By using an integrated hollow mold shell structure and lightweight, high-strength materials, the assembly gap and transportation problems of prefabricated toilets have been solved, improving structural stability and construction efficiency, and providing advantages such as rapid installation and pipeline integration.
Patent Information
- Application Number
- CN202522748029.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Existing prefabricated and modular bathrooms suffer from problems such as assembly gaps, a feeling of instability, difficulties in transportation and hoisting, complex mold design, and low production efficiency.
It adopts an integrated hollow mold shell structure, combined with connectors and prefabricated installation nodes to realize integrated pre-embedding of pipelines. It uses lightweight and high-strength materials such as fiber-reinforced cement-based and ultra-high performance concrete, and is equipped with a reinforcing mesh structure to form a composite stress system.
It eliminates assembly gaps and the feeling of stepping into empty space, reduces transportation and hoisting costs, improves construction efficiency and structural stability, and realizes integrated pre-embedding and rapid installation of pipelines.
Smart Images

Figure CN224998064U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building technology, and in particular to prefabricated modular integrated toilets. Background Technology
[0002] Current prefabricated integrated bathrooms can be divided into integrated bathrooms and modular bathrooms. Existing integrated bathrooms generally use detachable panels (such as PVC or composite boards) to assemble the walls, chassis, and ceiling, integrating bathroom facilities to form a complete bathroom solution. However, the walls mostly use a grid frame to support the detachable panels, resulting in assembly gaps between the panels and the frame. This causes a noticeable hollow feeling for users. Simultaneously, the chassis is a lightweight, spliced structure, prone to deformation under stress, creating a feeling of instability and severely impacting the user experience. This can even lead to users dismantling and reinstalling due to discomfort, resulting in resource waste. Traditional concrete modular bathrooms use a prefabricated cast-in-place concrete process, using molds to form integrated walls and chassis. However, cast-in-place concrete has a high structural density, with a single module weighing 3-5 times that of traditional lightweight materials. This significantly increases the difficulty of transportation and hoisting, requiring large tower cranes for lifting. Furthermore, the installation process demands extremely high precision, directly increasing tower crane and labor costs. Some existing technologies attempt to use thin-shell structures for modular prefabrication of bathrooms, but the molding of thin-shell structures requires customized irregular molds, which are difficult to design and process and have poor versatility, resulting in low production efficiency. At the same time, the thin-shell structure has a thin wall thickness, which makes it easy for surface defects to occur during the molding process, requiring additional process optimization costs and limiting the ability to mass-produce industrially. Utility Model Content
[0003] To overcome the problems existing in related technologies, this utility model provides a prefabricated modular integrated bathroom. Through integrated wall connection, cavity mold casting and pipeline integration design, it can improve structural stability and realize modular prefabrication installation, with the advantage of high hoisting efficiency.
[0004] This utility model provides a prefabricated modular integrated bathroom, including a sunken sump and walls surrounding the top of the sunken sump. The walls are integrally formed with different facing surfaces. The walls are hollow molded shells, and the two inner walls of the hollow molded shells are connected by connectors. The inner cavity of the hollow molded shells is used for concrete pouring. The outer side of the sunken sump is provided with installation nodes. The walls and the sunken sump are integrated with drainage pipes, water supply pipes and pipelines.
[0005] In some embodiments, the cavity mold includes any one of fiber-reinforced cement-based mold walls, ultra-high performance concrete mold walls, high performance concrete mold walls, and fine aggregate concrete mold walls.
[0006] In some embodiments, a reinforcing mesh structure is also provided in the inner cavity of the hollow mold shell.
[0007] In some embodiments, the reinforcing mesh structure includes any one of steel wire mesh, cold-drawn steel wire, steel bars, carbon fiber, and basalt fiber.
[0008] In some embodiments, the connector is a double-sided truss steel cage.
[0009] In some embodiments, the caisson includes a bottom plate and a plurality of caisson beams connected end to end, the caisson beams surrounding the bottom of the bottom plate, the installation node being a connecting steel bar, one end of the connecting steel bar being housed within the caisson beam, and the other end extending out of the caisson beam.
