A vertical shaft inner peripheral turnover operating platform

By designing a rotating operating platform within a vertical shaft and utilizing lifting and tilting components to achieve layer-by-layer fixing and tilting of the platform, the problems of high installation difficulty and low safety in existing technologies are solved, thereby improving construction efficiency and safety.

CN224997950UActive Publication Date: 2026-11-20CHINESE PEOPLES LIBERATION ARMY UNIT 63926
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522568399.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-03
Publication Date
2026-11-20
Estimated Expiration
2035-12-03

AI Technical Summary

Technical Problem

In existing technologies, the installation of the operating platform during vertical shaft construction is difficult and poses a high safety risk. It is inconvenient for workers to work in a fixed position inside the shaft, and safety is difficult to guarantee, especially when operating the platform in a small and complex space.

Method used

A rotating operating platform for vertical shafts was designed, including a lifting platform assembly and a tilting platform assembly. The platform is fixed and tilted layer by layer through structures such as threaded rods, locking pins and locking tongues. Workers do not need to be suspended in the shaft for installation. The platform is fixed to the shaft wall using ropes and expansion bolts.

Benefits of technology

It reduces the difficulty for workers to install platforms at heights, significantly improves construction safety and efficiency, reduces the risks of working at heights, and provides a convenient construction environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997950U_ABST
    Figure CN224997950U_ABST
Patent Text Reader

Abstract

The utility model discloses a vertical hoist internal turnover type operating platform relates to operating platform technical field, including skeleton, skeleton one side fixed mounting has connecting plate, is equipped with the connecting hole on the connecting plate, skeleton top four corner position fixed mounting has the lug, skeleton one side is equipped with lifting platform subassembly, lifting platform subassembly includes the positioning frame fixed mounting on skeleton, is equipped with the sliding sleeve on the positioning frame fixed mounting, the telescopic column slidingly installed in the sliding sleeve, is equipped with the first platform on the telescopic column upper end fixed mounting, skeleton opposite side is equipped with the turnover platform subassembly, is equipped with the threaded rod on the positioning frame screw thread installation, is equipped with the linkage board on the threaded rod rotation installation, this vertical hoist internal turnover type operating platform, through the cooperation of lifting platform subassembly and turnover platform subassembly, the worker can install the platform layer by layer, has reduced the worker's installation difficulty, has improved the security of operation significantly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of operating platform technology, specifically a rotating operating platform within a vertical shaft. Background Technology

[0002] During the construction of vertical shafts, multiple operating platforms need to be scientifically and rationally installed on the shaft walls. These platforms not only provide construction workers with stable standing positions but also greatly facilitate their vertical movement and operations within the shaft. This arrangement allows construction workers to carry out various construction tasks within the shaft more conveniently.

[0003] In the prior art, the authorized announcement number CN222667475U discloses an improved elevator shaft operating platform, including a platform, with connecting rods welded to both sides of the lower surface of the platform, and an A-threaded hole opened at one end of one side of the connecting rod. An A-bolt for fixing a support rod is passed through the internal thread of the A-threaded hole, and a rotating support assembly is fixedly installed at the bottom end of the support rod.

[0004] During platform installation, workers need to work suspended inside the shaft. This step requires them to use specialized tools, such as expansion bolts, to securely fix the platform's frame structure to the shaft walls. Due to the confined space and complex environment inside the shaft, workers face relatively high construction risks during this process, needing to be constantly aware of their own safety and deal with various emergencies. Furthermore, the limited operating space within the shaft makes fixed operations inconvenient for workers. Therefore, a revolving operating platform for vertical shafts is proposed. Utility Model Content

[0005] The purpose of this invention is to provide a rotating operating platform within a vertical shaft to solve the problems in the prior art.

[0006] To achieve the above objectives, this utility model provides the following technical solution: a rotating operating platform within a vertical shaft, comprising a frame, a connecting plate fixedly installed on one side of the frame, a connecting hole provided on the connecting plate, lifting lugs fixedly installed at the four corners of the top of the frame, a lifting platform assembly installed on one side of the frame, the lifting platform assembly comprising a positioning frame fixedly installed on the frame, a sliding sleeve fixedly installed on the positioning frame, a telescopic column slidably installed inside the sliding sleeve, a first platform fixedly installed at the upper end of the telescopic column, and a tilting platform assembly installed on the other side of the frame.

