A cast-in-place slab post-pouring belt and construction joint retaining device

By designing a stable planar frame structure, the problem of convenient installation and turnover of the post-pouring strip and construction joint retention device for cast-in-place slabs during the formwork erection and dismantling stages was solved, thus achieving efficient concrete construction joint retention.

CN224997655UActive Publication Date: 2026-11-20CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522791253.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-20
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

Existing technologies are difficult to use efficiently during both the formwork erection and demolding stages of concrete, and the post-cast strip and construction joint placement devices for cast-in-place slabs are not easy to reuse.

Method used

A stable planar frame structure is adopted, consisting of end side formwork for post-pouring strips, upper and lower layers of timber strips, horizontal support timber, side formwork for construction joints, passageway slabs, channel steel, tie rod assemblies, and angle steel. Through the design and connection of the formwork, convenient installation and turnover are achieved during the formwork erection and dismantling stages.

Benefits of technology

It enables convenient installation and turnover during the concrete formwork erection and dismantling stages, improves installation efficiency, and is suitable for the needs of pre-cast strips in the middle of concrete and side construction joints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997655U_ABST
    Figure CN224997655U_ABST
Patent Text Reader

Abstract

The utility model relates to a cast-in-place slab post-pouring belt and construction joint indwelling device, it includes: post-pouring belt end side form, upper layer end side batten, lower layer end side batten, first wooden frame, horizontal support wood square, construction joint side form, upper layer side batten, lower layer side batten, its installation is in the lower surface of construction joint side form and closes the along mouth of second recess, and pad is on the upper surface of bottom form, second wooden frame, it is installed on bottom form by leaning against the back surface of construction joint side form, corridor board, interval laying between horizontal support wood square, located upper layer end side batten top surface, channel steel, its both ends abut the side of horizontal support wood square overhanging end and install in corridor board both sides, pass the setting channel steel and corridor board and tighten on the web of channel steel of screw rod subassembly, angle steel, one limb closely welded fixed with channel steel web, its other limb closely horizontal support wood square overhanging end side through bolt fixed. The utility model is beneficial to turnover, and installation efficiency is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction, and in particular to a post-pouring strip and construction joint retention device for cast-in-place slabs. Background Technology

[0002] For example, Chinese Utility Model Patent Publication No. CN201137218Y discloses a temporary protective structure for the post-pouring strip stage of a base slab, including a base slab and a base slab pad, with a post-pouring strip in the middle of the two base slabs; its characteristic is that a temporary protective wall is set on each of the two base slabs on both sides of the post-pouring strip, and a waterproof canopy is set on the top surface between the two temporary protective walls. This structure can only be used for concrete curing, and it only reserves the post-pouring strip, making it inconvenient to use during both the formwork erection stage and the curing stage after formwork removal, in order to address situations where a post-pouring strip needs to be reserved in the middle of the concrete and a construction joint needs to be reserved on the side. Utility Model Content

[0003] The technical problem to be solved by this utility model is to provide a device for reserving post-pouring strips and construction joints in cast-in-place slabs. It is convenient to use during the formwork stage of concrete and also convenient to use during the curing stage after the concrete is demolded. It is easy to reuse and has high installation efficiency, so as to deal with the situation where post-pouring strips need to be reserved in the middle of the concrete and post-pouring strips need to be set on the side.

[0004] To solve the above problems, a device for placing post-pouring strips and construction joints in cast-in-place slabs was adopted, comprising: The end template of the post-pouring strip is horizontal and spaced along the longitudinal direction, and has a first groove on its upper and lower sides; The upper end side wooden strip is installed on top of the end side template of the post-pouring strip and closes the edge of the first groove on the upper side of the end side template of the post-pouring strip. The lower end side wooden strip is installed on the bottom surface of the end side template of the post-pouring strip, and closes the edge of the first groove on the lower side of the end side template of the post-pouring strip, and is placed on the bottom template. The first timber beam is mounted on the bottom template, resting against the back of the side template and the lower end side timber strip; The horizontal support timber is installed on the top surface of the upper end side timber strips on the top surface of the two rows of spaced post-pouring strip end side formwork, and extends out of the upper end side timber strips to form a cantilever end; The construction joint side formwork is set longitudinally and installed on both sides of the post-pouring strip end formwork, with second grooves on its upper and lower sides; Upper side wooden strips, which are installed on the side formwork of the construction joint and close the edge of the second groove; The lower side wooden strip is installed below the construction joint side formwork, and closes the edge of the second groove, and is placed on top of the bottom formwork; The second timber is installed on the bottom formwork, abutting against the back of the formwork next to the construction joint; The walkway slabs are laid at intervals between horizontal support timbers and are located on the top surface of the upper end side timber strips. Channel steel is installed on both sides of the walkway slab, with its two ends abutting against the sides of the cantilevered ends of the horizontal support timber. The tie rod assembly is threaded through the channel steel and the passage plate is screwed onto the web of the channel steel. Angle steel, one leg of which is welded and fixed to the web of the channel steel, and the other leg of which is fixed to the side of the cantilever end of the horizontal support timber by bolts.

