Perovskite crystallization apparatus
By integrating gas extraction and gas supply components into the perovskite crystallization equipment, the gas atmosphere and pressure during the crystallization process can be controlled and adjusted, solving the problem of poor film quality in existing equipment and improving the uniformity and defect reduction effect of perovskite films.
Patent Information
- Application Number
- CN202522811703.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-30
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-30
AI Technical Summary
Existing perovskite crystallization equipment has difficulty controlling the gas atmosphere and pressure during the crystallization process, resulting in poor perovskite film quality, manifested as poor film uniformity and numerous internal defects.
Design a perovskite crystallization device that integrates controllable pumping and supplying components, featuring vacuum crystallization and positive pressure crystallization modes. Through the coordinated control of the pumping and supplying components, a controllable low-pressure vacuum environment and a stable inert gas atmosphere are achieved, thereby regulating the gas atmosphere and pressure during the crystallization process.
This improved the quality of perovskite films, reduced pinhole and crack defects, achieved uniform drying and atmosphere protection of the films, and enhanced the consistency of film quality.
Smart Images

Figure CN225006375U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of perovskite battery preparation technology, and in particular to a perovskite crystallization device. Background Technology
[0002] Perovskite solar cells offer significantly higher photoelectric conversion efficiency than conventional solar cells, giving them a strong advantage. In the manufacturing process of perovskite solar cells, perovskite thin film crystallization is a crucial step. The general steps involve first coating a substrate surface with a perovskite precursor solution to form a coating, then placing the coated substrate inside a crystallization apparatus. The crystallization apparatus promotes the evaporation of the perovskite coating solvent, forming a perovskite thin film. However, in existing technologies, it is difficult to control process parameters such as gas atmosphere and pressure during the crystallization process, leading to poor perovskite film quality, specifically manifested as poor film uniformity and numerous internal defects.
[0003] It should be noted that the above content is only used to help understand the technical solution of this utility model, and does not represent an admission that the above content is prior art. Utility Model Content
[0004] The main purpose of this invention is to provide a perovskite crystallization device that allows for easy adjustment of process parameters such as gas atmosphere and pressure during the crystallization process, thereby improving the quality of perovskite thin films.
[0005] To achieve the above objectives, this utility model proposes a perovskite crystallization device; specifically, the perovskite crystallization device includes: A crystallization box, wherein the interior of the crystallization box is provided with a crystallization cavity; A cover body, which is connected to the crystallization box body to close the crystallization cavity; The gas extraction assembly and the gas supply assembly are provided, wherein the gas extraction assembly is used to extract the internal gas of the crystallization chamber, and the gas supply assembly is used to supply gas into the crystallization chamber. The perovskite crystallization equipment has two working modes: vacuum crystallization mode and positive pressure crystallization mode. When in vacuum crystallization mode, the air extraction component is activated and the air supply component is deactivated. When in positive pressure crystallization mode, the air extraction component and the air supply component are activated simultaneously.
[0006] In one embodiment, one side of the crystallization box is hinged to the cover, and the other side of the crystallization box is provided with a locking device, through which the crystallization box is sealed and connected to the cover.
[0007] In one embodiment, a sealing mounting groove is provided on the side of the crystallization box facing the cover, and the sealing mounting groove is arranged circumferentially around the crystallization box; the sealing mounting groove is used to install and accommodate a sealing strip, and the sealing strip is used to seal and connect with the cover.
[0008] In one embodiment, the crystallization chamber is provided with a first observation window; and / or, the cover is provided with a second observation window.
[0009] In one embodiment, the crystallization chamber is provided with an air inlet and an air outlet. The air extraction component extracts the internal gas of the crystallization chamber through the air outlet, and the air supply component supplies gas to the crystallization chamber through the air inlet. In one embodiment, the crystallization cavity is provided with a plurality of vent holes, which are distributed at the bottom and / or the left and right sides of the crystallization cavity, and the opening and closing of each vent hole is independently configured.
[0010] In one embodiment, a gas equalization plate is provided inside the crystallization cavity, and the gas equalization plate is installed inside the crystallization cavity by at least two connecting rods; the gas equalization plate is located on the side of the air inlet and / or the air outlet facing the center of the crystallization cavity, and a gas flow gap is left between the gas equalization plate and the air inlet and / or the air outlet.
