A pile foundation vertical bearing capacity testing device cooperated with a load box and anchorable
By setting a load cell at the bottom of the pile foundation and combining it with a recyclable ground anchor system, the problems of insufficient upper limit of loading and environmental pollution in traditional pile foundation bearing capacity testing are solved, and efficient and accurate pile foundation bearing capacity testing is achieved.
Patent Information
- Application Number
- CN202522584614.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-05
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-05
AI Technical Summary
Traditional methods for testing the bearing capacity of pile foundations suffer from problems such as insufficient upper limit of loading, high cost, and serious environmental pollution.
A pile foundation vertical bearing capacity testing device that combines recyclable ground anchors and load cells is used. By setting a load cell at the bottom of the pile and combining it with a recyclable ground anchor system, the device achieves efficient loading and accurate data acquisition of the pile foundation, reducing material consumption and environmental impact.
It improves the accuracy and economy of pile foundation bearing capacity testing, reduces construction costs, and conforms to the concept of green and environmentally friendly construction.
Smart Images

Figure CN224997664U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of static load testing technology for pile foundations, specifically a pile foundation vertical bearing capacity testing device that combines a recyclable ground anchor and a load cell. Background Technology
[0002] The design bearing capacity of pile foundations is high. The traditional self-balancing method is limited by the size of the load cell and the local compressive strength of the pile concrete. Its maximum loading value often cannot reach the actual ultimate bearing capacity of the pile, resulting in conservative test results that cannot truly reflect the bearing potential of the pile foundation. The surcharge method requires the transportation and hoisting of hundreds to thousands of tons of counterweight, which has extremely high requirements for site bearing capacity, space conditions and transportation capacity, and is expensive to implement. The anchor pile method requires the pre-construction of multiple anchor piles, which involves a large amount of work, high cost and long construction period.
[0003] To overcome the aforementioned shortcomings, this invention provides a pile foundation testing device that combines recyclable ground anchors and a load cell. This device significantly enhances the overall loading capacity through the synergistic effect of the recyclable ground anchors and the load cell, effectively overcoming the limitation of insufficient loading limits in traditional self-balancing methods. Furthermore, the ground anchor components can be completely recycled and reused after testing, fundamentally reducing material consumption and construction waste generated by traditional testing methods. This aligns with the green and low-carbon environmentally friendly construction concept, providing a more reliable, economical, and environmentally friendly solution for pile foundation bearing capacity testing. Utility Model Content
[0004] The purpose of this invention is to provide a pile foundation vertical bearing capacity testing device that combines recyclable ground anchors and load cells to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: a pile foundation vertical bearing capacity testing device that combines recyclable ground anchors and load boxes, comprising: a pile body, a load box set at the bottom of the pile body, and a reference beam fixedly connected to the top of the pile body by steel pads; the load box includes an upper displacement plate, a lower displacement plate, and several hydraulic jacks. The hydraulic jack is equipped with an upper displacement plate and a lower displacement plate, and the hydraulic jack is connected to an oil pump through a high-pressure oil pipe. The upper and lower displacement plates of the load cell are respectively connected to several upper and lower displacement wires. The upper ends of the upper and lower displacement wires extend along the pile body, and the upper ends of the upper and lower displacement wires are connected to displacement sensors.
[0006] Preferably, the load box is connected to a grouting pipe.
[0007] Preferably, the portions of the upper and lower displacement wires located within the pile body are both fitted with protective sleeves to ensure that the displacement wires are always taut, and the displacement sensor is connected to a data acquisition system.
[0008] Preferably, the hydraulic jack is connected to a hydraulic check valve and a hydraulic balance valve.
[0009] Preferably, the reference beam is equipped with a recovery anchor system, which includes anchors, steel strands and inner anchor heads. Several anchors are provided and fixed on the reference beam. The two ends of the steel strands are connected to the inner anchor heads and anchors, respectively. The steel strands and inner anchor heads are drilled into the soil, and the steel strands are covered with plastic tubes.
