Supporting structure for pile foundation of bridge
The bridge pile foundation reinforcement support structure, which uses modular prefabricated split structure and mechanical self-locking connection, solves the problems of long construction period and quality risks, realizes fast and reliable reinforcement construction, and reduces costs and environmental protection.
Patent Information
- Application Number
- CN202522820986.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-31
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-31
AI Technical Summary
The existing bridge pile foundation reinforcement process is complicated, resulting in a long construction period, and the on-site welding and pouring methods pose quality risks and material waste.
The modular, prefabricated, modular structure, including new pile foundations and temporary pile caps, is adopted. Through detachable clamp-type connections and mechanical self-locking structures, the entire dry construction method is achieved, simplifying the construction process.
It greatly shortens the construction period, improves construction efficiency, reduces potential quality problems, lowers material costs, and conforms to the concept of green environmental protection.
Smart Images

Figure CN224997669U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of bridge engineering technology, specifically relating to a support structure for adding piles to bridge pile foundations. Background Technology
[0002] In the reinforcement and renovation of bridge pile foundations in underwater structures, especially when additional pile caps are required, it is typically necessary to first construct an underwater cofferdam to isolate the construction area from the water body and pump out any accumulated water before excavating the foundation pit to expose the existing pile foundations for subsequent construction. However, this process significantly increases the free length of the existing pile foundations in the air. This increased free length directly leads to a decrease in the pile's inherent stiffness. Under the dead and live loads of the superstructure, the bending moment and shear force generated by the pile will increase dramatically. This can not only cause the pile top displacement to exceed the allowable range specified in the code, but in severe cases, it can even lead to structural damage such as cracking of the pile concrete. Simultaneously, the increased exposed length also significantly reduces the compression stability of the pile foundation, significantly increasing the risk of buckling instability under axial loads. Therefore, reliable supports must be provided for the exposed existing pile foundations during excavation to ensure structural safety and the smooth progress of the construction process.
[0003] Currently, the most common support schemes used in engineering are on-site wet construction methods. A typical structure usually includes: constructing new temporary piles on both sides of the existing pile foundation; these temporary piles are mostly bored piles or driven piles; welding or bolting large steel sections to the pile tops on-site as support beams; finally, binding reinforcing bars on the support beams on-site and pouring concrete to form a unified temporary cap. This temporary cap is connected to the existing pile foundation by methods such as rebar installation, thereby transferring the load to the newly added temporary piles. This support system, constructed through on-site welding and concrete pouring, is the mainstream practice for ensuring construction safety.
[0004] The existing support scheme involves multiple stages in its construction process, including pile foundation drilling, steel cage fabrication and lowering, concrete pouring and curing, and steel reinforcement binding and secondary pouring and curing of temporary foundations. The complex procedures result in an extremely long construction period. Utility Model Content
[0005] The technical problem to be solved by this utility model is to provide a support structure for adding piles to bridge pile foundations, which is simple in structure, reasonable in design and highly practical, in order to address the shortcomings of the prior art.
[0006] To solve the above-mentioned technical problems, the technical solution adopted by this utility model is: a support structure for reinforcing bridge pile foundations, used to support existing pile foundations during reinforcement, the support structure comprising: Two new pile foundations are installed on both sides of the existing pile foundations, and each new pile foundation includes a detachably connected lower support section and an upper support section. The temporary foundation includes a first foundation segment detachably connected to one of the upper support sections, and a second foundation segment detachably connected to the other upper support section. Both the first and second foundation segments are provided with clamping flaps at their closest points. The first and second foundation segments are connected by clamping flaps. The inner shape of the clamping flaps matches the shape of the existing pile foundation. When the clamping flaps are connected, they hold the existing pile foundation tightly.
[0007] Preferably, the upper end face of the lower support section is provided with a first connecting groove, a first wedge-shaped slider is slidably disposed in the first connecting groove along the vertical direction, a first steel ball is also disposed between the lower side of the first wedge-shaped slider and the inner wall of the first connecting groove, a first opening is provided on the side wall of the first connecting groove for the first steel ball to slide out radially, the lower end of the upper support section is provided with a first plug-in corresponding to the first wedge-shaped slider, a first connecting cylinder corresponding to the outer wall of the lower support section is also disposed on the outer side of the first plug-in, and a first clamping groove corresponding to the first steel ball is provided on the inner wall of the first connecting cylinder.
