A switching device

By introducing a pre-charge circuit and a pre-charge resistor into the switching device, combined with mechanical transmission control, the current surge problem caused by direct closing of the main circuit was solved, achieving electrical safety transition and improved system stability.

CN225003101UActive Publication Date: 2026-11-20SHANGHAI LIANGXIN ELECTRICAL CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522574475.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-03
Publication Date
2026-11-20
Estimated Expiration
2035-12-03

AI Technical Summary

Technical Problem

When existing fusion switches are directly closed without current limiting measures in the main circuit, they are prone to generating large currents, which can lead to contactor contact damage, arcing faults, and malfunctions of protection devices, affecting the safety and reliability of the power system.

Method used

Design a switching device that uses a first switch, a second switch, and a precharge switch connected in series. It employs a logic sequence of precharge circuit closing and opening, and main charge circuit closing and opening. Combined with a precharge resistor to limit current, it avoids directly closing the main charge circuit. It also uses mechanical transmission and control mechanisms to achieve precise control.

Benefits of technology

It effectively limits the current surge when the main circuit is closed, improves the safety, stability and controllability of the power system, and extends its service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225003101U_ABST
    Figure CN225003101U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of switch device, it is related to electrical equipment technical field.The switch device includes first switch, second switch and pre-charging switch, one of first switch and second switch is connected in series in the positive terminal circuit of power supply, the other is connected in series in the negative terminal circuit of power supply, and the conductive loop where first switch and second switch are located forms main charging loop;At least one pre-charging switch is connected in series with first switch or second switch and forms pre-charging loop by this, the closing and opening sequence of switch device is: pre-charging loop closing, pre-charging loop opening, main charging loop closing, main charging loop opening, by this, not only realize electrical safety transition, but also improve the controllability and stability of system, thereby effectively prolong the safety, stability and service life of power system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of electrical equipment technology, and more specifically, to a switching device. Background Technology

[0002] As a key component for power-on protection of battery systems, the integrated switch is widely used in power systems such as new energy vehicles, energy storage systems and DC power distribution. Its core function is to safely complete the connection and disconnection of the main circuit when the system starts up, and effectively suppress transient impacts during the power-on process.

[0003] However, existing integrated switches still have significant safety hazards in practical applications. When the main circuit is closed directly without current limiting measures, a large current is easily generated. This current may not only damage the contactor contacts and cause arcing faults, but may also trigger the protection device to malfunction, affecting the safety and reliability of the power system. Utility Model Content

[0004] This invention provides a switching device with a simple structure and reliable response, which can effectively limit the current generated when the main charging circuit is directly closed, thereby improving the safety and stability of the power system.

[0005] The embodiments of this utility model can be implemented as follows: In a first aspect, the present invention provides a switching device, including a first switch, a second switch, and a precharge switch; One of the first switch and the second switch is connected in series in the positive terminal circuit of the power supply, and the other is connected in series in the negative terminal circuit of the power supply. The conductive circuits containing the first switch and the second switch form the main charging circuit. At least one of the precharge switches is connected in series with the first switch or the second switch to form a precharge circuit; The closing and opening sequence of the switching device is as follows: closing the pre-charge circuit, opening the pre-charge circuit, closing the main charging circuit, and opening the main charging circuit.

[0006] In an optional embodiment, at least one of the precharge switches includes a first precharge switch, the first precharge being connected in series with the second switch, and the first precharge switch is also used to be connected in series with a precharge resistor. The pre-charge circuit is formed by the first pre-charge switch, the pre-charge resistor, and the conductive circuit containing the second switch. The closing and opening sequence of the switching device is as follows: the pre-charge circuit is closed, the pre-charge circuit is opened, the main charging circuit is closed, and the main charging circuit is opened.

[0007] In an optional embodiment, the closing and opening sequence of the switching device is as follows: the first precharge switch is closed, the second switch is closed to close the precharge circuit, the first precharge switch is opened to open the precharge circuit, the first switch is closed to close the main charging circuit, and the first and second switches are opened to open the main charging circuit.

