Floor thickness detection device for construction project management

By designing the signal transmitting probe, receiving probe, and fixed support assembly of the floor slab thickness detection device, the device achieves automated, highly stable clamping and alignment of the probe, solving the problems of measurement errors and operational inconvenience caused by human shaking, and improving the safety and efficiency of the detection.

CN225000449UActive Publication Date: 2026-11-20GUANGJI ENVIRONMENTAL CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522767405.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-11-20
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

Existing methods for measuring floor slab thickness suffer from measurement errors caused by human vibration, operational inconvenience, and safety hazards. Furthermore, they lack stable fixing and alignment mechanisms, which affect the accuracy and reliability of measurement results.

Method used

The floor slab thickness detection device includes a signal transmitting probe, a signal receiving probe, a detector, and a fixed support assembly. A hydraulic cylinder drives a Y-shaped connecting rod to push a gripper to hold the probe, which is then fixed to the floor slab by a vacuum suction cup. Combined with an electric telescopic rod to adjust the height, the device achieves automated, highly stable clamping and alignment of the probe.

Benefits of technology

It eliminates human error, improves the safety and efficiency of testing, and ensures the accuracy and reliability of measurement results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225000449U_ABST
    Figure CN225000449U_ABST
Patent Text Reader

Abstract

The utility model belongs to floor thickness detection technical field, especially related to a floor thickness detection device for construction engineering project management, including floor thickness detection instrument and fixed support component, floor thickness detection instrument includes signal emission probe, signal receiving probe and detection appearance, the fixed support component has two symmetrical distribution's Y type connecting rods and two fixed limit lug plates of connecting on left and right, the fixed support component horizontal fixed mounting has the hydraulic cylinder that can follow the axial telescoping in the bottom inner wall. The utility model discloses through hydraulic drive Y type connecting rod rod push top pull rod makes the jaw clamping signal emission probe, and simultaneously connecting rod linkage makes push rod extrusion vacuum chuck to let it adsorb on the floor, base stable electric telescopic rod, realized to the detection probe automation, high stability's clamping and alignment, effectively eliminated artificial operation error, improved the safety and detection efficiency of high altitude operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of floor slab thickness detection technology, and in particular to a floor slab thickness detection device for building engineering project management. Background Technology

[0002] In construction project management, floor slab thickness is a key indicator for measuring construction quality and ensuring structural safety. Currently, most common methods for measuring floor slab thickness rely on manual handheld testing equipment. This method has the following significant drawbacks: First, when holding the probe, human shaking or uneven pressure can easily lead to poor contact between the probe and the floor slab surface, resulting in measurement errors. Second, when testing at heights or on the underside of large-span floor slabs, manual operation is inconvenient and poses safety hazards, resulting in low testing efficiency. Furthermore, traditional methods lack a stable fixing and alignment mechanism, making it difficult to ensure precise vertical alignment of the signal transmitting and receiving probes, further affecting the accuracy and reliability of the measurement results.

[0003] To address the aforementioned issues, we propose a floor slab thickness detection device for building construction project management. Utility Model Content

[0004] The purpose of this utility model is to solve the problems in the background art by proposing a floor slab thickness detection device for building engineering project management.

[0005] To achieve the above objectives, the present invention adopts the following technical solution: a floor slab thickness detection device for building engineering project management, comprising a floor slab thickness detection instrument and a fixed support assembly. The floor slab thickness detection instrument includes a signal transmitting probe, a signal receiving probe, and a detector. The fixed support assembly is a U-shaped frame structure. The fixed support assembly has two symmetrically distributed Y-shaped connecting rods on the left and right sides and two fixedly connected limiting ears. A hydraulic cylinder that can extend and retract axially along the bottom inner wall is horizontally fixedly installed on the fixed support assembly. The signal transmitting probe is installed on the fixed support assembly. The fixed support assembly is provided with grippers for holding the signal transmitting probe. The two grippers are slidably installed on the top crossbeam of the fixed support assembly. The other ends of the two grippers are hinged to two top pull rods. The Y-shaped connecting rod is formed by merging a long connecting rod and a short connecting rod, wherein the merging point of the long connecting rod and the short connecting rod is located at 1 / 3 of the length of the long connecting rod. One end of the long connecting rod is hinged to the other end of the top pull rod, the middle part is hinged to the limiting ears, and the other end is hinged to the extension end of the hydraulic cylinder.

[0006] In the above-mentioned floor slab thickness detection device for building engineering project management, the detector and the signal receiving probe are installed on the upper surface of the floor slab, and the signal transmitting probe is closely attached to the lower surface of the floor slab and is vertically aligned with the installation position of the signal receiving probe.