[0008] Preferably, a second connecting groove is provided on the upper end face of the upper support section, and a second wedge-shaped slider is slidably arranged in the second connecting groove along the vertical direction. A second steel ball is also provided between the lower side of the second wedge-shaped slider and the inner wall of the second connecting groove. A second opening is provided on the side wall of the second connecting groove for the second steel ball to slide out radially. A second plug-in corresponding to the second wedge-shaped slider is provided on the lower side of the ends of the first and second base segments that are far apart from each other. A second connecting cylinder corresponding to the upper outer wall of the upper support section is also provided on the outer side of the second plug-in. A second clamping groove corresponding to the second steel ball is provided on the inner wall of the second connecting cylinder.
[0009] Preferably, each of the two clamping segments is provided with a flange at one end that is close to the other, and the flange is provided with bolt holes.
[0010] Preferably, each clamping segment is provided with a bearing connector on the side where it connects to the corresponding first or second bearing segment, and the bearing connector is fixedly connected to the side of the first or second bearing segment.
[0011] Preferably, shear keys are also provided on the inner wall of the clamping flap to form a mechanical interlock on the surface of the existing pile foundation.
[0012] This utility model has the following advantages compared with the prior art: 1. This utility model discloses a support structure for adding piles to bridge pile foundations. By designing the newly added pile foundation and temporary pile cap as modular prefabricated separate parts and adopting detachable and clamp-type connections, it realizes on-site dry operation, which greatly shortens the installation cycle and construction cycle. 2. The present invention provides a support structure for adding piles to bridge pile foundations. The purely mechanical connection used has high reliability and easy quality control, reducing quality risks caused by human factors. After the final pile reinforcement construction is completed, the upper support section and temporary pile cap can be disassembled as temporary supports, and the disassembled upper support section and temporary pile cap can be reused. This not only reduces the material cost of a single project, but also conforms to the concept of green and environmentally friendly construction. 3. This utility model discloses a support structure for adding piles to bridge pile foundations. Through the self-locking structure formed by plug-in connectors, wedge-shaped sliders, and steel balls, it achieves a quick and firm mechanical self-locking connection between the upper and lower support sections, as well as between the upper support section and the temporary abutment. This connection method simplifies the lengthy concrete pouring process in practice to a simple insertion and locking action. Furthermore, the installation process does not require on-site welding, tightening of a large number of bolts, or waiting for grout curing, thereby significantly shortening the construction cycle and improving construction efficiency.
[0013] The technical solution of this utility model will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of a support structure for adding piles to bridge pile foundations according to this utility model; Figure 2 This is a detailed connection diagram of a support structure for adding piles to a bridge pile foundation according to this utility model; Figure 3 for Figure 2 Enlarged structural diagram at point A in the middle; Figure 4 for Figure 2 Enlarged structural diagram at point B.
[0015] Explanation of reference numerals in the attached figures: 1. New pile foundation; 1-1. Lower support section; 1-2. Upper support section; 1-10. First connecting groove; 1-11. First wedge-shaped slider; 1-12. First steel ball; 1-13. First opening; 1-20. First plug-in piece; 1-21. First connecting cylinder; 1-22. First clamping groove; 1-23. Second connecting groove; 1-24. Second wedge-shaped slider; 1-25. Second steel ball; 1-26. Second opening; 2. Existing pile foundation; 3. Temporary pile cap; 3-1. First pile cap split; 3-2. Second pile cap split; 3-3. Hoop flap; 3-4. Second connecting cylinder; 3-5. Second clamping groove; 3-6. Second plug-in piece; 4. Flange; 5. Pile cap connecting piece. Detailed Implementation
[0016] like Figure 1 , Figure 2 , Figure 3 and Figure 4As shown, this utility model discloses a support structure for adding piles to bridge pile foundations, used to support existing pile foundations 2 during pile reinforcement. The support structure includes two newly added pile foundations 1 and a temporary pile cap 3. The two newly added pile foundations 1 are respectively set on both sides of the existing pile foundation 2. Each newly added pile foundation 1 includes a detachably connected lower support section 1-1 and an upper support section 1-2. The temporary pile cap 3 includes a first pile cap segment 3-1 detachably connected to one of the upper support sections 1-2, and a second pile cap segment 3-2 detachably connected to the other upper support section 1-2. Both the first pile cap segment 3-1 and the second pile cap segment 3-2 are provided with clamping petals 3-3 at their respective ends close to each other. The first pile cap segment 3-1 and the second pile cap segment 3-2 are connected by the clamping petals 3-3. The inner shape of the clamping petals 3-3 matches the outer shape of the existing pile foundation 2. When the clamping petals 3-3 are connected, they tightly hold the existing pile foundation 2.