[0008] In an optional embodiment, the switching device further includes a first mechanism, a second mechanism, and a first pre-charge mechanism; The first mechanism is driven to the first switch and is used to drive the first switch to close or open; the second mechanism is driven to the second switch and is used to drive the second switch to close or open; the first pre-charge mechanism is driven to the first pre-charge switch and is used to drive the first pre-charge switch to close or open.

[0009] In an optional embodiment, the first mechanism includes a first drive wheel for driving the first switch to close or open; the second mechanism includes a second drive wheel for driving the second switch to close or open; and the pre-charge mechanism includes a pre-charge drive wheel for driving the first pre-charge switch to close or open. The first drive wheel, the second drive wheel, and the precharge drive wheel are connected by a transmission, and there is a free stroke between the first drive wheel, the second drive wheel, and the precharge drive wheel, so that after the precharge drive wheel rotates and drives the first precharge switch to close, the second drive wheel drives the second switch to close, the precharge drive wheel drives the first precharge switch to open, the first drive wheel drives the first switch to close, and the first drive wheel and the second drive wheel drive the first switch and the second switch to open, respectively.

[0010] In an optional embodiment, at least one of the precharge switches includes a first precharge switch and a second precharge switch, wherein the first precharge switch is connected in parallel with the first switch, and the first precharge switch is also used to be connected in series with a precharge resistor, and the second precharge switch is connected in parallel with the second switch. The pre-charge circuit is formed by the first pre-charge switch, the pre-charge resistor, and the conductive circuit containing the second pre-charge switch. The closing and opening sequence of the switching device is as follows: the pre-charge circuit is closed, the pre-charge circuit is opened, the main charging circuit is closed, and the main charging circuit is opened.

[0011] In an optional embodiment, the closing and opening sequence of the switching device is as follows: the first precharge switch and the second precharge switch are closed to close the precharge circuit; the first precharge switch and the second precharge switch are opened to open the precharge circuit; the first switch and the second switch are closed to close the main charging circuit; and the first switch and the second switch are opened to open the main charging circuit.

[0012] In an optional embodiment, the switching device further includes a main charging mechanism and a pre-charging mechanism; The main charging mechanism is driven to both the first switch and the second switch, and is used to drive the first switch and the second switch to close or open synchronously; the pre-charging mechanism is driven to both the first pre-charging switch and the second pre-charging switch, and is used to drive the first pre-charging switch and the second pre-charging switch to close or open synchronously.

[0013] In an optional embodiment, the main charging mechanism includes a main charging drive wheel, which is used to drive the first switch and the second switch to close or open synchronously; the pre-charging mechanism includes a pre-charging drive wheel, which is used to drive the first pre-charging switch and the second pre-charging switch to close or open synchronously. The main charging drive wheel and the pre-charging drive wheel are connected by a transmission, and there is a free stroke between the main charging drive wheel and the pre-charging drive wheel, so that after the pre-charging drive wheel rotates and drives the first pre-charging switch and the second pre-charging switch to close and open synchronously, the main charging drive wheel drives the first switch and the second switch to close and open.

[0014] In an optional implementation, the first switch and the second switch are also used in series with a capacitor.

[0015] In an optional embodiment, the switching device further includes a control mechanism, the control mechanism being used to: In response to receiving a precharge closing command, a first operation is performed, the first operation being used to control the closing of the precharge circuit; In response to receiving a pre-charge instruction, a second operation is performed, the second operation being used to control the pre-charge circuit to trip; In response to receiving a main charge command, a third operation is performed, the third operation being used to control the main charge circuit to close after the precharge circuit is disconnected; And in response to receiving a sub-instruction, a fourth operation is performed, the fourth operation being used to control the main charging circuit to disconnect.