[0011] In one embodiment, the vacuuming assembly includes a vacuum pipe and a vacuum generator and a vacuum solenoid valve mounted on the vacuum pipe, with the vacuuming end of the vacuum pipe connected to the crystallization chamber; and / or, the gas supply assembly includes a gas supply pipe and a gas storage device and a gas supply solenoid valve mounted on the gas supply pipe, with the gas supply end of the gas supply pipe connected to the crystallization chamber.
[0012] In one embodiment, the perovskite crystallization device includes a vacuum pressure sensor, the detection end of which is located inside the crystallization chamber, and the vacuum pressure sensor is electrically connected to the suction solenoid valve and the supply solenoid valve.
[0013] In one embodiment, the perovskite crystallization equipment includes a base frame that can be placed into the crystallization cavity; specifically, the base frame includes two plates arranged symmetrically on the left and right, and the upper and lower sides of the two plates are respectively fixedly connected by at least two mounting rods; a plurality of placement grooves arranged vertically are provided on the opposite side of the two plates, and the placement grooves are used to support the side of the base.
[0014] In one embodiment, a handle is provided at the top of the base frame.
[0015] This invention integrates controllable vacuum and gas supply components, and features a dual-mode operation: a switchable vacuum crystallization mode and a positive pressure crystallization mode. In vacuum crystallization mode, a controllable low-pressure vacuum environment is actively formed and maintained within the crystallization chamber to precisely regulate the solvent evaporation rate of the perovskite coating, promoting the orderly and slow growth of perovskite grains and reducing pinholes and cracks in the perovskite film caused by excessively rapid evaporation. In positive pressure crystallization mode, by simultaneously controlling the gas supply and vacuum, a stable, flowing inert gas micro-positive pressure atmosphere is created within the crystallization chamber. This atmosphere isolates moisture and oxygen interference while uniformly removing solvent vapor from the perovskite coating, achieving uniform drying and atmosphere protection for the perovskite film. In practical operation, operators can select between vacuum and positive pressure crystallization modes by controlling the opening and closing of the vacuum and gas supply components. This allows for easy adjustment of process parameters such as the internal gas atmosphere and pressure within the crystallization chamber, thereby improving the quality of the perovskite film. Attached Figure Description
[0016] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0017] Figure 1 A schematic diagram of one embodiment of the perovskite crystallization equipment provided by this utility model; Figure 2 A second schematic diagram of the structure of an embodiment of the perovskite crystallization equipment provided by this utility model; Figure 3 A schematic diagram of the structure of the crystallization box in one embodiment of the perovskite crystallization equipment provided by this utility model; Figure 4 A schematic diagram of the structure of the substrate frame in one embodiment of the perovskite crystallization equipment provided by this utility model.
[0018] Explanation of reference numerals in the attached figures: 10. Crystallization chamber; 11. Hinge structure; 12. Locking device; 13. Sealing mounting groove; 14. Sealing strip; 15. First observation window; 16. Vacuum pressure sensor; 20. Cover; 21. Second observation window; 30. Crystallization chamber; 31. Air inlet; 32. Air outlet; 33. Gas distribution plate; 40. Vacuum extraction assembly; 41. Vacuum generator; 42. Vacuum extraction solenoid valve; 50. Gas supply components; 51. Gas storage device; 52. Gas supply solenoid valve; 60. Base frame; 61. Plate; 62. Mounting rod; 63. Placement slot; 64. Handle rod; 70. Matrix; The realization of the purpose, functional features and advantages of this utility model will be further explained in conjunction with the embodiments and with reference to the accompanying drawings. Detailed Implementation
[0019] The technical solutions of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, what is described is only a part of the embodiments of this utility model, and not all of the embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of this utility model.
[0020] It should be noted that if the embodiments of this utility model involve directional indicators (such as up, down, left, right, front, back, etc.), the directional indicators are only used to explain the relative positional relationship and movement of the components in a certain specific posture (as shown in the figure). If the specific posture changes, the directional indicators will also change accordingly.
[0021] Furthermore, it should be noted that the descriptions involving "first," "second," etc., in this utility model are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. If the combination of technical solutions is contradictory or impossible to implement, such a combination of technical solutions should be considered non-existent and not within the scope of protection claimed by this utility model.
