A dovetail slot quick-release guide rail for a shield tunneling machine

By designing a dovetail groove quick-release guide rail, and utilizing the sliding engagement and bolt connection between the trapezoidal boss and the dovetail groove structure, the compatibility and disassembly/removal issues of the shield machine guide rail were solved, improving construction efficiency and guiding accuracy, and extending service life.

CN224998360UActive Publication Date: 2026-11-20SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522267123.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-27
Publication Date
2026-11-20
Estimated Expiration
2035-10-27

AI Technical Summary

Technical Problem

Existing tunnel boring machine guide rails suffer from poor adaptability, cumbersome disassembly and assembly, easy wear and tear, and structural instability, which affect construction efficiency and accuracy.

Method used

A dovetail groove quick-release guide rail for tunnel boring machines was designed. It adopts a trapezoidal boss structure to precisely connect with the tunnel boring machine, and combines the dovetail groove structure with the sliding engagement of the chuck body. It is connected by circumferentially distributed bolts, and the outer side is provided with anti-slip texture and wear-resistant pad to enhance stability and wear resistance.

Benefits of technology

It enables rapid installation and disassembly of the shield machine guide rail, improving construction efficiency and stability, enhancing guiding accuracy, and extending the service life of components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224998360U_ABST
    Figure CN224998360U_ABST
Patent Text Reader

Abstract

The utility model discloses a dovetail groove quick detach guide rail for shield machine relates to shield machine accessory technical field, including base, chuck assembly and dovetail groove rail body, the installation of trapezoidal boss structure is equipped on base one side, and the installation hole of axial distribution has, and the chuck assembly contains annular chuck main part, and the dovetail groove structure of radial distribution is equipped in chuck main part, and the end of dovetail groove rail body has the adaptation protruding and through the protruding and dovetail groove structure sliding joint, and the base is fixed with chuck main part through the circumferential bolt, and the surface of chuck main part has the net concave and convex antiskid texture of integrated molding, and the wear -resisting pad layer is pasted between protruding and dovetail groove wall. This guide rail solves the problem that the existing guide rail is poor in adaptability, is complicated to dismount, is easy to wear, and has strong adaptability, is convenient to dismount, is wear -resisting stable, can improve shield machine construction efficiency and guide precision, and is applicable to the component guide scene in shield machine tunneling operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model provides a guide rail, and particularly relates to a dovetail groove quick-release guide rail for tunnel boring machines. Background Technology

[0002] In tunnel boring machine (TBM) construction, guide rails are crucial devices that ensure the precise operation of components such as the cutterhead and propulsion system. Their function is to guide and limit the movement of these moving parts, ensuring the TBM tunnels along a predetermined trajectory and maintaining construction accuracy and stability. Existing TBM guide rails typically employ a single-piece or simply bolted segmented structure, directly fixed to the rail body via a foundation base, and achieving their guiding function through conventional grooved or planar contact.

[0003] However, this type of structure has significant shortcomings: First, it has poor compatibility with tunnel boring machines (TBMs). Existing base connections are mostly simple flat surfaces or irregular bosses, lacking trapezoidal bosses and corresponding axial mounting holes designed for precise matching with the TBM. This makes positioning difficult during installation, easily leading to loose connections and affecting construction stability. Second, disassembly and assembly are cumbersome. The rail body is fixed to the base and chuck using complex bolt assemblies or welding, lacking a quick connection structure like a dovetail groove sliding snap-fit. This results in time-consuming equipment maintenance and component replacement, reducing construction efficiency. Third, its wear resistance and anti-slip performance are insufficient. The contact area between the rail body and the chuck... Without wear-resistant padding for protection, long-term use can easily lead to a decrease in guiding accuracy due to wear. The chuck body surface lacks anti-slip texture, making it easy to slip during operation and affecting the convenience of installation and debugging. Fourth, the overall structural stability is poor. The lack of circumferentially distributed bolts for precise fixing of the base and chuck body, as well as the dovetail groove structure for effective limiting of the rail body, makes it easy for components to shift and shake under the complex tunneling conditions of the tunnel boring machine. This makes it difficult to reliably guarantee the operating accuracy of the tunnel boring machine and meet the needs of efficient and precise tunneling construction. Therefore, there is an urgent need for a new type of guide rail structure that is adaptable, easy to assemble and disassemble, and wear-resistant and stable. Utility Model Content

[0004] In order to solve the above problems, this application provides a dovetail groove quick-release guide rail for tunnel boring machines, which solves the construction problems of poor compatibility, complicated disassembly and assembly, easy wear and tear and structural instability.

