Dredging device and sewage treatment system

By designing a sludge removal device with an oscillating nozzle, the problem that the nozzle cannot fully cover the bottom of the pool in the existing technology has been solved, achieving efficient cleaning of the sludge at the bottom of the pool and improving cleaning efficiency.

CN225007928UActive Publication Date: 2026-11-24CHINA TOBACCO GUANGXI IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522287866.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-29
Publication Date
2026-11-24
Estimated Expiration
2035-10-29

AI Technical Summary

Technical Problem

In existing technologies, fixed-installation nozzles cannot oscillate back and forth, resulting in a limited water flow impact range, making it difficult to fully cover the bottom area of ​​the pool, creating cleaning dead zones, and resulting in low cleaning efficiency.

Method used

A dredging device was designed, including an inlet pipe, a water storage tank, a water guide pipe, and a nozzle. The nozzle is oscillatingly mounted outside the water storage tank, and the reciprocating oscillation of the nozzle is realized through a drive component, a screw and nut mechanism, and a rotating mechanism to expand the spraying range.

Benefits of technology

It increased the coverage area of ​​the water tank cleaning, improved the cleaning efficiency, and achieved comprehensive and efficient cleaning of the silt at the bottom of the tank.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225007928U_ABST
    Figure CN225007928U_ABST
Patent Text Reader

Abstract

This application provides a sludge removal device and a wastewater treatment system, relating to sludge removal. The sludge removal device includes an inlet pipe, a water storage tank, a separator, a guide pipe, and a nozzle. The water storage tank has a cavity, and the separator is located within the cavity, dividing the cavity into a water storage chamber and an installation chamber. The water storage chamber is connected to the inlet pipe, and the guide pipe passes through the installation chamber and is connected to the water storage chamber. The nozzle is oscillatingly mounted outside the water storage tank and is connected to the guide pipe. This application expands the cleaning range and improves sludge removal efficiency by using an oscillating nozzle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of sludge removal, and more specifically, to a sludge removal device and a wastewater treatment system. Background Technology

[0002] In environmental protection fields such as industrial waste gas treatment, municipal wastewater treatment, and landfill leachate treatment, odor control pre-washing tanks play an irreplaceable role as key treatment facilities. During long-term operation, due to the continuous interception of solid impurities in the gas, the absorption of soluble substances through sedimentation, and the accumulation of metabolic products from aquatic microorganisms, a large amount of sludge gradually forms at the bottom of the pre-washing tank. Failure to remove this sludge in a timely manner will not only significantly reduce the treatment efficiency of the pre-washing tank but may also lead to functional limitations. Therefore, a regular sludge flushing and maintenance mechanism must be established.

[0003] The current industry standard for sludge removal technology involves installing multiple fixed nozzles inside the pool and using a water pump to deliver high-pressure water jets. The impact force of the water jets removes the sludge from the pool bottom, allowing it to be discharged with the water flow. However, this existing technology has significant limitations: First, the fixed nozzles cannot oscillate back and forth, limiting the range of the water jets and making it difficult to fully cover the entire pool bottom, creating cleaning dead zones and severely impacting the cleaning effect. Second, due to insufficient coverage, multiple cleaning operations are often required, significantly reducing overall cleaning efficiency. Utility Model Content

[0004] The purpose of this application is to provide a dredging device and a sewage treatment system that can increase the coverage area of ​​pool cleaning and improve cleaning efficiency.

[0005] In a first aspect, this utility model provides a dredging device, which includes an inlet pipe, a water storage tank, a separator, a water guide pipe, and a nozzle. The water storage tank has a cavity, and the separator is located inside the cavity and divides the cavity into a water storage cavity and an installation cavity. The water storage cavity is connected to the inlet pipe, and the water guide pipe passes through the installation cavity and is connected to the water storage cavity. The nozzle is oscillatingly mounted outside the water storage tank and is connected to the water guide pipe.

