A shallow-buried steel column base connecting joint

By adding an extended reinforcing rigid arm and a reinforcing outer ring plate to the outside of the steel column, combined with the ground beam concrete structure, the problem of insufficient bearing capacity of the column foot of shallow buried steel column is solved, achieving efficient construction and stable connection effect, which is suitable for seismic isolation technology in multi-story and high-rise steel structure buildings.

CN224997782UActive Publication Date: 2026-11-20YUNNAN DESIGN INST GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202620096240.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2026-01-23
Publication Date
2026-11-20
Estimated Expiration
2036-01-23

AI Technical Summary

Technical Problem

The insufficient anchorage depth of shallow-buried steel column bases results in low bending, shear, and pull-out bearing capacity, affecting the overall safety and stability of the joint. Traditional reinforcement measures are complex to construct and have limited effectiveness.

Method used

By employing extended reinforcing rigid arms and reinforced outer ring plates, combined with the concrete structure of the ground beam and upper support pier, the load is directly transferred to the ground beam through the extended reinforcing rigid arms. The added reinforced outer ring plates constrain the deformation of the steel column walls, and a robust rigid joint area is formed through a combination of factory prefabrication and on-site welding.

Benefits of technology

It significantly improves the bending, shear and pull-out bearing capacity of the joint, enhances the stability of the column base area, simplifies the construction process, reduces the difficulty of welding quality control, and ensures the reliability of construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997782U_ABST
    Figure CN224997782U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of steel column foot connecting node of shallow burying, including steel column, outer extension stiff arm, reinforcing outer ring plate, column foot bottom plate, upper buttress, lower buttress, ground beam, shock insulation pad and connecting plate;Column foot bottom plate is fixedly installed at the bottom end of steel column;Outer extension stiff arm one end is connected to the outer wall of steel column, and the other end is inserted into ground beam;Reinforcing outer ring plate is set in the outer wall of steel column, and is located between outer extension stiff arm and column foot bottom plate;Shock insulation pad is set between column foot bottom plate and lower buttress by connecting plate, and the connecting plate is respectively connected with the lower surface of column foot bottom plate and the upper surface of lower buttress;Upper buttress is cast on the surface of column foot bottom plate;Upper buttress is connected with ground beam, and lower buttress is installed on building foundation.The utility model is welded outer extension stiff arm and reinforcing outer ring plate outside steel column, realize the simplification of construction, cancel internal complex structure simultaneously, specially aiming at high limited working condition of shock insulation layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building engineering structural technology, specifically to a shallow-buried steel column base connection node. Background Technology

[0002] In recent years, with the continuous maturation and development of seismic isolation technology, its application in multi-story and high-rise steel structure buildings has become increasingly widespread. Compared with ordinary reinforced concrete structures, steel structure buildings using seismic isolation technology face special challenges in column base construction: because the seismic isolation layer itself has a certain height, and a concrete upper support needs to be set up on top to accommodate the column base, the actual depth to which the steel column base can be embedded in the concrete is strictly limited, often making it difficult to meet the design requirements for embedment depth in the code (usually 2 to 3 times the width of the column section), thus forming typical shallow-embedded column bases.

[0003] Due to insufficient anchorage depth, the bending, shear, and pull-out bearing capacities of these shallow-buried column bases are generally low, seriously affecting the overall safety and stability of the joint. To compensate for this deficiency, traditional methods often involve adding reinforcing measures such as studs and internal diaphragms inside the steel column. However, these methods are limited by construction space, complex to operate, and difficult to control on-site welding quality. Furthermore, they have limited effect on improving the mechanical properties of shallow-buried column bases and still pose certain safety hazards. Utility Model Content

[0004] The purpose of this invention is to provide a shallow-buried steel column base connection node to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: A shallow-buried steel column base connection node includes: a steel column, an outwardly extending reinforcing rigid arm, a reinforcing outer ring plate, a column base plate, an upper support, a lower support, a ground beam, a seismic isolation pad, and a connecting plate; The column base plate is fixedly installed at the bottom of the steel column; one end of the extended reinforcing arm is connected to the outer wall of the steel column, and the other end extends into the ground beam; The reinforcing outer ring plate is fitted onto the outer wall of the steel column and is located between the extended reinforcing rigid arm and the column base plate; The vibration isolation pad is installed between the column base plate and the lower support through a connecting plate, and the connecting plate is connected to the lower surface of the column base plate and the upper surface of the lower support respectively. The upper support pier is cast into shape on the surface of the column base plate; the upper support pier is connected to the ground beam, and the lower support pier is installed on the building foundation.