[0017] The bridge pile foundation support structure disclosed in this utility model supports an existing pile foundation 2 mainly by adding new pile foundations 1 on both sides of the existing pile foundation 2 and setting a temporary pile cap 3 on top to fix the existing pile foundation 2. Since the new pile foundation 1 includes a detachably connected lower support section 1-1 and an upper support section 1-2, during the support operation, the two lower support sections 1-1 are first buried on the banks on both sides of the existing pile foundation 2, and then the corresponding upper support section 1-2 is connected to the lower support section 1-1. After connection, the first pier segment 3-1 is hoisted to the top of one of the upper support sections 1-2 and connected in a detachable manner; then the second pier segment 3-2 is hoisted to the top of the other upper support section 1-2 and connected in the same way; finally, the first pier segment 3-1 and the second pier segment 3-2 are brought close to each other, so that the clamping petals 3-3 at their ends surround and fit against both sides of the existing pile foundation 2, and then the clamping petals 3-3 are locked with high-strength bolts, thereby firmly holding the existing pile foundation 2. At this point, the entire support structure is installed. The newly added pile foundation 1 and the existing pile foundation 2 form a stable load-bearing whole through the temporary pile cap 3, jointly bearing the load of the superbridge. The support work for the existing pile foundation 2 is now complete, and subsequent pile reinforcement work can begin on this support basis. Because the newly added pile foundation 1 on both sides and the temporary pile cap 3 on top have formed a stable support, the stability of the existing pile foundation can be effectively guaranteed during subsequent excavation work. Even if the free length of the pile foundation increases when excavating the ground line, the newly added pile foundation 1 and the temporary pile cap 3 on top can effectively avoid the risk of buckling of the existing pile foundation 2. In summary, the support structure disclosed in this utility model, by designing the newly added pile foundation 1 and the temporary pile cap 3 as modular prefabricated separate parts and adopting detachable and clamp-type connections, achieves fully dry on-site operation, greatly shortening the installation and construction cycle; moreover, the purely mechanical connection adopted has high reliability, easy quality control, and reduces quality risks caused by human factors; and after the final pile reinforcement construction is completed, the upper support section 1-2 and the temporary pile cap 3 can be disassembled as temporary supports, and the disassembled upper support section 1-2 and the temporary pile cap 3 can be reused, which not only reduces the material cost of a single project, but also conforms to the concept of green and environmentally friendly construction.
[0018] Furthermore, such as Figure 3As shown, in order to connect the lower support segment 1-1 with the corresponding upper support segment 1-2, the upper end face of the lower support segment 1-1 disclosed in this embodiment is provided with a first connecting groove 1-10. A first wedge-shaped slider 1-11 is slidably disposed in the first connecting groove 1-10 along the vertical direction. A vertical groove is provided on the inner wall of the first connecting groove 1-10. A protrusion corresponding to the groove is provided on the first wedge-shaped slider 1-11, so that the first wedge-shaped slider 1-11 can slide in the vertical direction. The lower side of the first wedge-shaped slider 1-11 is connected to the first connecting groove 1-10. A first steel ball 1-12 is also provided between the inner walls. A first opening 1-13 is provided on the side wall of the first connecting groove 1-10 for the first steel ball 1-12 to slide radially out. A first plug-in 1-20 corresponding to the first wedge-shaped slider 1-11 is provided at the lower end of the upper support section 1-2. A first connecting cylinder 1-21 corresponding to the outer wall of the lower support section 1-1 is also provided on the outer side of the first plug-in 1-20. A first clamping groove 1-22 corresponding to the first steel ball 1-12 is provided on the inner wall of the first connecting cylinder 1-21. Therefore, when the upper support section 1-2 moves downward and connects with the lower support section 1-1, a first clamping groove 1-22 corresponding to the first steel ball 1-12 is provided on the inner wall of the first connecting cylinder 1-21. When segment 1-1 is connected, the first insert 1-20 at its lower end will insert into the first connecting groove 1-10 and push the first wedge-shaped slider 1-11 downwards. During the downward movement, the wedge-shaped slider 1-11 will squeeze the