A deep-cone thickener

By adding a frame to the deep cone thickener and improving the installation method of the water inlet rod, the free water rising path was optimized, which solved the problems of reduced underflow concentration and poor operational stability, and achieved improved underflow concentration and equipment stability.

CN225006416UActive Publication Date: 2026-11-24ANHUI PROVINCE LUJIANG LONGQIAO MINING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522738340.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-24
Publication Date
2026-11-24
Estimated Expiration
2035-12-24

AI Technical Summary

Technical Problem

The existing deep cone thickeners have a dense design of water inlet rods but no reserved space for additional rods, resulting in insufficient free water rise path, which leads to reduced underflow concentration and poor operational stability.

Method used

By adding a new frame and changing the installation method of the water intake rod, the free water rising path is optimized, the obstruction of the cross braces is reduced, and the water intake efficiency is improved.

Benefits of technology

Without altering the original main structure, it improves the underflow concentration and operational stability, significantly reduces equipment modification costs, extends equipment lifespan, and enhances mineral processing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225006416U_ABST
    Figure CN225006416U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of mineral processing equipment and relates to a deep cone thickener, including a main shaft located on the axis of the deep cone thickener; upper cross braces, including a first upper cross brace and a second upper cross brace; lower cross braces, including a first lower cross brace and a second lower cross brace; inclined braces, including a first inclined brace and a second inclined brace; a scraper rake, installed parallel to the bottom surface of the deep cone thickener below the first inclined brace, and the scraper rake is fixed by the first inclined brace; the first upper cross brace, the first lower cross brace, and the first inclined brace are respectively provided with first through holes; the second upper cross brace, the second lower cross brace, and the second inclined brace are respectively provided with second through holes; and a water guide rod, including a first water guide rod and a second water guide rod; the diameter of the second water guide rod is smaller than the diameter of the second through hole. The deep cone thickener of this application effectively improves the overall water intake efficiency and underflow concentration by changing the installation method of the water guide rod.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of mineral processing equipment and relates to a deep cone thickener. Background Technology

[0002] The deep cone thickener is a key piece of equipment used in mineral processing to increase underflow concentration. After years of operation, the underflow concentration of the 18m deep cone thickener at Longqiao Mining has decreased due to changes in material composition. Existing technologies such as... Figure 1-2 As shown, the thickener frame is already equipped with water guide rods with a spacing of 400mm, which is a high density. However, the upward path of free water (water between mud flocs) is limited, resulting in the underflow concentration not being able to be further increased. The existing frame is a traditional design, with the water guide rods arranged along the cross braces. When free water rises, it needs to "bypass" the cross braces, which limits the water guiding effect and affects the operational stability.

[0003] The existing deep cone thickener has a densely packed intake manifold design but lacks provisions for expansion, resulting in insufficient free water rise path, reduced underflow concentration, and poor operational stability. Conventional modification methods are unlikely to effectively improve intake efficiency while preserving the existing structure. Summary of the Invention

[0004] This application provides a deep cone thickener that effectively improves overall water intake efficiency and underflow concentration by adding a new frame and changing the installation method of the water intake rod.

[0005] To achieve the above technical objectives, the technical solution adopted in this application is a deep cone thickener, comprising: The main shaft is located on the axis of the deep cone thickener. The upper cross brace includes a first upper cross brace and a second upper cross brace; both the first upper cross brace and the second upper cross brace are vertically mounted on the main shaft, and the first upper cross brace and the second upper cross brace form a 90° angle. The lower cross brace includes a first lower cross brace and a second lower cross brace; both the first lower cross brace and the second lower cross brace are vertically mounted on the main shaft, and the first lower cross brace and the second lower cross brace form a 90° angle; the first lower cross brace is parallel to the first upper cross brace, and the first lower cross brace is located below the first upper cross brace; the second lower cross brace is parallel to the second upper cross brace, and the second lower cross brace is located below the second upper cross brace. The diagonal brace includes a first diagonal brace and a second diagonal brace; one end of the first diagonal brace is installed at one end of the first lower cross brace, and the other end is installed at the bottom of the main shaft; one end of the second diagonal brace is installed at one end of the second lower cross brace, and the other end is installed at the bottom of the main shaft. The sludge scraper is installed below the first inclined brace in a manner parallel to the bottom surface of the deep cone thickener. The sludge scraper is fixed by the first inclined brace and has an angle relative to the first inclined brace. The first upper cross brace, the first lower cross brace and the first diagonal brace are respectively provided with first through holes; there are multiple first through holes, which are evenly distributed on the first upper cross brace, the first lower cross brace and the first diagonal brace. The second upper cross brace, the second lower cross brace, and the second diagonal brace are respectively provided with second through holes; there are multiple second through holes, which are evenly distributed on the second upper cross brace, the second lower cross brace, and the second diagonal brace; The water-guiding rod includes a first water-guiding rod and a second water-guiding rod; the first water-guiding rod passes through a first through hole in the first upper cross brace, the first lower cross brace and the first diagonal brace in sequence; the second water-guiding rod passes through a second through hole in the second upper cross brace, the second lower cross brace and the second diagonal brace in sequence. The diameter of the first water-guiding rod is matched with the diameter of the first through hole; the diameter of the second water-guiding rod is smaller than the diameter of the second through hole.