[0016] The beneficial effects of the switching device provided in this embodiment of the present invention include: when the system starts, the pre-charge circuit is first closed, so that the current flows through the pre-charge circuit where the pre-charge switch is located. After the voltage gradually stabilizes, the pre-charge circuit is opened to cut off the pre-charge path. Then, the first switch and the second switch are connected to close the main charging circuit and enter the normal power supply state. When the system is shut down, the main charging circuit is opened to cut off the main current path, avoiding the large current impact caused by directly closing the main charging circuit. This not only achieves electrical safety transition, but also improves the controllability and stability of the system, thereby effectively extending the safety, stability and service life of the power system. Attached Figure Description

[0017] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0018] Figure 1 A schematic diagram of the first embodiment of the switching device provided by this utility model; Figure 2 A schematic diagram of the pre-charge circuit closing of the first embodiment of the switching device provided in this utility model; Figure 3 A schematic diagram of the main charging circuit closing of the first embodiment of the switching device provided in this utility model; Figure 4 A schematic diagram of a second embodiment of the switching device provided in this utility model; Figure 5 A schematic diagram of the pre-charge circuit closing of the second embodiment of the switching device provided in this utility model; Figure 6 A schematic diagram of the main charging circuit closing in the second embodiment of the switching device provided in this utility model.

[0019] Icons: 10-Switch device; 100-First switch; 200-Second switch; 300-Pre-charge switch; 310-First pre-charge switch; 320-Second pre-charge switch; 400-Main charging circuit; 500-Pre-charge circuit; 600-Pre-charge resistor; 20-Power supply; 30-Capacitor. Detailed Implementation

[0020] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0022] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0023] In the description of this utility model, it should be noted that if terms such as "upper," "lower," "inner," or "outer" are used to indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the utility model product is usually placed during use, they are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.

[0024] Furthermore, the terms "first" and "second" are used only to distinguish descriptions and should not be interpreted as indicating or implying relative importance.

[0025] It should be noted that, where there is no conflict, the features in the embodiments of this utility model can be combined with each other.

[0026] As a key component for power-on protection of battery systems, the integrated switch is widely used in power systems such as new energy vehicles, energy storage systems and DC power distribution. Its core function is to safely complete the connection and disconnection of the main circuit when the system starts up, and effectively suppress transient impacts during the power-on process.

[0027] However, existing integrated switches still have significant safety hazards in practical applications. When the main circuit is closed directly without current limiting measures, a large current is easily generated. This current may not only damage the contactor contacts and cause arcing faults, but may also trigger the protection device to malfunction, affecting the safety and reliability of the power system.

[0028] Therefore, there is an urgent need for a simple, reliable, and easy-to-integrate closing control mechanism to effectively limit the surge current when the main circuit is directly closed, improve system safety and stability, and at the same time take into account economy and maintainability.

[0029] Please see Figures 1 to 6 This utility model provides a switching device 10, which solves the problem of instantaneous high current surge caused by directly closing the main circuit in a high voltage or large capacitor load system by setting a first switch 100, a second switch 200 and a pre-charge switch 300, and making specific designs on the electrical connection relationship and operation sequence between each switch.

[0030] In detail, one of the first switch 100 and the second switch 200 is connected in series in the positive terminal circuit of the power supply 20, and the other is connected in series in the negative terminal circuit of the power supply 20. The conductive circuit where the first switch 100 and the second switch 200 are located forms the main charging circuit 400, which is used to carry the main current under normal operating conditions. At least one pre-charge switch 300 is connected in series with the first switch 100 or the second switch 200 to form a pre-charge circuit 500. It can be understood that the pre-charge circuit 500 usually also includes an externally connected pre-charge resistor 600 or other current limiting element, which is used to limit the current amplitude in the initial stage.

[0031] Specifically, when the system starts up, the pre-charge circuit 500 is closed first, allowing current to flow through the pre-charge circuit 500 where the pre-charge switch 300 is located. After the voltage gradually stabilizes, the pre-charge circuit 500 is opened to cut off the pre-charge path. Subsequently, the first switch 100 and the second switch 200 are connected to close the main charging circuit 400, entering the normal power supply state. When the system shuts down, the main charging circuit 400 is opened to cut off the main current path.

[0032] This design ensures that the entire switching process follows the logical sequence of "pre-charge circuit 500 closing, pre-charge circuit 500 opening, main charging circuit 400 closing, and main charging circuit 400 opening," avoiding the large current surge caused by directly closing the main charging circuit 400. This not only achieves electrical safety transition but also improves the controllability and stability of the system, thereby effectively extending the safety and service life of the power system.

[0033] It is worth mentioning that the switching device 10 mentioned in this embodiment needs to be used in conjunction with the capacitor 30 to achieve circuit protection.

