A device for unblocking an underground pipe network
By using a drive motor to rotate the threaded shaft of the unblocking component, combined with a lifting cylinder and hydraulic rod to adjust the scraper to fit against the pipe wall, the problem of high-pressure water jets being unable to completely remove hard debris in existing technologies is solved, achieving thorough unblocking and cleaning of the inner walls of underground pipe networks.
Patent Information
- Application Number
- CN202522757955.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-26
AI Technical Summary
When using existing drain cleaning tools to unclog underground pipe networks, the high-pressure water jet is insufficient to completely remove hard debris, resulting in debris remaining on the inner wall of the pipe network, which may cause secondary blockages.
An underground pipe network dredging device was designed, which includes a drive motor, a water supply component, a dredging component, and an adjustment part. The drive motor drives the threaded shaft to rotate the dredging component, and the lifting cylinder and hydraulic rod adjust the scraper to fit against the pipe wall. The sliding wheel increases the rotation power to remove debris, and the water supply component flushes the inner wall.
It achieves thorough removal of debris from the inner walls of underground pipe networks, improves dredging efficiency, reduces the risk of secondary blockage, and ensures complete dredging of the pipe network.
Smart Images

Figure CN224997741U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of dredging device technology, specifically an underground pipeline dredging device. Background Technology
[0002] Underground pipe networks are a network-like pipe system formed by multiple underground pipes. They are usually used for urban drainage. Debris often enters the pipes by accident, causing blockages. Therefore, dredging devices are needed to unclog the underground pipe networks.
[0003] Currently, underground pipe cleaning devices typically consist of a cleaning drill bit, a drive unit, and a water pipe. The drive unit is connected to the cleaning drill bit through the water pipe, supplying water to the drill bit. The cleaning drill bit is equipped with a high-pressure nozzle, which generates a high-pressure water jet by passing the received water. The high-pressure water jet is sprayed diagonally backwards towards the cleaning drill bit, giving it the power to move forward and impact the blockage, thereby clearing the blockage in the pipe. At the same time, the high-pressure water jet also flushes the inner wall of the pipe, removing debris.
[0004] After the existing drain cleaner clears the blockage, the high-pressure water jet sprayed from the drain drill bit will flush the inner wall of the underground pipe network. However, if the debris on the inner wall of the underground pipe network is too hard, the high-pressure water jet cannot completely clean the debris. As a result, although the underground pipe network is cleared, debris still remains on the inner wall of the underground pipe network. Areas with debris may become blocked again, resulting in incomplete clearing of the underground pipe network. Utility Model Content
[0005] The purpose of this utility model is to provide an underground pipeline dredging device to solve the above-mentioned technical problems.
[0006] To achieve the above objectives, this utility model provides the following technical solution: an underground pipeline dredging device, comprising;
[0007] Drive motor;
[0008] A water supply assembly is installed at the tail of the drive motor;
[0009] The output end of the drive motor is fixedly connected to a threaded shaft, and the outer wall of the threaded shaft is provided with a dredging component.
[0010] The unblocking component includes an unblocking head, an adjustment part, and a moving part.
[0011] Preferably, the water supply assembly includes a water tank, which is fixedly installed at the tail of the drive motor. A rotating groove is provided on the back of the water tank, and a rotating disk is integrally formed thereon. Ball bearings are movably arranged in the rotating groove, and a sealing ring is fixedly installed inside the rotating groove. Water supply pipes are equidistantly arranged on the circumference of the rotating disk.
[0012] Preferably, the unblocking head portion includes:
[0013] The unclogging head has a threaded sleeve on the outer wall of the threaded shaft.
[0014] Preferably, the unclogging head has a movable groove and is integrally connected to a water supply pipe sleeve. The interior of the movable groove is fixedly connected to the other end of the water supply pipe. A connecting tail body is fixedly installed on one side of the unclogging head, and a connecting head frame is fixedly installed on the other side of the unclogging head. The outer circumference of the connecting head frame is integrally connected with double inserts at equal intervals.
[0015] Preferably, the adjustment part includes:
[0016] Double-leaf slotted base, integrally connected between the two inserts;
[0017] The connecting hole seat is movably connected to the double-leaf slot seat;
[0018] The lifting cylinder is fixedly installed on the top of the connecting hole seat.
[0019] Preferably, a first connecting hook block is movably connected to both sides of the outer wall of the connecting hole seat, a second connecting hook block is provided diagonally above the first connecting hook block, a connecting spring is fixedly connected between the first connecting hook block and the second connecting hook block, and a hydraulic rod is movably installed between the second connecting hook blocks via a pin.
[0020] Preferably, a scraper is movably connected between the telescopic end of the lifting cylinder and the telescopic end of the hydraulic rod.
[0021] Preferably, the moving part includes a sliding wheel, and the outer wall of the unclogging head is provided with grooves at equal intervals, and a connecting protrusion is integrally connected in the groove, and the sliding wheel is fixedly installed on the connecting protrusion.
