Tab platform and tab apparatus
By simultaneously machining the positioning block mounting slots using a connecting mechanism and a CNC machine tool, and combining this with zirconia ceramic positioning blocks, the problem of insufficient positioning accuracy in traditional cell splicing platforms is solved, achieving precise positioning of solar cells and improving production efficiency.
Patent Information
- Application Number
- CN202522516619.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-27
- Publication Date
- 2026-11-20
- Estimated Expiration
- 2035-11-27
AI Technical Summary
Traditional cell assembly platforms suffer from structural defects that result in insufficient cell positioning accuracy, affecting production yield and efficiency.
Multiple plate platform bases are connected into a whole by adopting a connecting mechanism, and the positioning block mounting slots are machined synchronously on a CNC machine tool to eliminate cumulative errors. The positioning blocks are made of zirconia ceramic material to improve positioning accuracy.
It achieves precise positioning of solar cells, improves production yield and equipment efficiency, avoids collisions and breakage caused by solar cell position deviations, and ensures the stability and wear resistance of the positioning block.
Smart Images

Figure CN225003998U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of solar cell manufacturing, and in particular to a splicing platform and splicing equipment. Background Technology
[0002] In automated production lines for solar cells, gantry loading stations are used to position the cells on the conveyor line and transfer them to carrier plates via pick-and-place modules. This process is typically accomplished by a receiving platform, which supports the cells through lifting movements and utilizes its positioning structure for precise positioning.
[0003] Traditional cell assembly platforms suffer from structural defects, resulting in cumulative errors due to the assembly of multiple components, which limits their positioning accuracy for solar cells. This insufficient accuracy can cause positional deviations when the cells are subsequently placed into the carrier plate receiving slot, affecting production yield and efficiency. Utility Model Content
[0004] Therefore, it is necessary to provide a cell splicing platform and splicing equipment that can improve the positioning accuracy of solar cells.
[0005] On the one hand, this application provides a stitching platform, including:
[0006] Multiple splicing platform bases are provided, each with a positioning block mounting slot.
[0007] Connection mechanism: Multiple splice platform bases are detachably connected by a connection mechanism so that the positioning block mounting slots on the multiple splice platform bases are parallel to each other and aligned along the width direction.
[0008] Optionally, the splicing platform also includes a positioning block, which is disposed in the positioning block mounting slot.
[0009] Optionally, the connecting mechanism is a long strip structure, and its extension direction is consistent with the width direction of the base of the splicing platform.
[0010] Optionally, the splicing platform also includes splicing platform base positioning components. There are multiple splicing platform base positioning components, which are arranged along the width direction of the splicing platform base and are used to position the connection between the splicing platform base and the connecting mechanism.
[0011] Optionally, the positioning block is made of zirconia ceramic material.
[0012] On the other hand, this application also provides a splicing device, including:
[0013] frame;
[0014] The splicing platform is mounted on the rack and can be any of the splicing platforms described above.
[0015] Optionally, the splicing equipment also includes a carrier plate alignment fixture, which is detachably mounted on the splicing platform base;
[0016] The carrier plate calibration fixture is equipped with carrier plate positioning pins, and the carrier plate is provided with carrier plate positioning holes. The carrier plate positioning pins are used to cooperate with the carrier plate positioning holes to achieve the positioning of the carrier plate.
[0017] Optionally, the base of the splicing platform is provided with a precision machining reference surface, and the carrier plate alignment fixture is detachably installed on the precision machining reference surface.
[0018] Optionally, the splicing device also includes a vision camera, which is mounted on the frame and used to capture the position of the carrier plate;
[0019] The control system is electrically connected to the vision camera.
[0020] The material handling mechanism is mounted on the frame and is electrically connected to the control system.
[0021] Optionally, the material handling mechanism is mounted on the frame via a gantry and is located above the receiving platform and the carrier plate.
[0022] The embodiments provided in this application connect multiple bonding platform bases into a whole using a connecting mechanism before processing the positioning block mounting slots. This ensures the parallelism and alignment of the multiple mounting slots in the width direction, effectively solving the problem of cumulative errors caused by the individual processing and assembly of multiple bonding platforms, and achieving precise positioning of the battery cells. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the structure of a splicing platform provided in an embodiment of this application.