[0006] In an optional embodiment, the dredging device further includes a driving component, a lead screw and nut mechanism, and a rotating mechanism located in the mounting cavity. The lead screw and nut mechanism is drivenly connected to the driving end of the driving component, and the rotating mechanism is drivenly connected to the lead screw and nut mechanism. The water guide pipe passes through the rotating mechanism. Under the driving action of the driving component, the rotating mechanism rotates relative to the water storage tank, thereby causing the water guide pipe to swing relative to the water storage tank.

[0007] In an optional embodiment, the number of the nozzles, the water guide pipes, and the rotating mechanisms are the same and correspond one-to-one, and the screw and nut mechanism is respectively connected to each of the rotating mechanisms in a transmission connection.

[0008] In an optional embodiment, the lead screw and nut mechanism includes a lead screw, a transmission component, and a rack. The lead screw is driven by the drive end of the drive component, the transmission component is slidably connected to the inner wall of the cavity, and the transmission component is threadedly connected to the lead screw. The rack is fixedly connected to the transmission component, and at least a portion of each of the rotating mechanisms meshes with the rack.

[0009] In an optional embodiment, the mounting cavity is provided with a mounting component and a fixing component, the mounting component and the fixing component are arranged opposite to each other, the rotating mechanism includes a rotating shaft and a gear, one end of the rotating shaft is rotatably connected to the fixing component, and the rotating shaft passes through the mounting component and extends to the side of the mounting component away from the fixing component, the water guide pipe passes through the rotating shaft, the gear is installed at the end of the rotating shaft away from the fixing component, and the rack meshes with the gear.

[0010] In an optional embodiment, the fastener consists of multiple fixing plates, one fixing plate being correspondingly arranged with one rotating shaft, and the multiple fixing plates being spaced apart along a first direction, the first direction being parallel to the length direction of the mounting component.

[0011] In an optional embodiment, the rotating shaft includes a first rotating sub-shaft, a second rotating sub-shaft, and a third rotating sub-shaft connected in sequence. The first rotating sub-shaft is rotatably connected to the fixing member, the second rotating sub-shaft is for the water guide pipe to pass through, and the third rotating sub-shaft is rotatably connected to the mounting member.

[0012] In an optional embodiment, the water guide pipe includes a rigid pipe and a flexible pipe. The rigid pipe passes through the second rotating shaft, one end of the flexible pipe is connected to the rigid pipe, and the other end of the flexible pipe passes through the separator and extends into the water storage chamber.

[0013] In an optional embodiment, the water inlet pipe includes a main pipe and a branch pipe, one end of the branch pipe is connected to the main pipe, and the other end of the branch pipe is connected to the water storage tank.

[0014] Secondly, this utility model provides a sewage treatment system, which includes a pre-washing tank and the sludge removal device described in the foregoing embodiments, wherein the sludge removal device is installed in the pre-washing tank.

[0015] Compared to existing technologies, the beneficial effects of this application are: This application achieves sludge removal through a water circuit connection of an inlet pipe, a water storage tank, a water guide pipe, and a nozzle. Furthermore, the nozzle of this application is oscillatingly positioned outside the water storage tank, which can increase the coverage area of ​​the water tank cleaning and improve cleaning efficiency. Attached Figure Description

[0016] To more clearly illustrate the technical solutions of the embodiments of this application, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0017] Figure 1 A schematic diagram showing the connection between the sludge removal device and the pre-washing tank in some embodiments is shown; Figure 2 A partial structural schematic diagram of the dredging device is shown in some embodiments; Figure 3 The diagram shows the connection diagrams of the various components inside the water storage tank in some embodiments; Figure 4 The diagram shows connection schematics of the water guide pipe, nozzle, rotating mechanism and fixing component in some embodiments; Figure 5 The diagram shows connection schematics of the drive unit, lead screw mechanism and connector in some embodiments.

[0018] Explanation of key component symbols: 10-Sludge removal device; 100-Inlet pipe; 110-Main pipe; 120-Branch pipe; 200-Water storage tank; 210-Connector; 220-Installation component; 230-Fixing component; 231-Fixing partition plate; 300-Divider; 400-Water guide pipe; 410-Hard pipe; 420-Hose; 500-Sprayer head; 600-Drive component; 700-Screw and nut mechanism; 710-Screw; 720-Transmission component; 730-Rack; 800-Rotating mechanism; 810-Rotating shaft; 811-First rotating shaft; 812-Second rotating shaft; 813-Third rotating shaft; 820-Gear; 20-Pre-washing tank. Detailed Implementation

[0019] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.

