The modularly designed turbine generator base, using a steel structure top plate, prefabricated support columns, and rock foundation, combined with high-damping alloy vibration isolators, solves the problems of long construction cycle, high cost, and poor quality of traditional bases, and achieves rapid splicing and high-precision installation, ensuring stable operation and safety of the equipment.
Patent Information
- Application Number
- CN202522790881.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-29
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-12-29
AI Technical Summary
Traditional steam turbine generator foundations, when constructed under engineering geological conditions where the bearing stratum is bedrock, have long construction cycles, high project costs, and poor construction quality, making it difficult to guarantee the stable operation and installation accuracy of the equipment.
The system adopts a modular design, using a steel structure top plate, prefabricated support columns and a rock foundation. Combined with high-damping alloy vibration isolators, the base can be quickly spliced and fixed through plug-in connections and anchoring components. The top of the support column is connected to the top plate using high-damping alloy vibration isolators to enhance stability and reduce vibration.
It significantly shortens the construction period, reduces project costs, improves construction precision and quality, ensures stable and safe operation of equipment, and enhances the vibration resistance of the base.
Smart Images

Figure CN224998403U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of steam turbine generator base technology, and in particular to a modular steam turbine generator base. Background Technology
[0002] Steam turbines and generators are the core equipment of power plants. The steam turbine generator base, as an important structure supporting the steam turbine and generator, is crucial for ensuring the stable operation of the equipment.
[0003] Currently, for engineering geological conditions where the bearing stratum is bedrock, traditional steam turbine generator foundations all adopt reinforced concrete foundation schemes, and all are made by on-site casting.
[0004] Currently, for engineering geological conditions where the bearing stratum is bedrock, traditional steam turbine generator foundations have the following disadvantages: 1) Long construction period: Traditional foundations are cast-in-place reinforced concrete frame structures, requiring on-site reinforcement binding and concrete pouring from the foundation to the superstructure, with a construction period of several months; 2) High project cost: Traditional foundations use reinforced concrete raft foundations, with dimensions of approximately 50m × 15m × 3m, requiring a large amount of steel reinforcement and concrete, resulting in high costs; 3) Poor construction quality and low precision: Traditional foundations are fabricated on-site, with limited construction conditions, making it difficult to guarantee project quality, which in turn makes it difficult to ensure precision during equipment installation.
[0005] Therefore, there is an urgent need in this field to develop a modular steam turbine generator base that, for engineering geological conditions where the bearing stratum is bedrock, can significantly shorten the construction cycle, improve construction accuracy, and ensure construction quality while ensuring stable and reliable equipment operation. Utility Model Content
[0006] The purpose of this utility model is to provide a modular steam turbine generator base. This base is designed for engineering geological conditions where the bearing stratum is bedrock. Under the premise of ensuring stable operation and safety of the equipment, it can significantly shorten the construction cycle, improve construction accuracy, and ensure construction quality.
[0007] This application provides a modular steam turbine generator base, including: a steel structure top plate, multiple prefabricated support columns, a rock foundation, and a high-damping alloy vibration isolator, wherein a steam turbine generator set is installed on the steel structure top plate, and the high-damping alloy vibration isolator is installed between the steel structure top plate and the top of each prefabricated support column.
[0008] The support column is vertically installed between the steel structure top plate and the rock foundation. The precast support column is composed of multiple segmented precast support column segments obtained by precast concrete. Adjacent segmented precast support column segments are connected by an insert-type connection structure.
[0009] In another preferred embodiment, the prefabricated support column comprises, from top to bottom, a first segmented prefabricated support column segment, a second segmented prefabricated support column segment, and a third segmented prefabricated support column segment.
[0010] In another preferred embodiment, the third segment of prefabricated support column is fixed to the rock foundation by an anchoring assembly.
[0011] In another preferred embodiment, the anchoring assembly includes a first flange plate pre-embedded at the bottom of the third segment prefabricated support column and a second flange plate pre-embedded at the top of the rock foundation, and is fixedly connected by bolts through bolt holes provided on the first flange plate and the second flange plate.
[0012] In another preferred embodiment, the anchoring assembly further includes an H-beam and a second anchor bar, one end of which is inserted into the rock foundation and the other end is welded to the underside of the second flange plate.
[0013] In another preferred embodiment, the second anchor bar is evenly distributed around the H-beam.
[0014] In another preferred embodiment, the H-beam is inserted into the rock foundation to a depth of 0.5m-1.5m.
