A multi-pass evaporator input tube assembly

By designing a split-type rotary quick-connect structure and support components, the maintenance difficulties and leakage problems caused by the non-removable welding and rigid connection of the multi-channel evaporator input pipeline are solved, achieving quick connection, sealing and stability, and improving equipment maintenance efficiency and pipeline life.

CN224999942UActive Publication Date: 2026-11-20FOSHAN SHUNDE DISTRICTTONGXINGYE IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522787707.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-29
Publication Date
2026-11-20
Estimated Expiration
2035-12-29

AI Technical Summary

Technical Problem

The existing multi-channel evaporator inlet pipe connection uses welding, which makes it non-removable, cumbersome to maintain and poses safety hazards. Furthermore, the rigid connection cannot buffer fluid vibration, leading to leakage and fatigue fracture.

Method used

It adopts a split-type rotary quick-connect structure, including a connecting tube, a first fixed sleeve and a second fixed sleeve. Through the rotational misalignment of the ferrule and the arc block, combined with the locking of the screw driven by the limit plate and the crank handle, it can achieve quick connection and separation. Flexible support is provided by the spring and rubber clamp in the support assembly.

Benefits of technology

It enables rapid connection and disconnection of multi-channel evaporator inlet pipes, improves maintenance efficiency, ensures the sealing and stability of the connection, prevents loosening and leakage, and extends the service life of the pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224999942U_ABST
    Figure CN224999942U_ABST
Patent Text Reader

Abstract

The utility model relates to refrigeration equipment technical field discloses a kind of multi-channel evaporator input pipe assemblies, it includes input pipe, shunt disc, connecting assembly and capillary, connecting assembly includes connecting pipe, first fixed sleeve and second fixed sleeve, first fixed sleeve inner wall and second fixed sleeve outer wall are fixed with clamping sleeve and arc block, both are fixed by rotating dislocation cooperation, shunt disc top is equipped with the support assembly including support column, support disc, support disc is equipped with spring and rubber clamp plate inside.The utility model is by using the structure of screw locking of screw joint buckle cooperation, replace traditional welding, realized the quick disassembly and double anti-loose sealing of pipeline, solved the problem of maintenance difficulty;Spring is driven simultaneously to rubber clamp plate to carry out flexible clamping to capillary, effectively absorb fluid vibration, prevent pipeline fatigue fracture, guarantee the stability of evaporator operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of refrigeration equipment technology, and in particular to a multi-channel evaporator inlet pipe assembly. Background Technology

[0002] As a core heat exchange component in a refrigeration system, the quality of the inlet piping connection of the multi-channel evaporator directly affects the system's refrigeration efficiency and operational safety. In existing technical solutions, to ensure that high-pressure refrigerant does not leak, the connection between the inlet pipe, the distribution plate, and the subsequent capillary tube is usually permanently fixed by flame brazing.

[0003] However, this traditional welding connection method has revealed significant shortcomings in practical applications. When the evaporator becomes clogged with dirt or ice, or when damaged piping components need to be replaced, maintenance personnel must use specialized gas welding equipment to melt and separate the weld points at high temperatures. This is not only cumbersome, time-consuming, and labor-intensive, resulting in extremely low maintenance efficiency, but also poses significant safety hazards when performing hot work in the narrow and complex internal space of the equipment. The high temperatures can easily damage surrounding insulation materials, plastic parts, or electrical components. Furthermore, rigid weld points cannot effectively buffer the fluid vibrations generated by the high-speed flow of refrigerant, which can easily lead to stress concentration at the weld joint under long-term operation, causing cracking and leakage, and affecting the reliability of the system.

[0004] Therefore, this utility model proposes a multi-channel evaporator input pipe assembly to overcome the shortcomings of the prior art. Utility Model Content

[0005] To overcome the above shortcomings, this utility model provides a multi-channel evaporator inlet pipe assembly, which aims to improve the problems in the prior art where the multi-channel evaporator inlet pipe generally adopts welding method, resulting in non-removable connection, extremely difficult later maintenance and repair, and rigid connection cannot buffer vibration, leading to easy fatigue and breakage of the pipe.

