Secondary chelation treatment device for waste incineration power plant

By employing a tower-style compact layout and a closed dust collection system, the problems of large footprint, severe dust generation, and complex operation of secondary chelation treatment systems have been solved, achieving efficient and low-cost waste incineration treatment and improving the operating environment and processing efficiency.

CN225007976UActive Publication Date: 2026-11-24JIANGSU HUPO ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522815213.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-11-24
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

Existing secondary chelation treatment systems in waste incineration power plants have large land areas, generate serious dust, are complex to operate, and have high labor costs, resulting in increased construction costs, difficulties in site planning, poor operating environment, and low treatment efficiency.

Method used

The secondary chelation treatment device adopts a tower-style compact arrangement, integrating an electric hoist, a sealed dust collection hood, a crushing component, a fly ash metering hopper, a chelating agent metering hopper, a fly ash mixer, and a fully automatic fly ash baler on a vertical frame. Combined with a sealed dust collection hood and an on-site dust collector, it forms a closed dust collection system to replace the open dust collection device, and a fully automatic fly ash baler is introduced at the bottom of the fly ash mixer.

Benefits of technology

It significantly reduces the floor space required, effectively controls dust, lowers labor costs, improves operational convenience and overall processing efficiency, and protects personal health and the workshop environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225007976U_ABST
    Figure CN225007976U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of waste incineration technology, specifically to a secondary chelation treatment device for waste incineration power plants. It includes an electric hoist, a sliding assembly, a sealed dust collection hood, a crushing assembly, a fly ash metering hopper, a chelating agent metering hopper, a fly ash mixer, a fully automatic fly ash baler, and a vertical frame. A storage hopper is located below the sealed dust collection hood. This design adopts a tower-style compact arrangement, significantly reducing the floor space required and lowering construction costs and site planning difficulties. Secondly, the storage hopper located below the sealed dust collection hood, equipped with an on-site dust collector, forms a closed dust collection system, effectively replacing open dust collection devices, greatly reducing dust emissions, and protecting human health and the operating workshop environment. Furthermore, a fully automatic fly ash baler is installed at the bottom of the fly ash mixer, replacing manual material handling, reducing labor costs, and improving the convenience of subsequent operation and overall processing efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of waste incineration technology, and in particular to a secondary chelation treatment device for waste incineration power plants. Background Technology

[0002] Currently, waste-to-energy incineration has become one of the most important and environmentally friendly methods for waste treatment. The Technical Specification for Pollution Control of Fly Ash from Municipal Solid Waste Incineration requires waste incineration companies to install reprocessing devices for fly ash that is substandard, spilled during loading and unloading, or spilled due to equipment malfunctions or maintenance. Under this specification, various secondary chelation treatment systems have emerged in the market. These systems, to a certain extent, achieve the reprocessing of fly ash from waste incineration, enabling it to meet relevant pollution control standards, reducing environmental pollution, improving the environmental friendliness of the waste incineration process, and providing technical support for the sustainable development of the waste-to-energy incineration industry.

[0003] However, firstly, they generally occupy a large area, which increases construction costs and site planning difficulties in the context of increasingly scarce land resources; secondly, dust problems are quite serious, as the existing secondary chelation treatment systems are scattered, and the top dust collection uses open-type dust collection devices, which cannot effectively control dust and have an adverse impact on human health and the operating workshop environment; thirdly, the operation is complicated, with manual material receiving at the bottom of the fly ash mixing machine, which not only increases labor costs but also hinders subsequent operation and reduces overall processing efficiency. Utility Model Content

[0004] The purpose of this utility model is to provide a secondary chelation treatment device for waste incineration power plants, aiming to solve the following problems: First, existing technologies generally require a large area, which increases construction costs and site planning difficulties in the context of increasingly scarce land resources. Second, dust problems are serious. Existing secondary chelation treatment systems have dispersed equipment layouts, and the top dust collection uses open-type dust collection devices, which cannot effectively control dust and adversely affect human health and the operating workshop environment. Third, the operation is complicated. The fly ash mixing machine requires manual material receiving at the bottom, which not only increases labor costs but also hinders subsequent operation and reduces overall processing efficiency.