[0005] To solve the above-mentioned technical problems, this utility model provides the following technical solution: a dovetail groove quick-release guide rail for a tunnel boring machine, including a base, a chuck assembly installed on the base, and a dovetail groove rail body adapted to the chuck assembly; The base has an installation part for connecting with the tunnel boring machine on one side. The chuck assembly includes an annular chuck body. The chuck body has a dovetail groove structure distributed radially. The dovetail groove rail is slidably engaged with the chuck body through the dovetail groove structure. The base and the chuck body are fixedly connected by circumferentially distributed connectors, and the surface of the chuck body is provided with an anti-slip textured structure.

[0006] Preferably, the mounting part is a trapezoidal boss structure located on one side of the base and corresponding to the tunnel boring machine; the boss structure is provided with mounting holes for mounting and fixing, and the mounting holes are distributed along the axial direction of the base and correspond to the connecting parts.

[0007] Preferably, the dovetail groove structure consists of multiple radial grooves on the chuck body, the cross-section of the radial grooves is dovetail-shaped, and the end of the dovetail groove rail body is provided with a protrusion adapted to the dovetail-shaped cross-section.

[0008] Preferably, the connector is a bolt, and the base is provided with bolt holes corresponding to the connector. The connector and the bolt holes correspond to fix the base and the chuck body.

[0009] Preferably, the anti-slip texture structure is a mesh-like uneven structure provided on the outer surface of the chuck body, and the mesh-like uneven structure is integrally formed on the chuck body.

[0010] Preferably, a suitable wear-resistant pad is provided between the protrusion of the dovetail groove rail body and the dovetail-shaped groove wall of the dovetail groove structure, and the wear-resistant pad is adhered to the surface of the protrusion.

[0011] One or more technical solutions provided in this application embodiment have at least the following technical effects or advantages compared with the prior art: Existing shield machine guide rails often suffer from problems such as time-consuming disassembly and assembly, decreased positioning accuracy due to easy wear of components, and poor compatibility with shield machines, affecting construction efficiency due to complex connection structures. This shield machine dovetail groove quick-release guide rail solves the connection and installation problems by setting a mounting part with a base and a trapezoidal boss structure on one side, and using axially distributed mounting holes to match the shield machine. The radial dovetail groove structure of the annular chuck body in the chuck assembly, combined with the protrusion at the end of the dovetail groove rail body, achieves sliding engagement, and the base and chuck body are fixed with circumferentially distributed bolts, simplifying the disassembly and assembly process and solving the problem of cumbersome disassembly and assembly. The mesh-like concave-convex anti-slip texture structure on the outside of the chuck body enhances the ease of operation, and the wear-resistant pad layer is placed between the protrusion and the dovetail groove wall to reduce component wear and ensure positioning accuracy. In this way, the problems of disassembly, wear and compatibility in the existing technology are solved, and the efficiency and stability of the guide rail during shield machine construction are improved.

[0012] Other advantages, objectives and features of this invention will be set forth in part in the description which follows, and in part will be apparent to those skilled in the art from the following examination or study, or may be taught from the practice of this invention. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of a dovetail groove quick-release guide rail for a tunnel boring machine according to the present invention; Figure 2 This is an exploded side view of a dovetail groove quick-release guide rail for a tunnel boring machine according to the present invention. Figure 3 This is a back sectional view of a dovetail groove quick-release guide rail for a tunnel boring machine according to this utility model. Figure 4 This is a cross-sectional view of the base portion of a dovetail groove quick-release guide rail for a tunnel boring machine according to this utility model.

[0014] As shown in the figure: 1. Base; 2. Chuck assembly; 3. Dovetail groove rail body; 4. Mounting part; 5. Chuck body; 6. Dovetail groove structure; 7. Connector; 8. Anti-slip textured structure; 9. Boss structure; 10. Protrusion; 11. Wear-resistant pad layer. Detailed Implementation

[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0016] It should be noted that the terms "vertical," "horizontal," "up," "down," "left," "right," and similar expressions used in this article are for illustrative purposes only and do not represent the only possible implementation.

[0017] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention pertains; the terminology used herein in the description of this invention is for the purpose of describing particular embodiments only and is not intended to limit the invention; the term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.

