Rapid drilling construction device for ground source heat pump buried pipe

By designing a water tank heating assembly and a high-pressure water jet, the drilling challenges in the high-altitude permafrost environment were solved, enabling rapid, stable, and safe drilling operations and improving construction efficiency.

CN224998318UActive Publication Date: 2026-11-20JILIN BILIAN NEW ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521578596.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-07-28
Publication Date
2026-11-20
Estimated Expiration
2035-07-28

AI Technical Summary

Technical Problem

In the permafrost environment of the plateau, traditional drilling equipment is difficult to penetrate the permafrost layer effectively, resulting in low construction efficiency and easy damage to the permafrost structure, which increases the difficulty and risk of construction.

Method used

It adopts a water storage tank heating component and a high-pressure water spray head design. The water storage tank stores and heats the liquid, and the hot water is sprayed out to soften the frozen soil. It can be used in conjunction with the drill bit to achieve rapid drilling and cleaning.

Benefits of technology

It increased drilling speed, shortened construction cycle, ensured construction stability and safety, and improved construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224998318U_ABST
    Figure CN224998318U_ABST
Patent Text Reader

Abstract

This utility model discloses a rapid drilling construction device for ground source heat pump buried pipes, belonging to the field of buried pipe drilling construction technology. The lower end of the connecting pipe is connected to a water storage tank via a connecting pipe. The lower end of the water storage tank is connected to a connecting pipe, which in turn connects to a spiral pipe, thus achieving communication between the water storage tank and the spiral pipe. An inlet is provided on the upper edge of the water storage tank. The water storage tank stores and heats the liquid, ensuring a hot water supply during drilling. The heating components are adaptable to different construction environments, especially in high-altitude permafrost areas, where the heated hot water prevents the frozen soil from freezing, improving construction efficiency. High-pressure water jets clean the spiral pipe, removing soil impurities and softening the frozen soil with hot water, reducing drilling difficulty. Anti-clogging protrusions prevent water jet clogging, ensuring continuous and stable water spraying operations. The drill head and water jet are used alternately, forming an efficient drilling and cleaning process. Post-drilling water cleaning, combined with other operations, shortens the construction cycle and improves construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of underground pipe drilling construction technology, and in particular to a rapid drilling construction device for underground pipes of ground source heat pumps. Background Technology

[0002] A ground source heat pump buried pipe is a device that provides heating and cooling to buildings by exchanging heat with the earth's soil and rock layers. It is mainly composed of pipes made of specific materials, which are finely processed and buried in shallow soil and rock layers at a certain depth. It couples with the soil and rock layers to exchange heat, thereby extracting shallow geothermal energy as the low-grade heat source of the heat pump.

[0003] The construction of the buried pipe heat exchange system is a core component of soil-source heat pump projects, and also a challenging aspect. Its main steps include drilling, pipe installation, pressure testing, backfilling, and connecting outdoor pipe fittings. Among these, the drilling equipment is the key piece of equipment throughout the entire construction process.

[0004] Drilling equipment mainly consists of a drilling rig and its auxiliary equipment. The drilling rig, as the core equipment for drilling operations, drives the drill string and drill bit to drill deeper into the formation. The rig's hoist facilitates the raising and lowering of the drill string or casing, and the replacement of drill bits. The pump's main function is to deliver flushing fluid into the hole to clean the bottom, cool the drill bit, and lubricate the drill string.

[0005] When drilling for ground source heat pump buried pipes in high-altitude permafrost environments, the physical and chemical properties of the soil differ significantly from those of ordinary soil. Permafrost possesses high stability and strength, making drilling exceptionally difficult. Traditional drilling methods may not effectively penetrate the permafrost layer or require significantly more time and energy. Furthermore, the ice crystal structure in permafrost is easily disrupted during drilling, leading to decreased soil stability and further increasing the construction difficulty.

[0006] Due to the unique properties of permafrost in high-altitude areas, drilling equipment requires greater power and more precise operation when penetrating the permafrost layer. This can lead to a significant reduction in drilling speed and a longer construction period. Furthermore, to ensure drilling quality and construction safety, workers may need to frequently stop the machine for inspection and adjustments, which also negatively impacts construction efficiency. Utility Model Content

[0007] The main purpose of this utility model is to provide a rapid drilling construction device for ground source heat pump buried pipes, which can effectively solve the problems mentioned in the background art.

