A dynamic balance steel structure construction frame
By designing a dynamic balancing steel structure construction frame, and utilizing the dynamic adjustment of sliding rods, sleeves, and counterweight plates, the safety risks caused by uneven weight distribution on the construction frame are resolved. This achieves improved stability and work efficiency of the construction frame, while reducing back strain.
Patent Information
- Application Number
- CN202522371209.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-07
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-11-07
AI Technical Summary
The existing steel structure construction scaffold has uneven weight distribution, which leads to a shift in the center of gravity and increased safety risks. In particular, in high-rise operations, the superposition of wind loads and unilateral load imbalance poses a risk of tilting and overturning.
A dynamic balancing steel structure construction frame was designed. A counterweight plate is connected by a sliding rod and a sliding sleeve. The counterweight plate is detachable and can be flexibly adjusted according to the weight of the workers to achieve dynamic balance of weight on both sides of the construction frame. The counterweight plate is quickly installed through hooks and positioning slots. Combined with rollers and reinforcing rods, the stability is improved. A storage box and traction rope are set to reduce the number of times you have to bend over.
It achieves dynamic balance of weight on both sides of the construction frame, avoiding the risk of tilting and overturning caused by unilateral load imbalance, improving work coordination and safety, reducing labor and time costs, and lowering the risk of back strain.
Smart Images

Figure CN224997943U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction technology, specifically to a dynamic balancing steel structure construction frame. Background Technology
[0002] A scaffold is a tool used by workers when performing high-altitude construction work. By standing on top of the scaffold, workers can access high-altitude work sites. The scaffold is a core auxiliary equipment that ensures the safety and efficiency of high-altitude operations (such as steel structure component installation, external wall anti-corrosion treatment, roof node welding, etc.).
[0003] Existing steel structure construction largely relies on ground-supported or frame-type scaffolding. The counterweights of these scaffoldings are usually fixed and cannot be dynamically adjusted according to the work environment. During on-site construction, materials of various sizes inevitably accumulate on the scaffolding platforms, leading to uneven weight distribution throughout the system. Sometimes, site limitations force workers to work on only one side, exacerbating the center of gravity imbalance. This is especially true in high-rise construction, where wind loads combined with unilateral load imbalance further increase safety risks. Utility Model Content
[0004] This invention addresses the shortcomings of existing technologies by providing a dynamically balanced steel structure construction frame. This solution enables dynamic weight balance on both sides of the construction frame, thus solving the problem of easy center of gravity shift in the construction frame.
[0005] To solve the above-mentioned technical problems, this utility model provides the following technical solution: A dynamically balanced steel structure construction frame includes a frame body with a sliding rod in the middle. A sliding sleeve is slidably connected to the sliding rod, and a connecting plate is fixed to the sliding sleeve. At least one counterweight plate is provided on the connecting plate, and the counterweight plate is detachably connected to the connecting plate. The introduction of the counterweight plate enables dynamic balance of weight on both sides of the construction frame, effectively avoiding the risk of tilting and overturning caused by unilateral load imbalance. It also allows workers to focus on construction, improving work coordination and safety.
[0006] Preferably, the connecting plate is provided with at least one hook, and the counterweight plate has a positioning groove adapted to the hook. This allows for flexible selection of different numbers and weights of counterweight plates according to the worker's weight, and enables quick and successful installation, ensuring precise matching of the counterweight with the working weight and improving the flexibility and applicability of counterweight adjustment.
[0007] Preferably, the construction frame body includes two sets of uprights, each set of uprights including two uprights, with an upper connecting rod and a lower connecting rod between the uprights. The two ends of the upper connecting rod and the lower connecting rod are fixedly connected to the two uprights respectively, and both the upper connecting rod and the lower connecting rod are perpendicular to the two uprights. The upright structure design can reduce weight and save time during installation and disassembly.
[0008] Preferably, multiple parallel crossbars are installed between the upper connecting rods of the two sets of uprights. The two ends of adjacent crossbars are fixedly connected to the upper connecting rods on both sides. Vertical rods are fixedly connected between the crossbars, and the vertical rods are set perpendicular to the crossbars, while the crossbars are parallel to the sliding rods. The vertical installation of the crossbars and vertical rods increases the stability of the work platform.