[0007] In the above-mentioned floor slab thickness detection device for building engineering project management, the limiting ear plate is provided with a push rod that slides up and down. The upper end of the push rod is fixedly connected to a vacuum suction cup, the vacuum suction cup is tightly attached to the bottom of the floor slab, and the lower end of the push rod abuts against a short connecting rod.

[0008] In the above-mentioned floor slab thickness detection device for building engineering project management, the top crossbeam of the fixed support assembly is provided with two symmetrical guide rails, the bottom of the gripper is provided with a slider that matches the guide rails, the opposite side of the gripper is provided with an anti-slip rubber pad, and the surface of the rubber pad is provided with tooth-like patterns.

[0009] In the above-mentioned floor slab thickness detection device for building engineering project management, a base is provided below the fixed support assembly, and an electric telescopic rod connected to the fixed support assembly is fixed on the base.

[0010] Compared with existing technologies, the advantages of this floor slab thickness detection device for construction project management are as follows: the hydraulically driven Y-shaped linkage pushes the top pull rod to make the gripper hold the signal transmitting probe, while the linkage causes the push rod to squeeze the vacuum suction cup to adhere to the floor slab. The base stabilizes the electric telescopic rod, realizing automated and highly stable clamping and alignment of the detection probe, effectively eliminating human operation errors and improving the safety and detection efficiency of high-altitude operations. Attached Figure Description

[0011] Figure 1 This is a schematic diagram of the structure of a floor slab thickness detection device for building engineering project management proposed in this utility model; Figure 2 This is a schematic diagram of the structure of a floor slab thickness detection instrument for building engineering project management proposed in this utility model. Figure 3 This is a schematic diagram of the fixed support assembly structure of a floor slab thickness detection device for building engineering project management proposed in this utility model.

[0012] Figure 4 This is a schematic diagram of the internal structure of the fixed support assembly of a floor slab thickness detection device for building engineering project management proposed in this utility model.

[0013] In the diagram: 1. Detector; 2. Signal transmitting probe; 3. Fixing bracket assembly; 4. Gripper; 5. Top pull rod; 6. Long connecting rod; 7. Short connecting rod; 8. Y-shaped connecting rod; 9. Limiting ear plate; 10. Push rod; 11. Vacuum suction cup; 12. Hydraulic cylinder; 13. Electric telescopic rod; 14. Base; 15. Guide rail. Detailed Implementation

[0014] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.

[0015] Reference Figures 1-3 A floor slab thickness detection device for construction project management includes a floor slab thickness detection instrument and a fixed support assembly. The floor slab thickness detection instrument includes a signal transmitting probe 2, a signal receiving probe, and a detector 1. The fixed support assembly 3 has a U-shaped frame structure, with two symmetrically distributed Y-shaped connecting rods 8 on the left and right sides and two fixedly connected limiting ear plates 9. A hydraulic cylinder 12, which can extend and retract axially along the bottom inner wall, is horizontally fixedly installed on the fixed support assembly 3. The hydraulic cylinder 12 is initially in a retracted state, and the Y-shaped connecting rods 8 drive the top pull rod 5 to open the two grippers 4 on the guide rail.

[0016] The signal transmitting probe 2 is mounted on the fixed bracket assembly 3. The fixed bracket assembly 3 is provided with grippers 4 for holding the signal transmitting probe 2. The two grippers 4 are slidably mounted on the top crossbeam of the fixed bracket assembly 3, and the signal transmitting probe 2 is placed between the two open grippers 4. The other end of the two grippers 4 is hinged to two top pull rods 5. The top crossbeam of the fixed bracket assembly 3 is provided with two symmetrical guide rails 15. The bottom of the grippers 4 is provided with sliders that match the guide rails. The opposite surfaces of the grippers 4 are provided with anti-slip rubber pads, and the surface of the rubber pads is provided with toothed texture to increase the friction between the grippers and the signal transmitting probe 2.

[0017] The Y-shaped connecting rod 8 is formed by the combination of a long connecting rod 6 and a short connecting rod 7. The point where the long connecting rod 6 and the short connecting rod 7 merge is located at 1 / 3 of the length of the long connecting rod 6. One end of the long connecting rod 6 is hinged to the other end of the top tie rod 5, the middle part is hinged to the limiting ear plate 9, and the other end is hinged to the telescopic end of the hydraulic cylinder 12. The limiting ear plate 9 is provided with a push rod 10 that slides up and down. The upper end of the push rod 10 is fixedly connected to the vacuum suction cup 11. The vacuum suction cup 11 is tightly attached to the bottom of the floor slab, and the lower end of the push rod 10 abuts against the short connecting rod 7.

