Ice flood prevention overwintering device for a seasonal freeze-thaw river pier

The composite protective device, consisting of triangular pile clusters, transverse horizontal bracing, and buffer structures, solves the protection problem of seasonally frozen-thawed river trestle bridges during the ice jam season, achieving efficient ice breaking and ice clearing, and improving the stability and economy of the trestle bridge.

CN224997659UActive Publication Date: 2026-11-20CHINA COMM SECOND PUBLIC OFFICE EAST CHINA CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522817539.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-11-20
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

Existing technologies for protecting seasonally frozen-thawed river trestle bridges suffer from high costs, lack of reusability, or limited protective effectiveness and stability, making it difficult to economically, efficiently, and reliably address the dual threats of ice jam impacts and ice dam blockage.

Method used

The composite protective device, which incorporates triangular pile clusters, horizontal horizontal linkages, ice-breaking structures, and buffer structures, decomposes and diverts the impact force of ice floes through triangular force distribution, active ice breaking, and flexible buffering. Combined with a detachable connection design, it improves stability and ice-breaking efficiency.

Benefits of technology

It effectively decomposes the impact of ice, reduces structural damage, ensures the safety of the trestle, and is easy to install and reuse, thus reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997659U_ABST
    Figure CN224997659U_ABST
Patent Text Reader

Abstract

The utility model discloses a seasonal freeze-thaw river pier's anti-ice flood overwintering device belongs to hydraulic engineering and construction technology field. The device includes the equilateral triangle planar arrangement of triangular stake cluster, the transverse flat link structure of connecting stake top, the icebreaking structure of setting in the main anti -collision stake ice -meeting side and the buffer structure of setting in the key stress position. Icebreaking structure is by along the vertical direction of main anti -collision stake arrangement multiple groups sawtooth angle steel constitutes, buffer structure includes high elasticity wear -resisting rubber pad. The utility model discloses through triangular stake cluster will the frontal impact of ice -floe be decomposed into lateral component force, utilizes the angle steel initiative cutting and crushing sleet, and through rubber pad buffering energy absorption to three -dimensional protection to pier has been realized, effectively solved the ice flood period ice collision damage and ice dam accumulation's difficult problem. The device structure is stable, and the icebreaking diversion efficiency is high, and can detachable turnover, especially applicable to Songhua river, the Yellow River and other river basin construction pier's overwintering protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of water conservancy engineering and construction technology, specifically relating to a wintering device for preventing ice jams and flooding on seasonally frozen and thawed river trestle bridges. Background Technology

[0002] When constructing bridges or trestle bridges over rivers, the structures must withstand the severe threat of ice jams during the spring thaw. During ice jams, flowing ice floes possess enormous kinetic energy, and their direct impact on bridge piers can cause structural damage. More dangerously, ice floes can accumulate in front of structures, forming "ice dams," raising upstream water levels and generating immense hydrostatic pressure and frost heave, potentially leading to foundation failure or even complete collapse. Currently, conventional techniques used in engineering projects for winter ice jam prevention of trestle bridges mainly include: 1. Structural reinforcement method: Local reinforcement of the trestle bridge piers and foundations, such as increasing reinforcement, expanding the abutment, or installing protective piers. While this method can improve the structure's impact resistance, it is a permanent reinforcement, costly, and cannot solve the fundamental problem of ice accumulation and water accumulation, making it uneconomical for temporary construction trestle bridges. 2. Independent ice-breaking pier method: Setting up independent ice-breaking piers or ice-breaking piles upstream of the trestle bridge. These structures are usually single piles or simple pile rows, relying on their own strength to rigidly resist ice floes. Such solutions have significant drawbacks: First, they suffer from single-point stress and insufficient overturning stability, making them prone to displacement or damage under sustained impact. Second, their ice-breaking and flow-guiding capabilities are limited; while large ice shards may break upon impact, fragments tend to accumulate in the narrow area between the ice-breaking pier and the trestle, failing to effectively divert the flow, and the risk of ice dams remains. In summary, existing protective technologies are either costly and not readily available, or offer limited protection and insufficient stability, making it difficult to economically, efficiently, and reliably address the dual threats of ice jam impact and ice dam blockage faced by trestle bridges on seasonally frozen-thawed rivers. Therefore, there is an urgent need for a new type of protective device that can actively decompose the impact force of ice shards, effectively break and divert ice shards, possess overall stability, and be easy to construct and reuse. Utility Model Content

