Composite structural connection device for construction methods

By combining the arc-shaped main keel and the film-covered board, the problem of insufficient precision of traditional formwork connection devices in irregular structures is solved, achieving high-precision formwork connection and stable support. It is suitable for buildings such as canopies, improving construction quality and efficiency.

CN224997987UActive Publication Date: 2026-11-20CHINA RAILWAY SIXTH GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522564020.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-02
Publication Date
2026-11-20
Estimated Expiration
2035-12-02

AI Technical Summary

Technical Problem

Traditional formwork connection devices are difficult to meet the high precision requirements of irregular structures, and are prone to problems such as misalignment of joints and grout leakage during use, which affect the appearance quality of buildings and construction efficiency.

Method used

The structure combines an arc-shaped main keel and an arc-shaped film-faced board, along with components such as horizontal timber, reinforcing blocks, and reinforcing pipes, to form a stable connection device. This ensures the curved geometry and support stability of the formwork. The pre-bent film-faced board reduces water absorption by the concrete, improving the accuracy and reusability after demolding.

Benefits of technology

It achieves high-precision template connection, reduces misalignment and grout leakage at joints, improves the building's appearance quality and construction efficiency, and is suitable for buildings with curved beams and irregular beams, especially structures such as canopies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224997987U_ABST
    Figure CN224997987U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of composite structure connecting devices for building method, its technical solution main point is, belong to building construction equipment field, including arc main keel, the arc main keel is equidistant distribution, the outer end of the arc main keel is fixedly connected with horizontal wood square, the horizontal wood square is equidistant distribution, one side of the outer end of the horizontal wood square is provided with arc film board one;By setting arc film board one is large-area arc for film glued board, directly form the surface curvature and smooth surface of canopy beam concrete, and reusable after form removal, high forming precision, cooperate the bottom multiple horizontal wood square and arc main keel, can support and guarantee the curve geometric shape of form, bear vertical and lateral load, force is transmitted to scaffold system, scaffold system can quickly adjust elevation and angle, ensure that film board cannot appear concave-convex deformation, the connecting device structure use cooperation is more convenient, it is more practical to apply to canopy building.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction equipment, and in particular to a composite structure connection device for construction methods. Background Technology

[0002] With the development of modern architectural aesthetics and construction technology, higher requirements have been placed on the appearance quality and structural design of buildings such as platform canopies, connecting corridor canopies, and station buildings. In particular, when fair-faced concrete or imitation fair-faced concrete finishes are used, strict requirements have been placed on the accuracy of formwork, line control, joint tightness, and surface flatness.

[0003] Traditional formwork connection devices are difficult to meet the requirements of high precision, reusability and good appearance of irregular structures. Traditional formwork positioning accuracy is insufficient, and joints are prone to misalignment and grout leakage, resulting in low practicality of the connection devices in building construction. Therefore, we propose a composite structure connection device for building construction methods. Utility Model Content

[0004] In order to overcome the shortcomings of the existing technology, the purpose of this utility model is to provide a composite structure connection device for construction methods.

[0005] The above-mentioned technical objective of this utility model is achieved through the following technical solution:

[0006] A composite structural connection device for construction methods includes an arc-shaped main keel, which is equidistantly distributed. A horizontal timber is fixedly connected to the outer end of the arc-shaped main keel, and the horizontal timber is also equidistantly distributed. An arc-shaped film-faced plate is provided on one side of the outer end of each horizontal timber. The arc-shaped film-faced plate is pre-bent into a designed structure. A template joint reinforcement strip is provided at the front end of the arc-shaped film-faced plate. A reinforcement block is snapped onto the outer end of the template joint reinforcement strip, and the reinforcement blocks are equidistantly distributed. An arc-shaped film-faced plate is also connected to the other side of the top of each horizontal timber.

[0007] By installing the arc-shaped main keel and the arc-shaped cladding panel, the connection device structure can be made more convenient to use and more practical in canopy construction.

[0008] Furthermore, each of the reinforcing blocks is fixedly connected to a reinforcing tube at its rear end, and the outer end of the reinforcing tube is fixedly connected to a reinforcing member.