[0007] Preferably, a threaded rod is threadedly installed on the positioning frame, a linkage plate is rotatably installed on the threaded rod, and locking pins are fixedly installed at both ends of the linkage plate, with the locking pins slidably installed on one side of the sliding sleeve.

[0008] Preferably, the telescopic column has a limiting hole, and the locking pin is embedded in the telescopic column through the limiting hole.

[0009] Preferably, the sliding sleeve is fixedly installed on the frame via a positioning bracket, the telescopic column is movably installed inside the frame via the sliding sleeve, the first platform is movably installed above the frame via the telescopic column, the telescopic column is restricted inside the sliding sleeve by a locking pin, and the linkage plate is movably installed on one side of the positioning bracket via a threaded rod.

[0010] Preferably, the flipping platform assembly includes a positioning seat fixedly mounted on the frame, a positioning shaft mounted on the positioning seat, a rotating support foot rotatably mounted on the positioning shaft, a second platform fixedly mounted on the rotating support foot, a movable slide groove provided on the second platform, a spring provided in the movable slide groove, a paddle slidably mounted in the movable slide groove, and a locking tongue fixedly mounted on the paddle.

[0011] Preferably, a lock hole is provided on one side of the first platform, and the lock tongue is embedded in the first platform through the lock hole.

[0012] Preferably, the rotating support leg is provided with a rotating groove, and the rotating support leg is rotatably mounted on the rotating support leg through the rotating groove.

[0013] Preferably, the second platform is rotatably mounted on the positioning shaft via a rotating support leg, the locking tongue is movably mounted in the movable slide groove via a paddle, one end of the spring is connected to the bottom of the movable slide groove, and the other end of the spring is connected to the paddle.

[0014] Compared with the prior art, the beneficial effects of this utility model are: 1. After the lower platform in this application is installed, the first platform can be lifted upwards. Once lifted, the threaded rod can be rotated inwards. As the threaded rod rotates inwards, the linkage plate moves towards the positioning frame, causing the locking pins at both ends of the linkage plate to engage inside the telescopic column, thereby locking the telescopic column in the sliding sleeve and fixing the lifted first platform. After the first platform is fixed, the user can stand on it to install the upper platform frame, which helps reduce the installation difficulty for workers. 2. After the upper platform is constructed in this application, the lever can be moved inwards along the movable slide to disengage the locking tongue from the locking hole. Once the locking tongue is disengaged, the second platform is released from its locked state, allowing it to be flipped open. After the second platform is flipped open, workers can use the space created to climb to the upper platform, enabling the platform to be installed layer by layer upwards. Throughout the installation process, workers do not need to be suspended inside the shaft, significantly improving operational safety. Attached Figure Description Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a partial structural schematic diagram of the present invention; Figure 3 This is a schematic diagram of the lifting platform component of this utility model; Figure 4 This is a schematic diagram of the flipping platform component of this utility model; Figure 5 This utility model Figure 4 Enlarged view of point A in the middle.

[0015] The diagram shows the following markings: 1. Frame; 2. Connecting plate; 3. Connecting hole; 4. Lifting lug; 5. Lifting platform assembly; 501. First platform; 502. Telescopic column; 503. Positioning frame; 504. Sliding sleeve; 505. Locking pin; 506. Threaded rod; 507. Linkage plate; 6. Tilting platform assembly; 601. Second platform; 602. Positioning seat; 603. Positioning shaft; 604. Rotating support leg; 605. Locking tongue; 606. Paddle; 607. Movable slide; 608. Spring. Detailed Implementation

[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0017] Example 1: As Figure 1 and Figure 2 As shown, this utility model provides a technical solution for a rotating operating platform in a vertical shaft, including a frame 1, a connecting plate 2 fixedly installed on one side of the frame 1, a connecting hole 3 opened on the connecting plate 2, lifting lugs 4 fixedly installed at the four corners of the top of the frame 1, a lifting platform assembly 5 installed on one side of the frame 1, and a tilting platform assembly 6 installed on the other side of the frame 1.