[0006] Preferably, the upper support pier is equipped with upper support pier reinforcement, and the ground beam is equipped with ground beam reinforcement to ensure the strength and integrity of the concrete structure and provide a reliable foundation for the anchoring and coordinated stress of the external steel components.

[0007] Preferably, the portion of the extended reinforcing arm that extends into the ground beam is connected to the reinforcing steel bars of the ground beam, thereby achieving a mechanical connection between the steel component and the internal concrete skeleton, and directly and effectively transferring the load to the main structure of the ground beam.

[0008] Preferably, the ground beam is a horizontally arranged concrete beam, which is cast as an integral concrete structure with the upper support pier to form a robust rigid joint area, significantly enhancing the overall stiffness, stability and ability to resist horizontal loads of the joint.

[0009] Preferably, the column base plate and the steel column are prefabricated components in the factory.

[0010] Compared with the prior art, the beneficial effects of this utility model are: This utility model adds an extended reinforcing rigid arm and a reinforcing outer ring plate to the outside of the steel column, which work together with the ground beam and the upper support concrete structure. The extended reinforcing rigid arm directly transfers the bending moment and shear force at the column base to the ground beam concrete, thereby improving the bending, shear and pull-out bearing capacity of the joint; the reinforcing outer ring plate effectively restrains the local deformation of the steel column wall and enhances the stability of the column base area.

[0011] This utility model is simple to manufacture and highly standardized in the factory, and the on-site welding operation space is open and convenient, which reduces the construction difficulty and ensures reliable and consistent weld quality.

[0012] This invention can still achieve a safe and reliable connection under shallow burial conditions, realizing the application scope and feasibility of seismic isolation technology in multi-story and high-rise steel structure buildings, and has clear engineering relevance and good practical value. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the overall structure of this utility model.

[0014] Figure 2 This is a schematic diagram of the reinforcing steel bars of the upper support pier and the ground beam of this utility model.

[0015] Figure 3 This is an exploded view of the entire utility model.

[0016] Figure 4 This is a schematic diagram showing the assembly and connection of the steel column, column base plate, and vibration isolation pad of this utility model.

[0017] Figure 5 This is a schematic diagram of the structure of the extended reinforcing rigid arm and the reinforcing outer ring plate of this utility model.

[0018] Figure 6 This is a cross-sectional view of the entire utility model.

[0019] In the diagram: 1. Steel column; 2. Outwardly extending reinforced rigid arm; 3. Reinforced outer ring plate; 4. Column base plate; 5. Upper support pier; 51. Upper support pier reinforcement; 6. Lower support pier; 7. Ground beam; 71. Ground beam reinforcement; 8. Vibration isolation pad; 9. Connecting plate. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0021] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed", "equipped with", "sleeved with", "connected", etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. For those skilled in the art, the specific meaning of the above terms in this utility model can be understood according to the specific circumstances. Example

[0022] Please see Figures 1 to 6 This utility model provides a technical solution: A shallow-buried steel column base connection node includes: a steel column 1, an outwardly extending reinforcing rigid arm 2, a reinforcing outer ring plate 3, a column base plate 4, an upper support 5, a lower support 6, a ground beam 7, a seismic isolation pad 8, and a connecting plate 9. The steel column 1 is vertically set at the center of the node, runs through the area of ​​the upper support 5, and its lower end is connected to the substructure through the column base plate 4.

[0023] The steel column 1 is vertically hoisted and positioned to ensure that the verticality of the axis meets the design requirements. Its bottom end is firmly connected to the column base plate 4, providing an installation benchmark for other components. The extended reinforcing arm 2 is arranged laterally on the lower outer wall of the steel column 1 and is fixed by welding. One end is welded to a predetermined position on the outer wall of the steel column 1, and the other end extends into the ground beam 7. The extended reinforcing arm 2 uses an H-shaped steel section. This H-shape distributes the force evenly and is easy to process. Depending on the actual needs such as the size of the project load and space constraints, other steel section types such as box-shaped and channel-shaped sections can also be selected. All types of sections must ensure compatibility with the welding of the steel column 1 and the coordinated force-bearing effect after extending into the ground beam 7.

[0024] The reinforcing outer ring plate 3 is fitted onto the outer wall of the steel column 1, located in the area between the extended reinforcing arm 2 and the column base plate 4. It is arranged circumferentially around the steel column 1, forming an adjacent assembly relationship with both. The reinforcing outer ring plate 3 is fixedly connected to the outer wall of the steel column 1 through a full welding process. The weld seam needs to be continuously formed around the circumference of the steel column 1, which can evenly distribute stress along the circumference of the steel column 1, strengthen the connection strength between the steel column 1 and the extended reinforcing arm 2, optimize the force transmission path, and together with the extended reinforcing arm 2, improve the load-bearing capacity and stiffness of the column base joint.