[0006] To achieve the above objectives, the present invention adopts the following technical solution: a multi-channel evaporator input pipe assembly, comprising an input pipe, a distribution plate fixedly connected to the top of the input pipe, multiple sets of connecting components connected to the distribution plate, and a capillary tube connected to the output end of the connecting components; The connecting component has a split-type rotary quick-connect structure, which includes a connecting tube, a first fixing sleeve and a second fixing sleeve. The bottom end of the connecting tube is fixedly connected to the output end of the distributor plate, the top end of the connecting tube is fixedly integrated with the first fixing sleeve, and the second fixing sleeve is fixedly integrated with the capillary tube. Furthermore, a retaining sleeve and an arc-shaped block are fixed to the inner wall of the first fixed sleeve and the outer wall of the second fixed sleeve. The second fixed sleeve is inserted into the first fixed sleeve, and the retaining sleeve and the arc-shaped block on the second fixed sleeve are fixed to the retaining sleeve and the arc-shaped block on the first fixed sleeve by means of rotational misalignment. A support assembly is provided at the top of the diverter plate. The support assembly includes a support column and a support plate. The support plate is provided with a spring and a rubber clamp for elastically clamping the capillary tube. Preferably, a limiting plate is fixed to the side wall of the second fixed sleeve. The limiting plate has a blocking and limiting function, which is used to limit the final rotation position of the arc-shaped block on the first fixed sleeve during the rotation docking process, so as to ensure accurate snap-fit ​​alignment. At the same time, the arc-shaped block on the second fixed sleeve is threadedly connected to a screw, and a crank handle is fixed to the end of the screw. The screw can be driven to move by operating the crank handle. Preferably, the end of the screw away from the crank handle is configured to be able to screw into the arc-shaped block corresponding to the inner wall of the first fixing sleeve, thereby using the mechanical pin principle to achieve circumferential locking and position fixation between the two. Preferably, a gasket is provided on the side wall of the screw, and the gasket abuts tightly against the surface of the arc-shaped block on the second fixing sleeve to increase the contact friction and prevent the screw from loosening in a vibration environment; Preferably, a sealing ring is provided between the first fixing sleeve and the second fixing sleeve. The sealing ring is pressed between the inner bottom wall of the first fixing sleeve and the bottom end face of the second fixing sleeve to prevent the internal refrigerant from leaking out. Preferably, the bottom end of the support column of the support assembly is fixedly connected to the top edge of the diverter plate, and the top end of the support column is fixed to the support plate as a whole, so as to play an overall support role; Preferably, the surface of the support plate has multiple holes that match the capillary tube, and the spring and the rubber clamp are evenly distributed along the circumferential direction on the inner wall of the holes to provide multi-directional flexible contact. Preferably, one end of the spring is fixed to the inner wall of the hole in the support plate, and the other end is fixedly connected to the rubber clamp. When the capillary passes through the hole in the support plate, the spring is in a compressed state and pushes the rubber clamp to fit tightly against the outer wall of the capillary, thereby effectively absorbing vibration energy.

[0007] This utility model has the following beneficial effects: 1. This utility model, by adopting a screw-on snap-fit ​​structure in which the first fixing sleeve and the second fixing sleeve cooperate, replaces the traditional welding connection method, and solves the problems of non-removable multi-channel evaporator pipeline connections, cumbersome subsequent maintenance and repair operations and the need for hot work. It achieves the technical effect of realizing rapid connection and separation of pipelines and significantly improving the efficiency of equipment assembly and on-site maintenance.

[0008] 2. This utility model solves the problem of conventional quick-connect structures being prone to reverse loosening and refrigerant leakage under high-frequency vibration and high-pressure environments in refrigeration systems by setting a limiting plate and a locking screw with a crank handle on the second fixed sleeve, and cooperating with the internal sealing ring structure. It achieves the technical effect of providing dual mechanical locking and anti-loosening functions, ensuring high-pressure sealing at the connection and the safety of system operation.