[0005] With this structure, after the end-side formwork of the post-pouring strip is installed, the upper and lower layers of reinforcing bars can pass through the first groove, which is suitable for the placement of the post-pouring strip during the formwork stage; after the upper and lower end-side wooden strips are closed along the edge, they can prevent the upper and lower layers of reinforcing bars from shifting; after the horizontal support timber is pressed against the upper end-side wooden strip at both ends to form a fixed structure, such as by nailing or bolting, it can provide lateral support force, allowing the end-side formwork of the post-pouring strip to cope with the lateral pouring pressure during the pouring stage, and its cantilevered bottom surface can provide a pouring reference surface for easy leveling; the first timber mainly fixes the lower side of the end-side formwork of the post-pouring strip; after the side formwork next to the construction joint is installed, it can cope with the side of the concrete. When construction joints need to be reserved, the walkway slab can close the post-pouring strip and form a walkway above it, which is beneficial for supporting construction personnel during the pouring stage. The channel steel reinforces the sides of the walkway slab, and the tie rod assembly fastens the channel steel and the walkway slab, which also enhances the bending resistance of the walkway slab and reinforces the interior of the walkway slab. Angle steel fastens the channel steel and the horizontal support timber, thus forming a stable planar frame slab structure to prevent the walkway slab from shifting. The bolt connection method is convenient for installation and dismantling and facilitates turnover. The frame slab structure formed by the channel steel, walkway slab and horizontal support timber can be used for the retention and protection of the post-pouring strip during both the formwork stage and the curing stage after formwork removal, and it is easy to install and dismantle.

[0006] As a further improvement of this utility model, the first wooden beam is penetrated by a first nail from top to bottom, and the first nail is driven into the bottom template; the second wooden beam is penetrated by a second nail from top to bottom, and the second nail is driven into the bottom template.

[0007] With this structure, the first nail facilitates the fastening of the stacked installation.

[0008] As a further improvement of this utility model, it also includes an angled support timber, which includes: a horizontal pad and an inclined support timber, both of which are fixed at one end to form an angle. The horizontal pad is placed between the second timber and the bottom template and is passed through by the second nail; the inclined support timber rests on the top of the upper side timber strip.

[0009] With this structure, the angular support timber is conducive to self-stabilizing the side formwork of the construction joint, so that the upper side of the side formwork of the construction joint is also supported, which is beneficial to resisting the pouring pressure during the pouring stage.

[0010] As a further improvement of this utility model, the interval between the angular support timbers is no more than 600mm.

[0011] With such a structure, the spacing is too long, which is not conducive to applying a uniformly distributed force.

[0012] As a further improvement of this utility model, the spacing between the horizontal support timbers is not less than 600mm.

[0013] Using such a structure, with too small spacing and too small walkway slab size, will increase the number of construction steps.

[0014] As a further improvement of this utility model, one end of the horizontal pad connecting to the inclined support timber is an inclined surface.

[0015] With this structure, the beveled surface increases the contact area, making the wood more stable after bonding.

[0016] As a further improvement of this utility model, the height of the upper end side wooden strip, the lower end side wooden strip, the upper side wooden strip, and the lower side wooden strip is equal to the thickness of the steel reinforcement protective layer.

[0017] This structure makes it easier to control the thickness of the steel reinforcement protective layer.

[0018] As a further improvement of this utility model, the top surface of the inclined support timber is provided with a hinge, the hinge including an upper page and a lower page that are hinged to each other, the upper page has an elongated hole, the upper page is attached to the top surface of the inclined support timber; the elongated hole allows bolts to pass through and be tightened on the top surface of the inclined support timber; a flat plate is welded to the bottom surface of the lower page.