[0009] Preferably, a rotating sleeve is rotatably mounted on one of the crossbars, and a connecting strip is fixedly connected to the rotating sleeve. A limit strip is fixedly connected to the construction frame body, and the connecting strip rests on the limit strip. A storage box for placing tools is hinged to the side of the connecting strip away from the rotating sleeve. A traction rope is provided on the storage box, and a positioning clip is fixed to the end of the traction rope. The limit strip can prevent the connecting strip and the storage box from rotating freely below the work platform. The operator can directly pull the traction rope to pull the tools to waist level, reducing the number of times they bend over and thus reducing back strain.
[0010] Preferably, the inner surface of the rotating sleeve is provided with a copper bushing, the inner wall of which contacts the crossbar, and the inner wall of the copper bushing is coated with grease. This reduces frictional wear between the rotating sleeve and the crossbar during rotation.
[0011] Preferably, the connecting strip is provided with a hinge shaft, and limit buckles are provided on both sides of the connecting strip. The storage box is provided with a hinge hole, and a limit groove is provided inside the hinge hole. The limit buckles and the limit groove cooperate with each other and have elastic deformation capability. The cooperation of the limit buckles and the limit groove can prevent the tool box from rotating freely around the hinge shaft.
[0012] Preferably, ladders are provided on both sets of uprights. Each ladder includes a vertical strut positioned between the upper and lower connecting rods. The vertical strut is parallel to the uprights, and multiple horizontal struts are provided between the vertical strut and the upright on the side furthest from the storage box. The presence of ladders on both sets of uprights facilitates easy access for workers to ascend and descend the construction scaffold.
[0013] Preferably, the bottom of the upright is equipped with rollers. The rollers at the four corners of the bottom allow it to move flexibly on complex construction sites.
[0014] Preferably, two reinforcing rods are provided between the two uprights, and between the uprights on the same side of different sets of uprights. The two ends of the reinforcing rods are fixedly connected to the two uprights respectively, and the two reinforcing rods are distributed in a crisscross pattern. This enhances the stability and load-bearing capacity of the construction frame body and reduces frame deformation and swaying.
[0015] As can be seen from the above technical solution, this utility model provides a dynamically balanced steel structure construction frame, which has at least the following beneficial effects: 1. This kind of dynamic balancing steel structure construction frame can adjust the number of counterweight plates according to the weight of the workers, and the position of the counterweight can be changed by the sliding sleeve moved by the personnel below, so as to achieve dynamic balance of weight on both sides of the construction frame, effectively avoiding the risk of tilting and overturning caused by unilateral load imbalance, while allowing the workers to focus on construction and improving work coordination and safety.
[0016] 2. This dynamic balancing steel structure construction frame has multiple hooks on the connecting plate and matching positioning slots on the counterweight plate. It can flexibly select different numbers and weights of counterweight plates according to the weight of the workers and quickly install them successfully. This ensures that the counterweight is accurately matched with the weight on the working side, which not only guarantees the accuracy of the balancing effect, but also avoids safety hazards caused by insufficient or excessive counterweight, and improves the flexibility and applicability of counterweight adjustment.
[0017] 3. This type of dynamic balancing steel structure construction frame, by setting up a storage box with a traction rope and positioning clamp, allows workers to directly pull the traction rope to pull the tools to waist level, reducing the number of times they bend over and thus reducing back strain.
[0018] 4. In this type of dynamic balancing steel structure construction frame, a copper bushing is provided on the inner surface of the rotating sleeve, and the inner wall of the copper bushing is coated with grease to reduce frictional wear between the rotating sleeve and the crossbar when the rotating sleeve rotates.
[0019] 5. This kind of dynamic balance steel structure construction frame is equipped with damping and limit buckles at the hinge joint between the connecting strip and the storage box. The simple limit buckles can prevent the tool box from rotating around the hinge axis at will. After taking or putting away tools, the storage box can be reset by releasing the traction rope.
[0020] 6. This kind of dynamic balance steel structure construction frame, by setting up ladders on both sides and staggered reinforcing bars, not only facilitates personnel to go up and down the construction frame, but also enhances the stability and load-bearing capacity of the construction frame body and reduces frame deformation and swaying.