[0020] In the description of this application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicating the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this application.

[0021] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, "multiple" means two or more, unless otherwise explicitly specified.

[0022] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.

[0023] In this application, unless otherwise expressly specified and limited, "above" or "below" the second feature can mean that the first feature is in direct contact with the second feature, or that the first feature is in indirect contact with the second feature through an intermediate medium. Furthermore, "above," "on top of," and "over" the second feature can mean that the first feature is directly above or diagonally above the second feature, or simply that the first feature is at a higher horizontal level than the second feature. "Below," "below," and "under" the second feature can mean that the first feature is directly below or diagonally below the second feature, or simply that the first feature is at a lower horizontal level than the second feature.

[0024] Example 1 Please see Figure 1 and Figure 2 This embodiment is applicable to the sludge removal of the pre-washing tank 20, where the sludge is formed at the bottom of the pre-washing tank 20.

[0025] This embodiment provides a dredging device 10, which includes an inlet pipe 100, a water storage tank 200, a separator 300, a water guide pipe 400, and a nozzle 500.

[0026] The water storage tank 200 is provided with a cavity. In this embodiment, the water storage tank 200 is a rectangular box structure.

[0027] The separator 300 is located inside the cavity and divides the cavity into a water storage cavity and an installation cavity. The water storage cavity is connected to the water inlet pipe 100.

[0028] The water guide pipe 400 passes through the installation cavity and communicates with the water storage cavity. The water inlet pipe 100 includes a main pipe 110 and a branch pipe 120. One end of the branch pipe 120 is connected to the main pipe 110, and the other end of the branch pipe 120 is connected to the water storage tank 200.

[0029] With the extension direction of the main pipe 110 as the first direction, the branch pipe 120 extends perpendicularly to the first direction, and the length direction of the water storage tank 200 is parallel to the extension direction of the main pipe 110.

[0030] The nozzle 500 is oscillatingly mounted outside the water storage tank 200, and the nozzle 500 is connected to the water guide pipe 400. Specifically, the main pipe 110 is located on one side of the water storage tank 200, and the nozzle 500 is located on the other side of the water storage tank 200. This design can expand the spray range of the nozzle 500 and avoid interference of the main pipe 110 with the spray of the nozzle 500.

[0031] Please see Figures 3 to 5 The dredging device 10 also includes a driving component 600, a screw and nut mechanism 700, and a rotating mechanism 800 located in the mounting cavity. The driving component 600 is fixedly connected to the wall of the mounting cavity. The screw and nut mechanism 700 is drivenly connected to the driving end of the driving component 600. The rotating mechanism 800 is drivenly connected to the screw and nut mechanism 700. The water guide pipe 400 passes through the rotating mechanism 800. Under the driving action of the driving component 600, the rotating mechanism 800 rotates relative to the water storage tank 200, thereby causing the water guide pipe 400 to swing relative to the water storage tank 200.

[0032] The mounting cavity is provided with a connector 210, and the drive component 600 is fixedly connected to the connector 210, with the drive end of the drive component 600 passing through the connector 210.

[0033] To increase the cleaning coverage area of ​​the dredging device 10, this embodiment can be configured to have multiple nozzles 500. The number of nozzles 500, water guide pipes 400, and rotating mechanisms 800 are the same and correspond one-to-one. The screw and nut mechanism 700 is connected to each of the rotating mechanisms 800. That is, in this embodiment, multiple nozzles 500 can be controlled by one drive component 600 and screw and nut mechanism 700.

[0034] The lead screw and nut mechanism 700 includes a lead screw 710, a transmission member 720, and a rack 730. The lead screw 710 is pulsatorically connected to the drive end of the drive member 600. The transmission member 720 is slidably connected to the inner wall of the cavity and threadedly connected to the lead screw 710. The rack 730 is fixedly connected to the transmission member 720. At least a portion of each of the rotating mechanisms 800 meshes with the rack 730.