[0005] To achieve the above objectives, this utility model employs a secondary chelation treatment device for waste incineration power plants, comprising an electric hoist, a sliding assembly, a sealed dust collection hood, a crushing assembly, a fly ash metering hopper, a chelating agent metering hopper, a fly ash mixing machine, a fully automatic fly ash baling machine, and a vertical frame. A storage hopper is located below the sealed dust collection hood. The electric hoist is mounted on the inner top of the vertical frame via the sliding assembly. The sealed dust collection hood is mounted on the vertical frame, and the crushing assembly is mounted on the vertical frame. The storage hopper is connected to the crushing assembly and is located at the feed end of the crushing assembly. The fly ash metering hopper and the chelating agent metering hopper are both installed on the vertical frame. The chelating agent metering hopper is connected to the fly ash mixer and is located at the feed end of the fly ash mixer. The fly ash metering hopper is connected to the fly ash mixer. The fly ash mixer is installed on the vertical frame. The discharge end of the fly ash mixer is connected to the fully automatic fly ash baler and is located at the feed end of the fully automatic fly ash baler.

[0006] The sliding assembly consists of an electric slide block and two slide rails. The electric slide block is slidably mounted on the two slide rails, and the electric hoist is located below the electric slide block. The two slide rails are respectively located at the top of the vertical frame.

[0007] The feed hopper of the chelating agent metering hopper is connected to the existing chelating agent conveying device.

[0008] The crushing assembly consists of a coarse crusher and a fine crusher. The discharge end of the coarse crusher is connected to the fine crusher and is located at the feed end of the fine crusher. The storage hopper is connected to the coarse crusher and is located at the feed end of the coarse crusher. The discharge end of the fine crusher is connected to the fly ash metering hopper and is located at the feed end of the fly ash metering hopper.

[0009] The secondary chelation treatment device for waste incineration power plants also includes an on-site dust collector, which is located on one side of the vertical frame. The discharge end of the on-site dust collector is connected to the sealed dust collection hood and is located at the feed end of the sealed dust collection hood.

[0010] This utility model discloses a secondary chelation treatment device for waste incineration power plants, comprising an electric hoist, a sliding assembly, a sealed dust collection hood, a crushing assembly, a fly ash metering hopper, a chelating agent metering hopper, a fly ash mixer, a fully automatic fly ash baler, and a vertical frame. A storage hopper is located below the sealed dust collection hood. This design employs a tower-style compact arrangement, integrating key components such as the electric hoist, sealed dust collection hood, crushing assembly, fly ash metering hopper, chelating agent metering hopper, fly ash mixer, and fully automatic fly ash baler onto the vertical frame, significantly reducing the floor space required and lowering construction costs and site planning complexity. Secondly, the storage hopper located below the sealed dust collection hood, equipped with an on-site dust collector, forms a closed dust collection system, effectively replacing open dust collection devices, greatly reducing dust emissions, and protecting personnel health and the operating workshop environment. Furthermore, the fully automatic fly ash baler located at the bottom of the fly ash mixer replaces manual material handling, reducing labor costs while improving the convenience of subsequent operation and overall processing efficiency. Attached Figure Description

[0011] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0012] Figure 1 This is a schematic diagram of the secondary chelation treatment device for waste incineration power plants according to this utility model.

[0013] Figure 2 This is a side view of the secondary chelation treatment device for waste incineration power plants according to this utility model.

[0014] Figure 3 This is a process flow diagram of the secondary chelation treatment device for waste incineration power plants according to this utility model.

[0015] In the diagram: 1-Electric hoist, 2-Enclosed dust hood, 3-Storage hopper, 4-Coarse crusher, 5-Fine crusher, 6-Fly ash metering hopper, 7-Chlorinating agent metering hopper, 8-Fly ash mixing machine, 9-Fully automatic fly ash baling machine, 10-On-site dust collector, 11-Sliding assembly, 12-Vertical frame. Detailed Implementation

[0016] The embodiments of this utility model are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and intended to explain this utility model, and should not be construed as limiting this utility model.

[0017] Please see Figures 1 to 3 This utility model provides a secondary chelation treatment device for waste incineration power plants, including an electric hoist 1, a sliding assembly 11, a sealed dust collection hood 2, a crushing assembly, a fly ash metering hopper 6, a chelating agent metering hopper 7, a fly ash mixing machine 8, a fully automatic fly ash baling machine 9, and a vertical frame 12. A storage hopper 3 is located below the sealed dust collection hood 2. The electric hoist 1 is mounted on the inner top of the vertical frame 12 via the sliding assembly 11. The sealed dust collection hood 2 is mounted on the vertical frame 12, and the crushing assembly is mounted on the vertical frame 12. The storage hopper 3 is connected to the crushing component and is located at the feed end of the crushing component. The fly ash metering hopper 6 and the chelating agent metering hopper 7 are both arranged on the vertical frame 12. The chelating agent metering hopper 7 is connected to the fly ash mixer 8 and is located at the feed end of the fly ash mixer 8. The fly ash metering hopper 6 is connected to the fly ash mixer 8. The fly ash mixer 8 is arranged on the vertical frame 12. The discharge end of the fly ash mixer 8 is connected to the fully automatic fly ash baler 9 and is located at the feed end of the fully automatic fly ash baler 9.