[0019] With this structure, the hinges can rotate easily, and the elongated holes allow the hinges to be fixed after they are lowered, so that the adjustment plate can be placed on the upper side wooden strip, providing a reference surface for pouring and preventing over-pouring.

[0020] As a further improvement of this utility model, the end side formwork of the post-pouring strip, the side formwork of the construction joint, and the bottom formwork are made of glued laminated timber.

[0021] With this structure, glued laminated timber is easy to install and easy to nail.

[0022] This invention is convenient to use during the formwork stage of concrete and also during the curing stage of concrete. It is easy to reuse and has high installation efficiency, in order to deal with situations where a post-pouring strip needs to be reserved in the middle of the concrete and a post-pouring strip needs to be set on the side. Attached Figure Description

[0023] Figure 1 This is a schematic diagram of the structure for leaving the pouring strip after the curing stage.

[0024] Figure 2 This is a schematic diagram of the assembly structure of the passageway panel.

[0025] Figure 3 A schematic diagram of the construction joint structure for the concrete formwork stage.

[0026] Figure 4 This is a schematic diagram of the installation structure of the end side formwork for the post-pouring strip.

[0027] Figure 5 This is a schematic diagram of the structure for leaving construction joints during the formwork support stage.

[0028] Figure 6 This is a schematic diagram of the installation structure of the angled support timber and the hinge.

[0029] Figure 7 This is a diagram illustrating the usage of the hinge.

[0030] Reference numerals: 1. End side template of post-pouring strip; 101. First groove; 2. Upper end side timber strips; 3. Lower end side timber strips; 4. First timber beam; 5. First nail; 6. Bottom formwork; 7. Horizontal support timber; 8. Construction joint side formwork; 9. Upper side timber strip; 10. Lower side timber strip; 11. Second timber; 12. Second nail; 13. Angular support timber; 131. Horizontal pad timber; 132. Diagonal support timber; 14. Hinge; 141. Previous page; 142. Next page; 143. Oblong hole; 144. Bolt; 145. Flat plate; 15. Aisle panel; 16. Channel steel; 17. Tie rod assembly; 18. Angle steel. Detailed Implementation

[0031] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0032] In the description of this utility model, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this utility model and for simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model. The terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance. Furthermore, unless otherwise explicitly specified and limited, the terms "installed," "connected," and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0033] Example 1 like Figures 1-7 As shown, a device for placing post-pouring strips and construction joints in cast-in-place slabs includes: The post-pouring strip end side template 1 is horizontal and spaced along the longitudinal direction, and has a first groove 101 on its upper and lower sides; The upper end side wooden strip 2 is installed on the top of the post-pouring strip end side template 1 and closes the edge of the first groove 101 on the upper side of the post-pouring strip end side template 1. The lower end side wooden strip 3 is installed on the bottom surface of the post-pouring strip end side template 1 and closes the edge of the first groove 101 on the lower side of the post-pouring strip end side template 1, and is placed on the bottom template 6. The first timber 4 is mounted on the bottom template 6, abutting against the back of the side template 1 and the lower end side timber strip 3; The horizontal support timber 7 is installed on the top surface of the upper end side timber strip 2 on the top surface of the two rows of spaced post-pouring strip end side templates 1, and extends out of the upper end side timber strip 2 to form a cantilever end. The construction joint side template 8 is set longitudinally and installed on both sides of the post-pouring strip end template 1, and its upper and lower sides are provided with second grooves 801; Upper side wooden strip 9, which is installed on the side formwork 8 of the construction joint and closes the edge of the second groove 801; The lower side wooden strip 10 is installed below the construction joint side template 8 and closes the edge of the second groove 801, and is placed on the bottom template 6; The second timber 11 is installed on the bottom formwork 6, abutting against the back of the side formwork 8 next to the construction joint. The passageway 15 is laid at intervals between the horizontal support timbers 7 and is located on the top surface of the upper end side timber strips 2. Channel steel 16 is installed on both sides of the walkway slab 15, with its two ends abutting against the sides of the cantilevered ends of the horizontal support timber 7. The tie rod assembly 17 is threaded through the channel steel 16 and the passage plate 15 and screwed onto the web of the channel steel 16. Angle steel 18 has one leg welded to the web of channel steel 16 and the other leg fixed to the side of the cantilever end of horizontal support timber 7 by bolts.