[0018] like Figure 1 and Figure 2As shown, a dovetail quick-release guide rail for a tunnel boring machine includes a base 1. One side of the base 1 has an mounting portion 4 for connection with the tunnel boring machine. The mounting portion 4 is a trapezoidal boss structure 9 corresponding to the tunnel boring machine. The boss structure 9 has mounting holes distributed along the axial direction of the base 1 and corresponding to connecting parts 7. A chuck assembly 2 is mounted on the base 1. The chuck assembly 2 includes an annular chuck body 5. The base 1 and the chuck body 5 are fixedly connected by circumferentially distributed connecting parts 7, which are bolts. The base 1 has bolt holes corresponding to the connecting parts 7. The connecting parts are fixed by corresponding connection with the bolt holes. The surface of the chuck body 5 has an anti-slip texture structure 8. The anti-slip texture structure 8 is a mesh-like concave-convex structure on the outer surface of the chuck body 5 and is integrally formed on the chuck body 5.

[0019] In this implementation plan, the connection and positional relationship of each component are clearly defined: the base 1 serves as the installation foundation for the overall structure, and the mounting part 4 on one side is fitted to the tunnel boring machine in the form of a trapezoidal boss structure 9. The axial mounting holes on the boss structure 9 are matched with the bolt positions of the connector 7 to ensure precise docking between the base 1 and the tunnel boring machine; the annular chuck body 5 of the chuck assembly 2 is installed on top of the base 1, and the two are stably connected by bolts distributed around the circumference passing through the center hole of the chuck body 5 and the bolt holes of the base 1. The mesh-like textured anti-slip structure 8 on the outer surface of the chuck body 5 is integrally formed with the chuck body 5 and tightly attached to its surface. From the perspectives of implementation key points and innovation, the beneficial effects of these component combinations are significant: First, the installation part 4 of the trapezoidal boss structure 9 is designed to correspond with the tunnel boring machine, and with the axially distributed installation holes corresponding to the connectors 7, it solves the problems of poor compatibility and positioning difficulties between the existing guide rails and the tunnel boring machine. During installation, it can quickly achieve precise docking, avoid loosening of the connection, and improve construction stability. Second, the circumferentially distributed bolt connectors 7 pass through the central hole and bolt hole to fix the base 1 and the chuck body 5. Compared with the existing complex bolt groups or welding fixing methods, it simplifies the disassembly and assembly process. During subsequent maintenance or component replacement, only the circumferential bolts need to be removed to separate the base and chuck assembly, which greatly shortens the operation time and improves construction efficiency. Third, the integrated mesh-like concave-convex anti-slip texture structure 8 on the surface of the chuck body 5 increases the friction during operation, avoids operational errors caused by slippage during installation and debugging, improves operational convenience, and at the same time, the integrated structure does not require additional assembly, reduces the risk of component detachment, and enhances the overall structural reliability. In addressing existing technical issues, the trapezoidal boss structure 9 and corresponding mounting holes ensure compatibility and connection stability, the circumferential bolt connector 7 simplifies the assembly and disassembly process, and the anti-slip texture structure 8 enhances operational safety and structural reliability. The synergistic effect of these structures effectively improves the shortcomings of existing guide rails.

[0020] like Figure 3 and Figure 4As shown, a dovetail groove quick-release guide rail for a tunnel boring machine has a dovetail groove structure 6 distributed radially on its chuck body 5. The dovetail groove structure 6 consists of multiple radial grooves with a dovetail-shaped cross-section. The end of the dovetail groove rail body 3, which is adapted to the chuck assembly 2, has a protrusion 10 adapted to the dovetail-shaped cross-section. The dovetail groove rail body 3 is slidably engaged with the dovetail groove structure 6 of the chuck body 5 through the protrusion 10. A wear-resistant pad 11 is provided between the protrusion 10 of the dovetail groove rail body 3 and the dovetail-shaped groove wall of the dovetail groove structure 6. The wear-resistant pad 11 is adhered to the surface of the protrusion 10.

