning mechanism, thereby adjusting the load distribution in a timely manner or taking protective measures to effectively block the downward transmission path of dynamic stress, prevent the lower soil layer from collapsing due to abnormal stress, and ensure the long-term stable operation of the equipment foundation.

[0040] In this embodiment, the diffuser frame 41 is a frame structure, and both ends of the diffuser frame 41 are respectively anchored to two adjacent reinforcing piles 12 to form a connecting beam between the piles.

[0041] The above structure, by configuring the diffuser frame 41 as a frame structure, enables it to have three-dimensional spatial stiffness when bearing equipment vibration loads, effectively resisting multi-directional deformation; both ends of the diffuser frame 41 are rigidly anchored to the adjacent reinforcing piles 12, ensuring no relative displacement at the connection interface, and the load is directly transmitted along the anchoring depth; the resulting pile connection beam, based on the overall stress characteristics of the frame structure, enables stress to diffuse efficiently between the adjacent reinforcing piles 12, significantly improving the fatigue resistance of the structure, thereby blocking the path of dynamic stress to be transmitted downward to the collapsible soil layer and strengthening the stress isolation effect.

[0042] The above are merely preferred embodiments of this utility model and do not limit the patent scope of this utility model. Any equivalent structural or procedural transformations made based on the description and drawings of this utility model, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this utility model.

Claims

1. A stress isolation structure based on a composite foundation, characterized in that, The structure includes a composite subbase, a stress isolation layer, and a stress foundation layer arranged sequentially from bottom to top. The composite subbase is disposed in the foundation soil layer and includes the soil between piles and the reinforcing piles disposed in the soil between piles. The stress isolation layer includes a reinforcing member and a cushion member. The cushion member is disposed on the upper and lower end faces of the reinforcing member. The stress foundation layer is used to bear the equipment load and transfer the equipment load to the stress isolation layer.

2. The stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The reinforced pile penetrates the stress isolation layer and then connects to the stress foundation layer.

3. The stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The stress foundation layer includes a raft slab and a grouting layer.

4. A stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The structure also includes a stress diffusion component, which is disposed between the reinforced piles and is connected to the composite subbase and stress foundation layer after penetrating the stress isolation layer.

5. A stress isolation structure based on a composite foundation as described in claim 4, characterized in that, The stress diffusion assembly includes a diffusion frame, a diffusion rod, and a diffusion element. The diffusion frame is horizontally connected between two adjacent reinforced piles. The diffusion rod is vertically mounted on the diffusion frame. The diffusion element is located at the bottom of the diffusion rod and extends into the composite subgrade.

6. A stress isolation structure based on a composite foundation as described in claim 5, characterized in that, The diffuser includes a diffuser seat and a plurality of stress plates. The diffuser seat is fixedly disposed with the diffuser rod, and the plurality of stress plates are evenly distributed on the diffuser seat at intervals.

7. A stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The reinforcing element includes a geogrid.

8. A stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The cushioning component includes a crushed stone cushioning layer.

9. A stress isolation structure based on a composite foundation as described in claim 1, characterized in that, The cushion layer component is equipped with a soil pressure box.

10. A stress isolation structure based on a composite foundation as described in claim 5 or 6, characterized in that, The diffuser frame is a frame structure, and both ends of the diffuser frame are anchored to two adjacent reinforcing piles to form a connecting beam between the piles.