[0034] Specifically, the first switch 100 and the second switch 200 are also connected in series with the capacitor 30, and the precharge switch 300 is also connected in series with the capacitor 30, so that the capacitor 30 is charged when the precharge circuit 500 is closed, thereby effectively suppressing the generation of surge current.

[0035] It should be noted that the number of precharge switches 300 can be one or two. If there is only one precharge switch 300, such as... Figures 1 to 3 As shown, the precharge switch 300 includes a first precharge switch 310, which is connected in series with the second switch 200. The first precharge switch 310 is also connected in series with the precharge resistor 600. The conductive circuit containing the first precharge switch 310, the precharge resistor 600, and the second switch 200 forms a precharge circuit 500, wherein the precharge circuit 500 is as follows... Figure 2 As shown by the solid line, the main charging circuit is 400. Figure 3 As shown by the solid line in the middle.

[0036] The closing and opening sequence of the switching device 10 is as follows: closing the pre-charge circuit 500, opening the pre-charge circuit 500, closing the main charging circuit 400, and opening the main charging circuit 400.

[0037] Correspondingly, the closing and opening sequence of the switching device 10 is as follows: the first precharge switch 310 closes, the second switch 200 closes, so that the precharge circuit 500 closes; the first precharge switch 310 opens, so that the precharge circuit 500 opens; the first switch 100 closes, so that the main charging circuit 400 closes; the first switch 100 and the second switch 200 open, so that the main charging circuit 400 opens.

[0038] Specifically, when the system starts up, the first pre-charge switch 310 and the second switch 200 are first closed to perform the pre-charge circuit 500 closing operation. This allows current to flow through the path formed by the first pre-charge switch 310, the pre-charge resistor 600, and the second switch 200 to the capacitor 30 on the load side for slow charging. Due to the presence of the pre-charge resistor 600, the current is effectively suppressed within a safe range, avoiding damage to the battery management system and other sensitive electronic components.

[0039] Once the circuit reaches a stable state, the first pre-charge switch 310 is opened, thus completing the opening action of the pre-charge circuit 500. Since the second switch 200 is still in the closed state, the first switch 100 is closed at this time, which will enable the main charging circuit 400 to conduct. When the system needs to be shut down, the first switch 100 and the second switch 200 are opened sequentially or simultaneously to disconnect the main charging circuit 400.

[0040] It can be seen that by connecting the first precharge switch 310 and the precharge resistor 600 in series, and forming a precharge circuit 500 together with the second switch 200, precise control of the precharge current path can be achieved, effectively reducing the electrical impact during system startup and improving the overall safety and reliability of operation.

[0041] Furthermore, the switching device 10 also includes a first mechanism, a second mechanism, and a first pre-charge mechanism.

[0042] The first mechanism is driven to the first switch 100 and is used to drive the first switch 100 to close or open; the second mechanism is driven to the second switch 200 and is used to drive the second switch 200 to close or open; the first precharge mechanism is driven to the first precharge switch 310 and is used to drive the first precharge switch 310 to close or open.

[0043] In this embodiment, the first mechanism and the first switch 100 are connected by a transmission. When the main charging circuit 400 receives a closing or opening command, the first mechanism generates directional displacement or rotational motion, and transmits power to the operating component of the first switch 100 through components such as connecting rods, gears, cams or electromagnetic drive components, so that it completes the closing or opening action.

[0044] It is understandable that this transmission path has a clear directionality and timing controllability, which can ensure that the first switch 100 accurately enters the conducting or isolating state at a specified time, providing a basic guarantee for the operation of subsequent circuits. Similarly, the second mechanism establishes an independent transmission connection with the second switch 200 to respond to the on / off requirements in the precharge circuit 500, and works with the first precharge switch 310 to jointly construct a complete current path during the precharge phase.

[0045] It can be seen that by setting the first mechanism, the second mechanism, and the first pre-charge mechanism to form a transmission connection with the corresponding switches, independent control and precise synchronization of the actions of switches in different circuits are achieved, enhancing the system's adaptability under complex operating procedures.