[0021] In this implementation scheme, the connection and positional relationship of each component are clear and explicit: the chuck body 5 serves as the bearing base of the dovetail groove structure 6, and its surface has multiple radial grooves with dovetail-shaped cross-sections evenly distributed along the radial direction, forming the dovetail groove structure 6; the dovetail groove rail body 3 serves as the core guiding component, and the protrusion 10 at its end is precisely matched with the dovetail-shaped cross-section of the dovetail groove structure 6. By embedding the protrusion 10 into the dovetail groove structure 6, the dovetail groove rail body 3 and the chuck body 5 can be slidably engaged, and can be flexibly disassembled and assembled along the radial direction; the wear-resistant pad 11 is fixed to the surface of the protrusion 10 by adhesive, completely covering the contact area between the protrusion 10 and the groove wall of the dovetail groove structure 6, forming a tightly fitting protective layer. From the perspectives of implementation key points and innovation, the beneficial effects of these component combinations are prominent: First, the sliding snap-fit ​​design of the dovetail groove structure 6 and the protrusion 10 breaks through the limitation of the existing guide rail body and chuck fixed connection. During installation, assembly can be completed simply by aligning the protrusion 10 with the dovetail groove structure 6 and pushing it in. During disassembly, it can be separated by sliding in the opposite direction, which greatly simplifies the disassembly and assembly process of the rail body, solves the problem of time-consuming maintenance and replacement of existing guide rails, and significantly improves construction efficiency; Second, the dovetail-shaped cross-section design, compared with conventional groove connection, can effectively limit the dovetail... The axial and radial displacement of the tail groove rail 3 prevents the rail from loosening or falling off during operation, enhancing the structural stability of the guide rail and ensuring precise guidance of the tunnel boring machine's moving parts. Thirdly, the wear-resistant pad 11, adhered to the surface of the protrusion 10, directly acts on the contact area between the rail and the chuck, reducing frictional wear between the protrusion 10 and the dovetail groove structure 6 wall. This solves the problem of decreased guiding accuracy caused by long-term wear in existing guide rails, extending component lifespan. Furthermore, the adhesive installation of the wear-resistant pad 11 facilitates individual replacement later, reducing maintenance costs. In addressing existing technical problems, the sliding connection between the dovetail groove structure 6 and the protrusion 10 enables convenient assembly and disassembly. The dovetail cross-section ensures structural stability, and the wear-resistant pad 11 alleviates wear. Each structure performs its function while working in concert, effectively compensating for the technical deficiencies of existing guide rails.

[0022] When actually installing and using the dovetail quick-release guide rail for this tunnel boring machine, the base is made of Q345 low-alloy high-strength steel to ensure load-bearing capacity. The chuck body is also made of Q345 steel to achieve strength matching with the base. The dovetail rail body is made of 40Cr alloy steel to improve wear resistance during long-term use, and the wear-resistant pad is made of nitrile rubber to enhance friction protection. During installation, a torque wrench is needed to tighten the bolts connecting the base and the chuck body to the designed torque value to ensure a secure and loose connection. At the same time, a laser positioning instrument is needed to accurately calibrate the docking position of the dovetail rail body and the dovetail structure on the chuck body to avoid affecting the guiding accuracy of the tunnel boring machine's moving parts due to installation deviations. When connecting the trapezoidal boss structure of the base to the tunnel boring machine, a layer of rubber should be laid between the contact surfaces. Oil-resistant rubber gaskets are installed to prevent mud, water, and dust generated during construction from seeping into the joints and causing corrosion of components. Before applying the wear-resistant pad, the raised surface at the end of the dovetail groove rail body must be cleaned with a metal surface degreaser and rust remover, and then slightly roughened with sandblasting equipment to improve the adhesion between the wear-resistant pad and the raised surface, preventing the wear-resistant pad from falling off due to long-term sliding friction. During routine maintenance and inspection, a feeler gauge should be used to check the fit clearance between the dovetail groove structure and the raised surface to ensure that the clearance is controlled within a reasonable range of 0.1-0.3mm. At the same time, a surface roughness tester should be used to check the mesh-like anti-slip texture structure on the outer side of the chuck body. If excessive wear is found, a grinding wheel should be used for slight repair to maintain the anti-slip effect during operation and ensure operational safety during installation and commissioning.