[0018] Specifically, the rope can be connected to the lifting lug 4, allowing the entire platform to be released into the vertical shaft. After the platform is released into the vertical shaft, the frame 1 can be fixed to the shaft wall using expansion bolts, thus installing the platform inside the shaft. Through the combined use of the lifting platform assembly 5 and the tilting platform assembly 6, workers can install the platform layer by layer, reducing the installation difficulty for workers and significantly improving the safety of the operation.

[0019] Example 2: Figure 2 and Figure 3As shown, the lifting platform assembly 5 includes a positioning frame 503 fixedly installed on the frame 1. A sliding sleeve 504 is fixedly installed on the positioning frame 503. A telescopic column 502 is slidably installed inside the sliding sleeve 504. A first platform 501 is fixedly installed on the upper end of the telescopic column 502. A threaded rod 506 is threadedly installed on the positioning frame 503. A linkage plate 507 is rotatably installed on the threaded rod 506. Locking pins 505 are fixedly installed at both ends of the linkage plate 507. The locking pins 505 are slidably installed on one side of the sliding sleeve 504. A limit hole is opened on the telescopic column 502. The locking pins 505 are embedded in the telescopic column 502 through the limit hole.

[0020] Specifically, after the lower platform is successfully installed, the operator can lift the first platform 501 upwards. The specific operating steps are as follows: First, lift the first platform 501 upwards to the predetermined height, ensuring it reaches the predetermined position. Then, the operator needs to rotate the threaded rod 506 inwards, causing the linkage plate 507 to move towards the positioning frame 503 under the action of force. During this process, the locking pins 505 at both ends of the linkage plate 507 will precisely embed into the internal structure of the telescopic column 502, thereby effectively locking the telescopic column 502 and firmly fixing it within the sliding sleeve 504. Through this series of precise operations, it can be ensured that the lifted first platform 501 is firmly fixed and will not shift.

[0021] After the first platform 501 is securely fixed, the user can safely stand on it to install the upper platform frame 1. This design greatly reduces the installation difficulty for workers operating at heights, improves construction efficiency and safety, and provides convenience and assurance for the entire installation process. Example 3: Figure 2 , Figure 4 and Figure 5 As shown, the flipping platform assembly 6 includes a positioning seat 602 fixedly mounted on the frame 1, a positioning shaft 603 mounted on the positioning seat 602, a rotating support 604 rotatably mounted on the positioning shaft 603, a second platform 601 fixedly mounted on the rotating support 604, a movable slide groove 607 provided on the second platform 601, a spring 608 provided in the movable slide groove 607, a paddle 606 slidably mounted in the movable slide groove 607, a locking tongue 605 fixedly mounted on the paddle 606, a locking hole provided on one side of the first platform 501, and the locking tongue 605 is embedded in the first platform 501 through the locking hole.

[0022] Specifically, after the upper platform is built, the lever 606 can be moved inwards along the movable slide 607 to disengage the bolt 605 from the lock hole. Once the bolt 605 is disengaged from the lock hole, the locking state of the second platform 601 can be released, allowing the second platform 601 to be flipped open.