[0046] Specifically, the first mechanism includes a first drive wheel, which is used to drive the first switch 100 to close or open; the second mechanism includes a second drive wheel, which is used to drive the second switch 200 to close or open; and the pre-charging mechanism includes a pre-charging drive wheel, which is used to drive the first pre-charging switch 310 to close or open.

[0047] The first drive wheel, the second drive wheel, and the precharge drive wheel are connected by a transmission, and there is a free stroke between the first drive wheel, the second drive wheel, and the precharge drive wheel, so that after the precharge drive wheel rotates and drives the first precharge switch 310 to close, the second drive wheel drives the second switch 200 to close, and then the precharge drive wheel drives the first precharge switch 310 to open, and then the first drive wheel drives the first switch 100 to close, and the first drive wheel and the second drive wheel drive the first switch 100 and the second switch 200 to open respectively.

[0048] With this design, when the external power source starts and drives the three drive wheels to rotate synchronously, the pre-charge drive wheel first overcomes the idle travel and drives the first pre-charge switch 310 to close, so that the power supply 20 starts charging the load-side capacitor through the current limiting element; then the second drive wheel ends the idle travel state and drives the second switch 200 to close, completing the conduction conditions of the pre-charge circuit 500; thereafter, the pre-charge drive wheel continues to move and acts in the opposite direction on the first pre-charge switch 310, causing it to open to cut off the pre-charge path; immediately after the first drive wheel completes the idle travel transition, it drives the first switch 100 to close, putting power into the main charging circuit 400; after the entire process is completed, the first drive wheel and the second drive wheel can further cooperate to complete the opening operation of the first switch 100 and the second switch 200, realizing the safe shutdown of the system.

[0049] Therefore, by setting a free travel distance between the first drive wheel, the second drive wheel, and the pre-charge drive wheel, and combining their respective transmission response characteristics, a technical effect of achieving precise mechanical timing control without relying on a complex electronic controller is achieved. Based on the above design, the entire switching device 10 can automatically execute a complete operation sequence including pre-charge, main switching, and disconnection under the action of a single drive source, greatly improving the system's integration and reliability.

[0050] Further, please refer to Figures 4 to 6 In another embodiment of the present utility model, at least one precharge switch 300 includes a first precharge switch 310 and a second precharge switch 320. The first precharge switch 310 is connected in parallel with the first switch 100, and the first precharge switch 310 is also used to be connected in series with the precharge resistor 600. The second precharge switch 320 is connected in parallel with the second switch 200.

[0051] The conductive circuit containing the first pre-charge switch 310, the pre-charge resistor 600, and the second pre-charge switch 320 forms a pre-charge circuit 500, wherein the pre-charge circuit 500 is as follows: Figure 5 As shown by the solid line, the main charging circuit is 400. Figure 6 As shown by the solid line in the middle.

[0052] The closing and opening sequence of the switching device 10 is as follows: closing the pre-charge circuit 500, opening the pre-charge circuit 500, closing the main charging circuit 400, and opening the main charging circuit 400.

[0053] Correspondingly, the closing and opening sequence of the switching device 10 is as follows: the first precharge switch 310 and the second precharge switch 320 are closed to close the precharge circuit 500; the first precharge switch 310 and the second precharge switch 320 are opened to open the precharge circuit 500; the first switch 100 and the second switch 200 are closed to close the main charging circuit 400; and the first switch 100 and the second switch 200 are opened to open the main charging circuit 400.

[0054] Specifically, firstly, the first pre-charge switch 310 and the second pre-charge switch 320 are closed to close the pre-charge circuit 500, enabling gradual charging of the capacitor. After the voltage of the capacitor 30 rises to near the voltage of the power supply 20, the pre-charge circuit 500 is opened, disconnecting the first pre-charge switch 310 and the second pre-charge switch 320 to cut off the current limiting path. Subsequently, the first switch 100 and the second switch 200 are closed to close the main charging circuit 400. Since the capacitor 30 on the load side is fully charged and has a high voltage at this time, it still has a protective function, thereby significantly reducing the current jump amplitude and contact erosion risk at the moment the first switch 100 and the second switch 200 are turned on. Finally, when the system is shut down, the first switch 100 and the second switch 200 are disconnected, and the main charging circuit 400 is opened, completing the overall circuit isolation.