[0021] 7. This kind of dynamic balance steel structure construction frame, with rollers at the four corners of the bottom, can move more flexibly in complex construction sites. Compared with ordinary steel structure construction frames, which require workers to constantly disassemble, move, and reassemble, it saves labor and improves efficiency. Attached Figure Description
[0022] To more clearly illustrate the technical solution of this utility model, the drawings used in the description will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0023] Figure 1 This is a three-dimensional structural diagram of the entire utility model; Figure 2 This is a side plan view of the present invention; Figure 3 This is a schematic diagram of the connection structure between the hook and the counterweight plate of this utility model; Figure 4 This is a schematic diagram of the connecting strip limiting buckle of this utility model; Figure 5 This is a schematic diagram of the limiting slot of the storage box of this utility model.
[0024] Explanation of key figure labels: 01. Construction frame body; 1. Upright pole; 2. Horizontal bar; 3. Ladder; 4. Roller; 5. Rotating sleeve; 6. Connecting strip; 7. Storage box; 8. Traction rope; 9. Positioning clamp; 10. Reinforcing rod; 11. Sliding rod; 12. Sliding sleeve; 13. Connecting plate; 14. Counterweight plate; 15. Hook; 16. Positioning groove; 17. Limiting strip; 18. Lower connecting rod; 19. Vertical pole; 20. Upper connecting rod; 21. Ladder vertical pole; 22. Ladder horizontal pole; 23. Limiting buckle; 24. Hinge shaft; 25. Hinge hole; 26. Limiting slot. Detailed Implementation
[0025] To make the objectives, features, and advantages of this utility model more apparent and understandable, the technical solutions of this utility model will be clearly and completely described below with reference to the accompanying drawings of the specific embodiments. Obviously, the embodiments described below are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this patent, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this patent.
[0026] The following describes, with reference to the accompanying drawings, some embodiments of the present invention, providing a dynamic balancing steel structure construction frame.
[0027] Example 1: Combination Figures 1-3As shown, this utility model provides a dynamic balancing steel structure construction frame. The construction frame body 01 includes two sets of uprights. Each set of uprights includes two uprights 1. An upper connecting rod 20 and a lower connecting rod 18 are provided between the two uprights 1. The two ends of the upper connecting rod 20 and the lower connecting rod 18 are respectively fixedly connected to the two uprights 1 and are perpendicular to each other. Multiple parallel horizontal bars 2 are provided between the upper connecting rods 20 of the two sets of uprights. The two ends of adjacent horizontal bars 2 are respectively fixedly connected to the two upper connecting rods 20. The horizontal bars 2 are perpendicular to the two uprights. Multiple vertical bars 19 are fixedly connected between the horizontal bars 2. The vertical bars 19 are set perpendicular to the horizontal bars 2 to make the overall structure more stable. A sliding rod 11 is fixedly connected to the main body 01 of the construction frame. The sliding rod 11 is parallel to the crossbar 2. A sliding sleeve 12 is slidably connected to the sliding rod 11. A connecting plate 13 is fixedly connected to the sliding sleeve 12. Multiple counterweight plates 14 are detachably installed on the connecting plate 13 to balance the weight on both sides of the main body 01 of the construction frame. When workers standing on the main body 01 of the construction frame work on one side, the workers below move the position of the connecting plate 13 on the sliding sleeve 12, which in turn moves the counterweight plates 14, realizing the dynamic balance of the weight on both sides of the construction frame. This avoids the risk of the construction frame tilting or overturning due to the imbalance of the load on one side. At the same time, the workers can focus on the construction operation without having to be distracted by adjusting the counterweight. The method of adjustment by the workers below also improves the overall coordination and safety of the operation.
[0028] The connecting plate 13 is provided with at least one hook 15, and the counterweight plate 14 is provided with a positioning groove 16 that matches the hook 15. Different amounts of counterweight plates 14 can be placed according to the weight of the workers, so that the counterweight is accurately matched with the weight on the working side. The hook 15 makes it easy to pick up and put down the counterweight plate 14.
[0029] The construction frame body 01 is equipped with ladders 3 on both sides. Each ladder 3 consists of a ladder vertical bar 21 between the upper connecting rod 20 and the lower connecting rod 18 of the two sets of uprights. The ladder vertical bar 21 is parallel to the upright 1. Multiple ladder horizontal bars 22 are provided between the ladder vertical bar 21 and one side upright 1 to form the ladder section, which facilitates workers to climb onto the construction frame body 01. Rollers 4 are provided at the four corners of the bottom of the construction frame body 01, which allows for more flexible movement in complex construction sites. Compared with ordinary steel structure construction frames, which require workers to constantly disassemble, move, and reassemble, this method saves labor and improves efficiency.