[0003] The purpose of this invention is to overcome the shortcomings of existing technologies and provide a winter protection device for ice jams on seasonally frozen and thawed river piers. This invention proposes a composite protective device integrating triangular stabilizing force, active mechanical ice breaking, and flexible buffer energy absorption. The aim is to effectively decompose the impact force of ice jams, efficiently break and disperse ice, significantly reduce structural damage, and achieve rapid installation and reusability, thereby economically and reliably ensuring the safety of the pier during the ice jam season.

[0004] To achieve the above objectives, the following technical solution is adopted: a wintering device for ice jam prevention on seasonally frozen-thawed river trestle bridges, comprising: a triangular pile cluster, a transverse horizontal bracing structure, an ice-breaking structure, and a buffer structure; the triangular pile cluster consists of three steel pipe piles arranged in an equilateral triangle, one of which serves as the main anti-collision pile facing the upstream ice direction, and the other two are the first diversion auxiliary pile and the second diversion auxiliary pile, respectively; the transverse horizontal bracing structure is rigidly connected to the top of the three steel pipe piles, connecting the triangular pile cluster into a single load-bearing unit; the ice-breaking structure is fixedly installed on the ice-facing side of the main anti-collision pile, the first diversion auxiliary pile, and the second diversion auxiliary pile; the buffer structure is located at the diversion point between the ice-breaking structure and the main anti-collision pile, the first diversion auxiliary pile, and the second diversion auxiliary pile. The ice-breaking structure is composed of multiple sets of angle steels arranged at intervals along the vertical direction of the main anti-collision pile, the first diversion auxiliary pile, and the second diversion auxiliary pile. The angle steels are welded to the ice-facing side of the main anti-collision pile, the first diversion auxiliary pile, and the second diversion auxiliary pile, with their tips pointing upstream.

[0005] The angle steel is unequal-sided angle steel, which is staggered on the ice-facing surface of the main anti-collision pile, the first diversion auxiliary pile and the second diversion auxiliary pile.

[0006] The buffer structure is located on the outer side of the ice-facing side of the ice-breaking structure and is used to absorb the impact energy after the ice-breaking structure breaks the ice when ice shards collide.

[0007] The buffer structure is an elastic buffer layer, which includes a highly elastic wear-resistant rubber pad and a stainless steel pressure plate; the rubber pad is attached and fixed to the surface of the steel pipe pile by the stainless steel pressure plate and fasteners.

[0008] The horizontal parallel structure is a rigid connection frame made of steel profiles.

[0009] The steel section is a double-channel steel.

[0010] The steel pipe piles are made of seamless steel pipes.

[0011] The lengths of the three steel pipe piles are all configured to penetrate the seasonally frozen soil layer of the river and anchor in the stable strata below.

[0012] The steel pipe pile is filled with sand, and the sand is densely packed inside the pile.

[0013] The sand is medium-coarse sand, and it is compacted by layered grouting and vibration.

[0014] The horizontal horizontal connection structure is fixed to the top of the steel pipe pile by a separable rigid connection.

[0015] Beneficial effects: 1. Three-dimensional protection, comprehensive solution: This utility model integrates "triangular force distribution, active ice breaking, and flexible buffering", which can not only resist the impact of ice shards, but also effectively prevent ice dams from accumulating, fundamentally solving the two major threats to the wintering of piers.

[0016] 2. Stable structure and strong resistance to overturning: This utility model adopts an equilateral triangular pile cluster foundation, which cleverly decomposes the frontal impact force into the internal force of the system. Combined with the top rigid flat connection and the sand filling in the pile, the overall stability and impact resistance and overturning resistance are significantly enhanced.

[0017] 3. Highly efficient ice breaking and smooth drainage: The pile body of this utility model has vertically staggered sawtooth angle steel on the ice-facing side, which can actively cut and break large pieces of ice. Combined with triangular diversion guidance, it makes it easy for broken ice to pass through, greatly improving the efficiency of ice breaking and drainage.