[0009] The installation of reinforcing blocks and reinforcing pipes improved the effectiveness of the device structure.

[0010] Furthermore, an assembly tube is fixedly connected to the rear end of the reinforcement component, and a reinforcing ring is sleeved on the outer end of the assembly tube.

[0011] The stability of the structural support connection of the device was improved by installing assembly pipes.

[0012] Furthermore, the bottom end of the arc-shaped main keel is fixedly connected to multiple sets of supporting steel pipes, and the bottom end of the supporting steel pipes is fixedly connected to a bearing ring.

[0013] By installing multiple sets of supporting steel pipes, the structural stability of the device was improved.

[0014] Furthermore, a reinforcing rod is bolted to the bottom end of the receiving ring, and a connecting pipe is installed at the outer end of the supporting steel pipe.

[0015] The installation of reinforcing bars further improved the effectiveness of the main steel pipe scaffolding support system.

[0016] Furthermore, a connecting ring is connected to the front end of the supporting steel pipe, and a base is fixedly connected to the bottom end of the reinforcing rod.

[0017] By installing connecting rings, the supporting steel pipe can be made more stable during use.

[0018] In summary, this utility model has the following beneficial effects:

[0019] 1. By setting up an arc-shaped main keel and an arc-shaped film-faced board, the arc-shaped film-faced board is a large-area arc-shaped film-faced plywood that has been pre-bent into the designed curve before assembly, directly forming the surface curvature and smooth surface of the canopy beam concrete. It can withstand lateral pressure, weight and impact during vibration. The film layer can reduce water absorption of concrete, making the surface smoother. It can also be reused after demolding, with high forming accuracy, and is particularly suitable for curved beams and irregular beams. Combined with multiple horizontal timbers at the bottom and the arc-shaped main keel, the arc-shaped main keel is a silver U-shaped metal arc beam, regularly arranged and connected with multiple horizontal timbers to support and ensure the curved geometry of the formwork, bear vertical and lateral loads, and transfer the force to the scaffolding system. The multiple horizontal timbers are used to fix the film-faced board formwork, bear vertical loads, and distribute the pressure of the formwork. The wood is easy to process and the elevation and angle can be quickly adjusted to ensure that the film-faced board will not deform. This connection device structure is more convenient to use and more practical in canopy construction. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the overall structure in this embodiment;

[0021] Figure 2 This is a three-dimensional structural schematic diagram of the arc-shaped film-coated plate in this embodiment;

[0022] Figure 3 This is a three-dimensional structural diagram of the supporting steel pipe in this embodiment;

[0023] Figure 4 This is a schematic diagram of the three-dimensional structure of the horizontal wooden beams in this embodiment.

[0024] In the diagram, 1. Curved main keel; 2. Horizontal timber; 3. Supporting steel pipe one; 4. Resisting ring; 5. Reinforcing rod; 6. Connecting pipe; 7. Connecting ring; 8. Base; 9. Curved film-faced board one; 10. Curved film-faced board two; 11. Template joint reinforcement strip; 12. Reinforcing block; 13. Reinforcing pipe; 14. Reinforcing component; 15. Assembly pipe; 16. Reinforcing ring. Detailed Implementation

[0025] The present invention will be further described in detail below with reference to the accompanying drawings.

[0026] Identical parts are indicated by the same reference numerals. It should be noted that the terms "front," "rear," "left," "right," "up," and "down" used in the following description refer to directions in the accompanying drawings, while the terms "bottom surface," "top surface," "inner," and "outer" refer to directions toward or away from the geometric center of a specific part, respectively.