[0034] With this structure, after the post-pouring strip end-side formwork 1 is installed, the upper and lower layers of reinforcing bars can pass through the first groove 101, which is suitable for the post-pouring strip placement during the formwork stage; after the upper end-side wooden strip 2 and the lower end-side wooden strip 3 close the edge, they can prevent the upper and lower layers of reinforcing bars from shifting; after the horizontal support timber 7 is pressed tightly against the upper end-side wooden strip 2 at both ends to form a fixed structure, such as by nailing or bolting, it can provide lateral support force, allowing the post-pouring strip end-side formwork 1 to cope with the lateral pouring pressure during the pouring stage, and its cantilevered bottom surface can provide a pouring reference surface for easy leveling; the first timber 4 mainly fixes the lower side of the post-pouring strip end-side formwork 1; After the side formwork 8 is installed, it can handle the situation where a construction joint needs to be reserved on the side of the concrete. The walkway slab 15 can close the post-pouring strip and form a walkway above the post-pouring strip, which is beneficial for supporting construction personnel during the pouring stage. The channel steel 16 reinforces the side of the walkway slab 15. The tie rod assembly 17 fastens the channel steel 16 and the walkway slab 15. The angle steel 18 fastens the channel steel 16 and the horizontal support timber 7, thereby forming a stable planar frame slab structure to prevent the walkway slab 15 from shifting. The bolt connection method is easy to install and dismantle and facilitates turnover. The walkway slab 15 can be used to protect the post-pouring strip during both the formwork stage and the curing stage, and it is easy to install and dismantle.

[0035] In this embodiment, the first wooden beam 4 is pierced by a first nail 5 from top to bottom, and the first nail 5 is driven into the bottom template 6; the second wooden beam 11 is pierced by a second nail 12 from top to bottom, and the second nail 12 is driven into the bottom template 6.

[0036] With this structure, the first nail facilitates the fastening of the stacked installation.

[0037] In this embodiment, an angular support timber 13 is also included. The angular support timber 13 includes a horizontal pad 131 and an inclined support timber 132, which are fixed at one end to form an angle. The horizontal pad 131 is placed between the second timber 11 and the bottom template 6 and is passed through by the second nail 12. The inclined support timber 132 rests on the top of the upper side timber strip 9.

[0038] With this structure, the angled support timber 13 is conducive to self-stabilizing support of the side formwork 8 of the construction joint, so that the upper side of the side formwork 8 of the construction joint is also supported, which is beneficial to resisting the pouring pressure during the pouring stage.

[0039] In this embodiment, the interval between the angled support timbers 13 is no more than 600mm.

[0040] With such a structure, the spacing is too long, which is not conducive to applying a uniformly distributed force.

[0041] In this embodiment, the spacing between the horizontal support timbers 7 is not less than 600mm.

[0042] Using such a structure, with too small spacing and too small walkway slab size, will increase the number of construction steps.

[0043] In this embodiment, the end of the horizontal pad 131 that connects to the inclined support timber 132 is an inclined surface.

[0044] With this structure, the beveled surface increases the contact area, making the wood more stable after bonding.

[0045] In this embodiment, the heights of the upper end side wooden strip 2, the lower end side wooden strip 3, the upper side side wooden strip 9, and the lower side side wooden strip 10 are equal to the thickness of the steel reinforcement protective layer.

[0046] This structure makes it easier to control the thickness of the steel reinforcement protective layer.

[0047] In this embodiment, a hinge 14 is provided on the top surface of the inclined support timber 132. The hinge 14 includes an upper page 141 and a lower page 142 that are hinged to each other. An elongated hole 143 is provided in the upper page 141, and the upper page 141 is attached to the top surface of the inclined support timber 132. The elongated hole 143 allows a bolt 144 to pass through and be tightened on the top surface of the inclined support timber 132. A flat plate 145 is welded to the bottom surface of the lower page 142.

[0048] With this structure, the hinge 14 can be rotated easily, and the elongated hole 143 allows the hinge 14 to be fixed after it is moved down, so that the plate 145 can be adjusted to fall on the upper side wooden strip 9, providing a reference surface for pouring and preventing over-pouring.

[0049] In this embodiment, the end side formwork 1 of the post-pouring strip, the side formwork 8 of the construction joint, and the bottom formwork 6 are made of glued laminated timber.

[0050] With this structure, glued laminated timber is easy to install and easy to nail.