[0009] 3. This utility model solves the problem that slender capillary tubes are prone to severe vibration under high-speed fluid impact, which can lead to pipeline fatigue fracture or noise by setting up a support component including a spring and a rubber clamp. It utilizes the flexible adaptive clamping method formed by the spring driving the rubber clamp. This achieves the technical effect of effectively absorbing pipeline vibration energy, automatically adapting to different pipe diameter tolerances, and extending the service life of the pipeline. Attached Figure Description

[0010] Figure 1 This is a perspective view of a multi-channel evaporator input pipe assembly proposed in this utility model; Figure 2 This is a schematic diagram showing the separation of the capillary tube and the distribution plate in a multi-channel evaporator input pipe assembly proposed in this utility model. Figure 3 This is a schematic diagram of the connection components of a multi-channel evaporator input pipe assembly proposed in this utility model; Figure 4 for Figure 3 Enlarged view of point A in the middle; Figure 5 This is a schematic diagram of the support component for a multi-channel evaporator input pipe assembly proposed in this utility model.

[0011] Legend: 1. Input pipe; 2. Diverter plate; 3. Connecting assembly; 301. Connecting pipe; 302. First fixing sleeve; 303. Second fixing sleeve; 304. Arc block; 305. Sleeve; 306. Handle; 307. Screw; 308. Gasket; 4. Capillary tube; 5. Support assembly; 501. Support column; 502. Support plate; 503. Spring; 504. Rubber clamp. Detailed Implementation

[0012] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0013] Reference Figures 1-5 The present invention provides an embodiment of a multi-channel evaporator inlet pipe assembly, including an inlet pipe 1 and a distribution plate 2 fixedly connected to the top of the inlet pipe 1. The inlet pipe 1 is used to receive refrigerant from the upstream pipeline of the equipment and guide it to flow upward. The distribution plate 2 is used to guide and distribute the inlet refrigerant to multiple flow channel branches. The distribution plate 2 is connected to multiple sets of connecting components 3. The connecting components 3 are used to establish a communication channel between the distribution plate 2 and the downstream pipeline and provide a quick disassembly and assembly interface. The output end of the multiple sets of connecting components 3 is connected to a capillary tube 4. The capillary tube 4 is used to deliver the refrigerant to each heat exchange channel of the multi-channel evaporator to complete the evaporation heat exchange process. The top of the distribution plate 2 is provided with a support component 5. The support component 5 is located above the connecting components 3 and is used to provide radial flexible support for the passing capillary tube 4 to eliminate vibration. The connection component 3 of the multi-channel evaporator inlet pipe assembly adopts a snap-fit ​​quick-connect structure. The connection component 3 specifically includes a connection pipe 301, a first fixing sleeve 302 and a second fixing sleeve 303. The bottom end of the connecting pipe 301 is fixedly connected to the output end of the distributor plate 2, and the top end of the connecting pipe 301 is fixedly integrated with the first fixing sleeve 302. The first fixing sleeve 302 has a cavity for refrigerant to flow inside. The second fixing sleeve 303 is fixedly integrated with the bottom end of the capillary tube 4. The outer diameter of the second fixing sleeve 303 is adapted to the inner diameter of the first fixing sleeve 302. The second fixing sleeve 303 is inserted into the first fixing sleeve 302. The inner wall of the first fixed sleeve 302 is fixed with a ferrule 305 and an arc-shaped block 304. The outer wall of the second fixed sleeve 303 is also fixed with a ferrule 305 and an arc-shaped block 304 that cooperate with each other. When the second fixed sleeve 303 is inserted into the first fixed sleeve 302 and rotated, the ferrule 305 and arc-shaped block 304 on the second fixed sleeve 303 and the ferrule 305 and arc-shaped block 304 on the first fixed sleeve 302 are circumferentially misaligned and overlapped, thereby realizing the axial position fixation of the second fixed sleeve 303 and the first fixed sleeve 302. This fit structure ensures that the connecting component 3 will not separate when subjected to internal fluid pressure, realizing the rapid physical connection of the pipeline. In a preferred embodiment, to prevent the connecting assembly 3 from loosening, a limiting plate is fixed to the side wall of the second fixing sleeve 303. The limiting plate is used to limit the final rotation position of the arc block 304 on the first fixing sleeve 302 during the rotation docking process, so as to ensure accurate snap-fit ​​alignment. A threaded hole is provided on the arc block 304 on the outer wall of the second fixing sleeve 303. A screw 307 is threadedly connected in the threaded hole. A crank 306 is fixed to the end of the screw 307. The screw 307 is driven to move by rotating the crank 306. The end of the screw 307 away from the crank handle 306 can be screwed into the arc-shaped block 304 corresponding to the inner wall of the first fixed sleeve 302. This mechanical pin-type connection achieves circumferential locking to prevent the connection from being reversed and loosened due to equipment vibration. A washer 308 is sleeved on the side wall of the screw 307. The washer 308 abuts against the surface of the arc-shaped block 304 on the second fixed sleeve 303 to increase friction and prevent the screw 307 from loosening itself. As another preferred embodiment, in order to ensure the sealing of the pipeline connection, a sealing ring is provided between the first fixed sleeve 302 and the second fixed sleeve 303. The sealing ring is located between the inner bottom wall of the first fixed sleeve 302 and the bottom end face of the second fixed sleeve 303. When the two are pressed and fixed, the sealing ring is compressed to prevent refrigerant leakage. As a further preferred embodiment, in order to improve the stability of the pipeline system, the support assembly 5 includes a support column 501 and a support plate 502. The bottom end of the support column 501 is fixedly connected to the top edge of the diverter plate 2, and the top end of the support column 501 is fixed to the support plate 502 as a whole. Multiple holes matching the capillary tube 4 are opened on the surface of the support plate 502. Springs 503 and rubber clamps 504 are evenly distributed along the circumferential direction on the inner wall of the holes. One end of the spring 503 is fixed to the inner wall of the hole in the support plate 502, and the other end is fixedly connected to the rubber clamp 504. The inner wall of the rubber clamp 504 is concave arc-shaped and has anti-slip texture. When the capillary tube 4 passes through the hole in the support plate 502, the spring 503 is in a compressed state and pushes the rubber clamp 504 to fit tightly against the outer wall of the capillary tube 4, thereby forming a multi-directional elastic clamping of the capillary tube 4, effectively absorbing vibration energy and adapting to different tube diameter tolerances.