[0024] Figure 2 for Figure 1 Enlarged view of a portion of point A in the middle.
[0025] Figure 3 for Figure 1 The diagram shows a structural schematic of the splicing platform from another perspective.
[0026] Figure 4 This is a partial structural diagram of the installation of a carrier plate positioning fixture according to another embodiment of this application.
[0027] Figure 5 This is a schematic diagram from another perspective of the installation of a carrier plate positioning fixture according to another embodiment of this application.
[0028] Figure 6 This is a partial structural schematic diagram of a splicing device according to another embodiment of this application.
[0029] Figure 7A schematic flowchart illustrating the fabrication method of the splicing platform provided in this application.
[0030] Explanation of reference numerals in the attached figures
[0031] 1. Base of the splicing platform; 2. Positioning block; 3. Connecting mechanism; 4. Carrier plate alignment fixture; 6. Vision camera; 7. Battery cell; 8. Positioning block mounting slot; 9. Frame; 10. Positioning component of the splicing platform seat; 11. Positioning block locking screw; 12. Splicing platform seat locking screw; 13. Carrier plate; 14. Carrier plate positioning hole; 15. Carrier plate positioning pin; 16. Carrier plate locking screw; 17. Reference surface. Detailed Implementation
[0032] To make the technical solution and beneficial effects of this application more apparent and understandable, a detailed description is provided below by listing specific embodiments. The accompanying drawings are not necessarily drawn to scale, and local features may be enlarged or reduced to more clearly show the details of the local features; unless otherwise defined, the technical and scientific terms used herein have the same meanings as those in the technical field to which this application pertains.
[0033] In the gantry loading station of an automated solar cell production line, the solar cells conveyed in via a high-speed conveyor belt need to be precisely positioned before being picked up and placed into a carrier plate by a pick-and-place module. This crucial positioning function is achieved by a receiving platform, which uses a lifting module to lift the solar cells and uses positioning blocks on it to calibrate them.
[0034] Traditional splicing platforms generally employ a split positioning structure. This structure consists of three parts: the splicing platform base, a separate adapter, and a positioning block. The positioning block is first installed on the adapter, and then fixed to the platform base via the adapter. The original intention of this design was to facilitate the adjustment and replacement of the positioning block.
[0035] However, this structure inevitably introduces multiple errors. The machining errors of the adapter itself, the assembly errors between the positioning block and the adapter, and the assembly errors between the adapter and the base will accumulate layer by layer, making it impossible to accurately control the final position of the positioning block, thus fundamentally limiting the positioning accuracy of the battery cells.
[0036] Furthermore, to improve production efficiency, a single machine typically requires multiple sets of such lamination platforms to operate simultaneously. Since the bases of these lamination platforms are individually machined and then installed onto the machine frame, it is difficult to ensure that the positioning block mounting slots on all lamination platforms are perfectly parallel and precisely aligned in the width direction during machining and assembly. The direct consequence is that when the loading and unloading module places the solar cells positioned on different platforms into the uniform receiving slots on the carrier plate, the inconsistent positions of multiple solar cells can cause some cells to fail to fit accurately. This can lead to collisions, jamming, or even breakage of the solar cells against the edges of the receiving slots, severely reducing product yield and equipment production efficiency.
[0037] Therefore, it is necessary to provide a splicing platform and splicing equipment.
[0038] On the one hand, the splicing platform provided in one embodiment of this application, see [link to previous document]. Figures 1 to 3 It may include: multiple splicing platform bases 1 and connecting mechanisms 3.
[0039] The multiple splicing platform bases 1 are provided with positioning block mounting slots 8. The multiple splicing platform bases 1 are detachably connected by a connecting mechanism 3 so that the positioning block mounting slots 8 on the multiple splicing platform bases 1 are parallel to each other and aligned along the width direction.