[0022] Perovskite solar cells offer significantly higher photoelectric conversion efficiency than conventional solar cells, giving them a strong advantage. In the manufacturing process of perovskite solar cells, perovskite thin film crystallization is a crucial step. The general steps involve first coating a substrate surface with a perovskite precursor solution to form a coating, then placing the coated substrate inside a crystallization apparatus. The crystallization apparatus promotes the evaporation of the perovskite coating solvent, forming a perovskite thin film. However, in existing technologies, it is difficult to control process parameters such as gas atmosphere and pressure during the crystallization process, leading to poor perovskite film quality, specifically manifested as poor film uniformity and numerous internal defects.
[0023] To solve the above-mentioned technical problems, this utility model proposes a perovskite crystallization device.
[0024] Please see Figures 1 to 2In one embodiment of this utility model, the perovskite crystallization apparatus includes: The crystallization box 10 has a crystallization chamber 30 inside; The cover 20 is connected to the crystallization box 10 to close the crystallization chamber 30. The gas extraction assembly 40 and the gas supply assembly 50 are used to extract the internal gas of the crystallization chamber 30 and the gas supply assembly 50 is used to supply gas to the crystallization chamber 30. The perovskite crystallization equipment has two working modes: vacuum crystallization mode and positive pressure crystallization mode. When in vacuum crystallization mode, the air extraction component 40 is started and the air supply component 50 is turned off. When in positive pressure crystallization mode, the air extraction component 40 and the air supply component 50 are started simultaneously.
[0025] This invention integrates a controllable vacuum pump component 40 and a gas supply component 50, and sets up a dual-operating mode: a switchable vacuum crystallization mode and a positive pressure crystallization mode. In vacuum crystallization mode, a controllable low-pressure vacuum environment can be actively formed and maintained inside the crystallization chamber 30 to precisely regulate the solvent evaporation rate of the perovskite coating, promoting the orderly and slow growth of perovskite grains, thereby reducing pinholes and cracks in the perovskite film caused by excessively rapid evaporation. In positive pressure crystallization mode, by synchronously controlling the gas supply and pump, a stable inert gas micro-positive pressure atmosphere can be formed inside the crystallization chamber 30, which can isolate moisture and oxygen interference and uniformly remove the solvent vapor from the perovskite coating, achieving uniform drying and atmosphere protection of the perovskite film. In actual operation, operators can control the opening and closing of the vacuum crystallization component 40 and the gas supply component to select between the vacuum crystallization mode and the positive pressure crystallization mode, making it easy to adjust the internal gas atmosphere and pressure and other process parameters of the crystallization chamber 30 during the crystallization process, thereby improving the quality of the perovskite film.
[0026] As a preferred embodiment of the above embodiments, refer to Figures 1 to 3 One side of the crystallization chamber 10 is hinged to the cover 20 via a hinge structure 11, and the other side of the crystallization chamber 10 is provided with a locking device 12. The crystallization chamber 10 is sealed and connected to the cover 20 via the locking device 12. This design, combining the hinge and the locking device 12, achieves convenient opening and closing of the cover 20 and reliable sealing in the closed state. It facilitates the quick removal and placement of the base 70 and daily maintenance, while ensuring the high sealing performance of the crystallization chamber 30 during operation, providing a mechanical structural basis for the stable maintenance of vacuum and positive pressure environments.
[0027] Furthermore, a sealing mounting groove 13 is provided on the side of the crystallization chamber 10 facing the cover 20. The sealing mounting groove 13 is arranged circumferentially around the crystallization chamber 10. The sealing mounting groove 13 is used to install and accommodate the sealing strip 14, which is used to seal and connect with the cover 20. With this arrangement, by providing the sealing mounting groove 13 and installing the sealing strip 14 around the crystallization chamber 10, a replaceable and easy-to-maintain elastic sealing interface is formed, which significantly improves the sealing reliability and durability between the cover 20 and the chamber, effectively prevents internal gas leakage, and ensures the purity and pressure stability of the process atmosphere.
[0028] Furthermore, the crystallization chamber 10 is provided with a first observation window 15; and / or, the cover 20 is provided with a second observation window 21. With this configuration, by providing the first observation window 15 and the second observation window 21 on the crystallization chamber 10 and / or the cover 20 respectively, real-time in-situ observation of the morphology, color changes and other states of the thin film during the crystallization process can be realized, which is convenient for process monitoring and process optimization.