first steel ball 1-12 located between itself and the groove wall, forcing the steel ball 1-12 to slide radially outwards from the first opening 1-13 and finally lock into the first clamping groove 1-22 on the inner wall of the first connecting cylinder 1-21, thereby achieving a quick and secure mechanical self-locking connection between the upper and lower support segments. This connection method disclosed in this utility model can achieve... The quick-detachable connection between the current support section 1-1 and the corresponding upper support section 1-2 simplifies the lengthy concrete pouring process in practice to a simple insertion and locking action through the prefabricated lower support section 1-1 and the corresponding upper support section 1-2. Moreover, the installation process does not require on-site welding, tightening of a large number of bolts, or waiting for grout curing, thus significantly shortening the construction cycle and improving construction efficiency. Secondly, this purely mechanical self-locking structure connection is reliable and effectively avoids the uncertainties caused by on-site human operation (such as welding and grouting), ensuring the stability and safety of the connection.
[0019] like Figure 4As shown, in order to achieve the connection between the upper support section 1-2 and the corresponding support platform, the upper end face of the upper support section 1-2 disclosed in this embodiment is provided with a second connecting groove 1-23. A second wedge-shaped slider 1-24 is slidably disposed in the second connecting groove 1-23 along the vertical direction. A vertical groove is provided on the inner wall of the second connecting groove 1-23. A protrusion corresponding to the groove is provided on the second wedge-shaped slider 1-24, so that the second wedge-shaped slider 1-24 can slide in the vertical direction. The lower side of the second wedge-shaped slider 1-24 is connected to the second connecting groove 1-2. A second steel ball 1-25 is also provided between the inner walls of section 3. A second opening 1-26 is provided on the side wall of the second connecting groove 1-23 for the second steel ball 1-25 to slide out radially. A second insertion piece 3-3 corresponding to the second wedge-shaped slider 1-24 is provided on the lower side of the ends of the first support segment 3-1 and the second support segment 3-2 that are far apart from each other. A second connecting cylinder 3-4 corresponding to the upper outer wall of the upper support section 1-2 is also provided on the outer side of the second insertion piece 3-3. A second clamp corresponding to the second steel ball 1-25 is provided on the inner wall of the second connecting cylinder 3-4. Tightening groove 3-5; When the first bearing platform segment 3-1 or the second bearing platform segment 3-2 is hoisted to the top of the corresponding upper support section 1-2, the second insert 3-3 on its lower side will insert into the second connecting groove 1-23 of the upper support section 1-2 and push the second wedge slider 1-24 to slide downward; during the downward movement, the wedge slider will squeeze the second steel ball 1-25 located between itself and the groove wall, forcing the steel ball to slide radially outward from the second opening 1-26 and finally jam into the second clamping groove 3-5 on the inner wall of the second connecting cylinder 3-4, thereby realizing the split of the bearing platform. The mechanical self-locking connection between the temporary support 2 and the upper support section 1-2 is quick and secure. Therefore, the mechanical self-locking connection method disclosed in this embodiment enables quick and detachable installation between the temporary support 2 and the upper support section 1-2. By using the prefabricated upper support section 1-2 and the corresponding support 2, the lengthy concrete pouring process in practice is simplified to a simple alignment-lowering-locking action, thereby significantly shortening the construction cycle. Furthermore, this purely mechanical connection can effectively avoid the risks of difficulty in controlling the density of on-site grouting, ensuring a high degree of reliability and consistency in the connection.
[0020] Furthermore, in this embodiment, each of the two clamping segments 3-3 disclosed is provided with a flange 4 at one end close to each other, and the flange 4 is provided with bolt holes. In this embodiment, by passing high-strength bolts through the flange holes and applying preload, the two clamping segments 3-3 can be precisely and firmly locked together. This locking effect is directly converted into a strong radial clamping force on the existing pile foundation, thereby generating sufficient friction to ensure that the load between the temporary pile cap and the existing pile foundation 2 can be safely and reliably transferred.