[0040] The stitching platform provided in this application can be found in [reference needed]. Figures 1 to 3 Multiple bonding platform bases 1 are detachably connected by a connecting mechanism 3. Therefore, multiple bonding platform bases 1 can be connected into a whole by using the connecting mechanism 3, and then the positioning block mounting slots 8 can be processed. This ensures the parallelism and alignment of the multiple positioning block mounting slots 8 in the width direction, effectively solving the problem of cumulative error caused by the individual processing and assembly of multiple bonding platform bases 1, and achieving precise positioning of the battery cell 7.
[0041] See Figures 1 to 3 In this embodiment, the bonding platform also includes a positioning block 2, which is disposed within the positioning block mounting groove 8. It should be noted that the positioning block 2 is directly disposed within the positioning block mounting groove 8, meaning it is not connected to the bonding platform base 1 via any adapter. Specifically, the positioning block 2 serves as a reference component that directly contacts the battery cell 7, and is directly embedded into the positioning block mounting groove 8 machined on the bonding platform base 1. Instead of requiring an adapter, the positioning block 2 is indirectly disposed within the positioning block mounting groove 8. This eliminates the additional errors introduced by the machining errors of traditional adapters and the assembly process, significantly improving the positioning accuracy of individual battery cells. Operators use positioning block locking screws 11 to secure the positioning block 2 to the positioning block mounting groove 8 from above or the side, ensuring that the positioning block 2 does not shift or loosen during production, thus providing a stable and reliable positioning reference for the battery cell.
[0042] See Figures 1 to 3 In this embodiment, the connecting mechanism 3 is an elongated structure, and its extension direction is consistent with the width direction of the splicing platform base 1. The elongated structure provides a continuous and stable rigid connection reference for multiple splicing platform bases 1, ensuring that the relative positions of all splicing platform bases 1 fixed thereon remain unchanged during processing and installation, especially ensuring the coordinate consistency of all positioning block mounting slots 8 in the width direction. The width direction mentioned here is also the arrangement direction of the multiple splicing platform bases 1 after they are connected by the connecting mechanism 3.
[0043] See Figure 3 In this embodiment, a plurality of splice platform base positioning components 10 are also included. These components are arranged along the width direction of the splice platform base 1 and are used for positioning the connection between the splice platform base 1 and the connecting mechanism 3. When installing the splice platform base 1 onto the connecting mechanism 3, it is first positioned using the splice platform base positioning components 10, and then the splice platform base 1 is fastened to the connecting mechanism 3 using the splice platform locking screws 12, ensuring that extremely high positional accuracy is maintained even after multiple disassemblies and reassemblies.
[0044] See Figure 2 In this embodiment, the positioning block 2 is made of zirconia ceramic material. In some cases, the extremely high hardness and wear resistance of zirconia ceramic are utilized to avoid wear caused by frequent contact with brittle solar cells. The high hardness of the ceramic material ensures the long-term dimensional stability of the working surface of the positioning block 2, while its smooth surface treatment ensures that the surface of the solar cell will not be scratched during the positioning process, thus ensuring positioning accuracy without introducing the quality risk of surface damage.
[0045] On the other hand, this application also provides a splicing device, see [link to application details]. Figure 6 It may include: a rack 9 and a bonding platform. The bonding platform is mounted on the rack 9, and the bonding platform is the bonding platform as described in any of the above embodiments.
[0046] In the above-mentioned bonding equipment, since the multiple bonding platform bases 1 in the bonding platform are detachably connected by the connecting mechanism 3, the multiple bonding platform bases 1 can be connected into a whole by using the connecting mechanism 3, and then the positioning block mounting slots 8 can be processed. This ensures the parallelism and alignment of the multiple positioning block mounting slots 8 in the width direction, effectively solving the problem of cumulative error caused by the individual processing and assembly of multiple bonding platform bases 1, and realizing the precise positioning of the battery cell 7.
[0047] See Figures 4 to 6In this embodiment, the bonding device may further include a carrier plate alignment fixture 4, which is detachably mounted on the bonding platform base 1 via carrier plate locking screws 16. The carrier plate alignment fixture 4 is provided with a carrier plate positioning pin 15, and the carrier plate 13 is provided with a carrier plate positioning hole 14. The carrier plate positioning pin 15 is used to cooperate with the carrier plate positioning hole 14 to achieve positioning of the carrier plate 13.