[0029] As a preferred embodiment of the above embodiments, refer to Figure 3 The crystallization chamber 30 is equipped with an air inlet 31 and an air outlet 32. The extraction assembly 40 extracts the internal gas of the crystallization chamber 30 through the air outlet 32, while the gas supply assembly 50 supplies gas to the crystallization chamber 30 through the air inlet 31. With this configuration, the air inlet 31 is connected to the gas supply assembly 50 and is responsible for introducing external gas (such as inert nitrogen or compressed dry air) into the crystallization chamber 30 as needed for the crystallization process, actively establishing or maintaining a specific atmosphere to prevent the substrate 70 from oxidizing or becoming damp. The air outlet 32 is connected to the extraction assembly 40 and is used to discharge the original gas in the crystallization chamber 30 or the perovskite coating solvent vapor generated during the reaction process. This design, which physically separates the air inlet and exhaust paths and controls them separately by the independent gas supply assembly 50 and extraction assembly 40, constitutes an active, bidirectional, and highly controllable gas exchange system, ensuring the smooth implementation of the technical solution of this application.
[0030] Furthermore, the crystallization chamber 30 is provided with a plurality of exhaust holes 32, which are distributed at the bottom and / or on the left and right sides of the crystallization chamber 30, and the opening and closing of each exhaust hole 32 is independently configured. This configuration, by providing multiple independently controllable exhaust holes 32 and distributing them in different locations within the chamber, enhances the controllability and flexibility of the gas flow path, facilitates the uniform distribution of atmosphere and pressure within the crystallization chamber 30, and allows for observation of the perovskite crystallization effect by comparing different exhaust configurations, thereby enabling optimization of the airflow field based on the crystallization effect.
[0031] Furthermore, a gas equalization plate 33 is disposed inside the crystallization chamber 30. The gas equalization plate 33 is installed inside the crystallization chamber 30 by at least two connecting rods. The gas equalization plate 33 is located on the side of the air inlet 31 and / or exhaust 32 facing the center of the crystallization chamber 30, and a gas flow gap is left between the gas equalization plate 33 and the air inlet 31 and / or exhaust 32. With this arrangement, by placing the gas equalization plate 33 inside the crystallization chamber 30 and in front of the inlet of the air inlet 31 and / or exhaust 32, where the gas equalization plate 33 is not directly blocking the orifice, but is suspended by at least two connecting rods to maintain a certain distance between it and the orifice, a gap that allows gas flow is formed. Understandably, when gas is introduced, the gas will first collide with the gas equalization plate 33, its kinetic energy will be dispersed, and the gas will be forced to enter the crystallization chamber 30 in a smoother and more diffuse manner through the gas flow gap between the gas equalization plate 33 and the orifice, thereby transforming the originally potentially concentrated and high-speed jet into a more widely distributed and more uniform laminar or diffuse flow. Similarly, during exhaust, the gas equalization plate 33 can also ensure that the gas in the crystallization chamber 30 is drawn more evenly to the exhaust port 32, avoiding excessive local suction effect that could cause airflow short-circuiting. The core purpose of this design is to break the airflow inhomogeneity caused by point-like intake / exhaust, effectively improve the uniformity of the atmosphere (pressure, composition, humidity) in the entire crystallization working area, and provide a stable gas environment for the uniform drying and crystallization of perovskite films. This is an important structural guarantee for ensuring the consistency of large-area film formation quality.
