A small pipe diameter filling pipeline cleaning and drying integrated device

Through integrated design and automatic control system, the problems of dispersion and low efficiency in cleaning and drying operations of small-diameter filling pipelines have been solved, realizing an efficient and reliable cleaning and drying process, and ensuring the consistency and repeatability of cleaning quality.

CN225007904UActive Publication Date: 2026-11-24CHINESE PEOPLES LIBERATION ARMY STRATEGIC SUPPORT FORCE AEROSPACE ENG UNIV NON-COMMISSIONED OFFICER SCHOOL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522804246.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-30
Publication Date
2026-11-24
Estimated Expiration
2035-12-30

AI Technical Summary

Technical Problem

In the existing technology, the cleaning and drying operations of small-diameter filling pipelines are scattered, cumbersome, inefficient, and have unstable cleaning quality, and there is a lack of integrated equipment.

Method used

An integrated cleaning and drying device for small-diameter filling pipelines was designed, which integrates a pure water storage tank, an ethanol storage tank, an oxidant cleaning solution storage tank, a combustion agent cleaning solution storage tank, a gas buffer tank, and a gas heater. The control system automatically switches valves to achieve automatic switching of media and one-button start. Combined with PLC program control, the cleaning, blowing, and drying processes are ensured to maintain process consistency and quality.

Benefits of technology

It achieves integrated operation of pipeline cleaning and drying, improves efficiency, ensures the reliability and repeatability of cleaning quality, and reduces the tediousness of manual operation and the number of times equipment needs to be moved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225007904U_ABST
    Figure CN225007904U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of pipeline cleaning and drying technology, and more specifically to an integrated cleaning and drying device for small-diameter filling pipelines, including a pure water storage tank, an ethanol storage tank, an oxidant cleaning solution storage tank, a combustion agent cleaning solution storage tank, a gas buffer tank, and a gas heater. The pure water storage tank, the ethanol storage tank, the oxidant cleaning solution storage tank, and the combustion agent cleaning solution storage tank are respectively connected to the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the combustion agent pressure cleaning tank via supply pipelines. These pressure cleaning tanks are connected to the pipeline to be cleaned. The gas buffer tank is connected to the gas heater and the pipeline to be cleaned via a gas supply pipeline. This device solves the problem that the functional units in the entire cleaning process are physically separated and lack effective integration.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pipeline cleaning and drying technology, and more specifically to an integrated cleaning and drying device for small-diameter filling pipelines. Background Technology

[0002] Small-diameter refueling pipelines, especially those used in aerospace, chemical, and pharmaceutical fields to transport high-purity, highly active substances, often retain harmful chemical residues on their inner walls after use. If these residues are not thoroughly removed, they can contaminate the next refueling medium, affecting product purity or system performance. Furthermore, reactions between different chemicals can lead to pipeline blockage, corrosion, and even safety accidents. Therefore, thorough cleaning and drying are essential after use, before reuse, or during maintenance. Currently, the cleaning and drying of such small-diameter pipelines typically employs a decentralized, step-by-step operation. Specifically, operators need to connect the pipeline to be cleaned sequentially to multiple independent devices or equipment to perform neutralization, flushing, purging, and drying steps separately. For example, a neutralizing liquid storage tank and pump set might be used for chemical neutralization, followed by flushing with a pure water storage tank, then initial purging with nitrogen, and finally, a separate heating and drying device might be needed for final drying. Throughout this process, the functional units are physically separated, lacking effective integration. Utility Model Content

[0003] In view of this, the present invention provides an integrated cleaning and drying device for small-diameter filling pipelines.

[0004] To achieve the above objectives, the present invention adopts the following technical solution: The system includes a pure water storage tank, an ethanol storage tank, an oxidizer cleaning solution storage tank, a combustion agent cleaning solution storage tank, a gas buffer tank, and a gas heater. The pure water storage tank, ethanol storage tank, oxidizer cleaning solution storage tank, and combustion agent cleaning solution storage tank are respectively connected to a pressurized pure water cleaning tank, a pressurized ethanol cleaning tank, a pressurized oxidizer cleaning tank, and a pressurized combustion agent cleaning tank via supply pipelines. These tanks are connected to the pipeline to be cleaned. The gas buffer tank is sequentially connected to the gas heater and the pipeline to be cleaned via a gas supply pipeline. The gas buffer tank is also connected to the pressurized pure water cleaning tank, the pressurized ethanol cleaning tank, the pressurized oxidizer cleaning tank, and the pressurized combustion agent cleaning tank via the gas supply pipelines.