[0048] See Figures 4 to 6 In this embodiment, a precision-machined reference surface 17 is provided on the lamination platform base 1, and the carrier plate alignment fixture 4 is detachably installed on the precision-machined reference surface 17. During debugging, the carrier plate alignment fixture 4 is installed on the precision-machined reference surface 17 of the lamination platform base 1 using carrier plate locking screws 16, and then the carrier plate 13 is fitted onto the carrier plate positioning pin 15 of the carrier plate alignment fixture 4 through the carrier plate positioning hole 14. At this time, the carrier plate 13 and the lamination platform base 1 are in a relative position that allows the solar cells to be accurately placed into the carrier plate 13 for accommodating the solar cells. The precision-machined reference surface 17 provides a stable and accurate physical reference for the positional relationship between the carrier plate 13 and the lamination platform base 1, further improving the calibration accuracy.
[0049] It should be added that the precision-machined reference surface 17 of the splicing platform base 1, which can also be directly called reference surface 17, refers to one or more smooth and flat planes formed on the splicing platform base 1 by high-precision cutting processes such as milling and grinding. This plane is not the original surface left by casting or ordinary machining, but is deliberately manufactured to serve as a precision reference for subsequent installation, measurement or calibration.
[0050] See Figure 6 In this embodiment, the wafer-mounting device may further include a vision camera 6, a pick-and-place mechanism, and a control system. The vision camera 6 is mounted on the frame 9 and is used to capture the position of the carrier plate 13. The control system is electrically connected to the vision camera 6, and the pick-and-place mechanism is mounted on the frame 9 and electrically connected to the control system (not shown in the figure). The control system can be a PLC control system. The vision camera 6 captures real-time images of the carrier plate positioning holes 14 on the carrier plate 13 and transmits the images to the control system. The control system calculates the deviation between the current actual position of the carrier plate 13 and the ideal reference position. Subsequently, the pick-and-place mechanism, for example, a correction system on it, performs motion compensation, ultimately guiding the pick-and-place mechanism to accurately place the battery cell 7 into the receiving slot of the battery cell 7 on the carrier plate 13.
[0051] See Figure 6 In this embodiment, the material handling mechanism can be mounted on the frame 9 via a gantry frame and located above the receiving platform and the carrier plate 13. This optimizes the spatial layout and maximizes equipment production efficiency while ensuring accuracy and avoiding interference.
[0052] See Figure 7 To facilitate understanding, the following details the preparation method of the splicing equipment, including:
[0053] Step 100: Connect multiple splice platform bases detachably through a connecting mechanism to obtain an integral structure.
[0054] Step 200: Use a grooving device to process positioning block mounting slots on multiple splicing platform bases.
[0055] Specifically, firstly, multiple sets of dispersed plate-joining platform bases are connected into a single structure via a connecting mechanism and plate-joining platform positioning components, eliminating the degree of freedom of individual parts. Then, this single structure is placed on a high-precision CNC machine tool for clamping, and the positioning block mounting slots on all plate-joining platform bases are simultaneously milled using the machine tool's precision motion axes.
[0056] Specifically, in the step of machining positioning block mounting slots on multiple splicing platform bases using a grooving device, the positioning block mounting slots on multiple splicing platform bases are machined simultaneously, further ensuring that the size, shape, position, and parallelism and alignment of all positioning block mounting slots meet uniform precision requirements.
[0057] In some cases, the grooving equipment can be a CNC machine tool. The CNC machine tool's cutting tool passes over the base of each connecting platform in sequence according to a preset program path. In one continuous machining stroke, under the same clamping state, the milling of all positioning block mounting slots is completed, thereby ensuring the parallelism, alignment and dimensional consistency of all positioning block mounting slots.
[0058] Specifically, in this embodiment, the positioning block mounting slots are machined using grooving equipment such as CNC machine tools. During machining, the cutting tool, under the control of the CNC program, sequentially passes through the machining positions of each connecting platform base along a predetermined path, and completes the milling of all positioning block mounting slots in one continuous machining stroke. Since this process is completed continuously by the same cutting tool and according to the same machining program after the workpiece is clamped once, it is equivalent to synchronous machining in effect.
