A precast beam-column steel structure
By combining the design of fixed sleeves and connecting sleeves with alumina wear-resistant ceramic layers and inclined haunches, the problems of insufficient strength and poor stability of traditional precast beam-column steel structure connection nodes are solved, realizing rapid installation and high-strength connection, and improving the stability and seismic performance of the structure.
Patent Information
- Application Number
- CN202522757624.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-26
AI Technical Summary
Traditional precast beam-column steel structures rely on welding or simple bolt connections for connection nodes, which suffer from residual welding stress, complex installation, poor seismic resistance, and consequently, insufficient connection strength and poor stability.
The design employs a synergistic approach of fixed sleeves and connecting sleeves, combined with an alumina wear-resistant ceramic layer and an inclined haunch plate, to form a three-dimensional force system. This optimizes the force transmission path, enhances bending stiffness and shear bearing capacity, reduces stress concentration, and ensures the stability and durability of the connection through high-strength bolts and anti-corrosion coating.
It enables rapid installation and high-strength connection of prefabricated beam-column steel structures, improves the overall structural stability and seismic performance, extends the service life of nodes, and meets the high-efficiency installation requirements of prefabricated buildings.
Smart Images

Figure CN224997779U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of steel structure connection technology, specifically to a prefabricated beam-column steel structure. Background Technology
[0002] Precast beams and columns are beams and columns that are prefabricated in a factory and then transported to the construction site for installation and fixation according to the design requirements. Buildings using precast beams and columns generally use a large amount of steel structure during the construction process. When fixing and connecting the steel structure frame components, steel structure connection nodes are required.
[0003] In prefabricated modular buildings, the connection performance of joints directly affects structural safety and construction efficiency. Traditional joints often rely on welding or simple bolt connections, which have problems such as residual welding stress, complex installation, and poor seismic resistance, resulting in insufficient connection strength of the steel structure and poor stability.
[0004] To address the aforementioned issues, a novel precast beam-column steel structure is proposed. Utility Model Content
[0005] To address the shortcomings of existing technologies, this utility model provides a prefabricated beam-column steel structure. Through the coordinated design of fixed sleeves and connecting sleeves, it enables rapid installation of columns and beams and high-strength connections, thereby improving the overall structural stability.
[0006] This utility model is achieved through the following technical solution: A precast beam-column steel structure is provided, comprising a vertically arranged upper column segment, a lower column segment, and horizontally arranged beam members. The upper column section and the lower column section are connected by a fixed sleeve. The inner diameter of the fixed sleeve is adapted to the outer diameter of the upper column section and the lower column section. The upper end of the fixed sleeve is fixed to the lower end of the upper column section by bolts, and the lower end of the fixed sleeve is fixed to the upper end of the lower column section by bolts. The fixed sleeve is welded with symmetrically arranged I-shaped connecting blocks on its side. The end face of the connecting block is recessed to form an I-shaped connecting groove. An inserting block is fitted into the connecting groove. Positioning holes I are opened on the two side wing plates of the inserting block. Positioning holes II are opened on the two side wing plates of the connecting block, which coincide with positioning holes I. The inserting block is inserted into the connecting groove and locked and fixed by reinforcing bolts that pass through positioning holes I and positioning holes II and nuts. A connecting sleeve is also fixed to the side of the fixed sleeve. The axis of the connecting sleeve is set horizontally. The end face of the connecting sleeve is recessed to form an I-shaped socket for inserting the I-shaped end of the horizontal beam member. Through holes are opened on the upper and lower flanges and web of the connecting sleeve. Bolt holes are opened at the ends of the horizontal beam member respectively. The through holes and bolt holes are fixed by bolts.
[0007] Furthermore, the through holes on the connecting sleeve are respectively opened at the three equal points of the central axis of its upper and lower flanges and web.
[0008] A tri-division hole arrangement reduces stress concentration by approximately 15-20% compared to a uniform distribution, extending joint fatigue life. The tri-division hole locations in the web avoid high-shear zones (such as ends), preventing premature web buckling. Through holes at the tri-division points form a "multi-point, multi-line" support system, ensuring a more continuous force flow path during bolt tightening and reducing relative displacement between the connecting sleeve and the beam member. Symmetrical hole distribution in the flanges enhances resistance to horizontal shear forces; web hole locations optimize bending performance; and under earthquake or wind loads, the hole arrangement effectively suppresses vibration-induced loosening.