[0018] 4. Buffering and shock absorption to protect the main body: The key parts of this utility model are equipped with highly elastic rubber pads, which absorb impact energy by reserving deformation gaps, reduce instantaneous stress peaks, reduce direct damage to the steel structure body, and extend the service life of the device.

[0019] 5. Economical and practical, easy to reuse: The main components of this utility model (such as steel pipe piles and horizontal linkage structures) adopt standardized design and can be separated and connected, making construction convenient. After the ice flood season, it is easy to disassemble and reuse in other work sites, which significantly reduces the overall cost of temporary protection projects.

[0020] The above description is only an overview of the technical solution of this utility model. In order to better understand the technical means of this utility model and to implement it in accordance with the contents of the specification, the preferred embodiments of this utility model are described in detail below with reference to the accompanying drawings. Attached Figure Description

[0021] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0022] Figure 1 This is a schematic diagram of the planar layout of this utility model; Figure 2 This is a schematic diagram of the structure of this utility model; Figure 3 This is a cross-sectional schematic diagram of the present invention; Figure 4 This is a detailed drawing of the ice-breaking structure of this utility model.

[0023] In the diagram: 1. Main anti-collision pile; 2. First diversion auxiliary pile; 3. Second diversion auxiliary pile; 4. Angle steel; 5. High-elasticity wear-resistant rubber pad; 6. Stainless steel pressure plate; 7. Horizontal horizontal bracing structure. Detailed Implementation

[0024] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0025] like Figures 1 to 4 As shown, this embodiment provides a winter ice jam prevention device for seasonal freeze-thaw river trestle bridges. This device is particularly suitable for ice jam protection of trestle bridges under construction in river basins such as the Songhua River and the Yellow River. Through a composite structure of "triangular force component, active ice breaking, and flexible buffering," it effectively decomposes and dissipates the impact energy of floating ice, preventing ice floes from accumulating and forming ice dams, thus ensuring the structural safety of the trestle bridge. Multiple sets can be installed according to the ice jam protection needs of the trestle bridge.

[0026] The device mainly consists of four components: a triangular pile cluster, a horizontal horizontal connection structure 7, an ice-breaking structure, and a buffer structure.

[0027] Furthermore, such as Figures 1-3 As shown, the triangular pile cluster is the load-bearing skeleton of the device, consisting of three high-strength steel pipe piles. In this embodiment, these three steel pipe piles are made of Q355B grade seamless steel pipes with an outer diameter of not less than 63cm. The three steel pipe piles are arranged in a stable equilateral triangle in plan view, with one steel pipe pile serving as the main anti-collision pile 1, its axis facing the direction of ice flow from the upstream of the river; the other two steel pipe piles serve as diversion auxiliary piles, namely the first diversion auxiliary pile 2 and the second diversion auxiliary pile 3.

[0028] During construction, precise measurements and layout were first conducted on the upstream side of the piers of the bridge to be protected to determine the three pile positions of an equilateral triangle. To ensure the impact stability of the ice jam prevention device and the diversion position of the ice jam, the deviation of the main impact pile 1 was controlled within ±50mm, and the deviation of the triangle side length was ≤30mm. A crawler crane in conjunction with a vibratory hammer was used to drive the steel pipe piles into the riverbed one by one. During driving, the verticality of the pile body must be strictly controlled, and it must be ensured that the pile length penetrates the seasonally frozen soil layer of this river section, and the depth of the pile tip embedded in the underlying stable rock layer is not less than 1.5 meters to meet the stability requirements for pull-out resistance and overturning resistance. The pile top elevation must be consistent.

[0029] Furthermore, such as Figure 2 and Figure 3As shown, the transverse horizontal connecting structure 7 is used to rigidly connect the tops of three independent steel pipe piles, forming a triangular frame that works together to bear loads. In this embodiment, the transverse horizontal connecting structure 7 is a double-splitting channel steel beam formed by splicing two channel steels back to back. After the three steel pipe piles are driven, the prefabricated transverse horizontal connecting structure 7 is hoisted to the designed position on the pile top and firmly connected to the top of each steel pipe pile by welding. The welding requires continuous and full welds, and a visual inspection is required after welding. Ultrasonic testing should be performed if necessary to ensure the connection quality and avoid cracking under low temperature and impact loads. This connection method is a separable rigid connection. After the ice jam season, the horizontal connecting structure can be dismantled by cutting the welds to allow for the reuse of the main components.