[0059] The embodiments provided in this application connect multiple bonding platform bases into a whole using a connecting mechanism before processing the positioning block mounting slots. This ensures the parallelism and alignment of the multiple positioning block mounting slots in the width direction, effectively solving the problem of cumulative errors caused by the individual processing and assembly of multiple bonding platform bases, and achieving precise positioning of the battery cells.
[0060] In this application, the terms "center," "longitudinal," "lateral," "length," "width," "thickness," "height," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," and "counterclockwise" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the purpose of simplifying the description of this application and do not indicate that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. In other words, they should not be construed as limitations on this application.
[0061] In this application, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating the relative importance of the indicated features or the number of indicated technical features. Therefore, a feature specified as "first" or "second" may explicitly include at least one of those features. In this application, "multiple" means at least two, such as two, three, etc.; "several" means at least one, such as one, two, three, etc., unless otherwise explicitly specified.
[0062] In this application, unless otherwise expressly defined, the terms "installation," "connection," "linking," "fixing," "setting," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral part; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can also refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.
[0063] In this application, unless otherwise expressly defined, the terms "above," "on top of," "over," "above," "below," "below," "below," or "below" for "first feature over second feature" can refer to the first and second features being in direct contact, or to the first and second features being in indirect contact through an intermediate medium. Furthermore, "above," "over," and "below" for "first feature over second feature" can mean the first feature is directly above or diagonally above the second feature, or simply indicates that the horizontal height of the first feature is higher than the horizontal height of the second feature. Similarly, "below," "below," and "below" for "first feature over second feature" can mean the first feature is directly below or diagonally below the second feature, or simply indicates that the horizontal height of the first feature is lower than the horizontal height of the second feature.
[0064] It should be understood that the above embodiments are exemplary and are not intended to include all possible embodiments covered by the claims. Various modifications and changes can be made to the above embodiments without departing from the scope of this disclosure. Similarly, the various technical features of the above embodiments can be arbitrarily combined to form other embodiments of this application that may not be explicitly described. Therefore, the above embodiments only illustrate several embodiments of this application and do not limit the scope of protection of this patent application.
Claims
1. A splicing platform, characterized in that, include: Multiple splicing platform bases are provided, each with a positioning block mounting slot. Connection mechanism; the multiple splicing platform bases are detachably connected by the connection mechanism so that the positioning block mounting slots on the multiple splicing platform bases are parallel to each other and aligned along the width direction.
2. The splicing platform according to claim 1, characterized in that, Also includes: A positioning block is disposed within the positioning block mounting slot.
3. The splicing platform according to claim 1, characterized in that, The connecting mechanism is a long strip structure, and its extension direction is consistent with the width direction of the base of the connecting platform.
4. The splicing platform according to claim 1, characterized in that, Also includes: A plurality of positioning components for the splicing platform base are provided, which are arranged along the width direction of the splicing platform base and are used to position the connection between the splicing platform base and the connecting mechanism.
5. The splicing platform according to claim 2, characterized in that, The positioning block is made of zirconium oxide ceramic material.
6. A splicing device, characterized in that, include: frame; A splicing platform is installed on the frame, and the splicing platform is the splicing platform as described in any one of claims 1 to 5.
7. The splicing device according to claim 6, characterized in that, Also includes: A carrier plate calibration fixture is detachably mounted on the base of the splicing platform; The carrier plate calibration fixture is equipped with a carrier plate positioning pin, and the carrier plate is provided with a carrier plate positioning hole. The carrier plate positioning pin is used to cooperate with the carrier plate positioning hole to achieve the positioning of the carrier plate.
8. The splicing device according to claim 7, characterized in that, The base of the splicing platform is provided with a precision machining reference surface, and the carrier plate calibration fixture is detachably installed on the precision machining reference surface.
9. The splicing device according to claim 7, characterized in that, Also includes: A vision camera, mounted on the frame, is used to capture images of the carrier plate's position. The control system is electrically connected to the vision camera. The material handling mechanism is mounted on the frame and is electrically connected to the control system.
10. The splicing device according to claim 9, characterized in that, The material handling mechanism is mounted on the frame via a gantry frame and is located above the receiving platform and the carrier plate.