[0051] This invention is convenient to use during the formwork stage of concrete and also during the curing stage of concrete. It is easy to reuse and has high installation efficiency, in order to deal with situations where a post-pouring strip needs to be reserved in the middle of the concrete and a post-pouring strip needs to be set on the side.

[0052] The above description, in conjunction with specific preferred embodiments, provides a further detailed explanation of the present invention. It should not be construed that the specific implementation of the present invention is limited to these descriptions. For those skilled in the art, several equivalent substitutions or obvious modifications can be made without departing from the concept of the present invention, and all such modifications, with identical performance or use, should be considered within the protection scope of the present invention.

Claims

1. A device for leaving post-pouring strips and construction joints in cast-in-place slabs, characterized in that... include: The post-pouring strip end side template (1) is horizontal and is spaced along the longitudinal direction, and has a first groove (101) on its upper and lower sides. The upper end side wooden strip (2) is installed on the top of the post-pouring strip end side template (1) and closes the edge of the first groove (101) on the upper side of the post-pouring strip end side template (1); The lower end side wooden strip (3) is installed on the bottom surface of the post-pouring strip end side template (1) and closes the edge of the first groove (101) on the lower side of the post-pouring strip end side template (1), and is placed on the bottom template (6); The first timber (4) is mounted on the bottom template (6) against the back of the side template (1) and the lower end side timber strip (3); The horizontal support timber (7) is installed on the top surface of the upper end side timber strip (2) on the top surface of the two rows of spaced post-pouring strip end side templates (1), and extends out of the upper end side timber strip (2) to form a cantilever end; The construction joint side template (8) is set along the longitudinal direction and installed on both sides of the post-pouring strip end template (1), and a second groove (801) is provided on its upper and lower sides. Upper side wooden strip (9), which is installed on the side formwork (8) of the construction joint and closes the edge of the second groove (801); The lower side wooden strip (10) is installed under the construction joint side template (8) and closes the edge of the second groove (801), and is placed on the bottom template (6); The second timber (11) is installed on the bottom formwork (6) against the back of the side formwork (8) of the construction joint; The passageway slab (15) is laid at intervals between the horizontal support timbers (7) and is located on the top surface of the upper end side timber strip (2); Channel steel (16) is installed on both sides of the walkway slab (15), with its two ends abutting against the sides of the cantilevered ends of the horizontal support timber (7); The tie rod assembly (17) is threaded through the channel steel (16) and the passage plate (15) and screwed onto the web of the channel steel (16); Angle steel (18) has one leg welded to the web of channel steel (16) and the other leg fixed to the side of the cantilever end of the horizontal support timber (7) by bolts.

2. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 1, characterized in that... The first timber (4) is pierced by the first nail (5) from top to bottom, and the first nail (5) is driven into the bottom template (6); the second timber (11) is pierced by the second nail (12) from top to bottom, and the second nail (12) is driven into the bottom template (6).

3. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 2, characterized in that... It also includes an angled support timber (13), which includes a horizontal pad (131) and an inclined support timber (132), with one end of the two fixed together to form an angle. The horizontal pad (131) is placed between the second timber (11) and the bottom template (6) and is passed through by the second nail (12). The inclined support timber (132) rests on the top of the upper side timber strip (9).

4. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 3, characterized in that... The interval between the angled support timbers (13) is no more than 600mm.

5. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 1, characterized in that... The spacing between the horizontal support timbers (7) shall not be less than 600 mm.

6. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 3, characterized in that... The horizontal pad (131) is connected to the inclined support wooden block (132) at one end, which is an inclined surface.

7. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 3, characterized in that... The heights of the upper end side wooden strip (2), the lower end side wooden strip (3), the upper side side wooden strip (9), and the lower side side wooden strip (10) are equal to the thickness of the steel reinforcement protective layer.

8. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 3, characterized in that... The top surface of the inclined support timber (132) is provided with a hinge (14), the hinge (14) includes an upper page (141) and a lower page (142) that are hinged to each other. The upper page (141) has an elongated hole (143) and is attached to the top surface of the inclined support timber (132). The elongated hole (143) allows a bolt (144) to pass through and be tightened on the top surface of the inclined support timber (132). A flat plate (145) is welded to the bottom surface of the lower page (142).

9. The device for placing post-cast strips and construction joints in cast-in-place slabs according to claim 1, characterized in that... The end formwork (1), the side formwork (8) of the construction joint, and the bottom formwork (6) are made of glued laminated timber.