[0023] Specifically, in the actual implementation of the dovetail quick-release guide rail for this tunnel boring machine, before installation, the chuck body and dovetail rail body need to be surface-treated with steel pretreatment equipment to remove rust, remove oxide scale and impurities, and then spray anti-rust primer. After the primer dries, subsequent assembly can proceed. Before attaching the wear-resistant pad, the raised surface at the end of the dovetail rail body is wiped clean with industrial alcohol to remove oil and dust. Then, the raised surface is dried to room temperature with a hot air gun. Next, epoxy resin adhesive is evenly applied to the raised surface. After aligning the wear-resistant pad with the edge of the raised surface, it is attached using a manual clamp. Apply pressure from both ends towards the middle to fix the joint, maintaining a pressure of 0.3 MPa for 24 hours to ensure the adhesive is fully cured and achieves a tight bond. When installing the dovetail groove rail, first embed the wooden guide block into the starting end of the dovetail groove structure of the chuck body, making the inclined surface of the guide block fit against the inclined surface of the dovetail groove structure. Then align the protrusion at the end of the dovetail groove rail with the guide surface of the guide block, and smoothly push the dovetail groove rail along the radial direction with both hands until the protrusion is completely inserted into the dovetail groove structure. If resistance is encountered during this process, gently tap the side of the rail with a rubber hammer to assist the sliding, avoiding forceful pushing that could damage the structure. As a whole, install the guide rail... When installing onto the tunnel boring machine (TBM), the guide rail is raised to the preset installation height using a hydraulic lifting platform. The base's level is adjusted using the baseline emitted by a laser alignment instrument. A level is used to check the base surface, ensuring the horizontal deviation does not exceed 0.2 mm / m. Simultaneously, the base's verticality is adjusted to ensure the coaxiality error between the base axis and the TBM's tunneling axis is controlled within 0.5 mm. After adjustment, the bolts on the mounting part are tightened diagonally and alternately using a torque wrench. The tightening torque is increased in three increments: 40%, 70%, and 100% of the design value. After the final tightening, a 10-second pause is allowed to confirm. Ensure bolts are properly tightened. During daily use, every 50 hours, inject lithium-based grease into the gap between the dovetail groove structure and the protrusion using a grease gun. The amount injected should be such that the grease slightly overflows from both ends of the gap. At the same time, use an ultrasonic flaw detector to inspect the circumferentially distributed connecting bolts to check for defects such as cracks inside the bolts. If local damage to the wear-resistant pad is found, first use a utility knife to cut and remove the old pad along the damaged edge, then use sandpaper to polish and clean the residual adhesive on the surface of the protrusion. After that, replace the new wear-resistant pad according to the initial pasting procedure to ensure the continuous and stable operation of the guide rail.

[0024] Although the present invention has been disclosed above with reference to preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art can make various modifications and alterations without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention should be determined by the claims.

Claims

1. A dovetail groove quick-release guide rail for a tunnel boring machine, characterized in that, Includes a base (1), a chuck assembly (2) mounted on the base (1), and a dovetail groove rail body (3) adapted to the chuck assembly (2); The base (1) has an installation part (4) for connecting with the tunnel boring machine on one side. The chuck assembly (2) includes an annular chuck body (5). The chuck body (5) has a dovetail groove structure (6) distributed radially. The dovetail groove rail (3) is slidably engaged with the chuck body (5) through the dovetail groove structure (6). The base (1) and the chuck body (5) are fixedly connected by circumferentially distributed connectors (7), and the surface of the chuck body (5) is provided with an anti-slip texture structure (8).

2. The dovetail groove quick-release guide rail for a tunnel boring machine according to claim 1, characterized in that, The mounting part (4) is a trapezoidal boss structure (9) located on one side of the base (1) and corresponding to the tunnel boring machine; the boss structure (9) is provided with mounting holes for installation and fixing, the mounting holes are distributed along the axial direction of the base (1) and correspond to the connector (7).

3. The dovetail groove quick-release guide rail for a tunnel boring machine according to claim 1, characterized in that, The dovetail groove structure (6) consists of multiple radial grooves on the chuck body (5). The cross-section of the radial groove is dovetail-shaped, and the end of the dovetail groove rail body (3) is provided with a protrusion (10) that matches the dovetail-shaped cross-section.

4. The dovetail groove quick-release guide rail for a tunnel boring machine according to claim 1, characterized in that, The connector (7) is a bolt. The base (1) is provided with bolt holes corresponding to the connector (7). The connector (7) is connected to the bolt holes to fix the base (1) and the chuck body (5).

5. A dovetail groove quick-release guide rail for a tunnel boring machine according to claim 1, characterized in that, The anti-slip texture structure (8) is a mesh-like uneven structure provided on the outer surface of the chuck body (5), and the mesh-like uneven structure is integrally formed on the chuck body (5).

6. A dovetail groove quick-release guide rail for a tunnel boring machine according to claim 3, characterized in that, A suitable wear-resistant pad (11) is provided between the protrusion (10) of the dovetail groove rail body (3) and the dovetail groove wall of the dovetail groove structure (6), and the wear-resistant pad (11) is attached to the surface of the protrusion (10).