[0027] Reference Figure 1-4 As shown, this is a composite structure connection device for construction methods in a preferred embodiment of the present invention. It includes an arc-shaped main keel 1, which is equidistantly distributed. A transverse timber 2 is fixedly connected to the outer end of the arc-shaped main keel 1, also equidistantly distributed. An arc-shaped film-coated board 9 is provided on one side of the outer end of the transverse timber 2. The arc-shaped film-coated board 9 is pre-bent into the designed structure. A template joint reinforcement strip 11 is provided at the front end of the arc-shaped film-coated board 9. A reinforcement block 12 is snapped onto the outer end of the template joint reinforcement strip 11, and the reinforcement blocks 12 are equidistantly distributed. An arc-shaped film-coated board 10 is also connected to the other side of the top of the transverse timber 2. By installing the arc-shaped main keel 1 and the arc-shaped film-coated board 9, the arc-shaped film-coated board 9, being a large-area arc-shaped film-coated plywood, is directly formed into a rain-shaped structure. The surface curvature and smoothness of the concrete beams allow them to withstand lateral pressure, weight, and the impact of vibration. The film coating reduces water absorption, making the surface smoother, and allows for reuse after demolding. It boasts high forming precision and is particularly suitable for curved and irregularly shaped beams. Combined with multiple horizontal timbers 2 and an arc-shaped main keel 1 at the bottom (the arc-shaped main keel 1 is a silver U-shaped metal arc beam, regularly arranged and connected to the multiple horizontal timbers 2), it supports and ensures the curved geometry of the formwork, bearing vertical and lateral loads and transferring force to the scaffolding system. The multiple horizontal timbers 2 are used to fix the film-coated formwork, bearing vertical loads and distributing pressure on the formwork. The wood is easy to process, allowing for quick adjustment of elevation and angle, ensuring the film-coated formwork does not deform. This connecting device structure is more convenient to use and more practical in canopy construction.

[0028] Reference Figure 1-3As shown, each of the reinforcing blocks 12 is fixedly connected to a reinforcing pipe 13 at its rear end, and a reinforcing member 14 is fixedly connected to the outer end of the reinforcing pipe 13. By installing the reinforcing blocks 12 and the reinforcing pipe 13, multiple reinforcing blocks 12 and reinforcing pipe 13 can form a reinforcing connection structure on the outside of the arc-shaped film-faced plate 9. When the arc-shaped film-faced plate 9 is under stress, especially during concrete vibration and pouring, the front end is prone to warping or sagging. Multiple reinforcing blocks 12 and reinforcing pipe 13 can "lock" the spatial position of the front end of the template, ensuring that the front lip line of the arc-shaped film-faced plate 9 is accurate and smooth, greatly reducing misalignment, cracks, and surface defects, and improving the performance of the device structure.

[0029] Reference Figure 2-3 As shown, the rear end of the reinforcement component 14 is fixedly connected to the assembly pipe 15, and the outer end of the assembly pipe 15 is fitted with a reinforcing ring 16. By installing the assembly pipe 15, the assembly pipe 15 can form a reinforced connection structure at the outer ends of the reinforcement component 14, the reinforcing block 12, and the reinforcing pipe 13. In conjunction with the reinforcing ring 16, the assembly pipe 15 is connected to the main steel pipe scaffolding support system, which improves the stability of the structural support connection of the device.

[0030] Reference Figure 1-3 As shown, multiple sets of supporting steel pipes 3 are fixedly connected to the bottom end of the arc-shaped main keel 1. A bearing ring 4 is fixedly connected to the bottom end of the supporting steel pipe 3. By installing multiple sets of supporting steel pipes 3, multiple sets of supporting steel pipes 3 are set at equal intervals at the bottom of the arc-shaped main keel 1. The supporting steel pipes 3 can bear the weight of all the templates, keels and concrete. They are strong, have a large load-bearing capacity, are flexible in adjustment, are suitable for irregular structures, can be reused, are economical, and improve the structural stability of the device.

[0031] Reference Figure 2-3 As shown, the bottom end of the receiving ring 4 is connected to a reinforcing rod 5 by bolts, and the outer end of the supporting steel pipe 3 is equipped with a connecting pipe 6. By installing the reinforcing rod 5, a supporting and reinforcing structure can be formed at the bottom of the receiving ring 4 and the connecting assembly. The reinforcing rod 5 is sleeved on the outside of the receiving ring 4 and connected by bolts. It can be disassembled and adjusted as needed. The height and level of the template can be precisely adjusted with the top support, which further improves the use effect of the main steel pipe scaffolding support system.