[0030] Two reinforcing rods 10 are provided between the uprights 1 on the same side of different sets of uprights on both sides of the construction frame body 01. The two ends of the reinforcing rods 10 are fixedly connected to the two uprights 1 respectively. The two reinforcing rods 10 are distributed in a cross pattern, which further improves the stability of the construction frame body 01, reduces the deformation and shaking of the construction frame, and significantly improves the overall stability and load-bearing capacity of the construction frame body 01.
[0031] As can be seen from the embodiments, different numbers and weights of counterweight plates 14 can be flexibly selected according to the weight of the operator, so that the counterweight is precisely matched with the weight on the working side. This not only ensures the accuracy of the balance effect, but also avoids safety hazards caused by insufficient or excessive counterweight, and improves the flexibility and applicability of counterweight adjustment.
[0032] A rotating sleeve 5 is rotatably mounted on a crossbar 2 of the construction frame body 01. A connecting strip 6 is fixedly connected to the rotating sleeve 5. A limit strip 17 is fixedly connected to the construction frame body 01. The connecting strip 6 rests on the limit strip 17. The limit strip prevents the connecting strip and the storage box from rotating freely below the work platform. A storage box 7 for placing tools is hinged to the side of the connecting strip 6 away from the rotating sleeve 5. A hinge shaft 24 is provided on the connecting strip 6. Limit buckles 23 are provided on both sides of the connecting strip 6. A hinge hole 25 is provided on the storage box 7. A limit groove 26 is provided inside the hinge hole 25. The limit buckles 23 and the limit groove 26 cooperate with each other and have elastic deformation capability. When rotated to the corresponding position, it engages with the limiting slot 26 to prevent the tool box 7 from rotating freely around the hinge axis. The storage box 7 is equipped with a traction rope 8, and the end of the traction rope 8 is fixed with a positioning clip 9. First, the worker clips the positioning clip 9 onto their clothing. When the worker needs to use the tools, they can directly pull the traction rope 8 to pull the storage box 7 to the waist position, making it easy for the worker to pick up and put down the tools, reducing the number of times the worker bends over, and reducing repetitive strain on the waist and back. It is especially suitable for scenarios where workers work on the scaffold for a long time, reducing occupational health risks.
[0033] Specifically, a copper bushing is fitted at the rotatable connection between the rotating sleeve 5 and the crossbar 2, and the inner wall of the bushing is coated with grease to reduce frictional wear between the rotating sleeve 5 and the crossbar 2 when the rotating sleeve 5 rotates.
[0034] As can be seen from the above embodiments: based on the weight of the workers operating on the construction scaffold body 01, a corresponding number and weight of counterweight plates 14 are detachably installed on the hooks 15 of the connecting plate 13 via positioning slots 16 to achieve initial weight balance. Subsequently, the workers on the working side climb onto the crossbars 2 via the ladders 3 on both sides of the construction scaffold body 01 to prepare for work. The workers below remain on the ground or in a suitable operating position. Before work, the workers on the working side clip the positioning clips 9 at the end of the traction ropes 8 on the storage box 7 onto their clothing. Then, the workers on the working side begin steel structure construction operations on one side of the construction scaffold body 01. During the operation, the construction scaffold needs to be moved constantly. Traditional fastener-type construction scaffolds require a lot of time and manpower to handle during erection and dismantling. At this time, rollers 4 are needed for portable movement within the site to save time and costs. The workers on the working side adjust their working positions or carry tools. When the weight distribution on both sides changes due to the change, the assistant below slides the sliding sleeve 12 on the sliding rod 11. The sliding sleeve 12 drives the connecting plate 13 and the counterweight plate 14 on the connecting plate 13 to move synchronously to balance the weight on both sides of the construction frame in real time and prevent the construction frame from tilting. If tools need to be retrieved during operation, the operator on the working side pulls the traction rope 8 directly. The traction rope 8 drives the storage box 7, which is hinged to the connecting bar 6, to rotate around the hinge point to the waist position. There are limit buckles 23 and limit slots 26 at the hinge position to prevent the tool box 7 from rotating around the hinge axis at will. After retrieving and placing the tools, the traction rope 8 is released to reset the storage box 7, reducing the number of times you have to bend over. After the operation is completed, the operator on the working side first puts the tools back into the storage box 7, removes the positioning clip 9, and goes down to the ground through the ladder 3. The assistant below moves the sliding sleeve 12 back to the initial position and removes the counterweight plate 14 on the connecting plate 13 to complete the entire operation process.