[0009] Furthermore, the surface of the interlocking block is coated with an alumina wear-resistant ceramic layer with a coating thickness of 0.5~1.0mm.
[0010] The Rockwell hardness of the alumina ceramic layer can reach HRA80-90, which is much higher than that of ordinary steel (about HRC20-30), improving the wear resistance of the interlocking blocks under repeated insertion and removal and vibration conditions; in fretting friction, the coating effectively resists wear and extends the maintenance cycle; the wear-resistant coating prevents the increase of the mating clearance due to wear, ensuring that the connecting block and the interlocking block maintain a tight fit for a long time; the coating can withstand temperature changes from -50℃ to 500℃, maintain stable performance, and expand the geographical applicability of the building.
[0011] Furthermore, an inclined armhole plate is welded between the bottom surface of the connecting sleeve and the fixed sleeve, with the inclination angle of the armhole plate being 30°~45°.
[0012] The haunch plate allows the beam end bending moment borne by the connecting sleeve to be transferred more smoothly to the fixed sleeve and column, avoiding stress concentration at right-angle connections. The 30°~45° inclined haunch plate can improve the bending stiffness of the joint area. The haunch plate effectively decomposes the horizontal shear force into axial force, reducing the shear stress of the connection weld. The structural reinforcement of the haunch plate and the material reinforcement of the wear-resistant coating complement each other, jointly extending the service life of the joint and reducing the maintenance frequency.
[0013] As a preferred option, an anti-corrosion coating is provided at the connection interface between the fixed sleeve and the upper and lower column sections, and 8.8 grade reinforced bolts are used.
[0014] The epoxy anti-corrosion coating forms a physical barrier, effectively isolating corrosive media such as moisture and chloride ions, and avoiding changes in the fit clearance caused by the accumulation of corrosion products. The 8.8 grade high-strength bolts have high tensile strength and yield strength, and can be subjected to higher preload to ensure tight connection. The anti-corrosion coating provides long-term protection, and the high-strength bolts ensure immediate load-bearing, forming a complementary relationship in the time dimension.
[0015] The beneficial effects of this utility model are: By connecting the fixed sleeve to the column, inserting the connecting sleeve into the beam, and using connecting blocks and interlocking blocks for lateral reinforcement, a three-dimensional stress system is formed, improving the bending stiffness of the joints and increasing the shear bearing capacity. The tri-division arrangement of through holes reduces the stress concentration factor and extends fatigue life. The interlocking block system enhances the overall stiffness of the fixed sleeve, providing a more stable mounting base for the connecting sleeve and indirectly improving the vibration resistance of the beam connection. The interlocking blocks bear part of the lateral load, reducing the lateral burden on the connecting sleeve and allowing the beam connection to focus more on bearing vertical loads.
[0016] The I-shaped socket of the connecting sleeve enables quick insertion of beam components, reducing on-site welding and improving installation efficiency; the components are prefabricated in the factory and assembled on-site, which is in line with the trend of prefabricated buildings.
[0017] Adding a haunch plate optimizes the force transmission path, moves the plastic hinge outward, realizes strong node weak component, enhances bending resistance, and the wear-resistant layer reduces wear and extends node life. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the overall structure of this utility model.
[0019] Figure 2 This is a three-dimensional structural diagram of the present invention.
[0020] Figure 3 This is a schematic diagram of the connection between the connecting sleeve and the fixed sleeve in this utility model.
[0021] Figure 4 This is a schematic diagram showing the connection between the connecting block and the fitting block in this utility model.
[0022] As shown in the figure: 1a. Upper column section, 1b. Lower column section, 2. Beam component, 3. Fixing sleeve, 4. Connecting block, 5. Fitting block, 6. Reinforcing bolt, 7. Connecting sleeve, 8. Armhole plate, 9. Through hole, 10. Insert, 11. Positioning hole II, 12. Positioning hole I, 13. Connecting groove. Detailed Implementation
[0023] To clearly illustrate the technical features of this solution, the following detailed implementation method will be used to describe the solution.