[0010] In some embodiments, the top of the cavity shell is an open structure.
[0011] In some embodiments, a pipe well is also provided inside the wall, and parts of the drainage pipe, water supply pipe and pipeline are housed in the pipe well.
[0012] In some embodiments, the outer and inner sides of the wall are provided with wire grooves for fixing the switch panel.
[0013] In some embodiments, the top surface of the caisson is sloped at an angle of 2%.
[0014] The technical solution provided by this utility model can include the following beneficial effects:
[0015] The prefabricated modular integrated bathroom provided by this utility model, through an integrated hollow mold shell structure combined with built-in connectors and prefabricated installation nodes, achieves integrated pre-embedding of pipelines while ensuring structural strength, which has the effects of improving construction efficiency, reducing transportation costs, and eliminating hollow noise. Attached Figure Description
[0016] The above and other objects, features and advantages of the present invention will become more apparent from the accompanying drawings, in which like reference numerals generally represent like parts.
[0017] Figure 1 This is a structural schematic diagram of a prefabricated modular integrated toilet shown in an embodiment of this utility model;
[0018] Figure 2 This is a schematic diagram of the structure of a prefabricated modular integrated bathroom after the walls have been removed, as shown in an embodiment of this utility model.
[0019] Figure 3This is another structural schematic diagram of the prefabricated modular integrated toilet shown in this embodiment of the utility model;
[0020] Figure 4 This is another structural schematic diagram of a prefabricated modular integrated toilet shown in an embodiment of the present utility model;
[0021] Figure 5 This is a schematic diagram illustrating the manufacturing process of a prefabricated modular integrated toilet according to an embodiment of this utility model.
[0022] Figure label:
[0023] 1. Caisson; 11. Caisson beam; 12. Base plate; 2. Wall; 3. Connector; 4. Reinforcing mesh structure; 5. Pipe shaft; 6. Cable tray; 71. Robotic arm; 72. Printing host; 8. Cast-in-place beam. Detailed Implementation
[0024] Preferred embodiments of the present invention will now be described in more detail with reference to the accompanying drawings. While preferred embodiments of the present invention are shown in the drawings, it should be understood that the present invention may be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the present invention will be thorough and complete, and will fully convey the scope of the present invention to those skilled in the art.
[0025] like Figures 1 to 5 As shown, this utility model proposes a prefabricated modular integrated bathroom, including a sunken box 1 and a wall 2 surrounding the top of the sunken box 1. The walls of the wall 2 are integrally formed with each other in different directions. The wall 2 is a hollow mold shell. The two inner walls of the hollow mold shell are connected by connectors 3. The inner cavity of the hollow mold shell is used for concrete pouring. The outer side of the sunken box 1 is provided with installation nodes, and drainage pipes, water supply pipes and pipelines are pre-set and integrated in the wall 2 and the top of the sunken box 1.
[0026] Specifically, the hollow mold shell is manufactured using an integrated molding process, with no seams between the walls, avoiding hollowing problems caused by assembly gaps. Pipelines are pre-embedded in the hollow mold shell during the factory stage, and after concrete pouring, it forms a bathroom structure integrating drainage, water supply, and HVAC systems. The top of the hollow mold shell is designed as an open structure to facilitate concrete pouring. One wall of wall 2 also has a door opening for installing a door, and the hollow mold shell with the door opening also has a cable tray 6 for installing switch panels. The other wall of wall 2 also has an opening for installing windows. In a specific embodiment, the caisson 1 is prefabricated using ordinary concrete to form the base slab and beams as a whole. The thickness of the base slab meets the design requirements, and the top surface has a pre-set 2% slope. This slope is based on the center point of the caisson 1 and slopes towards the drainage outlets on all sides, with the drainage outlets located at the lowest point of the caisson 1. The bottom of the caisson 1 is equipped with a double-layer, two-way steel mesh, and its surface is coated with polyurethane waterproof coating. Precast installation nodes are installed on the concrete beams surrounding the caisson 1. During installation, these nodes are filled with concrete to rigidly fix the caisson to the main structure. Wall 2 surrounds the top surface of the caisson 1. The height of wall 2 can be set to 2400-3500mm, and the thickness to be 100-400mm. Non-load-bearing walls 2 are 100-300mm thick, while load-bearing walls 2 are 160-400mm thick. The walls of wall 2, facing different directions, are integrally cast, with rounded transitions at the corners. The radius of these rounded transitions is 50mm to ensure structural integrity and waterproof sealing. Pipelines are pre-embedded simultaneously during the precasting of the caisson 1 and the hollow mold shell, forming an integrated drainage, water supply, and HVAC system structure after concrete pouring. The water supply pipes can be PPR pipes of DN15-DN45, and the drainage pipes can be UPVC pipes of DN50-DN300. The recessed box 1 is equipped with a sewage outlet, which connects to the sewage pipe. The water supply, drainage, and sewage pipes can be concealed within the pipe shaft 5 inside the wall 2 to avoid pipe exposure and maintain aesthetics. The conduits are divided into electrical conduits and HVAC conduits. The electrical conduits use Φ20-Φ25 PVC electrical pipes with copper core wires inside. The HVAC conduits use DN20-DN25 PE-RT pipes, laid horizontally along the inner side of the top of the casing.