[0010] Compared with the prior art, the beneficial effects of this utility model are: 1. Place the load cell at the bottom of the pile (the area least affected by construction disturbance), and protect the displacement rod with a protective sleeve to ensure the load cell remains stable during pile foundation construction and accurately obtain the pile bearing capacity data; 2. When the load cell provides insufficient reaction force, a recyclable ground anchor system composed of recyclable anchor cables and reaction force reference beam can be used to compensate for the reaction force. After testing, the steel strands and anchorages can be completely recycled, which greatly reduces anchoring costs, reduces soil damage, and conforms to the concept of green construction. At the same time, different numbers of anchor cables can be installed according to different pile diameters and lengths to meet the situation where the test reaction force is insufficient. 3. The load box applies pressure in stages through an independent hydraulic system, so as to realize the synchronous and graded loading of the pile end and pile side resistance, avoiding mutual interference. The displacement wire is directly connected to the data acquisition system with the sensor to monitor the compression and displacement of the pile body in real time, thereby improving the accuracy of the data. Attached Figure Description
[0011] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a top view of the protective sleeve, displacement wire, and displacement sensor of this utility model; Figure 3 This is a schematic diagram of the anchor, steel strand and inner anchor head structure in this utility model; Figure 4 In this utility model Figure 1 Enlarged view of point A.
[0012] In the diagram: 1. Steel pad; 3. Displacement sensor; 4. Data acquisition system; 5. High-pressure oil pipe; 8. Lower displacement wire; 9. Upper displacement wire; 10. Anchor; 11. Steel strand; 12. Inner anchor head; 13. Pile body; 14. Load box; 141. Upper displacement plate; 142. Lower displacement plate; 143. Hydraulic jack; 17. Oil pump; 19. Protective sleeve. Detailed Implementation
[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0014] Please see Figure 1-4 This utility model provides a technical solution: a pile foundation vertical bearing capacity testing device that combines recyclable ground anchors and load boxes, including: a pile body 13, a load box 14 set at the bottom of the pile body 13, and a reference beam fixedly connected to the top of the pile body 13 by a steel pad 1. The load box 14 includes an upper displacement plate 141, a lower displacement plate 142, and several hydraulic jacks 143; The hydraulic jack 143 is equipped with an upper displacement plate 141 and a lower displacement plate 142 at the top and bottom respectively. The hydraulic jack 143 is connected to the oil pump 17 through a high-pressure oil pipe 5, and a hydraulic balance valve and a hydraulic check valve are installed on the high-pressure oil pipe 5. The upper displacement plate 141 and the lower displacement plate 142 serve as the upper and lower load-bearing components of the load box 14, respectively. The upper displacement plate 141 and the lower displacement plate 142 are used to be tightly connected to the pile body 13 structure to bear and transmit the load applied by the pile body 13. The load on the pile body 13 is applied by the telescopic movement of the hydraulic jack 143 to simulate the external pressure that the pile foundation bears during actual use. The hydraulic check valve is used to regulate the pressure balance in the hydraulic system, ensuring that the pressure is evenly distributed among the hydraulic jacks 143 during loading, and avoiding equipment damage or inaccurate test results due to uneven pressure. The load cell 14 is connected to the grouting pipe. After the installation and testing of the load cell 14 are completed, grout is injected into the pile perimeter and pile end through the grouting pipe to fill the gap between the pile and the surrounding soil, thereby improving the bearing capacity and stability of the pile foundation.
[0015] The upper displacement plate 141 and lower displacement plate 142 of the load box 14 are respectively connected to several upper displacement wires 9 and lower displacement wires 8. The upper ends of the upper displacement wires 9 and lower displacement wires 8 extend along the pile body 13, and the upper ends of the upper displacement wires 9 and lower displacement wires 8 are connected to displacement sensors 3. The parts of the upper displacement wires 9 and lower displacement wires 8 located inside the pile body 13 are all covered with protective sleeves 19. The displacement sensors 3 are connected to the data acquisition system 4. The upper displacement wire 9, the lower displacement wire 8, and the displacement sensor 3 are used to accurately measure the displacement of the pile body 13 under load, providing important data for analyzing the bearing capacity of the pile foundation. The data is collected by the data acquisition system 4.
[0016] During pile foundation construction, the construction disturbance near the lower end of the pile 13 is relatively small. Placing the load cell 14 at this location can effectively reduce the impact of pile foundation construction disturbance on the load cell 14, prevent the load cell 14 from being damaged and failing due to construction disturbance, and thus accurately measure the bearing capacity of the pile body.
[0017] The reference beam is equipped with a recyclable ground anchor system, which includes anchors 10, steel strands 11, and inner anchor heads 12. Several anchors 10 are provided and fixed to the reference beam. The two ends of the steel strands 11 are connected to the inner anchor heads 12 and the anchors 10, respectively. A plastic tube is sleeved on the steel strands 11 to separate them from the soil, facilitating their subsequent retrieval. The steel strands 11 and the inner anchor heads 12 are drilled into the soil. By pulling the steel strands 11, the load is transferred to the surrounding inner anchor heads 12. After the test is completed, the steel strands 11 and the anchors 10 can be recycled for use in the next project, reducing project costs and minimizing the impact on the surrounding environment.