[0055] It can be seen that by setting two independent pre-charge switches 300 and connecting them in parallel with the corresponding main switches, and combining them with the pre-charge resistor 600 to form a dedicated pre-charge path, precise control of the charging process is achieved, which not only improves the flexibility of the pre-charge operation, but also enhances the redundancy of the system.

[0056] Furthermore, the switching device 10 also includes a main charging mechanism and a pre-charging mechanism.

[0057] The main charging mechanism is driven to both the first switch 100 and the second switch 200, and is used to drive the first switch 100 and the second switch 200 to close or open synchronously; the pre-charging mechanism is driven to both the first pre-charging switch 310 and the second pre-charging switch 320, and is used to drive the first pre-charging switch 310 and the second pre-charging switch 320 to close or open synchronously.

[0058] In this embodiment, the main charging mechanism establishes a transmission connection with both the first switch 100 and the second switch 200. When the main charging circuit 400 receives a closing or opening command, the main charging mechanism transmits power to the operating components of the first switch 100 and the second switch 200 through components such as connecting rods, gears, cams, or electromagnetic drive components, so that they can complete the closing or opening action at the same time. This ensures that the two switches of the main charging circuit 400 are turned on or off at the same time, effectively preventing the phenomenon of incomplete current path or abnormal voltage distribution caused by the delayed response of one switch.

[0059] Similarly, the pre-charge mechanism forms a linkage transmission connection with the first pre-charge switch 310 and the second pre-charge switch 320, which is used to uniformly control the timing of the two pre-charge switches 300 during the pre-charge phase. When the system starts and needs to connect to the pre-charge circuit 500, the pre-charge mechanism receives an external operation signal and outputs a synchronous driving force, causing the first pre-charge switch 310 and the second pre-charge switch 320 to close simultaneously, thereby ensuring that the pre-charge current can flow smoothly through the complete current-limiting path including the pre-charge resistor 600.

[0060] Specifically, the main charging mechanism includes a main charging drive wheel, which is used to drive the first switch 100 and the second switch 200 to close or open synchronously. The pre-charging mechanism includes a pre-charging drive wheel, which is used to drive the first pre-charging switch 310 and the second pre-charging switch 320 to close or open synchronously.

[0061] The main charging drive wheel and the pre-charging drive wheel are connected by a transmission, and there is a free stroke between the main charging drive wheel and the pre-charging drive wheel, so that after the pre-charging drive wheel rotates and drives the first pre-charging switch 310 and the second pre-charging switch 320 to close and open synchronously, the main charging drive wheel drives the first switch 100 and the second switch 200 to close and open.

[0062] This design ensures that after the precharge drive wheel drives the first precharge switch 310 and the second precharge switch 320 to close and maintain this position for a period of time, the two switches are then opened through the same continuous drive process, allowing the entire precharge phase to be completed independently. Once the precharge drive wheel continues to rotate and passes through the idle travel interval, it triggers the main charge drive wheel to start rotating, simultaneously driving the first switch 100 and the second switch 200 to close, thus establishing the main charge circuit 400. When the system is shut down, the main charge drive wheel drives the first switch 100 and the second switch 200 to open, cutting off the main power supply path and completing the overall power-off process.

[0063] It can be seen that by setting the main charging drive wheel and the pre-charging drive wheel to be connected by a no-travel transmission, mechanical timing lock between the two functional modules is achieved, and the preset operation sequence can be automatically executed without relying on an electronic controller or an external timing unit.

[0064] Furthermore, the switching device 10 also includes a control mechanism configured to respond to four specific types of control commands: pre-charge command, pre-fully charge command, main closing command, and disengagement command, and to perform a first operation, a second operation, a third operation, and a fourth operation, respectively.

[0065] Specifically, in response to receiving a pre-charge closing command, the control mechanism performs a first operation to control the pre-charge circuit 500 to close; in response to receiving a pre-charge command, the control mechanism performs a second operation to control the pre-charge circuit 500 to open; in response to receiving a main closing command, the control mechanism performs a third operation to control the main charging circuit 400 to close after the pre-charge circuit 500 is opened; and in response to receiving a discharging command, the control mechanism performs a fourth operation to control the main charging circuit 400 to open.