[0035] It should be noted that the terms “comprising,” “including,” or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0036] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
[0037] The above description of the disclosed embodiments enables those skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A dynamic balancing steel structure construction frame, comprising a construction frame body (01), characterized in that: A sliding rod (11) is provided in the middle of the construction frame body (01). A sliding sleeve (12) is slidably connected to the sliding rod (11). A connecting plate (13) is fixed on the sliding sleeve (12). At least one counterweight plate (14) is provided on the connecting plate (13). The counterweight plate (14) and the connecting plate (13) are detachably connected.
2. The dynamic balancing steel structure construction frame according to claim 1, characterized in that: The connecting plate (13) is provided with at least one hook (15), and the counterweight plate (14) is provided with a positioning groove (16) that matches the hook (15).
3. The dynamic balancing steel structure construction frame according to claim 1, characterized in that: The construction frame body includes two sets of uprights. Each set of uprights includes two uprights (1). An upper connecting rod (20) and a lower connecting rod (18) are provided between the uprights (1). The two ends of the upper connecting rod (20) and the lower connecting rod (18) are fixedly connected to the two uprights (1) respectively. The upper connecting rod (20) and the lower connecting rod (18) are both perpendicular to the two uprights (1).
4. The dynamic balancing steel structure construction frame according to claim 3, characterized in that: Multiple parallel horizontal bars (2) are provided between the upper connecting rods (20) of the two sets of uprights. Vertical bars (19) are fixedly connected between adjacent horizontal bars (2). The vertical bars (19) are set perpendicular to the horizontal bars (2), and the horizontal bars (2) are parallel to the sliding bars (11).
5. A dynamic balancing steel structure construction frame according to claim 4, characterized in that: A rotating sleeve (5) is rotatably mounted on one of the crossbars (2), and a connecting strip (6) is fixedly connected to the rotating sleeve (5). A limit strip (17) is provided on the construction frame body (01). The connecting strip (6) rests on the limit strip (17). A storage box (7) for placing tools is hinged on the side of the connecting strip (6) away from the rotating sleeve (5). A traction rope (8) is provided on the storage box (7), and a positioning clamp (9) is fixedly connected to the end of the traction rope (8).
6. A dynamic balancing steel structure construction frame according to claim 5, characterized in that: The inner surface of the rotating sleeve (5) is provided with a copper bushing, the inner wall of the copper bushing is in contact with the crossbar (2), and the inner wall of the copper bushing is coated with grease.
7. A dynamic balancing steel structure construction frame according to claim 5, characterized in that: The connecting strip (6) is provided with a hinge shaft (24), and limit buckles (23) are provided on both sides of the connecting strip (6). The storage box (7) is provided with a hinge hole (25), and a limit slot (26) is provided inside the hinge hole (25). The limit buckle (23) and the limit slot (26) cooperate with each other and have elastic deformation capability.
8. A dynamic balancing steel structure construction frame according to claim 5, characterized in that: Ladders (3) are provided on both uprights. Each ladder (3) includes a ladder vertical bar (21). The ladder vertical bar (21) is located between the upper connecting rod (20) and the lower connecting rod (18). The ladder vertical bar (21) is parallel to the upright (1). Multiple ladder horizontal bars (22) are provided between the ladder vertical bar (21) and the upright (1) on the side away from the storage box.
9. A dynamic balancing steel structure construction frame according to claim 3, characterized in that: The bottom of the upright (1) is provided with rollers (4).
10. A dynamic balancing steel structure construction frame according to claim 3, characterized in that: Two reinforcing rods (10) are provided between the uprights (1) on the same side of different sets of uprights. The two ends of the reinforcing rods (10) are fixedly connected to the two uprights (1) respectively, and the two reinforcing rods (10) are distributed in a cross pattern.