[0008] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A rapid drilling construction device for ground source heat pump buried pipes includes a support, a drive motor, a bearing assembly, a connecting pipe, a spiral pipe, and a drill bit. The drive motor and bearing assembly are mounted on the support, the connecting pipe is mounted on the output end of the drive motor, and the drill bit is mounted on the lower end of the spiral pipe. The lower end of the connecting pipe is connected to a water storage tank via a connecting pipe, and the lower end of the water storage tank is connected to a connecting pipe, which is connected to a spiral pipe, thereby enabling the water storage tank and the spiral pipe to communicate. The upper edge of the water storage tank is provided with a liquid inlet, and the upper side wall of the water storage tank is provided with a battery protective cover. The bottom of the battery protective cover is provided with a connection interface, which is connected to a heating component to heat the liquid in the water storage tank. The lower control valve of the water storage tank is connected to a drain pipe, and the side wall of the drain pipe is provided with multiple water spray heads. The water spray heads are directly facing the spiral blades on the spiral tube, and the outside of the water spray heads is covered with anti-clogging protrusions.

[0009] In a preferred embodiment of this utility model, the connecting pipe is connected to the connecting pipe, and the side wall of the connecting pipe is provided with a wiring hole, and the upper edge of the connecting pipe is provided with a wiring hole to facilitate wire routing. The battery protective cover is provided with a battery inside, and the notch wall of the battery protective cover is provided with a wiring hole. The battery wires are routed through multiple wiring holes. In a preferred embodiment of this utility model, the heating component is fixed to the battery protective cover by bolts, and a sealing ring is provided at the connection between the battery protective cover and the heating component. The battery protective cover is fixed to the water storage tank by bolts, and multiple sealing rings are provided at the connection between the battery protective cover and the water storage tank. In a preferred embodiment of this utility model, the liquid inlet and the water storage tank are designed as an integral unit, and a plug is connected to the upper end of the liquid inlet. The upper and lower ends of the water storage tank are provided with protruding pipes, and the protruding pipes of the water storage tank are fixed to the connecting pipe and the connecting pipe by bolts. In a preferred embodiment of this utility model, an electrically controlled valve is provided at the connection between the water storage tank and the drain pipe, and the water supply of the drain pipe is controlled by the electrically controlled valve. The spray head is a high-pressure spray head, and water is sprayed onto the surface of the spiral blades of the spiral tube by the high-pressure spray head. In a preferred embodiment of this utility model, the water nozzle sprays hot water into the buried pipe area, and the drill bit and the water nozzle spray water alternately.

[0010] Compared with the prior art, the present invention has the following beneficial effects: By storing and heating the liquid in a water tank, a continuous supply of hot water required during drilling is ensured. The heating element heats the liquid in the tank to adapt to different construction environments, especially in high-altitude permafrost areas, where the heated water effectively prevents the permafrost from freezing and improves construction efficiency.

[0011] The high-pressure water spray function of the nozzles not only cleans the spiral tubes, removing mud and impurities generated during drilling, but also further softens the frozen soil by spraying hot water, reducing drilling difficulty. Meanwhile, the anti-clogging protrusion design effectively prevents the nozzles from becoming clogged, ensuring the continuity and stability of the water spraying operation.

[0012] The alternating use of the drill bit and water jet head creates an efficient drilling and cleaning process. The drill bit drills the hole first, and then the water jet head sprays hot water to clean the drilled area. The two work together to shorten the construction cycle and improve construction efficiency.

[0013] The close connection and precise control of the water storage tank, spray nozzles, and heating components with the entire system ensures the stability and safety of the construction process. The precise control of drainage volume by the electrically controlled valves further improves the accuracy and efficiency of the construction. Attached Figure Description

[0014] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a side view of the overall structure of this utility model; Figure 3 This is an exploded view of the overall structure of this utility model; Figure 4 This is an exploded view of the water storage tank, drain pipe, and heating component of this utility model; Figure 5 for Figure 4 Enlarged view of point A in the middle; Figure 6 for Figure 4 Enlarged diagram of point B in the middle.