[0032] As a preferred embodiment of the above embodiments, refer to Figures 1 to 2 The vacuum pumping assembly 40 includes a vacuum pumping pipe (not shown in the attached diagram) and a vacuum generator 41 and a vacuum pumping solenoid valve 42 mounted on the vacuum pumping pipe. The vacuum pumping end of the vacuum pumping pipe is connected to the crystallization chamber 30. Alternatively, the gas supply assembly 50 includes a gas supply pipe (not shown in the attached diagram) and a gas storage device 51 and a gas supply solenoid valve 52 mounted on the gas supply pipe. The gas supply end of the gas supply pipe is connected to the crystallization chamber 30. With this configuration, the vacuum pumping assembly 40 consists of a vacuum pumping pipe, a vacuum generator 41, and a vacuum pumping solenoid valve 42, and is connected to the exhaust port 32 of the crystallization chamber 30 through the vacuum pumping end, forming an active vacuum pumping system. The vacuum generator 41 is the power source responsible for generating negative pressure, and the vacuum pumping solenoid valve 42 is a control switch that can be quickly opened and closed to precisely control the timing and duration of the vacuum pumping operation. The two are connected in series on the vacuum pumping pipe, allowing the equipment to establish and maintain various pressure states from low vacuum to specific negative pressure within the crystallization chamber 30 as needed. The gas supply assembly 50 consists of a gas supply pipe, a gas storage device 51 (such as a gas cylinder or gas supply system), and a gas supply solenoid valve 52. The gas supply end is connected to the gas inlet 31 of the crystallization chamber 30, forming a controllable gas supply system. The gas storage device 51 provides a stable gas source (such as nitrogen, compressed dry air, etc.), while the gas supply solenoid valve 52 controls the on / off state and flow rate of the gas; the two work together to inject a specific atmosphere into the chamber according to process requirements.
[0033] Furthermore, the perovskite crystallization equipment includes a vacuum pressure sensor 16, the detection end of which is located inside the crystallization chamber 30. The vacuum pressure sensor 16 is electrically connected to the suction solenoid valve 42 and the supply solenoid valve 52. This configuration, by linking the vacuum pressure sensor 16 with the suction solenoid valve 42 and the supply solenoid valve 52, enables real-time monitoring and closed-loop automatic control of the pressure within the crystallization chamber 30. It allows for dynamic adjustment of suction or supply based on a preset process curve, resulting in more precise and stable pressure control and significantly improving the automation level and consistency of the process.
[0034] As a preferred embodiment of the above embodiments, refer to Figure 4 The perovskite crystallization equipment includes a substrate frame 60, which can be placed into a crystallization chamber 30. Specifically, the substrate frame 60 includes two plates 61 arranged symmetrically on the left and right sides, and the upper and lower sides of the two plates 61 are fixedly connected by at least two mounting rods 62 respectively. Several vertically arranged placement slots 63 are provided on the opposite side of the two plates 61, which are used to support the sides of the substrate 70. In this configuration, the substrate frame 60 is composed of two symmetrical plates 61 forming the main frame. These two plates 61 are rigidly connected and fixed on their upper and lower sides by at least two mounting rods 62 respectively, thereby forming a stable and hollow three-dimensional frame structure. Inside this frame, multiple vertically arranged placement slots 63 are provided. These placement slots 63 are specifically used to support the flat substrate 70 (such as glass or silicon wafers) coated with a perovskite precursor coating. This design fixes the substrate 70 in a vertical array and in a suspended manner within the crystallization chamber 30. In this way, on the one hand, the vertical placement can effectively utilize the vertical space of the chamber to achieve high-throughput batch sample processing; on the other hand, the two sides of the substrate 70 are completely exposed to the chamber atmosphere, ensuring full and uniform contact between the gas and the surface of the substrate 70.
[0035] Furthermore, a handle 64 is provided on the top of the base frame 60. This design allows for quick loading and unloading of the base frame 60, optimizing the process flow cycle.
[0036] The crystallization method used in the perovskite crystallization equipment of this invention includes the following steps: Step S10: Activate the pumping assembly to extract the gas inside the crystallization chamber, creating a low-pressure vacuum state, i.e., vacuum crystallization mode. In this step, the pumping assembly (typically including a vacuum generator, solenoid valve, and piping system) connected to the crystallization chamber is actively activated to continuously extract the original gas (such as air, residual solvent vapor, etc.) from the sealed crystallization chamber. This process is not statically closed but a dynamic negative pressure establishment process. As gas is continuously removed, the density of gas molecules inside the chamber continuously decreases, leading to a gradual decrease in pressure inside the chamber, eventually forming and maintaining a low-pressure vacuum environment lower than the external atmospheric pressure. The core purpose of establishing this controllable low-pressure state is to create a controlled and slow evaporation condition for the solvent in the perovskite coating. Under low pressure, the boiling point of the solvent decreases, and the volatilization kinetics become more moderate and controllable. This helps to guide the orderly and slow nucleation and growth of perovskite crystals, thereby effectively suppressing film defects (such as pinholes, cracks, and uneven crystallization) caused by the rapid volatilization of the perovskite coating solvent. This lays a key environmental foundation for the preparation of high-quality, highly uniform perovskite films.