[0027] Furthermore, the cavity mold shell includes any one of fiber-reinforced cement-based mold shell walls, ultra-high performance concrete mold shell walls, high performance concrete mold shell walls, and fine stone concrete mold shell walls, achieving the dual goals of ensuring structural strength and reducing material density through differentiated cavity mold shell characteristics.
[0028] Fiber-reinforced cementitious materials are lightweight, high-strength building materials composed of cellulose fibers and cementitious materials. The fibers are uniformly dispersed in the cement paste to form a reinforcing matrix, which can reduce the thickness of the formwork wall and avoid the excessive weight caused by excessive wall thickness in traditional cast-in-place concrete. Cavity formwork made of fiber-reinforced cementitious materials combines durability and aesthetic appeal, supports drilling and processing, is easy to install, and also has a cost advantage, making it particularly suitable for bathroom installations in non-permanent locations (such as temporary buildings and rental apartments).
[0029] Ultra-high performance concrete refers to high-density concrete formed by optimizing particle size distribution and incorporating steel fibers. It can use fine aggregates with a particle size of less than 1 mm and a silica fume composite system to achieve a compressive strength of over 120 MPa for the formwork shell. High-performance concrete refers to medium-to-high strength concrete incorporating mineral admixtures and high-efficiency water-reducing agents. Specifically, it can use fly ash to replace part of the cement and control the water-cement ratio below 0.4 to improve the durability of the formwork shell and reduce shrinkage.
[0030] Among them, fine stone concrete can be low-flow concrete prepared with aggregates with a particle size of 5-10 mm. Specifically, the surface smoothness of the inner cavity of the mold can be optimized by reducing the proportion of coarse aggregate and increasing the mortar content.
[0031] In this embodiment, the cavity shell is prefabricated using any one of the four materials mentioned above, which reduces material density while ensuring structural strength. In practical applications, fiber-reinforced cementitious concrete, ultra-high performance concrete (UHPC), high performance concrete (HPC), or fine aggregate concrete can be selected based on a combination of cost and performance considerations.
[0032] Furthermore, the reinforcing mesh structure 4 includes any one of the following: steel wire mesh, cold-drawn steel wire, reinforcing steel, carbon fiber, and basalt fiber. The inner cavity of the hollow mold shell is equipped with the reinforcing mesh structure 4 before concrete pouring, and one of the following materials—steel wire mesh, cold-drawn steel wire, reinforcing steel, carbon fiber, or basalt fiber—is selected as the reinforcing material according to actual needs. During the pouring process, concrete fills the inner cavity of the mold shell and combines with the reinforcing mesh structure 4 to form a composite load-bearing system. The reinforcing mesh ensures that the formed wall 2 has uniform load-bearing capacity and deformation resistance by dispersing stress, limiting crack propagation, and improving interfacial adhesion.
[0033] Furthermore, the connector 3 adopts a double-sided truss steel cage structure.