[0015] In another preferred embodiment, the bearing layer of the rock foundation is hard rock, and the H-beam is inserted into the hard rock. The hard rock includes, but is not limited to, the following bedrock with high bearing capacity, good integrity and shallow burial depth: unweathered or slightly weathered granite, basalt, quartzite, diorite, andesite, and diabase.
[0016] In another preferred embodiment, the connecting ends of adjacent prefabricated support column segments are respectively provided with mutually cooperating protrusions and grooves to form the insert-type connection structure.
[0017] In another preferred embodiment, steel plates are pre-embedded at the end faces of the connecting ends of adjacent prefabricated support column segments. After the insertion connection is completed, the pre-embedded steel plates are bevel welded.
[0018] In another preferred embodiment, the steel structure top plate is formed by welding an upper steel plate, a lower steel plate, and a vertical stiffening plate disposed between the two, and the whole is in the form of a cuboid structure.
[0019] In another preferred embodiment, the high-damping alloy vibration isolator is made of a ferromagnetic high-damping alloy material.
[0020] It should be understood that, within the scope of this utility model, the above-described technical features of this utility model and the technical features specifically described below (such as in the embodiments) can be combined with each other to form new or preferred technical solutions. Due to space limitations, they will not be described in detail here. Attached Figure Description
[0021] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. It should be understood that the drawings described below are merely some implementation examples of this utility model, and those skilled in the art can obtain other implementation examples based on these drawings without creative effort.
[0022] Figure 1 This is a side view of the modular steam turbine generator base according to this application;
[0023] Figure 2 This is a top view of the modular steam turbine generator base according to this application;
[0024] Figure 3 A view of the prefabricated support column connection node of the modular steam turbine generator base of this application is shown;
[0025] Figure 4a An exploded schematic diagram of the connection between the bottom of the prefabricated support column of the modular steam turbine generator base of this application and the rock foundation is shown.
[0026] Figure 4b It shows Figure 4a AA section view;
[0027] Figure 4c It shows Figure 4a BB section view;
[0028] Figure 4d A schematic diagram showing the connection between the bottom of the prefabricated support column of the modular steam turbine generator base of this application and the rock foundation is shown.
[0029] In each of the attached figures, the markings are as follows:
[0030] 1-Steel structure roof slab
[0031] 2-High Damping Alloy Vibration Isolator
[0032] 3-Precast concrete support column first section
[0033] 4-Second section of precast concrete support column
[0034] 5-Precast concrete support column, third section
[0035] 6-Rock Foundation
[0036] 7-holes
[0037] 8-First flange plate
[0038] 9-First bolt hole
[0039] 10-First Anchor Bar
[0040] 11-Second flange plate
[0041] 12-Second bolt hole
[0042] 13-Second Anchor Bar
[0043] 14-H-beam
[0044] 15- Bolt Detailed Implementation
[0045] Through extensive and in-depth research, the inventors have developed, for the first time, a modular steam turbine generator base. Designed for engineering conditions where the bearing stratum is bedrock, this base replaces the traditional cast-in-place reinforced concrete top slab with a steel structure top slab, replaces the cast-in-place support columns with segmented prefabricated structures, and eliminates the reinforced concrete raft foundation. Anchor bars, H-beams, and bolts are used to connect the bottom of the support columns to the bedrock. This significantly shortens the construction period and improves engineering precision and quality while ensuring stable equipment operation and structural safety. Furthermore, the support column segments are connected by insert-type connections, and high-damping alloy vibration isolators are used to connect the top of the support columns to the top slab, enhancing stability and reducing vibration.
[0046] In the following description, many technical details are presented to help the reader better understand this application. However, those skilled in the art will understand that the technical solutions claimed in this application can be implemented even without these technical details and various variations and modifications based on the following embodiments.
[0047] the term
[0048] As used herein, the terms “rock foundation” and “bedrock” are used interchangeably;
[0049] In this invention, all directional indicators (such as up, down, left, right, front, back, etc.) are only used to explain the relative positional relationship and movement of each component in a specific posture (as shown in the figure). If the specific posture changes, the directional indicator will also change accordingly.
[0050] This application has at least one of the following advantages:
[0051] (a) By using a steel structure top plate, precast reinforced concrete support columns and a rock foundation, the base structure can be completed by splicing the components on site, which can significantly reduce the construction period.
[0052] Optionally, (b) traditional foundations all use reinforced concrete raft foundations with a thickness of about 3m, which consumes a huge amount of steel bars and concrete. This utility model can reduce the project cost by millions by using natural rock foundations instead of reinforced concrete foundations.