[0015] In the diagram: 1. Bracket; 2. Drive motor; 3. Bearing assembly; 4. Connecting pipe; 5. Water tank; 6. Liquid inlet; 7. Connecting pipe; 8. Battery protective cover; 9. Connecting interface; 10. Heating assembly; 11. Connecting pipe; 12. Drain pipe; 13. Water spray head; 14. Anti-clogging protrusion; 15. Spiral pipe; 16. Drill head. Detailed Implementation

[0016] To make the technical means, creative features, objectives and effects of this utility model easier to understand, the present utility model will be further described below in conjunction with specific embodiments.

[0017] like Figure 1 - Figure 6As shown, the rapid drilling device for ground source heat pump buried pipes mainly consists of a support 1, a drive motor 2, a bearing assembly 3, a connecting pipe 4, a spiral pipe 15, and a drill head 16. The drive motor 2 and bearing assembly 3 are precisely mounted on the support 1 to ensure stable operation of the device. The connecting pipe 4 is installed at the output end of the drive motor 2, while the drill head 16 is installed at the lower end of the spiral pipe 15 to facilitate drilling operations.

[0018] To connect the water storage tank 5 and the spiral pipe 15, the lower end of the connecting pipe 4 is connected to the water storage tank 5 via the connecting pipe 7. The lower end of the water storage tank 5 is connected to the connecting pipe 11, which in turn is connected to the spiral pipe 15, thereby ensuring the flow of liquid between the water storage tank 5 and the spiral pipe 15.

[0019] The upper edge of the water storage tank 5 is provided with a liquid inlet 6 for replenishing the liquid inside the tank. Simultaneously, a battery protective cover 8 is provided on the upper side wall of the water storage tank 5 to protect the internal battery from damage. A connection interface 9 is provided at the bottom inner side of the battery protective cover 8, and a heating component 10 is connected to the connection interface 9 to heat the liquid inside the water storage tank 5, adapting to different construction environments.

[0020] A drain pipe 12 is connected to the lower control valve of the water storage tank 5. The side wall of the drain pipe 12 is provided with multiple spray heads 13. These spray heads 13 are positioned directly in front of the spiral blades on the spiral tube 15 to clean and de-ice the spiral tube 15. Anti-clogging protrusions 14 are fitted around the spray heads 13 to prevent them from being blocked.

[0021] To facilitate wire routing, the connecting pipe 4 is connected to the coupling pipe 7. The side wall of the coupling pipe 7 has a wiring hole, and the upper edge of the connecting pipe 4 also has a wiring hole. In addition, the battery protective cover 8 houses the battery, and its notch wall also has wiring holes, allowing the battery wires to be routed through multiple wiring holes.

[0022] The heating element 10 is bolted to the battery protective cover 8 to ensure its stability and safety. A sealing ring is provided at the connection between the battery protective cover 8 and the heating element 10 to prevent liquid ingress. The battery protective cover 8 is bolted to the water tank 5, and multiple sealing rings are provided at the connection to ensure the water tank 5 is airtight.

[0023] The liquid inlet 6 and the water storage tank 5 are integrated into one unit. A plug is connected to the upper end of the liquid inlet 6 to prevent liquid from overflowing. The upper and lower ends of the water storage tank 5 are provided with protruding pipes, which are fixed to the connecting pipe 7 and the connecting pipe 11 with bolts to ensure a firm connection.

[0024] An electrically controlled valve is installed at the connection between the water storage tank 5 and the drain pipe 12. The valve controls the water supply through the drain pipe 12 to achieve precise control of the drainage volume. The spray head 13 is a high-pressure spray head, which sprays water onto the surface of the spiral blades of the spiral tube 15 to improve cleaning efficiency.

[0025] The hot water sprayed from the water nozzle 13 flows into the buried pipe area, and the water spraying operation of the drill bit and the water nozzle 13 is used alternately. In drilling construction in plateau permafrost, the drill bit 16 drills the hole first, and then the hot water is sprayed out through the water nozzle 13 and flows into the permafrost. The two are operated alternately, which effectively improves construction efficiency and shortens the construction cycle.

[0026] Check and ensure that there is sufficient liquid in the water tank 5, and add liquid through the inlet 6. Ensure that the battery inside the battery cover 8 is fully charged, and check that the heating assembly 10 is working properly. Check that the electronic control valve is working properly, and ensure that the drain pipe 12 is securely connected to the water tank 5.

[0027] Start the drive motor 2 to rotate the connecting pipe 4 and the spiral pipe 15. Simultaneously, start the heating assembly 10 to heat the liquid in the water storage tank 5. Align the drill bit 16 with the predetermined drilling position and start the drive motor 2 to drill. During drilling, hot water is sprayed through the water nozzle 13 to clean the drilling area and prevent the frozen soil from freezing.