[0032] Reference Figure 2-3 As shown, the front end of the supporting steel pipe 3 is also connected to a connecting ring 7, and the bottom end of the reinforcing rod 5 is fixedly connected to a base 8. By installing the connecting ring 7, which is installed on one side of the supporting steel pipe 3, and in conjunction with the connecting pipe 6 connected to the other side of the supporting steel pipe 3, multiple connected supporting steel pipes 3 can have a reinforced support structure, making the supporting steel pipe 3 more stable in use.

[0033] Specific implementation process: When using this connecting device, first determine the position of the template and the frame reference. The construction personnel first mark the projection line of the canopy beam on the ground. According to the curve of the beam, arrange the positions of multiple sets of supporting steel pipes 3. Place the adjustable reinforcing rods 5 and the base 8 in the marked positions as the foundation of the entire support system. After determining the height and position, connect the reinforcing rods 5 and the bearing rings 4 to complete the initial vertical positioning of the main steel pipe scaffolding support system.

[0034] After the main steel pipe scaffolding support system is erected, the lateral resistance is improved. The entire steel pipe support becomes a "load-bearing platform" for the keel and formwork. Then, the arc-shaped main keel 1 is placed on the top support one by one, and the arc-shaped main keel 1 is fixed to the top support by bolts or clips.

[0035] Next, horizontal timber slabs 2 are laid at certain intervals on the curved main keel 1 to form a continuous and dense support surface to support the curved film-coated board 9. The film-coated components are cut into panels with corresponding curvatures, and the curved film-coated board 9 is attached to the surface of the horizontal timber slabs 2 and the curved main keel 1. Then, template joint reinforcement strips 11 made of tape or rubber strips to prevent grout leakage are added at the template joints. Multiple reinforcement blocks 12 and reinforcement pipes 13 can form a reinforcement connection structure on the outside of the curved film-coated board 9. When the curved film-coated board 9 is under stress, especially when concrete is vibrated and poured, the front end is prone to warping or sagging. Multiple reinforcement blocks 12 and reinforcement pipes 13 can "lock" the spatial position of the front end of the template, so that the curved film-coated board 9 can ensure the accurate and smooth front lip line of the curved beam, greatly reducing misalignment, cracks and surface defects. Then, the concrete is poured in layers.

[0036] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A composite structure connection device for construction methods, characterized in that: The system includes an arc-shaped main keel (1), which is equidistantly distributed. The outer end of the arc-shaped main keel (1) is fixedly connected to a horizontal timber (2), which is equidistantly distributed. An arc-shaped film-coated board (9) is provided on one side of the outer end of the horizontal timber (2). The arc-shaped film-coated board (9) is pre-bent into the designed structure. A template joint reinforcement strip (11) is provided at the front end of the arc-shaped film-coated board (9). A reinforcement block (12) is snapped to the outer end of the template joint reinforcement strip (11). The reinforcement blocks (12) are equidistantly distributed. An arc-shaped film-coated board (10) is also connected to the other side of the top of the horizontal timber (2).

2. The composite structure connection device for construction methods according to claim 1, characterized in that: Each of the reinforcing blocks (12) is fixedly connected to a reinforcing pipe (13) at its rear end, and a reinforcing member (14) is fixedly connected to the outer end of the reinforcing pipe (13).

3. The composite structure connection device for construction methods according to claim 2, characterized in that: The rear end of the reinforcement member (14) is fixedly connected to an assembly tube (15), and a reinforcing ring (16) is sleeved on the outer end of the assembly tube (15).

4. The composite structure connection device for construction methods according to claim 1, characterized in that: The bottom end of the arc-shaped main keel (1) is fixedly connected to multiple sets of supporting steel pipes (3), and the bottom end of the supporting steel pipes (3) is fixedly connected to a receiving ring (4).

5. A composite structure connection device for construction methods according to claim 4, characterized in that: The bottom end of the receiving ring (4) is connected to a reinforcing rod (5) by bolts, and the outer end of the supporting steel pipe (3) is equipped with a connecting pipe (6).

6. A composite structure connection device for construction methods according to claim 5, characterized in that: The front end of the supporting steel pipe (3) is also connected to a connecting ring (7), and the bottom end of the reinforcing rod (5) is fixedly connected to a base (8).