[0030] Furthermore, such as Figure 3 and Figure 4 As shown, the ice-breaking structure is located on the ice-facing side of the main anti-collision pile 1, the first diversion auxiliary pile 2, and the second diversion auxiliary pile 3. Specifically, the ice-breaking structure is composed of multiple sets of angle steel 4 forming a sawtooth shape. These angle steel 4 are non-uniformly arranged at certain intervals along the vertical direction of the main anti-collision pile 1, the first diversion auxiliary pile 2, and the second diversion auxiliary pile 3. Based on the river's normal ice level (referring to the water level line corresponding to the most common and most frequent ice thickness during the ice jam season) determined by hydrological data, a denser arrangement (e.g., spacing of 0.3 meters) is adopted within a certain range (e.g., ±0.5 meters) above and below this water level line; above this area, a conventional spacing (e.g., 0.5 meters) is adopted. This design can specifically enhance the ice-breaking capability in the main ice jam area. It is firmly fixed to the ice-facing arc surface of the pile body by welding, with the tips of all angle steel 4 facing upstream. Furthermore, such as Figure 3 and Figure 4 As shown, the angle steel 4 selected in this embodiment is an unequal-sided angle steel. Each group of angle steel usually has 4-8 pieces arranged on the same horizontal section of the pile. These angle steel pieces are preferably angle steels with a side length ratio greater than 1.5 and are arranged in an alternating pattern on the ice-facing surface of the pile. This design of "multiple groups, vertical distribution, and staggered inclination" allows the tip and edge of the angle steel to form stress concentration when large ice blocks hit, efficiently cutting and tearing the ice layer into small pieces, thereby greatly reducing its overall impact energy and accumulation risk.

[0031] Furthermore, the buffer structure is located on the outer side of the ice-facing side of the ice-breaking structure. This buffer structure aims to absorb and disperse impact energy, protecting the steel structure itself. It comprises two parts: the first part is located at the interface between the ice-breaking structure and the main anti-collision pile 1 on the outer side of the ice-facing side; the second part is located in the outer area of ​​the multiple sets of angle steel 4 on the ice-facing side of the first diversion auxiliary pile 2 and the second diversion auxiliary pile 3, as detailed in [link to details]. Figure 3 .

[0032] Furthermore, such as Figure 2 and Figure 3 As shown, in specific implementation, the buffer structure uses a highly elastic wear-resistant rubber pad 5 as an elastic buffer layer. During installation, the rubber pad 5 is first attached to the surface of the steel structure at the predetermined position, and then it is pressed and fixed using stainless steel pressure plates 6 and high-strength bolts and other fasteners. When ice shards impact, the rubber pad 5 undergoes compression deformation, transforming the severe rigid impact into a continuous flexible buffer, effectively reducing the instantaneous impact stress peak and reducing direct frictional damage between the ice shards and the steel.

[0033] Furthermore, to further improve the stiffness and damping performance of steel pipe piles, sand filling can be performed inside the pile body after the steel pipe piles are driven and the top horizontal connection is completed. The specific process is as follows: medium-coarse sand is poured into the pile using a "layered pouring and vibration compaction" method, with each layer of sand no more than 1 meter thick. Then, an immersion vibrator is used to thoroughly compact the sand until the sand surface no longer settles, ensuring a dense sand filling. This measure increases the pile's mass and improves its dynamic response characteristics.

[0034] Furthermore, the working principle of this device can be summarized as follows: When the ice jam season arrives, the upstream floating ice first impacts the main anti-collision pile 1. Multiple sets of interlaced angle steel 4 on the pile cut and break large ice chunks. Some ice fragments slide along the pile side, while the remaining ice is diverted to both sides under the guidance of the pile's arc surface. The diverted ice then impacts the first diversion auxiliary pile 2 and the second diversion auxiliary pile 3 on both sides. Its forward impact force is decomposed into two lateral components, which are borne by the triangular frame through the top horizontal connecting structure 7. Throughout the impact process, the rubber buffer pads 5 at various locations continuously absorb energy, protecting the steel structure. Ultimately, the fully broken and diverted ice fragments are able to pass smoothly under the trestle with the water flow, fundamentally preventing the formation of ice dams and direct impact on the main body of the trestle.