[0037] Step S20: Simultaneously, the extraction assembly is activated to draw gas from the crystallization chamber, and the gas supply assembly is activated to supply gas into the crystallization chamber, thereby creating a positive pressure flow state inside the crystallization chamber, i.e., a positive pressure crystallization mode. In the above steps, by simultaneously activating the extraction assembly to continuously draw gas from the crystallization chamber and activating the gas supply assembly to inject a specific gas (such as nitrogen or compressed dry air, or other inert or protective gases) into the chamber, the two actions operate synchronously and in real time. This continuously replaces the original atmosphere inside the chamber (which may contain water, oxygen impurities, or solvent vapors) with clean, dry protective gas; and establishes and maintains a slightly positive pressure environment within the chamber, slightly higher than the external atmospheric pressure. More importantly, the continuous intake and extraction of gas create a stable, low-speed flowing gas atmosphere within the chamber. This positive pressure flow state has a dual core function: firstly, the micro-positive pressure can effectively block the infiltration of external air, providing a strictly water- and oxygen-free inert drying environment for the perovskite film; secondly, the continuous and uniform gas flow can efficiently and uniformly remove the solvent volatile molecules of the perovskite coating, avoiding the problem of uneven drying caused by local solvent vapor saturation, thereby achieving uniform and controllable drying and crystallization kinetics on the entire substrate surface.
[0038] This setup allows the same equipment to flexibly implement two different crystallization modes (vacuum crystallization mode and positive pressure crystallization mode) by selectively executing vacuum evacuation or positive pressure gas supply processes. This not only meets the process requirements of different material systems but also fully utilizes the functional potential of the equipment, improving the versatility and practicality of the method.
[0039] Vacuum crystallization involves forcefully extracting the gas (mainly air and solvent vapor) from the crystallization chamber using a vacuum pump or vacuum generator, rapidly reducing the internal pressure to near-vacuum (e.g., a few to several hundred Pascals). The solvent removal mechanism primarily relies on diffusion and volumetric flow. Therefore, vacuum crystallization is generally more advantageous than positive pressure crystallization for the rapid and complete removal of low-boiling-point solvents, especially those penetrating into the perovskite subsurface layer, creating a low-oxygen, low-water environment for subsequent heating and annealing. This is because, in vacuum mode, the lower the system pressure, the lower the boiling point of the liquid, resulting in the instantaneous generation and collapse of numerous bubbles within the solvent (overall boiling and volumetric expansion effects), which is highly conducive to the rapid and thorough removal of low-boiling-point solvents. Furthermore, maintaining a low system pressure after the rapid removal of low-boiling-point solvents prevents their vapor from recondensing back into the film. Specifically, in the initial stage of vacuum crystallization (at higher pressure), the rapid evaporation of the solvent generates localized convection, with some vapor being expelled with the extracted gas. In the later stages (when the pressure drops to very low levels), the mean free path of gas molecules increases, and convection almost disappears. After evaporating from the liquid film surface, solvent molecules need to slowly diffuse throughout the cavity before being captured by the exhaust vents.
[0040] Positive pressure crystallization can achieve "precise, controllable, and efficient removal of high-boiling-point solvents" and promote the rapid formation and transformation of perovskite mesophases. It enables more uniform solvent escape, resulting in denser, more crystalline films. Therefore, positive pressure crystallization is generally more effective than vacuum crystallization in removing high-boiling-point solvents from the perovskite chamber. This is because the principle of positive pressure crystallization involves continuously introducing dry or heated inert gases (such as N2 or CDA) into the crystallization chamber while maintaining a positive pressure environment slightly above atmospheric pressure (e.g., 1.05-1.2 atmospheres) through the exhaust port. Its solvent removal mechanism mainly relies on "forced convection" and "purging." The main processes are manifested in the following three aspects: First, the continuously introduced large amount of inert gas acts as a carrier gas. As it flows across the wet film surface, it rapidly "encapsulates" and carries away the evaporated solvent molecules. Second, the high-speed airflow creates strong convection within the cavity, continuously renewing the gaseous environment on the film surface, breaking the local saturation layer of solvent vapor, and greatly increasing the solvent evaporation rate (following aerodynamic principles). Third, the positive pressure and flowing gas make it difficult for solvent vapor to condense on the cavity wall, and it is directly blown out through the exhaust port.