[0014] Working principle: First, the refrigerant enters the bottom of the input pipe 1 from the upstream pipeline of the equipment, flows upward along the input pipe 1 and enters the internal cavity of the distribution plate 2 which is fixedly connected to it. Under the guiding action of the distribution plate 2, the refrigerant is initially distributed to the inlet of multiple sets of connecting components 3. Then, it is precisely distributed to the corresponding capillary tubes 4 through the connecting components 3. Finally, it is transported to each heat exchange channel of the multi-channel evaporator through the capillary tubes 4 to complete the evaporation process. The support component 5 continuously supports and fixes the capillary tubes 4 throughout the entire operation to ensure the stability of the pipeline.

[0015] The output end of the distributor plate 2 is fixedly connected to the bottom end of the connecting pipe 301. The top end of the connecting pipe 301 is fixedly integrated with the first fixing sleeve 302. The second fixing sleeve 303 is fixedly integrated with the capillary tube 4. The side walls of the first fixing sleeve 302 and the second fixing sleeve 303 are both fixed with a retaining sleeve 305 and an arc-shaped block 304. A sealing ring is provided between the first fixing sleeve 302 and the second fixing sleeve 303. During connection, by fitting the second fixing sleeve 303 with the first fixing sleeve 302 and then rotating it, the retaining sleeve 305 and the arc-shaped block 304 on the inner wall of the second fixing sleeve 303 are spliced ​​and fixed with the retaining sleeve 305 and the arc-shaped block 304 on the side wall of the first fixing sleeve 302. At the same time, the second fixing... A limiting plate is fixed to the side wall of the fixed sleeve 303 to limit the position of the arc block 304 on the first fixed sleeve 302 during rotation. After the position is fixed, the crank 306 on the arc block 304 on the second fixed sleeve 303 is rotated to drive the screw 307 to rotate and screw into the inner wall of the corresponding arc block 304 on the first fixed sleeve 302, thereby fixing its position and further enhancing the sealing and fixing effect. At the same time, the gasket 308 on the side wall of the screw 307 is used to prevent the screw 307 from rotating and to avoid loosening. When the refrigerant flows in from the connecting pipe 301, it will enter the capillary tube 4 through the cavity of the first fixed sleeve 302 and the second fixed sleeve 303 to realize the delivery of refrigerant.