[0018] The construction and recycling methods for recyclable ground anchor systems include the following steps: (1) Drilling: Drilling operations are carried out at the corresponding locations around the pile foundation according to the test requirements; (2) Drilling: Insert the prepared inner anchor head, steel strand, plastic pipe and grouting pipe into the hole together; (3) Grouting: Prepare cement grout according to the design mix ratio. Grouting should be carried out in strict accordance with pressure grouting, bottom grouting, top grouting and secondary grouting operations. (4) Tensioning: After the strength of the grouting body meets the tensioning requirements, rotate the steel strand 11 counterclockwise and make it tightly connected through the special structure inside the inner anchor head. Then, use a through-hole jack to perform tensioning. Over-tensioning is used. After the tension value stabilizes, lock the outer end of the steel strand 11. (5) Anchor cable recovery: After the test is completed, first remove the working anchor on the reference beam, then rotate the steel strand 11 clockwise to disconnect it from the inner anchor head 12. Then continue to use the jack to tension the steel strand 11 so that the steel strand 11 is pulled out from the inner anchor head 12. Finally, pull the steel strand 11 out of the plastic tube by manpower to complete the recovery of the steel strand 11.
[0019] Working principle: High-pressure hydraulic oil is supplied to the hydraulic jack 143 in the load box 14 through the oil pump 17 and high-pressure oil pipe 5, so that the hydraulic jack 143 gradually extends and applies a load to the pile body 13. The displacement of the pile body 13 under different loads is accurately measured by the lower displacement wire 8, the upper displacement wire 9 and the displacement sensor 3. Combined with the magnitude of the applied load, key parameters such as pile side friction, pile bearing capacity and pile displacement can be obtained through relevant calculation and analysis methods, so as to comprehensively and accurately evaluate the bearing capacity performance of the pile foundation. A recyclable ground anchor system consisting of anchor 10, steel strand 11, inner anchor head 12 and reaction reference beam provides compensation reaction force, making the measured results closer to the actual bearing capacity of the pile foundation.
[0020] The contents not described in detail in this specification are existing technologies known to those skilled in the art.
[0021] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A pile foundation vertical bearing capacity testing device that combines recyclable ground anchors and load cells, comprising: The pile body (13) is characterized in that: a load box (14) is provided at the bottom of the pile body (13), and a reaction reference beam is fixedly connected to the top of the pile body (13) by a steel pad (1). The load box (14) includes an upper displacement plate (141), a lower displacement plate (142) and several hydraulic jacks (143). The hydraulic jack (143) is provided with an upper displacement plate (141) and a lower displacement plate (142) on the top and bottom respectively. The hydraulic jack (143) is connected to the oil pump (17) through a high-pressure oil pipe (5). The upper displacement plate (141) and lower displacement plate (142) of the load box (14) are respectively connected to several upper displacement wires (9) and lower displacement wires (8). The upper ends of the upper displacement wires (9) and lower displacement wires (8) extend along the pile body (13), and the upper ends of the upper displacement wires (9) and lower displacement wires (8) are connected to displacement sensors (3).
2. The pile foundation vertical bearing capacity testing device with recyclable ground anchor and load cell cooperation as described in claim 1, characterized in that, The load box (14) is connected to the grouting pipe.
3. The pile foundation vertical bearing capacity testing device with recyclable ground anchor and load cell as described in claim 1, characterized in that, The upper displacement wire (9) and the lower displacement wire (8) located inside the pile body (13) are both covered with protective sleeves (19), and the displacement sensor (3) is connected to the data acquisition system (4).
4. The pile foundation vertical bearing capacity testing device with recyclable ground anchor and load cell cooperation as described in claim 1, characterized in that, A hydraulic check valve and a hydraulic balance valve are installed between the hydraulic jack (143) and the high-pressure oil pipe (5).
5. The pile foundation vertical bearing capacity testing device with recyclable ground anchor and load cell as described in claim 1, characterized in that, The reference beam is equipped with a recovery anchor system, which includes an anchor (10), a steel strand (11), and an inner anchor head (12). There are several anchors (10), which are fixed on the reference beam. The two ends of the steel strand (11) are connected to the inner anchor head (12) and the anchor (10), respectively. The steel strand (11) and the inner anchor head (12) are drilled into the soil, and the steel strand (11) is covered with a plastic tube.