[0006] As an improved technical solution of this application, one side of the second water-guiding rod is welded and fixed to the second through hole, that is, the axis of the second water-guiding rod is not coaxial with the axis of the second through hole.

[0007] As an improved technical solution of this application, there is a height difference of 3500mm between the second upper cross brace and the second lower cross brace.

[0008] As an improved technical solution of this application, the second upper cross brace is located 1600mm above the first upper cross brace.

[0009] As an improved technical solution of this application, there is a pair of each of the first upper horizontal brace, the first lower horizontal brace, the second upper horizontal brace, the second lower horizontal brace, the first diagonal brace, and the second diagonal brace; the pair of first upper horizontal braces are arranged symmetrically with respect to the main axis; the pair of first lower horizontal braces are arranged symmetrically with respect to the main axis; the pair of second upper horizontal braces are arranged symmetrically with respect to the main axis; the pair of second lower horizontal braces are arranged symmetrically with respect to the main axis; the pair of first diagonal braces are arranged symmetrically with respect to the main axis; and the pair of second diagonal braces are arranged symmetrically with respect to the main axis.

[0010] Beneficial effects This deep cone thickener technology effectively improves the underflow concentration and operational stability of the thickener without altering its original main structure, resolving the concentration reduction issue caused by material changes. The newly added water guide rod structure optimizes the free water upward path, reduces cross bracing obstruction, and improves water intake efficiency. This deep cone thickener technology features a reasonable structure, is easy to implement, significantly reduces equipment modification costs, extends equipment lifespan, and improves mineral processing efficiency. Attached Figure Description

[0011] Figure 1 A schematic diagram of the structure of a prior art deep cone thickener; Figure 2 A top view schematic diagram of the existing deep cone thickener is shown; Figure 3 A top view of the deep cone thickener of this technology is shown. Figure 4 A schematic diagram illustrating the installation structure of the second water guide rod and the second through hole in this technology is shown. Figure 5 A schematic diagram illustrating the water flow around the first lower cross brace at the bottom of the deep cone thickener of this technology is shown, with arrows indicating the direction of water flow. Figure 6 A schematic diagram illustrating the flow of water through the second through hole at the bottom of the deep cone thickener of this technology as it passes through the second lower cross brace. The arrows in the diagram represent the direction of water flow. In the diagram, 1 is the main shaft; 2 is the first upper cross brace; 3 is the second upper cross brace; 4 is the first lower cross brace; 5 is the first diagonal brace; 6 is the first water guide rod; 7 is the second water guide rod; 8 is the mud scraper; and 9 is the second through hole. Detailed Implementation

[0012] The main technology of this application is based on the existing deep cone thickener structure, with the addition of a new set of cross braces and the improvement of the water intake rod installation method, which optimizes the free water rising path, reduces cross brace obstruction, and improves water intake efficiency.

[0013] The technical solution of this application will be described in detail below with reference to the accompanying drawings.

[0014] like Figure 3 As shown, a deep cone thickener includes a main shaft 1, an upper cross brace, a lower cross brace, and an oblique brace.

[0015] Among them, the main shaft 1 is located on the axis of the deep cone thickener and can drive the rotation of the upper cross brace, the lower cross brace and the diagonal brace under the drive of external force.

[0016] The upper cross brace includes a first upper cross brace 2 and a second upper cross brace 3. Both the first upper cross brace 2 and the second upper cross brace 3 are vertically mounted on the main shaft 1, and the first upper cross brace 2 and the second upper cross brace 3 form a 90° angle. In actual application, there are two first upper cross braces 2, which are located on the same straight line and are symmetrically arranged with respect to the main shaft 1; there are also two second upper cross braces 3, which are located on the same straight line and are symmetrically arranged with respect to the main shaft 1.