[0053] Optionally, (c) by using a steel structure top plate and prefabricated support columns, this utility model can significantly improve the manufacturing accuracy of the structure, thereby effectively ensuring the subsequent equipment installation and avoiding rework.
[0054] Optionally, (d) the base of this utility model is provided with a high-damping alloy vibration isolator between the top plate and the support column. The high-damping alloy converts mechanical vibration energy into heat energy through the movement of micro-defects. It has the characteristics of wide temperature range stability, high strength and high damping synergy. It can not only effectively reduce structural vibration, but also improve the service life of the base and equipment.
[0055] Optionally, (e) since the steam turbine and generator placed on the base weigh more than two thousand tons, the internal forces on each support column are mainly pressure and there is no tension. That is, each support column mainly bears vertical pressure. The force of the insert-type connection node and the bedrock anchoring structure is clear, the structure is simple, and the overall safety and reliability are high.
[0056] A modular steam turbine generator base
[0057] This application provides a modular steam turbine generator base for engineering conditions where the bearing stratum is bedrock. The base includes: a steel structure top plate 1, multiple prefabricated support columns, a rock foundation 6, and a high-damping alloy vibration isolator 2. The steam turbine generator set is installed on the steel structure top plate 1, and the high-damping alloy vibration isolator 2 is installed between the steel structure top plate 1 and the top of each prefabricated support column.
[0058] The support columns are set vertically between the steel structure top slab 1 and the rock foundation 6. The precast support columns are composed of multiple segmented precast support column segments obtained by precast concrete. Adjacent segmented precast support column segments are connected by insert-type connection nodes.
[0059] Example 1
[0060] To make the objectives, technical solutions, and advantages of this utility model clearer, the embodiments of this utility model will be described in further detail below with reference to the accompanying drawings. It should be understood that these are merely examples provided to the reader of possible implementations of this utility model, and are not intended to limit the scope of this utility model.
[0061] See Figures 1-4dThis application provides a modular steam turbine generator base for engineering conditions where the bearing stratum is bedrock. The base includes: a steel structure top plate 1, multiple prefabricated support columns, a rock foundation 6, and a high-damping alloy vibration isolator 2. The steam turbine generator set is installed on the steel structure top plate 1, and the high-damping alloy vibration isolator 2 is installed between the steel structure top plate 1 and the top of each prefabricated support column.
[0062] The steel structure top plate 1 is welded together from two layers of steel plates and a vertical stiffening plate in the middle, forming a rectangular shape to ensure that it has sufficient load-bearing capacity and good dynamic characteristics.
[0063] like Figure 2 As shown, the steel structure top plate 1 is connected to the support column via a high-damping alloy vibration isolator 2. The high-damping alloy vibration isolator 2 is made of ferromagnetic high-damping alloy material, possessing high strength and excellent damping characteristics. It is connected between the lower surface of the steel structure top plate 1 and the top of the first section 3 of the support column by bolts or welding, serving to isolate and dissipate equipment vibration.
[0064] The support columns are set vertically between the steel structure top slab 1 and the rock foundation 6. The precast support columns consist of three precast support column segments obtained by precast concrete. Adjacent precast support column segments are connected by insert-type connection nodes.
[0065] Specifically, each precast support column is a segmented precast structure, consisting of three segments precast in the factory, from top to bottom including the first segment 3 of the precast concrete support column, the second segment 4 of the precast concrete support column, and the third segment 5 of the precast concrete support column.
[0066] like Figure 3 As shown, Figure 3 The diagram shows a view of a prefabricated support column connection node. The connection between adjacent segmented support column sections uses an insert-type splicing method. Specifically, by setting mutually matching protrusions and grooves at the connection ends of each adjacent segmented support column section, an insert-type connection structure is formed, connecting the two segmented support column sections together. Steel plates are pre-embedded in the end faces (i.e., contact surfaces) of the connection ends of the two segmented support column sections, and bevel welding is used after the segmented support column sections are butt-jointed, resulting in a more reliable connection between the two segmented support columns. The protrusion can be cubic in shape.
[0067] See Figures 4a-4dThe third section 5 of the precast concrete support column is fixed to the rock foundation 6 by an anchoring assembly, which includes a flange, H-beams, anchor bars, and bolts. Specifically, a first flange plate 8 is pre-embedded at the bottom of the support column (i.e., the bottom of the third section 5 of the precast concrete support column), and a first anchor bar 10 is welded thereon to enhance the anchoring. The first flange plate 8 has first bolt holes 9 machined on it. A second flange 11 is pre-embedded at the top of the rock foundation 6, and a second bolt hole 12 is machined on it. A second anchor bar 13 and an H-beam 14 are also welded to the lower part of the second flange 11. One end of the second anchor bar 13 and the H-beam 14 is inserted into the rock foundation 6, and the other end is welded to the bottom of the second flange plate 11.