[0034] Specifically, the double-sided truss steel cage structure is a three-dimensional frame structure formed by welding two sets of symmetrically distributed truss units together with transverse connecting bars. Threaded steel bars can be cross-welded to form diamond-shaped grid units, and longitudinal connecting bars are used to fix the two sets of grid units at intervals to form a mezzanine space. This structure achieves bidirectional force balance through the double-sided symmetrical truss layout, enhancing the bending resistance of connector 3 during concrete pouring. When the double-sided truss steel cage is installed inside the hollow mold shell, its mezzanine space can be fully filled with concrete to form an overall load-bearing skeleton. The two sets of symmetrical truss units form a stable frame through transverse connecting bars, creating a composite structure with bidirectional shear resistance.
[0035] Furthermore, the caisson 1 includes a base plate 12 and several caisson beams 11 connected end to end. The caisson beams 11 surround the bottom of the base plate 12. The installation nodes are connecting steel bars, one end of which is housed within the caisson beam 11, and the other end extends out of the caisson beam 11. The base plate 12 and the caisson beams 11 enclose the caisson 1, with the sewage outlet located on the base plate 12. Simultaneously, drainage pipes and water supply pipes pass through the caisson 1 to connect to the pipework of the restrooms on other floors. The number of caisson beams 11 is matched to the number of surfaces of the wall 2. During casting, connecting steel bars are pre-reserved on the outer side of the caisson beams 11. After the restroom is hoisted to the installation position, it can be connected and fixed to the cast-in-place beams 8 of the main building structure. A keyway with a depth of not less than 20mm is pre-reserved on the caisson beams 11, and a rough surface with a depth of not less than 4mm is also provided. After the steel bars are connected, rigid fixation is achieved by pouring concrete of the same grade as the main structure.
[0036] Furthermore, the top of the hollow mold shell is an open structure. This open design keeps the top of the hollow mold shell open during prefabrication, allowing concrete to be poured directly from the top, avoiding the operational complexity of traditional closed mold shells that require multiple grouting holes. The reinforcing mesh structure 4 is pre-fixed within the mold shell cavity, forming a composite load-bearing system with the reinforcing mesh after concrete filling, thus improving the overall rigidity of the wall 2. The open structure allows construction personnel to visually observe the concrete filling status, ensuring the compactness of the pour.
[0037] When applying the technical solution of this utility model, the following method can be used to fabricate the cavity mold shell using ultra-high performance concrete and high performance concrete:
[0038] 1) Mix raw materials according to the proportion;
[0039] 2) The production of integrated wall panels 2 is automated by adopting a vertical automatic production equipment system. The production system mainly consists of a vertical twin-shaft mixer, cement silo, silica fume / steel fiber metering tank, high-efficiency water-reducing agent injection device, 3D printing host 72 equipped with gantry robotic arm 71, control system and auxiliary system.
[0040] 3) Design the cavity shell model of the bathroom using professional software, export the relevant format control files, and set the printing parameters using slicing software.
[0041] 4) Start the vertical mixer, add cement, silica fume, and steel fiber in sequence, dry mix for a period of time, then add water and water-reducing agent, and wet mix until fluidized. Then pump the mixed UHPC or HPC to the printing host 72 hopper through pipeline, while the hopper has a built-in agitator to prevent segregation.
[0042] 5) The level of the printing platform is detected by the laser sensor. First, the caisson 1 is placed on the printing platform. Then, the erected steel truss is placed on the surface of the caisson 1. The equipment is run and the robotic arm 71 drives the nozzle to move along the trajectory to extrude the material layer by layer.
[0043] 6) After the components are formed, they are transferred to the curing chamber for curing.
[0044] When using fiber-reinforced cementitious materials to fabricate hollow mold shells, the following method can be used as a reference:
[0045] 1) Mix raw materials according to the proportion;
[0046] 2) Add to a mixer and mix thoroughly to form a slurry of suitable concentration;
[0047] 3) Depending on the molding method, pressing can be performed using methods such as flow casting, sheet forming, pressure filtration, or extrusion.