[0005] Furthermore, each of the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the propellant pressure cleaning tank is equipped with two manual valves.

[0006] Furthermore, the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the combustion agent pressure cleaning tank are respectively equipped with a first level gauge, a second level gauge, a third level gauge, and a fourth level gauge.

[0007] Furthermore, a first solenoid valve is provided between the pure water storage tank and the pure water pressurized cleaning tank, and a second solenoid valve is provided between the pure water pressurized cleaning tank and the pipeline to be cleaned.

[0008] Furthermore, a first pressure reducing valve, a second pressure reducing valve, a fourth pressure reducing valve, and a third pressure reducing valve are respectively provided between the gas buffer tank and the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the combustion agent pressure cleaning tank.

[0009] Furthermore, a third solenoid valve is provided between the first pressure reducing valve and the pure water pressure cleaning tank, a fourth solenoid valve is provided between the second pressure reducing valve and the ethanol pressure cleaning tank, and a fifth solenoid valve is provided between the ethanol pressure cleaning pipeline and the pipeline to be cleaned.

[0010] Furthermore, a sixth solenoid valve is provided between the gas buffer tank and the gas heater.

[0011] Furthermore, a seventh solenoid valve is provided between the fourth pressure reducing valve and the oxidant pressure cleaning tank, and an eighth solenoid valve is provided between the oxidant pressure cleaning tank and the pipeline to be cleaned.

[0012] Furthermore, an eleventh solenoid valve is provided between the combustion agent cleaning liquid storage tank and the combustion agent pressurized cleaning tank, a tenth solenoid valve is provided between the third pressure reducing valve and the combustion agent pressurized cleaning tank, and a ninth solenoid valve is provided between the combustion agent pressurized cleaning tank and the pipeline to be cleaned.

[0013] Furthermore, a thirteenth solenoid valve is provided between the ethanol washing solution storage tank and the ethanol pressure cleaning tank, and a twelfth solenoid valve is provided between the oxidant washing solution storage tank and the oxidant pressure cleaning tank.

[0014] Compared to existing technologies, operators no longer need to move and connect multiple devices. The pipeline to be cleaned is simply connected to the equipment's standard interface in one go. All media switching (from neutralizing liquid to ethanol, then to pure water, and finally to hot nitrogen) is no longer a matter of physical rewiring, but is automatically accomplished by the control system switching valves. This fundamentally eliminates tedious manual operations, compressing multi-step processes into a "one-button start," greatly improving efficiency. This invention solidifies the optimal cleaning and drying process into a preset program in the PLC. A level gauge ensures consistent liquid volume during each pressurization, a pressure reducing valve ensures stable pressure during rinsing and drying, and a gas heater temperature control ensures a constant drying temperature. Operators cannot arbitrarily change key parameters, thus ensuring that every operation follows the exact same standard procedure, guaranteeing the reliability and repeatability of the cleaning quality. Attached Figure Description

[0015] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0016] Figure 1 This is a schematic diagram of the structure of this utility model.