[0025] The outer ring plate 3 is a horizontal outer ring plate, which can fully cover the circumference of the steel column 1, and the stress is evenly distributed. If there are spatial layout restrictions or specific stress requirements in the project, vertical stiffening plates can also be used. The core function of all these is to strengthen the local stress performance of the column base.

[0026] The column base plate 4 is horizontally positioned at the bottom of the steel column 1, with its upper surface flush against the bottom end face of the steel column 1 and its lower surface connected to the substructure via a connecting plate 9. During installation, the plate surface must be horizontal and perpendicular to the axis of the steel column 1 to ensure uniform load distribution. The column base plate 4 bears all the load transmitted by the steel column 1 and smoothly distributes it to the lower vibration isolation pad 8, foundation, or short columns, while providing a stable supporting foundation for the steel column 1 and ensuring the vertical bearing capacity of the column base. The connecting plate 9 is horizontally arranged on the upper and lower sides of the vibration isolation pad 8. The vibration isolation pad 8 is positioned and fixed via the connecting plate 9. During installation, the contact surface of the vibration isolation pad 8 must be flat and free from offset to ensure uniform force distribution. The vibration isolation pad 8 effectively absorbs external vibration energy, reducing the transmission of vibration to the upper steel column 1 and the building structure, while also possessing a certain vertical bearing capacity, thus serving both support and vibration isolation functions.

[0027] The upper support pier 5 is cast onto the surface of the column base plate 4, with its upper surface flush with the surrounding structure and its sides seamlessly connected to the ground beam 7. The upper support pier 5 enhances the overall rigidity and stability of the joint. Through its tight integration with the steel column 1 and the column base plate 4, it disperses the local pressure borne by the column base. Simultaneously, through its integrated structure with the ground beam 7, it transfers part of the load to the ground beam 7, improving the joint's collaborative load-bearing capacity. The lower support pier 6 is set on the building foundation to bear all the loads transferred from the superstructure, providing a stable installation platform.

[0028] The upper support pier 5 is internally equipped with upper support pier reinforcement 51, and the ground beam 7 is internally equipped with ground beam reinforcement 71 to ensure the strength and integrity of the concrete structure and provide a reliable foundation for the anchoring and coordinated load-bearing of external steel components. The ground beam 7 is connected to the upper support pier 5 and installed by simultaneously binding the ground beam reinforcement 71 and then casting it as a whole after connecting it with the upper support pier reinforcement 51, so as to receive the force transmitted by the outward reinforcing rigid arm 2 and improve the joint's resistance to lateral displacement. The lower support pier 6 is set on the building foundation and is cast after being connected to the building foundation reinforcement during installation. It bears all the upper load and transmits it to the building foundation, providing stable support for the joint.

[0029] The portion of the extended reinforcing arm 2 extending into the ground beam 7 is connected to the ground beam reinforcement 71. The extended end of the extended reinforcing arm 2 is located within the reinforcement arrangement area inside the ground beam 7, forming an interlocking spatial relationship with the ground beam reinforcement 71. During installation, the ground beam reinforcement 71 is first tied, and then the extended reinforcing arm 2 is extended into the preset area. It is then firmly fixed to the ground beam reinforcement 71 through tying, welding, or special connectors. Subsequently, the ground beam 7 concrete is poured to form an integrated structure, thereby achieving a mechanical connection between the steel component and the internal concrete skeleton. This connection can directly open the load transfer path from the steel column 1 to the ground beam 7, efficiently transferring the vertical pressure, horizontal shear force, and bending moment borne by the column base to the main structure of the ground beam 7, avoiding losses or stress concentration during the load transfer process, and significantly improving the joint stress performance and bearing reliability.

[0030] The ground beam 7 is a horizontally arranged concrete beam, which is arranged horizontally on the side of the upper support 5 and is adjacent to the upper support 5 in a spatial relationship. During installation, the upper support reinforcement 51 and the ground beam reinforcement 71 are first fixed by staggered lap joint to ensure that the two reinforcement skeletons form an integral force system. Then, the formwork covering the area of ​​the upper support 5 and the ground beam 7 is erected and sealed and reinforced at the same time. Subsequently, the same batch of concrete is used for integrated casting, so that the ground beam 7 and the upper support 5 are integrated into an inseparable integral concrete structure, which enhances the structural stability of the joint, effectively resists external horizontal forces such as earthquakes and wind loads, and ensures the load-bearing reliability of the column foot joint under complex stress conditions.