[0018] The hydraulic cylinder 12 is activated to extend it. The hydraulic cylinder pushes the long connecting rod 6 to rotate around the hinge point of the limiting ear plate 9 in the middle. The rotation of the long connecting rod 6 is converted into a thrust on the gripper 4 through the top pull rod 5, driving the two grippers 4 to slide towards each other along the guide rail 15, thereby firmly clamping the signal transmitting probe 2 in the middle. At the same time, the movement of the long connecting rod 6 causes its merged short connecting rod 7 to swing upward. The short connecting rod 7 pushes up the push rod 10, causing the vacuum suction cup 11 fixed at the upper end of the push rod to move upward until it is tightly adsorbed on the lower surface of the floor slab. This process realizes the temporary locking and fixation of the entire fixed bracket assembly 3 relative to the floor slab. At this time, the signal transmitting probe 2 fixed by the gripper 4 is also tightly attached to the lower surface of the floor slab.

[0019] The operator places the detector 1 and the signal receiving probe connected to it on the upper surface of the floor slab, and precisely aligns it with the installation position of the signal transmitting probe 2 on the lower surface. The detector 1 is then activated, and the signal transmitting probe 2 emits a signal that passes through the floor slab and is received by the signal receiving probe on the upper surface. The detector 1 calculates the precise thickness of the floor slab by processing parameters such as signal propagation time.

[0020] A base 14 is provided below the fixed support assembly 3. An electric telescopic rod 13 connected to the fixed support assembly 3 is fixed on the base 14. By controlling the raising and lowering of the electric telescopic rod 13 at the bottom of the fixed support assembly 3, the height of the entire device can be adjusted to adapt to the floor height under different working conditions. The electric telescopic rod 13 is installed on the base 14 to ensure overall stability.

[0021] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A floor slab thickness detection device for construction project management, comprising a floor slab thickness detection instrument and a fixing bracket assembly, characterized in that, The floor slab thickness measuring instrument includes a signal transmitting probe (2), a signal receiving probe, and a measuring instrument (1). The fixed support assembly (3) is a U-shaped frame structure. The fixed support assembly (3) has two symmetrically distributed Y-shaped connecting rods (8) on the left and right sides and two fixedly connected limiting ear plates (9). The fixed support assembly (3) is horizontally fixed with a hydraulic cylinder (12) that extends and retracts axially along the bottom inner wall. The signal transmitting probe (2) is mounted on the fixed support assembly (3). The fixed support assembly (3) is provided with a clamping device for the signal transmitting probe. 2) The gripper (4) is slidably mounted on the top crossbeam of the fixed bracket assembly (3). The other end of the gripper (4) is hinged to two top pull rods (5). The Y-shaped connecting rod (8) is formed by the combination of a long connecting rod (6) and a short connecting rod (7). The point where the long connecting rod (6) and the short connecting rod (7) are combined is located at 1 / 3 of the length of the long connecting rod (6). One end of the long connecting rod (6) is hinged to the other end of the top pull rod (5), the middle part is hinged to the limiting ear plate (9), and the other end is hinged to the telescopic end of the hydraulic cylinder (12).

2. The floor slab thickness detection device for construction project management according to claim 1, characterized in that, The detector (1) and the signal receiving probe are installed on the upper surface of the floor slab, and the signal transmitting probe (2) is closely attached to the lower surface of the floor slab and is aligned vertically with the installation position of the signal receiving probe.

3. The floor slab thickness detection device for construction project management according to claim 1, characterized in that, The limiting ear plate (9) is provided with a push rod (10) that slides up and down. The upper end of the push rod (10) is fixedly connected to a vacuum suction cup (11). The vacuum suction cup (11) is tightly attached to the bottom of the floor slab. The lower end of the push rod (10) abuts against the short connecting rod (7).

4. The floor slab thickness detection device for construction project management according to claim 1, characterized in that, The top crossbeam of the fixed bracket assembly (3) is provided with two symmetrical guide rails (15), the bottom of the gripper (4) is provided with a slider that matches the guide rail, the opposite side of the gripper (4) is provided with an anti-slip rubber pad, and the surface of the rubber pad is provided with toothed texture.

5. The floor slab thickness detection device for construction project management according to claim 1, characterized in that, The fixed bracket assembly (3) is provided with a base (14) below it, and an electric telescopic rod (13) connected to the fixed bracket assembly (3) is fixed on the base (14).