[0024] like Figures 1-4As shown, a precast beam-column steel structure includes a vertically arranged upper column segment 1a, a lower column segment 1b, and a horizontally arranged beam member 2. The upper column segment 1a and the lower column segment 1b are connected by a fixing sleeve 3. The inner diameter of the fixing sleeve 3 is adapted to the outer diameter of the upper column segment 1a and the lower column segment 1b. The upper end of the fixing sleeve 3 is fixed to the lower end of the upper column segment 1a by bolts, and the lower end of the fixing sleeve 3 is fixed to the upper end of the lower column segment 1b by bolts. An anti-corrosion coating is provided at the connection interface between the fixing sleeve 3 and the upper column segment 1a and the lower column segment 1b. The bolts are 8.8 grade high-strength bolts.
[0025] The fixed sleeve 3 is welded with symmetrically arranged I-shaped connecting blocks 4. The end face of the connecting block 4 is recessed to form an I-shaped connecting groove 13. The connecting groove 13 is fitted with a fitting block 5. The two side wing plates of the fitting block 5 are provided with positioning holes I12. The two side wing plates of the connecting block 4 are provided with positioning holes II11 that coincide with the positioning holes I12. The fitting block 5 is inserted into the connecting groove 13 and locked and fixed by reinforcing bolts 6 that pass through the positioning holes I12 and II11 and nuts.
[0026] A connecting sleeve 7 is also fixed to the side of the fixed sleeve 3. The axis of the connecting sleeve 7 is set horizontally. The end face of the connecting sleeve 7 is recessed to form an I-shaped insertion 10 for inserting into the I-shaped end of the horizontal beam component 2. Through holes 9 are opened on the upper and lower flanges and web of the connecting sleeve 7. Bolt holes are opened at the end of the horizontal beam component 2. The through holes 9 and bolt holes are fixed by bolts.
[0027] The through holes on the connecting sleeve 7 are respectively opened at the three equal points of the central axis of its upper and lower flanges and web.
[0028] The surface of the interlocking block 5 is coated with an alumina wear-resistant ceramic layer with a coating thickness of 0.5~1.0mm.
[0029] An inclined armhole plate 8 is welded between the bottom surface of the connecting sleeve 7 and the fixed sleeve 3. The inclination angle of the armhole plate 8 is 30°~45°.
[0030] Column components: Upper column segment 1a and lower column segment 1b are made of Q345B grade hot-rolled H-beams or rectangular steel pipes, with cross-sectional dimensions determined according to the design load (H300×300×10×15). The ends of the column segments are machined to match the inner diameter of the fixing sleeve 3, with tolerance controlled within ±0.5mm. The end faces should be flat, and the perpendicularity deviation ≤1 / 1000.
[0031] Beam Component 2: The horizontal beam component uses Q235B grade I-beams (I250×125×6×9), with the ends machined into I-shaped sockets, the dimensions of which are adapted to the sockets of connecting sleeve 7. The recommended socket depth is 150mm, with a tolerance of ±0.2mm. Bolt holes are opened at the ends of the beam component, with the hole diameter 1mm larger than the bolt diameter (e.g., 21mm for an M20 bolt), and the position is aligned with the through hole of the connecting sleeve.
[0032] The fixed sleeve 3 is made of Q345B grade square steel pipe (200mm×200mm×10mm), and the length of the sleeve is generally 300mm. The inner diameter is matched with the outer diameter of the column section (gap 0.5-1mm).
[0033] Bolt holes with a diameter of 20mm (for M18 bolts) are made on the front of the upper and lower ports. The holes are 50mm away from the edge of the port, avoiding the welding area of the connecting block 4 and the connecting sleeve 7 (if the connecting block is welded to the center of the side, the bolt holes are offset to the edge).
[0034] Surface treatment: The inner and outer walls are coated with an epoxy anti-corrosion coating with a dry film thickness of ≥80μm, which meets the ISO 12944 anti-corrosion standard.
[0035] The connecting sleeve 7 is machined from an I-beam section (I200×100×5.5×8) with a length of 250mm. The end face is recessed with an I-beam-shaped socket with a depth of 100mm. The socket size is precisely matched with the end of the beam member 2 (gap ≤0.5mm).
[0036] Through-hole machining: Through holes 9 are drilled at the trisection points of the central axis of the upper and lower flanges and the web (i.e., the length of each component is divided into three equal parts, and the hole positions are at the division points). For a 250mm long sleeve, the through holes are 83mm and 167mm from the end face. The hole diameter is consistent with the bolt holes of the beam component, and CNC drilling is used for machining, with a positional tolerance ≤0.5mm.