[0021] Furthermore, to improve installation efficiency, each clamping segment 3-3 in this embodiment is provided with a foundation connector 5 on the side where it connects to the corresponding first foundation segment 3-1 or second foundation segment 3-2. The foundation connector 5 is fixedly connected to the side of the first foundation segment 3-1 or second foundation segment 3-2. During factory prefabrication, the clamping segment 3-3 and the foundation connector 5 are designed as an integrated unit, or the foundation connector 5 is also provided with corresponding bolt holes. Subsequent on-site installation can achieve the connection between the clamping segment 3-3 and the corresponding first foundation segment 3-1 or second foundation segment 3-2 by welding or bolt connection.
[0022] Furthermore, in this embodiment, the inner wall of the clamping petal 3-3 is also provided with shear keys, and in the actual construction period, a micro-groove is made at the corresponding position of the existing pile foundation 2. This transforms the single-penetration friction connection between the clamping petal 3-3 and the existing pile foundation 2 into a double-insurance connection method of mechanical interlocking and friction combination, providing absolute safety guarantee for the entire temporary support system.
[0023] This utility model discloses a support structure for adding piles to bridge pile foundations. The specific construction method for adding piles to existing pile foundations is as follows (wherein the lower support section 1-1 and upper support section 1-2 that make up the newly added pile foundation 1, as well as the first pile cap segment 3-1 and the second pile cap segment 3-2 that make up the temporary pile cap 3, are all prefabricated on site, and the clamping segments 3-3 with pile cap connectors 5 and flanges are all prefabricated in the factory): S1. Construction preparation and installation of the lower support section Remove debris from the riverbank and level the site. Use a total station to accurately measure and mark the center point of the new pile 1. Drill a hole at the pile location, ensuring that its depth and diameter meet the installation requirements of the lower support section 1-1. Use a crane to vertically and slowly lower the prefabricated lower support section 1-1 into the hole. Fill the space between the lower support section 1-1 and the hole wall with high-strength non-shrink grout. Once the grout reaches the design strength, the lower support section 1-1 is firmly fixed in the foundation, forming a stable foundation. S2, Upper support section quick assembly Use a crane to lift the prefabricated upper support section 1-2 directly above the lower support section 1-1. After alignment, slowly lower it. During the lowering process, the first connector 1-20 at the lower end of the upper support section 1-2 will be inserted into the connecting groove of the lower support section 1-1, automatically triggering the internal wedge slider to lock with the steel ball to achieve a reliable connection. S3. Surface treatment of existing pile foundations and hoisting of temporary pile caps At the location where the clamp needs to be installed on the existing pile foundation 2, a small core drilling rig and other equipment are used to perform micro-grooving to form a keyway that matches the shear key on the inner wall of the clamp petal 3-3. Then, the surface dust and debris of the pile foundation are thoroughly cleaned. On the ground, the corresponding clamp petal 3-3 is connected to the corresponding first bearing platform segment 3-1 or second bearing platform segment 3-2 through the bearing platform connector 5. Then, the completed first bearing platform segment 3-1 is hoisted to the top of one of the upper support sections 1-2 using a crane. The second plug-in 3-3 on its lower side will also be quickly connected to the top of the upper support section 1-2. The second bearing platform segment 3-2 is hoisted and fixed in the same way. Then, the clamp petals 3-3 on the two bearing platform segments are tightly wrapped around the existing pile foundation 2 to ensure that the shear key is fully embedded in the pre-cut keyway. The flange 4 at the end of the clamp petal 3-3 is connected with high-strength bolts and the design torque is applied to make the clamp firmly hold the existing pile foundation 2. S4. Surface treatment of existing pile foundations and hoisting of temporary pile caps Under the protection of the temporary support system, the foundation pit at the existing pile foundation 2 is excavated to the design elevation. The steel reinforcement of the permanent pile cap 4 is tied and the formwork is erected. According to the design requirements, structural treatments such as rebar installation are carried out between the existing pile foundation 2 and the lower support section 1-1. The concrete of the permanent pile cap 4 is poured and fully cured. After it reaches the design strength, the bridge load will be gradually and safely transferred from the temporary pile cap 3 to the permanent pile cap 4. S5. Surface treatment of existing pile foundations and hoisting of temporary pile caps Loosen the high-strength bolts on the clamping flap 3-3 flange 4, and use a crane to lift the first bearing platform segment 3-1 and the second bearing platform segment 3-2 off the upper support section 1-2 respectively. Then lift the upper support section 1-2 off the lower support section 1-1 to complete the disassembly.