[0022] This utility model provides a device for dredging underground pipe networks. It has the following beneficial effects:
[0023] (1) This utility model starts the drive motor, which drives the threaded shaft, which drives the unblocking component to rotate, so that the unblocking component can scrape off the residual debris on the inner wall of the underground pipe. A water tank is designed at the tail of the drive motor, and a water supply pipe is used to flush the inner wall of the underground pipe with water.
[0024] (2) This utility model utilizes an adjustment part according to the different inner diameter of the pipe. The specific operation method is to start the lifting cylinder. Under the action of the hydraulic rod, connecting hook block one, connecting hook block two, and connecting spring, the lifting cylinder can better adapt to drive the scraper to fit against the inner wall of the underground network pipe. This allows it to quickly scrape away any residual debris encountered during rotation. The sliding wheel on the outer wall of the dredging head increases the power of rotation and improves the dredging efficiency. Attached Figure Description
[0025] Figure 1 This is a perspective view of the overall structure of this utility model;
[0026] Figure 2 This is a side view of the overall structure of this utility model;
[0027] Figure 3 This is a view of the unblocking component of this utility model;
[0028] Figure 4 This utility model Figure 3 A magnified view of A in the middle.
[0029] In the diagram: 111 Drive motor, 112 Threaded shaft, 2 Water supply assembly, 211 Water tank, 212 Rotating disc, 213 Sealing ring, 214 Water supply pipe, 3 Unblocking assembly, 31 Unblocking head, 32 Adjustment part, 33 Moving part, 311 Unblocking head, 312 Connecting tail body, 313 Water supply pipe sleeve, 314 Connecting head frame, 315 Double insert, 321 Double leaf groove seat, 322 Connecting hole seat, 323 Connecting hook block one, 324 Connecting hook block two, 325 Connecting spring, 326 Lifting cylinder, 327 Hydraulic rod, 328 Scraper, 331 Connecting protrusion, 332 Sliding wheel. Detailed Implementation
[0030] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0031] Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain the present invention, and should not be construed as limiting the present invention.
[0032] Example 1
[0033] A preferred embodiment of the underground pipe network dredging device provided by this utility model is, for example... Figure 1-4 As shown: An underground pipeline dredging device, comprising;
[0034] Drive motor 111;
[0035] Water supply component 2 is installed at the tail of drive motor 111;
[0036] Among them, the output end of the drive motor 111 is fixedly connected to the threaded shaft 112, and the outer wall of the threaded shaft 112 is provided with a dredging component 3;
[0037] The water supply assembly 2 includes a water tank 211, which is fixedly installed at the tail of the drive motor 111. A rotating groove is provided on the back of the water tank 211, and a rotating disk 212 is integrally formed thereon. A ball is movably arranged in the rotating groove, and a sealing ring 213 is fixedly installed inside the rotating groove. Water supply pipes 214 are equidistantly connected around the circumference of the rotating disk 212.
[0038] By starting the drive motor 111, the drive motor 111 drives the threaded shaft 112, and the threaded shaft 112 drives the unblocking component 3 to rotate, so that the unblocking component 3 can scrape away the residual debris on the inner wall of the underground pipe. A water tank 211 is designed at the tail of the drive motor 111, and a water supply pipe 214 is used to flush the inner wall of the underground pipe with water.
[0039] Example 2
[0040] Based on Embodiment 1, a preferred embodiment of the underground pipeline dredging device provided by this utility model is as follows: Figure 1-4 As shown: The unblocking component 3 includes an unblocking head part 31, an adjustment part 32, and a moving part 33;
[0041] The unblocking head part 31 includes:
[0042] The unblocking head 311 is threaded onto the outer wall of the threaded shaft 112;
[0043] The unclogging head 311 has a movable groove and is integrally connected to a water supply pipe sleeve 313. The interior of the movable groove is fixedly connected to the other end of the water supply pipe 214. A connecting tail body 312 is fixedly installed on one side of the unclogging head 311, and a connecting head frame 314 is fixedly installed on the other side of the unclogging head 311. Double inserts 315 are integrally connected to the outer circumference of the connecting head frame 314 at equal intervals.
[0044] Adjustment part 32 includes:
[0045] The double-leaf slot 321 is integrally connected between the double inserts 315;
[0046] Connecting hole seat 322 is movably connected to double leaf slot seat 321;
[0047] The lifting cylinder 326 is fixedly installed on the top of the connecting hole seat 322;
[0048] Connecting hook block 1 323 is movably connected to both sides of the outer wall of connecting hole seat 322. Connecting hook block 2 324 is provided diagonally above connecting hook block 1 323. Connecting spring 325 is fixedly connected between connecting hook block 1 323 and connecting hook block 2 324. Hydraulic rod 327 is movably installed between connecting hook block 2 324 through pin shaft. Scraper 328 is movably connected between the extension end of lifting cylinder 326 and the extension end of hydraulic rod 327.