[0066] Specifically, when the control mechanism receives the pre-charge closing command, it performs the first operation, which completes the closing action by driving the relevant switches in the pre-charge circuit 500 (such as the first pre-charge switch 310, or the first pre-charge switch 310 and the second pre-charge switch 320), so that the current initially charges the load-side capacitor 30 through the path containing the pre-charge resistor 600. With this design, the initial potential can be established without directly applying the full voltage, effectively suppressing the generation of inrush current.

[0067] Subsequently, when the pre-charge process is completed and a pre-charge command is received, the control mechanism performs a second operation, namely, controlling the switch in the pre-charge circuit 500 to cut off the current limiting path and end the pre-charge stage.

[0068] The control device then receives the main closing command to execute a third operation. This operation only allows the main charging circuit 400 to close after confirming that the pre-charge circuit 500 has been disconnected. That is, it drives the first switch 100 and the second switch 200 to close, thereby connecting the low-impedance main power supply path to the circuit. This interlocking mechanism avoids the risk of short circuits that may be caused by the simultaneous conduction of the main charging circuit 400 and the pre-charge circuit 500, ensuring the safety of the switching process.

[0069] When the power system is shut down, the control mechanism receives a sub-command to perform the fourth operation, namely, to control the first switch 100 and the second switch 200 in the main charging circuit 400 to open, thereby achieving complete electrical isolation between the power supply 20 and the load.

[0070] As can be seen, the entire control process forms a closed-loop operation sequence with priority judgment capability. All actions are conditionally judged based on the completion status of the preceding state, ensuring that each step complies with the safety start-stop specifications.

[0071] In summary, this utility model embodiment provides a switching device 10. When the system starts, the pre-charge circuit 500 is first closed, allowing current to flow through the pre-charge circuit 500 where the pre-charge switch 300 is located. After the voltage gradually stabilizes, the pre-charge circuit 500 is opened to cut off the pre-charge path. Subsequently, the first switch 100 and the second switch 200 are connected to close the main charging circuit 400, entering the normal power supply state. When the system is shut down, the main charging circuit 400 is opened to cut off the main current path, avoiding the large current surge caused by directly closing the main charging circuit 400. This not only achieves electrical safety transition but also improves the controllability and stability of the system, thereby effectively extending the safety, stability, and service life of the power system.

[0072] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the protection scope of the claims.

Claims

1. A switching device, characterized in that, Includes a first switch (100), a second switch (200), and a precharge switch (300); One of the first switch (100) and the second switch (200) is connected in series to the positive terminal circuit of the power supply (20), and the other is connected in series to the negative terminal circuit of the power supply (20). The conductive circuit where the first switch (100) and the second switch (200) are located forms the main charging circuit (400). At least one of the precharge switches (300) is connected in series with the first switch (100) or the second switch (200) to form a precharge circuit (500). The closing and opening sequence of the switching device is as follows: the pre-charge circuit (500) is closed, the pre-charge circuit (500) is opened, the main charging circuit (400) is closed, and the main charging circuit (400) is opened.

2. The switching device according to claim 1, characterized in that, At least one of the precharge switches (300) includes a first precharge switch (310), the first precharge being connected in series with the second switch (200), and the first precharge switch (310) is also used to be connected in series with a precharge resistor (600); The conductive circuit containing the first precharge switch (310), the precharge resistor (600), and the second switch (200) forms the precharge circuit (500); the closing and opening sequence of the switching device is as follows: the precharge circuit (500) is closed, the precharge circuit (500) is opened, the main charging circuit (400) is closed, and the main charging circuit (400) is opened.

3. The switching device according to claim 2, characterized in that, The closing and opening sequence of the switching device is as follows: the first precharge switch (310) is closed, the second switch (200) is closed to close the precharge circuit (500), the first precharge switch (310) is opened to open the precharge circuit (500), the first switch (100) is closed to close the main charging circuit (400), and the first switch (100) and the second switch (200) are opened to open the main charging circuit (400).