[0037] A haunch plate 8 is welded between the bottom surface of the connecting sleeve 7 and the fixed sleeve 3. The haunch plate 8 is made of Q235B steel plate with a thickness of 10mm and an inclination angle of 40°. The weld is a full penetration groove weld, which conforms to the welding specification JGJ 81-2002.
[0038] Connecting block 4 is made of Q235B I-beam (I150×75×5×7), cut to a length of 200mm. An I-shaped connecting groove is recessed on the end face, with a groove depth of 50mm and a groove width matching the web thickness of the mating block 5 (tolerance ±0.2mm). Positioning holes II (18mm diameter) are provided on both sides of the connecting block's flanges for reinforcing bolts 6.
[0039] The interlocking block 5 is made of the same material as the connecting block, with an I-beam structure and dimensions that seamlessly fit the connecting groove. The surface is coated with an alumina wear-resistant ceramic layer: applied via thermal spraying, with a coating thickness of 0.8mm and adhesion ≥10MPa (tested according to ASTM C633 standard). Positioning holes I (18mm in diameter) are provided on both sides of the interlocking block's flanges, aligned with positioning hole II.
[0040] The reinforcing bolt 6 is an 8.8 grade high-strength bolt (M16×50), with anti-loosening nuts and washers.
[0041] The armhole plate 8 is prefabricated simultaneously with the connecting sleeve.
[0042] Bolts and nuts: All bolts used (including bolts for fixing sleeve ends, bolts for connecting sleeves and reinforcing bolts) are high-strength standard parts of grade 8.8, and the torque coefficient is controlled between 0.11 and 0.15.
[0043] The epoxy coating consists of a primer, intermediate coat and topcoat, and is resistant to salt spray for ≥1000 hours (tested according to ISO 9227).
[0044] Assembly is completed in the factory, ensuring component integration and reducing on-site work. The steps are as follows: Assembly of fixed sleeve 3 and connecting sleeve 7 Position the connecting sleeve 7 on the designated side (e.g., front) of the fixed sleeve 3, and use a clamp to ensure the axis is horizontal.
[0045] For welding the bottom surface of the connecting sleeve 7 to the side surface of the fixed sleeve 3: first, spot weld for fixation, then perform a full-circumference fillet weld with a weld leg size of 8mm. After welding, check for deformation; the deviation should be ≤2mm.
[0046] Welding of the armhole plate 8: The armhole plate 8 is installed between the connecting sleeve 7 and the fixed sleeve 3, and welded on both sides. The weld is qualified by ultrasonic testing.
[0047] Assembly of connecting block 4 and fitting block 5 Weld the connecting block 4 to the two symmetrical sides of the fixed sleeve 3, ensuring that the center line of the connecting block 4 is perpendicular to the axis of the fixed sleeve 3.
[0048] Insert the interlocking block 5: Insert the interlocking block 5 into the connecting groove of the connecting block 4, aligning the positioning hole I and the positioning hole II.
[0049] Insert reinforcing bolt 6: through the hole, tighten the nut to the initial preload (30% of the final value), but do not tighten it completely yet.
[0050] The on-site installation steps in this embodiment are as follows: On-site installation must follow the principle of "columns first, beams later," and standard hoisting tools must be used. Key steps include: Column segment installation and fixing sleeve connection Hoist the lower column section 1b to the foundation position and level it (levelness ≤ 1 / 1000).
[0051] Install fixing sleeve 3: Slide the fixing sleeve onto the upper end of the lower column section, aligning it with the bolt holes. Insert the bolt (M18×60) and initially tighten the nut.
[0052] Hoist the upper column section 1a: Insert its lower end into the upper port of the fixing sleeve and adjust its verticality. Tighten all bolts: Use a torque wrench to tighten them in three stages (30%, 70%, and 100% of the final value). The final torque is set according to the bolt specifications (e.g., the final torque for an M18 bolt is 400 N·m).
[0053] Check the connection: Use a feeler gauge to measure the gap between the sleeve and the column section; it should be ≤0.5mm.
[0054] Connection between beam members and connecting sleeves Positioning beam component 2: Hoist the beam component so that its I-shaped end is aligned with the insertion port of the connecting sleeve 7.
[0055] Insertion procedure: Slowly advance the beam member, using the insertion port for self-alignment. If necessary, use a tapered guide pin to assist alignment (the guide pin diameter is 0.5mm smaller than the bolt hole; insert it into the through hole for initial positioning).