[0068] The depth to which the H-beam 14 and the second anchor bar 13 are anchored into the rock foundation 6 (i.e., bedrock) should be determined through structural calculations based on the mechanical properties of the bedrock and the equipment load to ensure sufficient bearing capacity. For example, under conditions of hard and intact bedrock, the depth can be 0.5m to 1.5m. Reliable fixation of the precast support column to the rock foundation 6 is achieved through bolt connections inserted into the first bolt hole 9 and the second bolt hole 12.
[0069] Preferably, the bearing layer of the rock foundation 6 is a bedrock with high bearing capacity and good integrity, such as hard rock. Preferably, the hard rock includes, but is not limited to, the following bedrocks with high bearing capacity, good integrity and shallow burial depth: unweathered or slightly weathered granite, basalt, quartzite, diorite, andesite, and diabase.
[0070] It should be noted that in this patent application, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one" does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element. In this patent application, if it refers to performing an action according to an element, it means performing the action at least according to that element, including two cases: performing the action only according to that element, and performing the action according to that element and other elements. Expressions such as "multiple," "repeatedly," and "various" include two, two times, two kinds, and more than two, more than two times, and more than two kinds.
[0071] All documents mentioned in this application are considered to be incorporated in their entirety into the disclosure of this application so that they can serve as a basis for modifications if necessary. Furthermore, it should be understood that after reading the foregoing disclosure of this application, those skilled in the art can make various alterations or modifications to this application, and these equivalent forms also fall within the scope of protection claimed in this application.
Claims
1. A modular steam turbine generator base, characterized in that, include: The structure includes a steel roof slab (1), multiple precast support columns, a rock foundation (6), and high-damping alloy vibration isolators (2). A steam turbine generator set is installed on the steel roof slab (1), and the high-damping alloy vibration isolators (2) are installed between the steel roof slab (1) and the top of each precast support column. The precast support column is vertically arranged between the steel structure top plate (1) and the rock foundation (6). The precast support column is composed of multiple segmented precast support column segments obtained by precast concrete. Adjacent segmented precast support column segments are connected by an insert connection structure.
2. The turbine generator base as described in claim 1, characterized in that, The prefabricated support column comprises, from top to bottom, a first segmented prefabricated support column segment, a second segmented prefabricated support column segment, and a third segmented prefabricated support column segment.
3. The turbine generator base as described in claim 2, characterized in that, The third segment of the precast support column is fixed to the rock foundation (6) by an anchoring assembly.
4. The turbine generator base as described in claim 3, characterized in that, The anchoring assembly includes a first flange plate (9) pre-embedded at the bottom of the third segment prefabricated support column and a second flange plate (11) pre-embedded at the top of the rock foundation (6). The anchoring assembly is fixedly connected by bolts through bolt holes provided on the first flange plate (9) and the second flange plate (11).
5. The turbine generator base as described in claim 4, characterized in that, The anchoring assembly also includes an H-beam (14) and a second anchor bar (13), one end of which is inserted into the rock foundation (6), and the other end is welded to the bottom of the second flange plate (11).
6. The turbine generator base as described in claim 5, characterized in that, The H-beam (14) is inserted into the rock foundation (6) to a depth of 0.5m-1.5m.
7. The turbine generator base as described in claim 6, characterized in that, The bearing layer of the rock foundation (6) is hard rock, and the H-beam (14) is inserted into the hard rock. The hard rock includes, but is not limited to, the following bedrock with high bearing capacity, good integrity and shallow burial depth: unweathered or slightly weathered granite, basalt, quartzite, diorite, andesite, and diabase.
8. The turbine generator base as described in claim 1, characterized in that, The connecting ends of adjacent prefabricated support column segments are respectively provided with mutually cooperating protrusions and grooves to form the insert-type connection structure.
9. The turbine generator base as described in claim 8, characterized in that, Steel plates are pre-embedded at the end faces of the connecting ends of adjacent prefabricated support column segments. After the insertion connection is completed, the pre-embedded steel plates are bevel welded.
10. The turbine generator base as described in claim 1, characterized in that, The steel structure top plate (1) is formed by welding an upper steel plate, a lower steel plate and a vertical stiffening plate set between the two, and the whole is a cuboid structure.