[0035] In this embodiment, the mounting cavity is provided with a mounting component 220 and a fixing component 230, and the mounting component 220 and the fixing component 230 are arranged opposite to each other.

[0036] The rotating mechanism 800 includes a rotating shaft 810 and a gear 820. One end of the rotating shaft 810 is rotatably connected to the fixing member 230, and the rotating shaft 810 passes through the mounting member 220 and extends to the side of the mounting member 220 away from the fixing member 230. The water guide pipe 400 passes through the rotating shaft 810, and the gear 820 is mounted on the end of the rotating shaft 810 away from the fixing member 230. The rack 730 meshes with the gear 820.

[0037] The fixing member 230 is composed of multiple fixing plates 231, one fixing plate 231 is correspondingly arranged with one rotating shaft 810, and the multiple fixing plates 231 are arranged at intervals along a first direction, which is parallel to the length direction of the mounting member 220.

[0038] The rotating shaft 810 includes a first rotating sub-shaft 811, a second rotating sub-shaft 812, and a third rotating sub-shaft 813 connected in sequence. The first rotating sub-shaft 811 is rotatably connected to the fixing member 230. The second rotating sub-shaft 812 is through which the water guide pipe 400 passes. The third rotating sub-shaft 813 is rotatably connected to the mounting member 220. The diameter of the second rotating sub-shaft 812 is larger than the diameter of the first rotating sub-shaft 811, and the diameter of the third rotating sub-shaft 813 is larger than the diameter of the third rotating sub-shaft 813.

[0039] The water guide pipe 400 includes a rigid pipe 410 and a flexible pipe 420. The rigid pipe 410 passes through the second rotating split shaft 812. One end of the flexible pipe 420 is connected to the rigid pipe 410, and the other end of the flexible pipe 420 passes through the separator 300 and extends into the water storage chamber. The flexible pipe 420 has a certain degree of flexibility and can deform with the swing of the rigid pipe 410 and the nozzle 500. That is, the flexible pipe 420 provides the feasibility for the swing of the rigid pipe 410 and the nozzle 500.

[0040] Please see Figures 1 to 3 Based on the above, this embodiment further explains the operating principle of the dredging device 10 as follows.

[0041] Water flow path: After the external high-pressure water flows into the branch pipe 120 through the self-contained pipe 110, it passes through the water storage chamber, the hose 420, and the rigid pipe 410, and is then sprayed from the nozzle 500 to the bottom of the pre-washing tank 20 to impact the sludge and achieve sludge removal.

[0042] Please see Figures 3 to 5 .

[0043] Spray head 500 oscillation: Start drive component 600. The output end of drive component 600 drives lead screw 710 to rotate around its own axis. The thread on lead screw 710 engages with transmission component 720. Since transmission component 720 is threadedly connected to lead screw 710 and transmission component 720 is limited by mounting component 220 and the inner wall of water storage tank 200, transmission component 720 makes reciprocating linear motion along the axis of lead screw 710. Rack 730 reciprocates synchronously with transmission component 720. Due to the meshing of rack 730 and gear 820, gear 820 is driven to rotate alternately in the forward and reverse directions. Gear 820 drives the first rotating shaft 811, the second rotating shaft 812 and the third rotating shaft 813 to rotate on fixed component 230, thereby driving rigid pipe 410 and spray head 500 to oscillate back and forth.

[0044] Please continue reading. Figure 1 .

[0045] Sludge flushing: During the reciprocating swing of the nozzle 500, high-pressure water is evenly sprayed onto different areas at the bottom of the pre-washing tank 20, impacting and peeling off the sludge, so that the sludge is discharged from the pre-washing tank 20 with the water flow, achieving comprehensive and efficient cleaning of the sludge.

[0046] This embodiment achieves sludge removal through a water circuit connection of inlet pipe 100, water storage tank 200, water guide pipe 400 and nozzle 500. In this embodiment, the nozzle 500 is oscillatingly set outside the water storage tank 200, which can increase the coverage area of ​​the water tank cleaning and improve the cleaning efficiency.