[0016] The bottom end of the support column 501 is fixedly connected to the top edge of the distribution plate 2, and the top end of the support column 501 is fixedly integrated with the support plate 502. The support plate 502 has multiple holes that match the capillary tube 4. Springs 503 and rubber clamps 504 are evenly distributed on the inner wall of the holes. One end of the spring 503 is fixed to the cavity wall of the support plate 502, and the other end is fixedly connected to the rubber clamp 504. When the capillary tube 4 passes through the holes of the support plate 502, the spring 503 will push the rubber clamp 504 to fit tightly against the outer wall of the capillary tube 4, thereby forming radial support for the capillary tube 4 and preventing it from shaking when the refrigerant flows or the equipment vibrates, thus ensuring the stability of the pipeline connection.

Claims

1. A multi-channel evaporator inlet pipe assembly, comprising: Input tube (1); The flow divider (2) is fixedly connected to the top of the input pipe (1); Multiple sets of connection components (3), the multiple sets of connection components (3) are connected to the distribution plate (2); Capillary tube (4), which is connected to the output end of the connecting component (3); The connecting component (3) is characterized in that it includes a connecting tube (301), a first fixing sleeve (302) and a second fixing sleeve (303). The bottom end of the connecting tube (301) is fixedly connected to the output end of the diverter plate (2), the top end of the connecting tube (301) is fixedly integrated with the first fixing sleeve (302), and the second fixing sleeve (303) is fixedly integrated with the capillary tube (4). The inner wall of the first fixing sleeve (302) and the outer wall of the second fixing sleeve (303) are both fixed with a sleeve (305) and an arc-shaped block (304). The second fixing sleeve (303) is inserted into the first fixing sleeve (302), and the sleeve (305) and arc-shaped block (304) on the second fixing sleeve (303) cooperate with the sleeve (305) and arc-shaped block (304) on the first fixing sleeve (302) for fixation. The top of the diverter plate (2) is provided with a support assembly (5), which includes a support column (501) and a support plate (502). The support plate (502) is provided with a spring (503) for elastically clamping the capillary tube (4) and a rubber clamp (504).

2. The multi-channel evaporator inlet pipe assembly according to claim 1, characterized in that: The second fixed sleeve (303) has a limit plate fixed to its side wall. The limit plate is used to limit the rotation position of the arc block (304) on the first fixed sleeve (302). The arc block (304) on the second fixed sleeve (303) is threadedly connected to a screw (307). A crank (306) is fixed to the end of the screw (307).

3. A multi-channel evaporator inlet pipe assembly according to claim 2, characterized in that: The end of the screw (307) away from the crank handle (306) is screwed into the arc-shaped block (304) corresponding to the inner wall of the first fixing sleeve (302) to achieve position fixation.

4. A multi-channel evaporator inlet pipe assembly according to claim 2, characterized in that: A gasket (308) is fitted on the side wall of the screw (307). The gasket (308) abuts against the surface of the arc-shaped block (304) on the second fixing sleeve (303) to prevent the screw (307) from loosening.

5. A multi-channel evaporator inlet pipe assembly according to claim 1, characterized in that: A sealing ring is provided between the first fixing sleeve (302) and the second fixing sleeve (303), and the sealing ring is located between the inner bottom wall of the first fixing sleeve (302) and the bottom end face of the second fixing sleeve (303).

6. A multi-channel evaporator inlet pipe assembly according to claim 1, characterized in that: The bottom end of the support column (501) is fixedly connected to the top edge of the diversion plate (2), and the top end of the support column (501) is fixed to the support plate (502) as one piece.

7. A multi-channel evaporator inlet pipe assembly according to claim 6, characterized in that: Multiple holes matching the capillary tube (4) are opened on the surface of the support plate (502), and springs (503) and rubber clamps (504) are evenly distributed on the inner wall of the holes.

8. A multi-channel evaporator inlet pipe assembly according to claim 7, characterized in that: One end of the spring (503) is fixed to the inner wall of the hole in the support plate (502), and the other end is fixedly connected to the rubber clamp (504). When the capillary tube (4) passes through the hole in the support plate (502), the spring (503) pushes the rubber clamp (504) to fit tightly against the outer wall of the capillary tube (4).