[0023] After the second platform 601 is flipped open, workers can use the space it creates to climb onto the upper platform for installing the platforms layer by layer. The entire installation process does not require workers to be suspended inside the shaft, significantly improving operational safety. Working principle: The rope can be connected to the lifting lug 4, thereby using the rope to release the entire platform into the vertical shaft. After the platform is released into the vertical shaft, the frame 1 can be fixed to the shaft wall using expansion bolts, thus installing the platform in the shaft. After the lower platform is installed, the first platform 501 can be lifted upwards. After the first platform 501 is lifted, the threaded rod 506 can be rotated inwards. After rotating the threaded rod 506 inwards, the linkage plate 507 will move towards the positioning frame 503, causing the locking pins 505 at both ends of the linkage plate 507 to embed into the telescopic column 502, locking the telescopic column 502 into the sliding sleeve 504, thereby fixing the lifted first platform 501 in place. After the lifted first platform 501 is fixed in place, the user can stand on the first platform 501 to install the upper platform frame 1, reducing the installation difficulty for workers. Furthermore, after the upper platform is completed, the lever 606 can be moved inward to the movable slide 607 to disengage the locking tongue 605 from the locking hole. After the locking tongue 605 disengages from the locking hole, the locking state of the second platform 601 can be released, thereby flipping the second platform 601 open. After the second platform 601 is flipped open, the worker can use the space it opens to climb onto the upper platform in order to install the platform layer by layer. During the entire installation process, there is no need for workers to be suspended in the shaft, which significantly improves the safety of the operation.

[0024] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

Claims

1. A rotating operating platform in a vertical shaft, comprising a frame (1), a connecting plate (2) fixedly installed on one side of the frame (1), a connecting hole (3) provided on the connecting plate (2), and lifting lugs (4) fixedly installed at the four corners of the top of the frame (1), characterized in that: A lifting platform assembly (5) is installed on one side of the frame (1). The lifting platform assembly (5) includes a positioning frame (503) fixedly installed on the frame (1). A sliding sleeve (504) is fixedly installed on the positioning frame (503). A telescopic column (502) is slidably installed inside the sliding sleeve (504). A first platform (501) is fixedly installed at the upper end of the telescopic column (502). A tilting platform assembly (6) is installed on the other side of the frame (1).

2. The vertical shaft internal rotary operating platform according to claim 1, characterized in that: A threaded rod (506) is threadedly installed on the positioning frame (503), and a linkage plate (507) is rotatably installed on the threaded rod (506). Locking pins (505) are fixedly installed at both ends of the linkage plate (507), and the locking pins (505) are slidably installed on one side of the sliding sleeve (504).

3. The vertical shaft internal rotary operating platform according to claim 2, characterized in that: The telescopic column (502) has a limiting hole, and the locking pin (505) is embedded in the telescopic column (502) through the limiting hole.

4. A rotating operating platform within a vertical shaft according to claim 3, characterized in that: The sliding sleeve (504) is fixedly installed on the frame (1) by the positioning frame (503). The telescopic column (502) is movably installed on the inner side of the frame (1) by the sliding sleeve (504). The first platform (501) is movably installed on the top of the frame (1) by the telescopic column (502). The telescopic column (502) is restricted in the sliding sleeve (504) by the locking pin (505). The linkage plate (507) is movably installed on one side of the positioning frame (503) by the threaded rod (506).

5. A rotating operating platform within a vertical shaft according to claim 4, characterized in that: The flipping platform assembly (6) includes a positioning seat (602) fixedly installed on the frame (1), a positioning shaft (603) is installed on the positioning seat (602), a rotating support (604) is rotatably installed on the positioning shaft (603), a second platform (601) is fixedly installed on the rotating support (604), a movable slide groove (607) is provided on the second platform (601), a spring (608) is provided in the movable slide groove (607), a paddle (606) is slidably installed in the movable slide groove (607), and a locking tongue (605) is fixedly installed on the paddle (606).

6. A rotating operating platform within a vertical shaft according to claim 5, characterized in that: A lock hole is provided on one side of the first platform (501), and the lock tongue (605) is embedded in the first platform (501) through the lock hole.

7. A rotating operating platform within a vertical shaft according to claim 6, characterized in that: The rotating support (604) is provided with a rotating groove, and the rotating support (604) is rotatably mounted on the rotating support (604) through the rotating groove.

8. A rotating operating platform within a vertical shaft according to claim 7, characterized in that: The second platform (601) is rotatably mounted on the positioning shaft (603) via a rotating support (604). The locking tongue (605) is movably mounted in the movable slide (607) via a paddle (606). One end of the spring (608) is connected to the bottom of the movable slide (607), and the other end of the spring (608) is connected to the paddle (606).

Citation Information

Patent Citations

  • Improved elevator shaft operation platform

    CN222667475U