4. The switching device according to claim 2 or 3, characterized in that, The switching device further includes a first mechanism, a second mechanism, and a first pre-charge mechanism; The first mechanism is driven to the first switch (100) and is used to drive the first switch (100) to close or open. The second mechanism is driven to the second switch (200) and is used to drive the second switch (200) to close or open. The first pre-charge mechanism is driven to the first pre-charge switch (310) and is used to drive the first pre-charge switch (310) to close or open.

5. The switching device according to claim 4, characterized in that, The first mechanism includes a first drive wheel, which is used to drive the first switch (100) to close or open; the second mechanism includes a second drive wheel, which is used to drive the second switch (200) to close or open; the precharge mechanism includes a precharge drive wheel, which is used to drive the first precharge switch (310) to close or open. The first drive wheel, the second drive wheel, and the precharge drive wheel are connected by a transmission, and there is a free stroke between the first drive wheel, the second drive wheel, and the precharge drive wheel, so that after the precharge drive wheel rotates and drives the first precharge switch (310) to close, the second drive wheel drives the second switch (200) to close, and then the precharge drive wheel drives the first precharge switch (310) to open, and then the first drive wheel drives the first switch (100) to close, and the first drive wheel and the second drive wheel drive the first switch (100) and the second switch (200) to open respectively.

6. The switching device according to claim 1, characterized in that, At least one of the precharge switches (300) includes a first precharge switch (310) and a second precharge switch (320), wherein the first precharge switch (310) is connected in parallel with the first switch (100), and the first precharge switch (310) is also used to be connected in series with the precharge resistor (600), and the second precharge switch (320) is connected in parallel with the second switch (200); The conductive circuit containing the first precharge switch (310), the precharge resistor (600), and the second precharge switch (320) forms the precharge circuit (500); the closing and opening sequence of the switching device is as follows: the precharge circuit (500) is closed, the precharge circuit (500) is opened, the main charging circuit (400) is closed, and the main charging circuit (400) is opened.

7. The switching device according to claim 6, characterized in that, The closing and opening sequence of the switching device is as follows: the first precharge switch (310) and the second precharge switch (320) are closed to close the precharge circuit (500); the first precharge switch (310) and the second precharge switch (320) are opened to open the precharge circuit (500); the first switch (100) and the second switch (200) are closed to close the main charging circuit (400); and the first switch (100) and the second switch (200) are opened to open the main charging circuit (400).

8. The switching device according to claim 6 or 7, characterized in that, The switching device also includes a main charging mechanism and a pre-charging mechanism; The main charging mechanism is driven to both the first switch (100) and the second switch (200), and is used to drive the first switch (100) and the second switch (200) to close or open synchronously; the pre-charging mechanism is driven to both the first pre-charging switch (310) and the second pre-charging switch (320), and is used to drive the first pre-charging switch (310) and the second pre-charging switch (320) to close or open synchronously.

9. The switching device according to claim 8, characterized in that, The main charging mechanism includes a main charging drive wheel, which is used to drive the first switch (100) and the second switch (200) to close or open synchronously. The pre-charging mechanism includes a pre-charging drive wheel, which is used to drive the first pre-charging switch (310) and the second pre-charging switch (320) to close or open synchronously. The main charging drive wheel and the pre-charging drive wheel are connected by a transmission, and there is a free stroke between the main charging drive wheel and the pre-charging drive wheel, so that after the pre-charging drive wheel rotates and drives the first pre-charging switch (310) and the second pre-charging switch (320) to close and open synchronously, the main charging drive wheel drives the first switch (100) and the second switch (200) to close and open.

10. The switching device according to claim 1, characterized in that, The first switch (100) and the second switch (200) are also used in series with the capacitor (30).

11. The switching device according to claim 1, characterized in that, The switching device further includes a control mechanism, the control mechanism being used for: In response to receiving a precharge closing command, a first operation is performed, the first operation being used to control the closing of the precharge circuit (500); In response to receiving a pre-charge instruction, a second operation is performed, the second operation being used to control the pre-charge circuit (500) to open; In response to receiving a main charge command, a third operation is performed, the third operation being used to control the main charge circuit (400) to close after the precharge circuit (500) is opened; And in response to receiving a sub-instruction, a fourth operation is performed, the fourth operation being used to control the main charging circuit (400) to disconnect.