[0056] Bolt fixing: After the beam component is in place, insert the bolts (such as M20×70) into the through holes of the connecting sleeve 7 and the bolt holes of the beam component 2. Tighten the nuts in a diagonal sequence, controlling the torque to a final value of 500 N·m.
[0057] Final inspection: Measure the levelness of beam component 2, deviation ≤ 2mm; check the contact surface of the socket, gap ≤ 1mm.
[0058] Final fastening of the lateral reinforcement mechanism Tighten the reinforcing bolt 6: Use a torque wrench to tighten the reinforcing bolt 6 to a final torque of 300 N·m.
[0059] Conduct load tests, such as applying a static load of 1.5 times the design load, and observe for any permanent deformation.
[0060] To be more specific, a typical embodiment parameter is provided: Application scenario: Medium-sized industrial plant, column spacing 6m, floor height 5m.
[0061] Component parameters: Column component: H300×300×10×15, material Q345B.
[0062] Beam components: I250×125×6×9, material Q235B.
[0063] Fixed sleeve 3: square 200×200×10mm, length 300mm.
[0064] Connecting sleeve 7: I200×100×5.5×8, length 250mm, through hole distance from end face 83mm and 167mm.
[0065] Reinforcing bolt 6: All grade 8.8, M18 for fixing sleeve, M20 for connecting sleeve.
[0066] Performance indicators: Node bending strength ≥300kN·m, installation time ≤2 hours per node.
[0067] Of course, the above description is not limited to the examples above. Technical features of this utility model not described can be implemented by or using existing technology, and will not be repeated here. The above embodiments and drawings are only used to illustrate the technical solution of this utility model and are not intended to limit this utility model. This utility model has been described in detail with reference to preferred embodiments. Those skilled in the art should understand that any changes, modifications, additions or substitutions made by those skilled in the art within the scope of this utility model do not depart from the spirit of this utility model and should also fall within the protection scope of the claims of this utility model.
Claims
1. A precast beam-column steel structure, comprising a vertically arranged upper column segment (1a), a lower column segment (1b), and a horizontally arranged beam member (2), characterized in that: The upper column section (1a) and the lower column section (1b) are connected by a fixing sleeve (3). The inner diameter of the fixing sleeve (3) is adapted to the outer diameter of the upper column section (1a) and the lower column section (1b). The upper end of the fixing sleeve (3) is fixed to the lower end of the upper column section (1a) by bolts, and the lower end of the fixing sleeve (3) is fixed to the upper end of the lower column section (1b) by reinforcing bolts (6). The fixed sleeve (3) is welded with symmetrically arranged I-shaped connecting blocks (4). The end face of the connecting block (4) is recessed to form an I-shaped connecting groove. The connecting groove is fitted with a fitting block (5). The two side wing plates of the fitting block (5) are provided with positioning holes I. The two side wing plates of the connecting block (4) are provided with positioning holes II (11) that coincide with positioning holes I (12). The fitting block (5) is inserted into the connecting groove (13) and locked and fixed by reinforcing bolts (6) that pass through positioning holes I (12) and II (11) with nuts. A connecting sleeve (7) is also fixed on the side of the fixed sleeve (3). The axis of the connecting sleeve (7) is set horizontally. The end face of the connecting sleeve (7) is recessed to form an I-shaped socket for inserting into the I-shaped end of the horizontal beam member (2). Through holes (9) are opened on the upper and lower flanges and web of the connecting sleeve (7). Bolt holes are opened at the end of the horizontal beam member (2). The through holes (9) and bolt holes are fixed by reinforcing bolts (6).
2. The precast beam-column steel structure according to claim 1, characterized in that: The through holes on the connecting sleeve (7) are respectively opened at the three equal points of the central axis of its upper and lower flanges and web.
3. The precast beam-column steel structure according to claim 1, characterized in that: The surface of the interlocking block (5) is coated with an alumina wear-resistant ceramic layer with a coating thickness of 0.5~1.0mm.
4. The precast beam-column steel structure according to claim 1, characterized in that: An inclined armhole plate (8) is welded between the bottom surface of the connecting sleeve (7) and the fixed sleeve (3), with an inclination angle of 30°~45°.
5. The precast beam-column steel structure according to claim 1, characterized in that: A corrosion-resistant coating is provided at the connection interface between the fixed sleeve (3) and the upper column section (1a) and the lower column section (1b), and the bolts are 8.8 grade reinforced bolts (6).