[0017] Figure Labels 1. Pure water storage tank; 2. Ethanol storage tank; 3. Oxidizing agent cleaning solution storage tank; 4. Combustion agent cleaning solution storage tank; 5. Gas buffer tank; 6. Gas heater; 7. Liquid supply pipeline; 8. Pure water pressurized cleaning tank; 9. Ethanol pressurized cleaning tank; 10. Oxidizing agent pressurized cleaning tank; 11. Combustion agent pressurized cleaning tank; 12. Pipeline to be cleaned; 13. Manual valve; 14. First level gauge; 15. Second level gauge; 16. Third level gauge; 17. Fourth level gauge; 18. 19. First solenoid valve; 20. Second pressure reducing valve; 21. Fourth pressure reducing valve; 22. Third pressure reducing valve; 23. First pressure reducing valve; 24. Second solenoid valve; 25. Third solenoid valve; 26. Fourth solenoid valve; 27. Fifth solenoid valve; 28. Sixth solenoid valve; 29. ​​Seventh solenoid valve; 30. Eighth solenoid valve; 31. Ninth solenoid valve; 32. Tenth solenoid valve; 33. Eleventh solenoid valve; 34. Gas supply line; 35. Twelfth solenoid valve; 36. Thirteenth solenoid valve. Detailed Implementation

[0018] The technical solutions in the embodiments of this utility model are described clearly and completely below. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0019] Example like Figure 1 As shown, the purpose of this utility model is to provide an integrated cleaning and drying device for small-diameter filling pipelines, aiming to solve the problems of scattered equipment, cumbersome operation, low efficiency, and unstable cleaning quality in the existing technology. In actual operation, the device can be installed on a small towing vehicle, with wheels installed at the bottom and a towing bar at the rear. This integrated mobile design allows the device to be flexibly moved to different work locations according to operational needs.

[0020] The cleaning and drying equipment specifically includes a pure water storage tank 1, an ethanol storage tank 2, an oxidant cleaning solution storage tank 3, a combustion agent cleaning solution storage tank 4, a gas buffer tank 5, and a gas heater 6. The pure water storage tank 1, the ethanol storage tank 2, the oxidant cleaning solution storage tank 3, and the combustion agent cleaning solution storage tank 4 are respectively connected to a pure water pressurized cleaning tank 8, an ethanol pressurized cleaning tank 9, an oxidant pressurized cleaning tank 10, and a combustion agent pressurized cleaning tank 11 via a liquid supply pipeline 7. The pure water pressurized cleaning tank 8, the ethanol pressurized cleaning tank 9, the oxidant pressurized cleaning tank 10, and the combustion agent pressurized cleaning tank 11 are connected to the pipeline to be cleaned 12. The gas buffer tank 5 is connected to the gas heater 6 and the pipeline to be cleaned 12 sequentially via a gas supply pipeline 32. The gas buffer tank 5 is also connected to the pure water pressurized cleaning tank 8, the ethanol pressurized cleaning tank 9, the oxidant pressurized cleaning tank 10, and the combustion agent pressurized cleaning tank 11 via the gas supply pipeline 32. A flow meter is installed between the sixth solenoid valve 27 and the gas heater 6. The gas heater 6 uses electric heating to heat the gas through an electric heating element. It has an intelligent automatic temperature control function. The heater automatically shuts off after heating to the set temperature. When the temperature drops below the set temperature, the heater will restart heating, and this cycle continues until the set temperature is reached, keeping the gas temperature constant. The set temperature range for the gas heater 6 is room temperature to 120℃.

[0021] For safety reasons, flow sensors and temperature sensors will be installed in the pipeline of gas heater 6. Gas heater 6 will not be allowed to start if there is no airflow or the temperature exceeds the limit. Gas heater 6 will also be connected to gas supply pipeline 32 and pipelines that need to be cleaned and dried through various pipelines. Pneumatic ball valves controlled by solenoid valves will be installed in the pipelines. The pipelines can be dried by the PLC system program.

[0022] Each of the pressurized cleaning tanks—pure water 8, ethanol 9, oxidizer 10, and propellant 11—is equipped with two manual valves 13. These two manual valves 13, mounted on the same structure, are connected to a drain pipe and an exhaust pipe, respectively. Each of the pressurized cleaning tanks 8, 9, 10, and 11 is equipped with a first level gauge 14, a second level gauge 15, a third level gauge 16, and a fourth level gauge 17, respectively. These level gauges detect the liquid level, enabling automatic replenishment. A first solenoid valve 18 connects the pure water storage tank to the pressurized cleaning tank 8, and a second solenoid valve 23 connects the pressurized cleaning tank 8 to the pipeline 12 to be cleaned.