[0049] The moving part 33 includes a sliding wheel 332. The outer wall of the unclogging head 311 is provided with grooves at equal intervals, and a connecting protrusion 331 is integrally connected in the groove. The sliding wheel 332 is fixedly installed on the connecting protrusion 331.
[0050] By adjusting the adjustment part 32 according to the different inner diameter of the pipe, the specific operation method is to start the lifting cylinder 326. Under the action of the hydraulic rod 327, the connecting hook block 1 323, the connecting hook block 2 324, and the connecting spring 325, the lifting cylinder 326 can better adapt to drive the scraper 328 to fit against the inner wall of the underground network pipe. This allows residual debris to be quickly scraped away when it is rotating forward. The sliding wheel 332 is set on the outer wall of the unblocking head 311 to improve the power of rotation and improve the efficiency of unblocking.
[0051] In use, the drive motor 111 is started, which drives the threaded shaft 112, which in turn drives the unblocking component 3 to rotate. Depending on the inner diameter of the pipe, the adjustment mechanism 32 is used. Specifically, the lifting cylinder 326 is activated. Under the action of the hydraulic rod 327, connecting hook block 1 323, connecting hook block 2 324, and connecting spring 325, the lifting cylinder 326 can better adapt to the inner wall of the underground pipe, allowing the scraper 328 to fit against the inner wall of the underground pipe network. This ensures that any residual debris encountered during rotation can be quickly scraped away. The process involves installing sliding wheels 332 on the outer wall of the unblocking head 311 to increase the power of rotation and improve unblocking efficiency. At the same time, a water tank 211 is designed at the tail of the drive motor 111, and a water supply pipe 214 is used to flush the inner wall of the underground network pipe with water. The back of the water tank 211 has a rotating groove and an integrally formed rotating disk 212. Ball bearings are movably installed in the rotating groove, and a sealing ring 213 is fixedly installed inside the rotating groove. This ensures that when the water supply pipe 214 rotates with the unblocking component 3, it does not affect the flushing of the inner wall of the underground network pipe.
[0052] Finally, it should be noted that the above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. An underground pipe network dredging device, characterized in that, include; Drive motor (111); Water supply assembly (2) is provided at the tail of the drive motor (111); The output end of the drive motor (111) is fixedly connected to a threaded shaft (112), and the outer wall of the threaded shaft (112) is provided with a dredging component (3). The unblocking component (3) includes an unblocking head (31), an adjustment part (32), and a moving part (33).
2. The underground pipeline dredging device according to claim 1, characterized in that: The water supply component (2) includes a water tank (211), which is fixedly installed at the tail of the drive motor (111). A rotating groove is provided on the back of the water tank (211), and a rotating disk (212) is integrally formed thereon. A ball is movably arranged in the rotating groove, and a sealing ring (213) is fixedly installed inside the rotating groove. Water supply pipes (214) are equidistantly arranged on the circumference of the rotating disk (212).
3. The underground pipeline dredging device according to claim 1, characterized in that: The unblocking head part (31) includes: The unclogging head (311) is threaded onto the outer wall of the threaded shaft (112).
4. The underground pipeline dredging device according to claim 3, characterized in that: The unclogging head (311) has a movable groove and is integrally connected to a water supply pipe sleeve (313). The interior of the movable groove is fixedly connected to the other end of the water supply pipe (214). A connecting tail body (312) is fixedly installed on one side of the unclogging head (311), and a connecting head frame (314) is fixedly installed on the other side of the unclogging head (311). The outer circumference of the connecting head frame (314) is integrally connected with double inserts (315) at equal intervals.
5. The underground pipeline dredging device according to claim 1, characterized in that: The adjustment part (32) includes: A double-leaf slot (321) is integrally connected between the double inserts (315); The connecting hole seat (322) is movably connected to the double-leaf slot seat (321); The lifting cylinder (326) is fixedly installed on the top of the connecting hole seat (322).
6. The underground pipeline dredging device according to claim 5, characterized in that: Connecting hook block 1 (323) is movably connected to both sides of the outer wall of the connecting hole seat (322). Connecting hook block 2 (324) is provided diagonally above the connecting hook block 1 (323). Connecting spring (325) is fixedly connected between connecting hook block 1 (323) and connecting hook block 2 (324). Hydraulic rod (327) is movably installed between connecting hook block 2 (324) via a pin.
7. The underground pipeline dredging device according to claim 5, characterized in that: A scraper (328) is movably connected between the telescopic end of the lifting cylinder (326) and the telescopic end of the hydraulic rod (327).
8. The underground pipeline dredging device according to claim 3, characterized in that: The moving part (33) includes a sliding wheel (332), and the outer wall of the unclogging head (311) is provided with grooves at equal intervals, and a connecting protrusion (331) is integrally connected in the groove. The sliding wheel (332) is fixedly installed on the connecting protrusion (331).