[0041] As a preferred embodiment of the above, step S10 includes the following steps: Step S11: When the internal pressure of the crystallization chamber reaches a preset value, the pumping assembly stops operating, allowing the internal pressure of the crystallization chamber to recover to atmospheric pressure through natural leakage. The core process in this step is as follows: First, active pumping precisely reduces the pressure inside the crystallization chamber from atmospheric pressure to a preset value (e.g., 1000 Pa). Once the vacuum pressure sensor inside the chamber detects that the pressure has reached this preset value, the control system immediately instructs the pumping assembly to stop working (closing the pumping solenoid valve and stopping the vacuum generator). Afterward, the crystallization chamber no longer undergoes active pressure intervention, but instead allows the internal pressure to recover extremely slowly through a very small natural leakage at the chamber's sealing interface (or through specially designed controllable micro-leaks). This pressure recovery is a passive, natural, and linear process, with a rate much lower than active pumping, thus creating a gradual environment within the chamber where the pressure slowly and monotonically increases from the preset low pressure value to atmospheric pressure. This dynamically changing low-pressure environment allows the evaporation rate of the perovskite coating solvent to decrease smoothly and in a controlled manner. The core advantage of this model lies in its ability to guide the perovskite crystals to grow and assemble in an extremely slow and orderly manner by creating a drying driving force that automatically varies over time, thereby minimizing film defects (such as cracks and pores) caused by sudden changes in drying stress.
[0042] Step S12: When the internal pressure of the crystallization chamber reaches a preset value, the pumping component continues to operate to maintain the internal pressure of the crystallization chamber within a preset fluctuation range. The core process in this step is as follows: First, the pumping component actively pumps the pressure inside the crystallization chamber to a preset value (e.g., 1000 Pa). After reaching the preset value, the pumping component does not stop but continues to operate continuously at low power. Simultaneously, the system typically uses a controlled micro-intake (e.g., inert gas) to dynamically and finely balance the pumping rate and the micro-intake rate through a closed-loop feedback control system. This allows the internal pressure to be precisely and stably maintained within a very narrow fluctuation range (e.g., ±100 Pa) centered on the preset value, rather than being allowed to fluctuate freely. This mode creates a long-term, constant low-pressure platform. Its core advantage lies in providing a constantly driven, highly controllable drying environment for the crystallization process of perovskite thin films. The evaporation rate of the perovskite coating solvent remains constant under this stable low pressure, which is very beneficial for the uniform and predictable layer-by-layer growth and assembly of perovskite crystals. It can effectively suppress problems such as uneven film formation and large differences in grain size caused by pressure fluctuations.
[0043] Step S13: When the internal pressure of the crystallization chamber reaches a preset value, the suction assembly stops operating, allowing the internal pressure of the crystallization chamber to recover through natural leakage. Once the internal pressure of the crystallization chamber recovers to a critical value, the suction assembly is restarted to return the internal pressure of the crystallization chamber to the preset value. The core process in the above steps is: first, active suction lowers the internal pressure to a preset value (e.g., 1000 Pa). After reaching this value, the suction assembly stops operating, and the internal pressure begins to slowly rise due to slight natural leakage. The system continuously monitors the pressure, and when the pressure rises to a preset upper limit critical value (e.g., 1500 Pa), the suction assembly is immediately restarted to pull the pressure back to the preset value. This forms a periodic pressure cycle of "suction decrease - natural recovery - re-suction decrease." This mode creates a dynamic low-pressure environment with periodic, sawtooth-like fluctuations in pressure within a certain range (e.g., 1000 Pa to 1500 Pa). Its core advantage lies in providing intelligent, buffered drying control: during the pressure recovery phase, the driving force for solvent evaporation in the perovskite coating gradually weakens, allowing crystal growth to proceed slowly; when the pressure is withdrawn, the driving force moderately increases. This periodic, controlled pressure fluctuation prevents excessively rapid solvent evaporation and film stress concentration caused by continuous strong suction, while also avoiding insufficient drying power in the later stages that might result from a slow, one-way pressure recovery. It simulates optimized, unsteady crystallization kinetics, which helps to break disordered crystallization and promote grain recombination, thereby potentially yielding perovskite films with fewer defects and higher crystal quality within a wider process window.