[0035] This invention organically combines a triangular stabilizing structure, active mechanical ice breaking, and flexible buffer energy absorption, providing a winter overpass solution for trestle bridges that is highly protective, easy to construct, and reusable.

[0036] Where there is no conflict, those skilled in the art can combine the relevant technical features in the above examples according to the actual situation to achieve the corresponding technical effects. Specific details of the various combinations will not be elaborated here.

[0037] It should be noted that all directional indicators (such as up, down, left, right, front, back, etc.) in this utility model embodiment are only used to explain the relative positional relationship and movement of each component in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.

[0038] Furthermore, the use of terms such as "first" and "second" in this utility model is for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features.

[0039] The above description is merely a preferred embodiment of the present invention. The present invention is not limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein. Any simple modifications, equivalent variations, and alterations made to the above embodiments based on the technical essence of the present invention shall still fall within the scope of the present invention.

Claims

1. A wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges, characterized in that: include: The structure comprises a triangular pile cluster, a transverse horizontal connection structure (7), an ice-breaking structure, and a buffer structure. The triangular pile cluster consists of three steel pipe piles arranged in an equilateral triangle. One of the steel pipe piles serves as the main anti-collision pile (1) facing the upstream direction of the ice flow, while the other two steel pipe piles are the first diversion auxiliary pile (2) and the second diversion auxiliary pile (3), respectively. The transverse horizontal connection structure (7) is rigidly connected to the top of the three steel pipe piles to connect the triangular pile cluster into a single load-bearing unit. The ice-breaking structure is fixedly installed on the ice-facing side of the main anti-collision pile (1), the first diversion auxiliary pile (2), and the second diversion auxiliary pile (3). The buffer structure is installed at the diversion point between the ice-breaking structure and the main anti-collision pile (1), the first diversion auxiliary pile (2), and the second diversion auxiliary pile (3).

2. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1, characterized in that: The ice-breaking structure is composed of multiple sets of angle steels (4) arranged at intervals along the vertical direction of the main anti-collision pile (1), the first diversion auxiliary pile (2) and the second diversion auxiliary pile (3). The angle steels (4) are welded to the ice-facing side of the main anti-collision pile (1), the first diversion auxiliary pile (2) and the second diversion auxiliary pile (3), and their tips face the upstream direction.

3. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 2, characterized in that: The angle steel (4) is made of unequal-sided angle steel and is staggered on the ice-facing surface of the main anti-collision pile (1), the first diversion auxiliary pile (2) and the second diversion auxiliary pile (3).

4. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1, characterized in that: The buffer structure is located on the outer side of the ice-facing side of the ice-breaking structure and is used to absorb the impact energy after the ice-breaking structure breaks the ice when ice shards collide.

5. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 4, characterized in that: The buffer structure is an elastic buffer layer, which includes a highly elastic wear-resistant rubber pad (5) and a stainless steel pressure plate (6); the rubber pad (5) is attached and fixed to the surface of the steel pipe pile by the stainless steel pressure plate (6) and fasteners.

6. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1, characterized in that: The transverse horizontal bracing structure (7) is a rigid connection frame made of steel profiles.

7. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 6, characterized in that: The steel profile is a double-channel steel.

8. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1, characterized in that: The steel pipe piles are made of seamless steel pipes.

9. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1 or 8, characterized in that: The lengths of the three steel pipe piles are all configured to penetrate the seasonally frozen soil layer of the river and anchor in the stable strata below.

10. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 9, characterized in that: The steel pipe pile is filled with sand, and the sand is densely packed inside the pile.

11. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 10, characterized in that: The sand is medium-coarse sand, and it is compacted by layered grouting and vibration.

12. The wintering device for preventing ice jams and flooding on seasonally frozen-thawed river trestle bridges according to claim 1, characterized in that: The transverse horizontal connection structure (7) is fixed to the top of the steel pipe pile by a separable rigid connection.