[0017] The lower cross brace includes a first lower cross brace 4 and a second lower cross brace. Both the first and second lower cross braces are vertically mounted on the main shaft 1, forming a 90° angle with each other. The first lower cross brace 4 is parallel to the first upper cross brace 2 and is located below it. The second lower cross brace is parallel to the second upper cross brace 3 and is located below it. In practical applications, there are two first lower cross braces 4, located on the same straight line and symmetrically arranged relative to the main shaft 1; there are also two second lower cross braces, located on the same straight line and symmetrically arranged relative to the main shaft 1.

[0018] The diagonal bracing includes a first diagonal bracing 5 and a second diagonal bracing. One end of the first diagonal bracing 5 is installed at one end of the first lower cross bracing 4, and the other end is installed at the bottom of the main shaft 1; one end of the second diagonal bracing is installed at one end of the second lower cross bracing, and the other end is installed at the bottom of the main shaft 1.

[0019] The sludge scraper 8 is installed parallel to the bottom surface of the deep cone thickener below the first inclined support 5. The sludge scraper 8 is fixed by the first inclined support 5 and has an angle relative to the first inclined support 5. In actual application, the sludge scraper 8 has an angle of 30°-60° with the first inclined support 5.

[0020] The first upper cross brace 2, the first lower cross brace 4, and the first diagonal brace 5 are respectively provided with first through holes; there are multiple first through holes, which are evenly distributed on the first upper cross brace 2, the first lower cross brace 4, and the first diagonal brace 5.

[0021] The second upper cross brace 3, the second lower cross brace and the second diagonal brace are respectively provided with second through holes 9; there are multiple second through holes 9, which are evenly distributed on the second upper cross brace 3, the second lower cross brace and the second diagonal brace.

[0022] The water-guiding rod includes a first water-guiding rod 6 and a second water-guiding rod 7. The first water-guiding rod 6 passes sequentially through the first through hole on the first upper cross brace 2, the first lower cross brace 4, and the first diagonal brace 5.

[0023] The second water-guiding rod 7 passes through the second through hole 9 on the second upper cross brace 3, the second lower cross brace and the second diagonal brace in sequence.

[0024] In some embodiments, the diameter of the first water guide rod 6 matches the diameter of the first through hole; specifically, the water guide rod is installed at the first through hole by welding, with no gap between the water guide rod and the first through hole. When the main shaft 1 drives the first lower cross brace 4 to rotate, the water flow at this position will flow around the edge of the first lower cross brace 4, see Figure 5 .

[0025] In other embodiments, the diameter of the second water-guiding rod 7 is smaller than the diameter of the second through hole 9. One side of the second water-guiding rod 7 is welded and fixed to the second through hole 9, meaning the axis of the second water-guiding rod 7 is not coaxial with the axis of the second through hole 9. Figure 4 As shown. Specifically, one side of the second water guide rod 7 is welded to the inner wall of one side of the second through hole 9, and a large gap is left between the other side of the second water guide rod 7 and the second through hole 9. When the main shaft 1 drives the second lower cross brace to rotate, the water flow on this side will flow through the gap between the second water guide rod 7 and the second through hole 9, as shown. Figure 6 .

[0026] As an improved technical solution of this application, there is a height difference of 3500mm between the second upper cross brace 3 and the second lower cross brace.

[0027] As an improved technical solution of this application, the second upper cross brace 3 is located 1600mm above the first upper cross brace 2.

[0028] As an improved technical solution of this application, there is a pair of each of the first upper horizontal brace 2, the first lower horizontal brace 4, the second upper horizontal brace 3, the second lower horizontal brace, the first diagonal brace 5, and the second diagonal brace; a pair of first upper horizontal braces 2 are symmetrically arranged relative to the main axis 1; a pair of first lower horizontal braces 4 are symmetrically arranged relative to the main axis 1; a pair of second upper horizontal braces 3 are symmetrically arranged relative to the main axis 1; a pair of second lower horizontal braces are symmetrically arranged relative to the main axis 1; a pair of first diagonal braces 5 are symmetrically arranged relative to the main axis 1; and a pair of second diagonal braces are symmetrically arranged relative to the main axis 1.