[0047] Example 2 Please see Figure 1 Based on the above embodiments, this embodiment provides a sewage treatment system, which includes a pre-washing tank 20 and a sludge removal device 10 as described in the above embodiments. The sludge removal device 10 is installed in the pre-washing tank 20.

[0048] Since sludge forms at the bottom of the pre-washing tank 20, in this embodiment, the sludge removal device 10 is installed at the bottom of the pre-washing tank 20 to facilitate sludge removal.

[0049] Since this embodiment includes the dredging device 10 provided in the above embodiments, this embodiment has all the advantages of the above embodiments.

[0050] In the description of this specification, the references to terms such as "one embodiment," "some embodiments," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Moreover, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.

[0051] Although embodiments of this application have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting this application. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of this application.

Claims

1. A dredging device, characterized in that, The device includes an inlet pipe, a water tank, a separator, a water guide pipe, and a nozzle. The water tank has a cavity, and the separator is located inside the cavity and divides the cavity into a water storage cavity and an installation cavity. The water storage cavity is connected to the inlet pipe, and the water guide pipe passes through the installation cavity and is connected to the water storage cavity. The nozzle is oscillatingly mounted outside the water tank and is connected to the water guide pipe. It also includes a drive component, a lead screw and nut mechanism, and a rotating mechanism located in the mounting cavity. The lead screw and nut mechanism is driven by the drive end of the drive component, and the rotating mechanism is driven by the lead screw and nut mechanism. The water guide pipe passes through the rotating mechanism. Under the driving action of the drive component, the rotating mechanism rotates relative to the water storage tank to drive the water guide pipe to swing relative to the water storage tank. The number of nozzles, water pipes and rotating mechanisms are the same and correspond one-to-one, and the screw and nut mechanism is respectively connected to each of the rotating mechanisms in a transmission connection. The lead screw and nut mechanism includes a lead screw, a transmission component, and a rack. The lead screw is driven by the drive end of the drive component. The transmission component is slidably connected to the inner wall of the cavity and threadedly connected to the lead screw. The rack is fixedly connected to the transmission component. At least a portion of each of the rotating mechanisms meshes with the rack.

2. The dredging device as described in claim 1, characterized in that, The mounting cavity is provided with a mounting component and a fixing component, the mounting component and the fixing component are arranged opposite to each other, the rotating mechanism includes a rotating shaft and a gear, one end of the rotating shaft is rotatably connected to the fixing component, and the rotating shaft passes through the mounting component and extends to the side of the mounting component away from the fixing component, the water guide pipe passes through the rotating shaft, the gear is installed at the end of the rotating shaft away from the fixing component, and the rack meshes with the gear.

3. The dredging device as described in claim 2, characterized in that, The fastener is composed of multiple fixing plates, one fixing plate being correspondingly arranged with one rotating shaft, and the multiple fixing plates being arranged at intervals along a first direction, which is parallel to the length direction of the mounting component.

4. The dredging device as described in claim 2, characterized in that, The rotating shaft includes a first rotating sub-shaft, a second rotating sub-shaft, and a third rotating sub-shaft connected in sequence. The first rotating sub-shaft is rotatably connected to the fixing member, the second rotating sub-shaft is for the water guide pipe to pass through, and the third rotating sub-shaft is rotatably connected to the mounting member.

5. The dredging device as described in claim 4, characterized in that, The water guide pipe includes a rigid pipe and a flexible pipe. The rigid pipe passes through the second rotating shaft, one end of the flexible pipe is connected to the rigid pipe, and the other end of the flexible pipe passes through the partition and extends into the water storage chamber.

6. The dredging device according to any one of claims 1 to 5, characterized in that, The water inlet pipe includes a main pipe and a branch pipe. One end of the branch pipe is connected to the main pipe, and the other end of the branch pipe is connected to the water storage tank.

7. A wastewater treatment system, characterized in that, It includes a pre-washing tank and a sludge removal device as described in any one of claims 1 to 6, wherein the sludge removal device is installed in the pre-washing tank.