[0024] The above description is merely a preferred embodiment of the present utility model and does not constitute any limitation on the present utility model. Any simple modifications, alterations, or equivalent structural changes made to the above embodiments based on the technical essence of the present utility model shall still fall within the protection scope of the present utility model.
Claims
1. A support structure for adding piles to bridge pile foundations, used to support existing pile foundations (2) when adding piles, characterized in that, The supporting structure includes: Two new pile foundations (1) are respectively set on both sides of the existing pile foundation (2). Each new pile foundation (1) includes a detachably connected lower support section (1-1) and an upper support section (1-2). The temporary foundation (3) includes a first foundation segment (3-1) detachably connected to one of the upper support segments (1-2), and a second foundation segment (3-2) detachably connected to the other upper support segment (1-2). The first foundation segment (3-1) and the second foundation segment (3-2) are each provided with a clamping flap (3-3) at their respective ends. The first foundation segment (3-1) and the second foundation segment (3-2) are connected by the clamping flap (3-3). The inner shape of the clamping flap (3-3) matches the shape of the existing pile foundation (2). When the clamping flap (3-3) is connected, it will hold the existing pile foundation (2) tightly.
2. The support structure for adding piles to bridge pile foundations according to claim 1, characterized in that, The upper end face of the lower support section (1-1) is provided with a first connecting groove (1-10). A first wedge-shaped slider (1-11) is slidably arranged in the first connecting groove (1-10) along the vertical direction. A first steel ball (1-12) is also provided between the lower side of the first wedge-shaped slider (1-11) and the inner wall of the first connecting groove (1-10). A first opening (1-13) is provided on the side wall of the first connecting groove (1-10) for the first steel ball (1-12) to slide out radially. The lower end of the upper support section (1-2) is provided with a first plug-in (1-20) corresponding to the first wedge-shaped slider (1-11). A first connecting cylinder (1-21) corresponding to the outer wall of the lower support section (1-1) is also provided on the outer side of the first plug-in (1-20). A first clamping groove (1-22) corresponding to the first steel ball (1-12) is provided on the inner wall of the first connecting cylinder (1-21).
3. The support structure for adding piles to bridge pile foundations according to claim 1, characterized in that, The upper end face of the upper support section (1-2) is provided with a second connecting groove (1-23). A second wedge-shaped slider (1-24) is slidably disposed in the second connecting groove (1-23) along the vertical direction. A second steel ball (1-25) is also disposed between the lower side of the second wedge-shaped slider (1-24) and the inner wall of the second connecting groove (1-23). A second opening (1-26) is provided on the side wall of the second connecting groove (1-23) for the second steel ball (1-25) to slide out radially. The lower side of the first support segment (3-1) and the second support segment (3-2) that are far apart from each other is provided with a second plug-in (3-6) corresponding to the second wedge slider (1-24). The outer side of the second plug-in (3-6) is also provided with a second connecting cylinder (3-4) corresponding to the upper outer wall of the upper support segment (1-2). The inner wall of the second connecting cylinder (3-4) is provided with a second clamping groove (3-5) corresponding to the second steel ball (1-25).
4. The support structure for adding piles to bridge pile foundations according to claim 1, characterized in that, Each of the two clamping segments (3-3) is provided with a flange (4) at one end that is close to each other, and the flange (4) is provided with bolt holes.
5. A support structure for adding piles to bridge pile foundations according to claim 1, characterized in that, Each of the clamping segments (3-3) is provided with a base connector (5) on the side where it connects to the corresponding first base segment (3-1) or second base segment (3-2). The base connector (5) is fixedly connected to the side of the first base segment (3-1) or the second base segment (3-2).
6. The support structure for adding piles to bridge pile foundations according to claim 1, characterized in that, Shear keys are also provided on the inner wall of the clamping petal (3-3) to form a mechanical interlock on the surface of the existing pile foundation (2).