[0028] During drilling, the drill bit 16 and the water nozzle 13 are used alternately. After drilling is completed, hot water continues to be sprayed from the water nozzle 13 to ensure the area where the buried pipe is laid is clean and at a suitable temperature. When drilling and cleaning are completed, the drive motor 2 and the heating element 10 are turned off. The electric control valve is closed to stop the water supply from the drain pipe 12. The equipment is inspected and cleaned to ensure there is no residual liquid or debris.

[0029] Regularly inspect the wear and tear of each component of the equipment and replace any damaged parts promptly. Clean the water spray head 13 and anti-clogging protrusion 14 to ensure they are unobstructed. Check the integrity of the battery protective cover 8 and the sealing ring to ensure the equipment's sealing and safety.

[0030] It should be noted that, in this document, relational terms such as first and second (number one, number two), etc., are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Unless otherwise specified, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes the element.

[0031] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A rapid drilling construction device for a ground source heat pump buried pipe, comprising a support (1), a drive motor (2), a bearing assembly (3), a connecting pipe (4), a spiral pipe (15), and a drill bit (16), wherein the drive motor (2) and the bearing assembly (3) are mounted on the support (1), the connecting pipe (4) is mounted on the output end of the drive motor (2), and the drill bit (16) is mounted on the lower end of the spiral pipe (15), characterized in that: The lower end of the connecting pipe (4) is connected to a water storage tank (5) via a connecting pipe (7), and the lower end of the water storage tank (5) is connected to a connecting pipe (11). The connecting pipe (11) is connected to a spiral pipe (15), thereby realizing the connection between the water storage tank (5) and the spiral pipe (15). The upper edge of the water tank (5) is provided with an inlet (6), and the upper side wall of the water tank (5) is provided with a battery protective cover (8). The bottom of the battery protective cover (8) is provided with a connection interface (9), which is connected to a heating component (10). The heating component (10) heats the liquid in the water tank (5). The lower control valve of the water tank (5) is connected to a drain pipe (12), and the side wall of the drain pipe (12) is provided with multiple spray nozzles (13). The spray nozzles (13) are directly facing the spiral blades on the spiral tube (15), and the outside of the spray nozzles (13) is covered with anti-clogging protrusions (14).

2. The rapid drilling construction device for buried pipes of ground source heat pumps according to claim 1, characterized in that: The connecting pipe (4) is connected to the connecting pipe (7), and the side wall of the connecting pipe (7) is provided with a wiring hole. The upper edge of the connecting pipe (4) is provided with a wiring hole to facilitate the wiring of the wires. The battery protective cover (8) is provided with a battery inside. The notch wall of the battery protective cover (8) is provided with a wiring hole. The wires of the battery are routed through multiple wiring holes.

3. The rapid drilling construction device for buried pipes of ground source heat pumps according to claim 2, characterized in that: The heating component (10) is fixed to the battery protective cover (8) by bolts, and a sealing ring is provided at the connection between the battery protective cover (8) and the heating component (10). The battery protective cover (8) is fixed to the water storage tank (5) by bolts, and a multi-layer sealing ring is provided at the connection between the battery protective cover (8) and the water storage tank (5).

4. The rapid drilling construction device for buried pipes of ground source heat pumps according to claim 3, characterized in that: The inlet (6) and the water tank (5) are designed as a single unit, and the upper end of the inlet (6) is connected to a plug. The upper and lower ends of the water tank (5) are provided with protruding pipes, and the protruding pipes of the water tank (5) are fixed to the connecting pipe (7) and the connecting pipe (11) by bolts.

5. The rapid drilling construction device for buried pipes of ground source heat pumps according to claim 4, characterized in that: An electric control valve is installed at the connection between the water storage tank (5) and the drain pipe (12). The electric control valve controls the water supply of the drain pipe (12). The spray head (13) is a high-pressure spray head. Water is sprayed onto the surface of the spiral blade of the spiral tube (15) through the high-pressure spray head.

6. The rapid drilling construction device for buried pipes of ground source heat pumps according to claim 5, characterized in that: The water nozzle (13) sprays hot water into the buried pipe area, and the drill bit and the water nozzle (13) spray water alternately.