[0023] A first pressure-reducing valve 22, a second pressure-reducing valve 19, a fourth pressure-reducing valve 20, and a third pressure-reducing valve 21 are respectively installed between the gas buffer tank 5 and the pure water pressure-bearing cleaning tank 8, the ethanol pressure-bearing cleaning tank 9, the oxidant pressure-bearing cleaning tank 10, and the combustion agent pressure-bearing cleaning tank 11. A third solenoid valve 24 is installed between the first pressure-reducing valve 22 and the pure water pressure-bearing cleaning tank 8; a fourth solenoid valve 25 is installed between the second pressure-reducing valve 19 and the ethanol pressure-bearing cleaning tank 9; and a fifth solenoid valve 26 is installed between the ethanol pressure-bearing cleaning pipeline and the pipeline 12 to be cleaned. A sixth solenoid valve 27 is installed between the gas buffer tank 5 and the gas heater 6. A seventh solenoid valve 28 is installed between the fourth pressure-reducing valve 20 and the oxidant pressure-bearing cleaning tank 10; and an eighth solenoid valve 29 is installed between the oxidant pressure-bearing cleaning tank 10 and the pipeline 12 to be cleaned. An eleventh solenoid valve 32 is installed between the combustion agent cleaning solution storage tank 4 and the combustion agent pressurized cleaning tank 11; a tenth solenoid valve 31 is installed between the third pressure reducing valve 21 and the combustion agent pressurized cleaning tank 11; a ninth solenoid valve 30 is installed between the combustion agent pressurized cleaning tank 11 and the pipeline to be cleaned 12; a thirteenth solenoid valve 34 is installed between the ethanol cleaning solution storage tank 2 and the ethanol pressurized cleaning tank 9; and a twelfth solenoid valve 33 is installed between the oxidant cleaning solution storage tank 3 and the oxidant pressurized cleaning tank 10. This equipment uses PLC programming to achieve a one-button automatic control mode for cleaning, purging, and drying, making it convenient for operators. Each process—oxidant neutralization solution cleaning, fuel decontamination solution cleaning, pure water cleaning, alcohol cleaning, and gas heating drying—is set as an independently controllable automatic program, and process combinations can also be implemented as needed.

[0024] Working principle (taking the cleaning of an oxidizer filling pipe as an example): 1. Preparation stage: The operator connects the pipeline to be cleaned to the main pipeline interface of the equipment and selects the cleaning program through the external touch screen.

[0025] 2. Automatic Liquid Replenishment and Pressurization: The control system first executes a preparation program, opening the first solenoid valve 18, the twelfth solenoid valve 33 (the replenishment valve connecting the oxidant washing solution storage tank and the oxidant pressurized cleaning tank), and the thirteenth solenoid valve 34 (the replenishment valve connecting the ethanol washing solution storage tank and the ethanol pressurized cleaning tank). It also opens the manual valve 13 on the exhaust pipes of the pure water pressurized cleaning tank 8, the ethanol pressurized cleaning tank 9, and the oxidant pressurized cleaning tank 10 to replenish the water, ethanol, and oxidant pressurized cleaning tanks. When the first level gauge 14, the second level gauge 15, and the third level gauge 16 detect a high liquid level, they close the first solenoid valve 18, the twelfth solenoid valve 33, the third solenoid valve 34 between their respective pressurized cleaning tanks and storage tanks, as well as the manual valve 13 on the exhaust pipes of the pure water pressurized cleaning tank 8, the ethanol pressurized cleaning tank 9, and the oxidant pressurized cleaning tank 10. Subsequently, the third solenoid valve 24, the fourth solenoid valve 25, and the seventh solenoid valve 28 are opened to allow the nitrogen gas in the pressure buffer tank 5 (reduced to 0.6-0.8 MPa by the pressure reducing valve) to enter each pressure cleaning tank, putting it into a standby state for cleaning.

[0026] 3. Cleaning and drying procedures: Oxidant neutralization solution flushing: The PLC opens the eighth solenoid valve 29, and the pressurized oxidant neutralization solution flows out from the oxidant pressure cleaning tank 10 to flush the oxidant filling hose. When the preset time is up, the eighth solenoid valve 29 is closed.