[0029] In practical applications, the following steps are included: 1. Evaluation of the existing frame structure: The spacing of the first water intake rod in the existing frame is 400mm, which is highly dense and there is no reserved space for addition; 2. Determine the location of the new frame: at a position rotated 90° horizontally relative to the existing frame (see...). Figure 3 A new frame is added using the existing main shaft 1; the new frame includes a second upper cross brace 3, a second lower cross brace, a second diagonal brace and a second water guide rod 7 installed on the main shaft 1; 3. Design of the new frame structure: The total height of the new frame is 1876mm higher than the original frame. The bottom of the frame is the second water intake rod 7 (without the mud scraper 8), which ensures that free water can rise directly to the clear water layer along the second water intake rod 7. 4. Optimize the design of the second water intake rod: The second water intake rod 7 of the newly added frame adopts a structure that passes through the second diagonal brace, the second lower horizontal brace, and the second upper horizontal brace 3, avoiding obstruction by the horizontal brace, so that the free water in the mud layer can rise continuously along the second water intake rod 7 without interruption; 5. Special structural treatment: Due to obstruction by the feed well, the water guide rod near the main shaft 1 area is changed to a two-section structure for easier on-site installation; 6. Mechanical Analysis and Connection: The new frame must be based on the mechanical analysis of the existing frame, which shall be carried out by the original designer of the thickener to ensure a reasonable connection with the existing structure, avoid off-center loading, and improve the process effect; 7. Implementation and commissioning: After installation, conduct operation and commissioning to verify the effect of improving underflow concentration and the stability of the equipment.

Claims

1. A deep cone thickener, characterized in that, include The main shaft is located on the axis of the deep cone thickener. The upper cross brace includes a first upper cross brace and a second upper cross brace; both the first upper cross brace and the second upper cross brace are vertically mounted on the main shaft, and the first upper cross brace and the second upper cross brace form a 90° angle. The lower cross brace includes a first lower cross brace and a second lower cross brace; both the first lower cross brace and the second lower cross brace are vertically mounted on the main shaft, and the first lower cross brace and the second lower cross brace form a 90° angle; the first lower cross brace is parallel to the first upper cross brace, and the first lower cross brace is located below the first upper cross brace; the second lower cross brace is parallel to the second upper cross brace, and the second lower cross brace is located below the second upper cross brace. The diagonal brace includes a first diagonal brace and a second diagonal brace; one end of the first diagonal brace is installed at one end of the first lower cross brace, and the other end is installed at the bottom of the main shaft; one end of the second diagonal brace is installed at one end of the second lower cross brace, and the other end is installed at the bottom of the main shaft. A sludge scraper is mounted below the first inclined brace in a manner parallel to the bottom surface of the deep cone thickener. The sludge scraper is fixed by the first inclined brace and has an angle relative to the first inclined brace. The first upper cross brace, the first lower cross brace and the first diagonal brace are respectively provided with first through holes; there are multiple first through holes, which are evenly distributed on the first upper cross brace, the first lower cross brace and the first diagonal brace. The second upper cross brace, the second lower cross brace, and the second diagonal brace are respectively provided with second through holes; there are multiple second through holes, which are evenly distributed on the second upper cross brace, the second lower cross brace, and the second diagonal brace; The water-guiding rod includes a first water-guiding rod and a second water-guiding rod; the first water-guiding rod passes through a first through hole in the first upper cross brace, the first lower cross brace and the first diagonal brace in sequence; the second water-guiding rod passes through a second through hole in the second upper cross brace, the second lower cross brace and the second diagonal brace in sequence. The diameter of the first water-guiding rod is matched with the diameter of the first through hole; the diameter of the second water-guiding rod is smaller than the diameter of the second through hole.

2. The deep cone thickener according to claim 1, characterized in that, One side of the second water-guiding rod is welded and fixed to the second through hole, that is, the axis of the second water-guiding rod is not coaxial with the axis of the second through hole.

3. A deep cone thickener according to claim 1, characterized in that, There is a height difference of 3500mm between the second upper cross brace and the second lower cross brace.

4. A deep cone thickener according to claim 1, characterized in that, The second upper cross brace is located 1600mm above the first upper cross brace.

5. A deep cone thickener according to claim 1, characterized in that, There is one pair of each of the first upper cross brace, the first lower cross brace, the second upper cross brace, the second lower cross brace, the first diagonal brace, and the second diagonal brace; the pair of first upper cross braces are symmetrically arranged relative to the main axis; the pair of first lower cross braces are symmetrically arranged relative to the main axis; the pair of second upper cross braces are symmetrically arranged relative to the main axis; the pair of second lower cross braces are symmetrically arranged relative to the main axis; the pair of first diagonal braces are symmetrically arranged relative to the main axis; and the pair of second diagonal braces are symmetrically arranged relative to the main axis.