[0048] 4) The molded blanks need to undergo pre-curing, high-pressure steam curing and drying treatment to form fiber-reinforced cement-based boards;
[0049] 5) The plates and steel reinforcement cage are connected and installed using special connectors to form a cavity structure;
[0050] 6) Inspect the dimensions, surface flatness, position of embedded parts, and integrity of the cavity of the mold shell, repair any local defects, and finally form a finished cavity mold shell that can be directly poured with concrete.
[0051] When using fine aggregate concrete to construct hollow mold shells, the following method can be used as a reference:
[0052] 1) Mix raw materials according to the proportion;
[0053] 2) A custom steel mold is used, with a pre-set positioning groove for the steel cage and a fixing pin for the reinforcing mesh inside the mold. At the same time, the double-sided truss steel cage and the reinforcing mesh are fixed to the set position inside the mold cavity by the positioning pin.
[0054] 3) Pour the concrete into a custom steel mold and use an immersion vibrator to compact it, ensuring a smooth inner surface;
[0055] 4) After demolding, cover with geotextile and spray with water for curing.
[0056] Compared with existing technologies, the prefabricated modular integrated bathroom provided by this utility model eliminates the assembly gaps of traditional detachable panel splicing by using a one-piece molding design for the wall 2 with different orientations. Simultaneously, it employs a hollow mold shell with an internal double-sided truss steel cage and reinforcing mesh structure 4, forming a composite force-bearing system with the inner cavity poured concrete, avoiding the feeling of hollowness and instability. By selecting lightweight, high-strength materials such as fiber-reinforced cement-based and ultra-high-performance concrete, and using a hollow mold shell, the self-weight of the bathroom can be significantly reduced, lowering transportation and hoisting costs. This prefabricated modular integrated bathroom has pre-embedded water supply and drainage pipes, requiring only quick on-site fixing through prefabricated installation nodes, eliminating the need for excavation or drilling, thus significantly reducing installation time. The open structure at the top of the mold shell facilitates concrete pouring and defect observation, comprehensively achieving multiple advantages such as improved structural stability, optimized construction efficiency, and controllable costs.
[0057] The various embodiments of the present invention have been described above. These descriptions are exemplary and not exhaustive, nor are they limited to the disclosed embodiments. Many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments. The terminology used herein is chosen to best explain the principles, practical application, or improvement of the technology in the market, or to enable others skilled in the art to understand the embodiments disclosed herein.
Claims
1. A prefabricated modular integrated toilet, characterized in that, It includes a caisson and walls surrounding the top of the caisson. The walls are integrally formed on different sides. The walls are hollow molded shells. The two inner walls of the hollow molded shells are connected by connectors. The inner cavity of the hollow molded shells is used for concrete pouring. The outer side of the caisson is provided with installation nodes. The walls and the caisson integrate drainage pipes, water supply pipes and pipelines.
2. The prefabricated modular integrated toilet according to claim 1, characterized in that, The hollow mold shell includes any one of fiber-reinforced cement-based mold shell walls, ultra-high performance concrete mold shell walls, high performance concrete mold shell walls, and fine stone concrete mold shell walls.
3. The prefabricated modular integrated toilet according to claim 1, characterized in that, The cavity of the hollow mold shell is also equipped with a reinforcing mesh structure.
4. The prefabricated modular integrated toilet according to claim 3, characterized in that, The reinforcing mesh structure includes any one of steel wire mesh, cold-drawn steel wire, steel bars, carbon fiber, and basalt fiber.
5. The prefabricated modular integrated toilet according to claim 1, characterized in that, The connector is a double-sided truss steel cage.
6. The prefabricated modular integrated toilet according to claim 1, characterized in that, The caisson includes a bottom plate and several caisson beams connected end to end. The caisson beams surround the bottom of the bottom plate. The installation node is a connecting steel bar, one end of which is housed in the caisson beam and the other end extends out of the caisson beam.
7. The prefabricated modular integrated toilet according to claim 1, characterized in that, The top of the cavity mold shell has an open structure.
8. The prefabricated modular integrated bathroom according to claim 1, characterized in that, The wall also contains a pipe well, in which the drainage pipe, water supply pipe and part of the pipeline are housed.