[0044] This setup, by refining the three control strategies of the vacuum crystallization mode (steps S11, S12, and S13), provides a multi-gradient, programmable pressure control method for process development. It can accurately match different solvent evaporation characteristics and crystal growth kinetics requirements, which is beneficial for exploring the optimal crystallization process and thus improving the quality of perovskite films.
[0045] It should be noted that other aspects of the perovskite crystallization equipment and crystallization method disclosed in this utility model are existing technologies and will not be repeated here.
[0046] The above are merely optional embodiments of this utility model and do not limit the patent scope of this utility model. Any application of this utility model directly or indirectly in other related technical fields is included within the patent protection scope of this utility model.
Claims
1. A perovskite crystallization device, characterized in that, The perovskite crystallization equipment includes: A crystallization box, wherein the interior of the crystallization box is provided with a crystallization cavity; A cover body, which is connected to the crystallization box body to close the crystallization cavity; The gas extraction assembly and the gas supply assembly are provided, wherein the gas extraction assembly is used to extract the internal gas of the crystallization chamber, and the gas supply assembly is used to supply gas into the crystallization chamber. The perovskite crystallization equipment has two working modes: vacuum crystallization mode and positive pressure crystallization mode. When in vacuum crystallization mode, the air extraction component is activated and the air supply component is deactivated. When in positive pressure crystallization mode, the air extraction component and the air supply component are activated simultaneously.
2. The perovskite crystallization equipment as described in claim 1, characterized in that: One side of the crystallization box is hinged to the cover, and the other side of the crystallization box is provided with a locking device. The crystallization box is sealed and connected to the cover through the locking device.
3. The perovskite crystallization equipment as described in claim 2, characterized in that: The crystallization box is provided with a sealing installation groove on the side facing the cover, and the sealing installation groove is arranged circumferentially around the crystallization box; the sealing installation groove is used to install and accommodate a sealing strip, and the sealing strip is used to seal and connect with the cover.
4. The perovskite crystallization equipment as described in claim 1, characterized in that: The crystallization chamber is provided with a first observation window; and / or, the cover is provided with a second observation window.
5. The perovskite crystallization equipment as described in claim 1, characterized in that: The crystallization chamber is provided with an air inlet and an air outlet. The air extraction component extracts the internal gas of the crystallization chamber through the air outlet, and the air supply component supplies gas to the crystallization chamber through the air inlet. Furthermore, the crystallization cavity is provided with a plurality of exhaust holes, which are distributed at the bottom and / or the left and right sides of the crystallization cavity, and the opening and closing of each exhaust hole is independently configured.
6. The perovskite crystallization equipment as described in claim 5, characterized in that: An air distribution plate is provided inside the crystallization chamber. The air distribution plate is installed inside the crystallization chamber by at least two connecting rods. The air distribution plate is located on the side of the air inlet and / or the air outlet facing the center of the crystallization chamber, and a gas flow gap is left between the air distribution plate and the air inlet and / or the air outlet.
7. The perovskite crystallization equipment as described in claim 1, characterized in that: The air extraction assembly includes an air extraction pipe and a vacuum generator and an air extraction solenoid valve installed on the air extraction pipe, with the air extraction end of the air extraction pipe connected to the crystallization chamber. And / or, the gas supply assembly includes a gas supply pipe, a gas storage device and a gas supply solenoid valve installed on the gas supply pipe, and the gas supply end of the gas supply pipe is connected to the crystallization chamber.
8. The perovskite crystallization equipment as described in claim 7, characterized in that: The perovskite crystallization equipment includes a vacuum pressure sensor, the detection end of which is located inside the crystallization chamber, and the vacuum pressure sensor is electrically connected to the suction solenoid valve and the supply solenoid valve.
9. The perovskite crystallization equipment as described in claim 1, characterized in that: The perovskite crystallization equipment includes a base frame that can be placed into the crystallization cavity; specifically, the base frame includes two plates arranged symmetrically on the left and right, and the upper and lower sides of the two plates are respectively fixedly connected by at least two mounting rods; a plurality of placement grooves arranged vertically are provided on the opposite side of the two plates, and the placement grooves are used to support the side of the base.
10. The perovskite crystallization equipment as described in claim 9, characterized in that: The top of the base frame is equipped with a handle.