[0031] Prefabrication is carried out in the factory, with the core process being the connection between the column base plate 4 and the steel column 1. According to the design drawings, the column base plate 4 is precisely aligned with the bottom of the steel column 1 and fixed by welding to ensure a strong weld, facilitating direct on-site installation and use.

[0032] Upon entering the on-site construction phase, the concrete construction of the lower support pier 6 is carried out first, and the pouring operation of the lower support pier 6 is completed according to the design requirements. After the construction of the lower support pier 6 is completed, the vibration isolation pad 8 is installed in the preset position of the lower support pier 6 according to the installation specifications to ensure that the vibration isolation pad 8 and the lower support pier 6 are stably connected.

[0033] After the vibration isolation pad 8 is installed and fixed, the prefabricated components are hoisted to the construction position and connected to the upper part of the vibration isolation pad 8 through the column base plate 4. After the connection is completed, the installation position and verticality of the steel column 1 are calibrated to ensure that the steel column 1 meets the design installation requirements.

[0034] After the steel column 1 is calibrated and approved, the welding of the reinforcing components is carried out. One end of the extended reinforcing arm 2 is welded to the outer wall of the steel column 1 to ensure a firm weld. At the same time, the other end of the extended reinforcing arm 2 is aligned with the preset position of the ground beam 7 to ensure that it can be smoothly inserted into the ground beam 7 for subsequent construction. While welding the extended reinforcing arm 2, the reinforcing outer ring plate 3 is welded to the preset position of the outer wall of the steel column 1 to complete the installation of the reinforcing components.

[0035] According to the design drawings, the upper support pier reinforcement 51 and the ground beam reinforcement 71 are tied separately to ensure that the reinforcement layout meets the design specifications. After the reinforcement is tied, the construction formwork for the upper support pier 5 and the ground beam 7 is erected. The formwork support must be firm and reliable to meet the stress requirements of subsequent concrete pouring.

[0036] After the formwork support is completed and inspected and approved, concrete is poured into the formwork until the pouring height reaches the design elevation, so that the upper support pier 5 and the ground beam 7 form an integral structure through concrete pouring, ensuring the overall rigidity and stability of the joint.

[0037] After the concrete reaches the design strength, the construction formwork is removed to avoid premature removal affecting the structural strength. After the formwork is removed, the finishing work is completed, and the overall installation of the steel column 1 column base connection node is finally achieved.

[0038] The construction process organically combines factory prefabrication with on-site construction. All components are easy to process, and on-site construction mainly involves welding and assembly, making operation simple and construction quality easy to control. Through the synergistic effect of the extended reinforcing rigid arm 2, the reinforced outer ring plate 3, the ground beam 7, and the upper support 5, the bearing capacity and stability of the shallow-buried column base are significantly improved. Compared with traditional construction methods, it has significant advantages, strong construction convenience, and is suitable for the construction of column bases in steel structure buildings where the height of the seismic isolation layer is limited.

[0039] All other parts of this utility model not described herein are the same as existing technologies, or are known technologies, or can be implemented using existing technologies, and will not be described in detail here.

[0040] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A shallow-buried steel column base connection node, characterized in that, include: Steel column (1), extended reinforcing rigid arm (2), reinforced outer ring plate (3), column base plate (4), upper support (5), lower support (6), ground beam (7), seismic isolation pad (8) and connecting plate (9); The column base plate (4) is fixedly installed at the bottom of the steel column (1); one end of the extended reinforcing rigid arm (2) is connected to the outer wall of the steel column (1), and the other end extends into the ground beam (7); The reinforcing outer ring plate (3) is fitted onto the outer wall of the steel column (1) and is located between the extended reinforcing rigid arm (2) and the column base plate (4); The vibration isolation pad (8) is set between the column base plate (4) and the lower support (6) through a connecting plate (9), and the connecting plate (9) is connected to the lower surface of the column base plate (4) and the upper surface of the lower support (6) respectively. The upper support (5) is cast on the surface of the column base plate (4); the upper support (5) is connected to the ground beam (7); the lower support (6) is installed on the building foundation.

2. The shallow-buried steel column base connection node according to claim 1, characterized in that, The upper support pier (5) is equipped with upper support pier steel bars (51), and the ground beam (7) is equipped with ground beam steel bars (71).

3. The shallow-buried steel column base connection node according to claim 2, characterized in that, The portion of the extended reinforcing arm (2) that extends into the ground beam (7) is connected to the ground beam reinforcement (71).

4. The shallow-buried steel column base connection node according to claim 3, characterized in that, The ground beam (7) is a horizontally set concrete beam, which is cast as an integral concrete structure with the upper support pier (5).

5. A shallow-buried steel column base connection node according to claim 1, characterized in that, The column base plate (4) and the steel column (1) are prefabricated components in the factory.