A slow cooling field stockpile drainage system for mineral processing slag

By designing a drainage system for the slag slow cooling yard, the problem of water accumulation in the slag yard that could not be drained in time was solved, enabling timely extraction and reuse of the water, improving production efficiency and saving water resources.

CN224997724UActive Publication Date: 2026-11-20BAIYIN NONFERROUS GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522576531.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-04
Publication Date
2026-11-20
Estimated Expiration
2035-12-04

AI Technical Summary

Technical Problem

During the mineral processing, water accumulated in the slag cooling yard cannot be drained in time, causing loaders to carry water into the production process, affecting production efficiency, increasing the moisture content of new slag, and wasting water resources.

Method used

Design a drainage system for a slag slow cooling yard, including a pump pit, a vertical slurry pump, a radar level gauge, buried drainage pipelines, and a circulating water pump house. The vertical slurry pump will pump out the water accumulated in the slag yard and return it to the cooling water production system.

Benefits of technology

It enables timely extraction and reuse of water accumulated in the slag yard, ensuring continuous production, saving costs and recovering water resources. The annual recovery volume is approximately 160,000 cubic meters, saving 75,000 yuan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997724U_ABST
    Figure CN224997724U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of ore dressing slag slow cooling field yard drainage systems, belong to fluid conveying equipment technical field. Including: pump pit excavated in slag yard water-logged area;Filter screen is located at pump pit mouth;Vertical slurry pump is located in pump pit;Radar liquid level meter is located in pump pit, for monitoring water level;Buried drainage pipeline is laid in slag yard underground, one end is connected with vertical slurry pump, the other end extends to slag yard drainage open ditch;The slag yard drainage open ditch is connected to circulating water pump house by pipeline. The utility model effectively solves the current slag system new slag mine water content big production bottleneck problem, and slag yard water is promptly pumped out, and the pumped water can be secondarily used, enters cooling water production system, and production continuity is ensured. Slag yard water is recycled into production system, about 160,000 square meters are recycled per year, and cost is saved about 75,000 yuan per year.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of mineral processing technology, specifically to a drainage system for a mineral processing slag slow cooling yard. Background Technology

[0002] Currently, in mineral processing, slag cooling yards typically employ a combination of natural aeration and water cooling for slow slag cooling. During bag turning operations, significant amounts of water accumulate inside the slag bags. If this water is not drained promptly, the loader will carry water and slag into the production process during transport, severely impacting subsequent processes, increasing the moisture content of new slag, and limiting production efficiency. Currently, slag yard water accumulation relies heavily on natural evaporation or simple drainage, which is inefficient and wastes water resources significantly. Therefore, a system that can effectively and promptly drain accumulated water and achieve water recycling is urgently needed. Utility Model Content

[0003] The purpose of this invention is to provide a drainage system for the slow cooling yard of ore beneficiation slag, which can promptly pump out the water accumulated in the slag yard, and the pumped water can be reused and enter the cooling water production system.

[0004] The technical solution adopted in this utility model is as follows:

[0005] A drainage system for a slag slow cooling yard includes:

[0006] Pump pits were excavated in the waterlogged area of ​​the slag heap.

[0007] A filter screen installed at the pump pit opening;

[0008] A vertical slurry pump installed in a pump pit;

[0009] A radar level gauge installed in the pump pit is used to monitor the water level;

[0010] The buried drainage pipeline is laid under the slag yard, with one end connected to the vertical slurry pump and the other end extending to the slag yard drainage ditch.

[0011] The slag yard drainage channel is connected to the circulating water pump room via a pipeline.

[0012] The buried drainage pipeline is a DN100 pipeline.

[0013] A drainage ditch is also provided between the open drainage ditch of the slag yard and the circulating water pump house, and the pipeline is installed in the drainage ditch.

[0014] The vertical slurry pump is connected to the power distribution room via a cable.

[0015] In summary, due to the adoption of the above technical solution, the beneficial effects of this utility model are:

[0016] This invention effectively solves the production bottleneck problem of high water content in the current slag supply system. It promptly pumps out the accumulated water from the slag yard, and the pumped water can be reused in the cooling water production system to ensure continuous production. The slag yard water is recycled into the production system, with approximately 160,000 cubic meters recycled annually, saving approximately 75,000 yuan per year. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the structure of this utility model;

[0018] In the diagram: 1. Vertical slurry pump; 2. Radar level gauge; 3. Cable; 4. Power distribution room; 5. Filter screen; 6. Buried drainage pipeline; 7. Slag yard drainage ditch; 8. Drainage ditch; 9. Circulating water pump room. Detailed Implementation

[0019] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0020] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0021] In the description of this utility model, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0022] Example 1

[0023] like Figure 1 As shown, this embodiment provides a drainage system for a slag slow cooling yard, including:

[0024] Pump pits were excavated in the waterlogged area of ​​the slag heap.

[0025] Filter screen 5 is installed at the pump pit opening;

[0026] A vertical slurry pump 1 is installed in a pump pit; the vertical slurry pump 1 is connected to the power distribution room 4 via a cable 3.

[0027] Radar level gauge 2, installed in the pump pit, is used to monitor the water level;

[0028] A DN100 buried drainage pipeline 6 is laid underground in the slag yard, with one end connected to a vertical slurry pump 1 and the other end extending to a slag yard drainage ditch 7; the slag yard drainage ditch 7 is connected to a circulating water pump house 9 via a pipeline. A drainage ditch 8 is also provided between the slag yard drainage ditch 7 and the circulating water pump house 9, and the pipeline is installed in the drainage ditch 8.

[0029] The steps for using this utility model are as follows:

[0030] 1. Before turning over the slag bags, pour out as much water as possible (up to 80%) from the slag bag placement area in advance, establish a system for this purpose, and strictly enforce it.

[0031] 2. For example Figure 1 As shown, after the slag bag is turned over, a pump pit is dug in the northeast of the slag yard where the water accumulation is the largest and a vertical slurry pump 1 is placed there. The remaining 20% ​​of the water that cannot be directly poured out by the slag bag truck is pumped away by the vertical slurry pump 1.

[0032] 3. The vertical slurry pump 1 is connected to the power distribution room 4 via cable 3, and a radar level gauge 2 is placed in the cooling water of the pump pit to detect the water level and pump the water away in time.

[0033] 4. Lay a DN100 buried drainage pipeline 6 below the ground of the slag yard and extend it to the newly built slag yard drainage ditch 7. The vertical slurry pump 1 pumps water to the slag yard drainage ditch 7 through the buried drainage pipeline 6.

[0034] 5. Install pipes in the drainage ditch 8 to the circulating water pump room 9 so that water can enter the cooling water production system for recycling.

Claims

1. A drainage system for a slag slow cooling yard, characterized in that, include: Pump pits were excavated in the waterlogged area of ​​the slag heap. A filter screen installed at the pump pit opening; A vertical slurry pump installed in a pump pit; A radar level gauge installed in the pump pit is used to monitor the water level; The buried drainage pipeline is laid under the slag yard, with one end connected to the vertical slurry pump and the other end extending to the slag yard drainage ditch. The slag yard drainage channel is connected to the circulating water pump room via a pipeline.

2. The drainage system for a slag slow cooling yard according to claim 1, characterized in that, The buried drainage pipeline is a DN100 pipeline.

3. The drainage system for a slag slow cooling yard according to claim 1, characterized in that, A drainage ditch is also provided between the open drainage ditch of the slag yard and the circulating water pump house, and the pipeline is installed in the drainage ditch.

4. A drainage system for a slag slow cooling yard as described in claim 1, characterized in that, The vertical slurry pump is connected to the power distribution room via a cable.