[0027] Pure water rinsing: The PLC opens the second solenoid valve 23, and pure water flows out from the pure water pressurized cleaning tank 8 to rinse the pipeline. When the preset time is up, the second solenoid valve is closed.

[0028] Ethanol flushing: The PLC opens the fifth solenoid valve 26, allowing anhydrous ethanol to flow from the pressurized ethanol cleaning tank 9 for final flushing of the pipeline. After the preset time, the fifth solenoid valve 26 closes.

[0029] Hot nitrogen drying: The PLC opens the sixth solenoid valve, allowing nitrogen to enter the gas heater 6 and be heated to the set temperature (e.g., 80℃). Then, nitrogen is introduced into the main pipeline to purge and dry the cleaned pipeline. Once the preset time is reached, the sixth solenoid valve 27 is closed, ending the entire process.

[0030] The various embodiments described in this specification are presented in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. The above description of the disclosed embodiments enables those skilled in the art to implement or use this invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of this invention. Therefore, this invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An integrated cleaning and drying device for small-diameter filling pipelines, characterized in that, The system includes a pure water storage tank, an ethanol storage tank, an oxidizer cleaning solution storage tank, a combustion agent cleaning solution storage tank, a gas buffer tank, and a gas heater. The pure water storage tank, ethanol storage tank, oxidizer cleaning solution storage tank, and combustion agent cleaning solution storage tank are respectively connected to a pressurized pure water cleaning tank, a pressurized ethanol cleaning tank, a pressurized oxidizer cleaning tank, and a pressurized combustion agent cleaning tank via supply pipelines. These tanks are connected to the pipeline to be cleaned. The gas buffer tank is sequentially connected to the gas heater and the pipeline to be cleaned via a gas supply pipeline. The gas buffer tank is also connected to the pressurized pure water cleaning tank, the pressurized ethanol cleaning tank, the pressurized oxidizer cleaning tank, and the pressurized combustion agent cleaning tank via the gas supply pipelines.

2. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, Each of the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the propellant pressure cleaning tank is equipped with two manual valves.

3. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, The pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the combustion agent pressure cleaning tank are respectively equipped with a first level gauge, a second level gauge, a third level gauge, and a fourth level gauge.

4. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A first solenoid valve is provided between the pure water storage tank and the pure water pressurized cleaning tank, and a second solenoid valve is provided between the pure water pressurized cleaning tank and the pipeline to be cleaned.

5. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A first pressure reducing valve, a second pressure reducing valve, a fourth pressure reducing valve, and a third pressure reducing valve are respectively installed between the gas buffer tank and the pure water pressure cleaning tank, the ethanol pressure cleaning tank, the oxidant pressure cleaning tank, and the combustion agent pressure cleaning tank.

6. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A third solenoid valve is provided between the first pressure reducing valve and the pure water pressure cleaning tank, a fourth solenoid valve is provided between the second pressure reducing valve and the ethanol pressure cleaning tank, and a fifth solenoid valve is provided between the ethanol pressure cleaning pipeline and the pipeline to be cleaned.

7. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A sixth solenoid valve is provided between the gas buffer tank and the gas heater.

8. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A seventh buffer valve is provided between the fourth pressure reducing valve and the oxidant pressure cleaning tank, and an eighth solenoid valve is provided between the oxidant pressure cleaning tank and the pipeline to be cleaned.

9. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, An eleventh solenoid valve is provided between the combustion agent cleaning liquid storage tank and the combustion agent pressure cleaning tank; a tenth solenoid valve is provided between the third pressure reducing valve and the combustion agent pressure cleaning tank; and a ninth solenoid valve is provided between the combustion agent pressure cleaning tank and the pipeline to be cleaned.

10. The integrated cleaning and drying equipment for small-diameter filling pipelines according to claim 1, characterized in that, A thirteenth solenoid valve is installed between the ethanol washing solution storage tank and the ethanol pressure cleaning tank, and a twelfth solenoid valve is installed between the oxidant washing solution storage tank and the oxidant pressure cleaning tank.