[0018] In this embodiment, the tower-type compact layout design greatly reduces the footprint and solves the problems of construction cost and site planning under the constraints of land resources. At the same time, the combined use of the sealed dust hood 2 and the on-site dust collector 10 effectively controls dust and protects human health and the operating environment. In addition, the introduction of the fully automatic fly ash baler 9 simplifies the operation process, reduces labor costs, and improves the overall processing efficiency.

[0019] Furthermore, the sliding assembly 11 consists of an electric slide block and two slide rails. The electric slide block is slidably disposed on the two slide rails, and the electric hoist 1 is disposed below the electric slide block. The two slide rails are respectively disposed at the top of the vertical frame 12.

[0020] In this embodiment, the design of the sliding component 11 enables the electric hoist 1 to move flexibly, improving the efficiency and accuracy of material handling. The smooth sliding of the electric slide on the slide rail ensures the stable operation of the electric hoist 1 on the vertical frame 12, reducing material spillage caused by shaking or deviation, and further improving the safety and efficiency of operation.

[0021] Furthermore, the feed hopper of the chelating agent metering hopper 7 is connected to the existing chelating agent conveying device.

[0022] In this embodiment, this design enables automatic metering and delivery of the chelating agent, avoiding errors and uncertainties caused by manual addition, and improving the accuracy and stability of the chelation reaction.

[0023] Furthermore, the crushing assembly consists of a coarse crusher 4 and a fine crusher 5. The discharge end of the coarse crusher 4 is connected to the fine crusher 5 and is located at the feed end of the fine crusher 5. The storage hopper 3 is connected to the coarse crusher 4 and is located at the feed end of the coarse crusher 4. The discharge end of the fine crusher 5 is connected to the fly ash metering hopper 6 and is located at the feed end of the fly ash metering hopper 6.

[0024] In this embodiment, the dual-stage crushing design enables the unqualified fly ash products to be more fully crushed and refined, improving the efficiency and effect of the subsequent chelation reaction. The series use of the coarse crusher 4 and the fine crusher 5 ensures the uniformity and consistency of the fly ash particles, providing a better material basis for subsequent processing.

[0025] Furthermore, the secondary chelation treatment device for waste incineration power plants also includes an on-site dust collector 10, which is located on one side of the vertical frame 12, and the discharge end of the on-site dust collector 10 is connected to the sealed dust collection hood 2 and located at the feed end of the sealed dust collection hood 2.

[0026] In this embodiment, the on-site dust collector 10 forms a complete dust removal system connected to the sealed dust collection hood 2, effectively capturing and treating the dust generated during the processing. This design not only improves the workshop environment and protects the health of operators, but also meets environmental protection requirements and reduces pollution to the external environment.

[0027] In this invention, the electric hoist 1, guided by the sliding component 11, hoists the substandard fly ash product to the storage hopper 3 below the sealed dust collection hood 2 mounted on the vertical frame 12. Subsequently, the fly ash passes through the coarse crusher 4 and the fine crusher 5 in the crushing assembly for thorough crushing and refinement. The crushed fly ash enters the fly ash metering hopper 6 for precise metering and is fed together with the chelating agent from the original chelating agent conveying device and metered by the chelating agent metering hopper 7 into the fly ash mixing machine 8 for stirring and chelation. The qualified fly ash after chelation finally enters the fully automatic fly ash baling machine 9 for automated baling. Throughout the process, the on-site dust collector 10 and the sealed dust collection hood 2 work together to effectively control dust and ensure a clean workshop environment.

[0028] It is worth noting that the standard parts used in this application can all be purchased from the market, and the specific connection methods of each part are all connected by conventional means such as bolts, rivets, and welding that are mature in the prior art. Furthermore, the machinery, parts, and equipment all adopt conventional models in the prior art, and the circuit connection adopts conventional connection methods in the prior art. The contents not described in detail in the description belong to the prior art known to those skilled in the art, and will not be described in detail here.

[0029] The above-disclosed embodiments are merely preferred embodiments of the present utility model and should not be construed as limiting the scope of the present utility model. Those skilled in the art can understand that implementing all or part of the above-described embodiments and making equivalent changes in accordance with the claims of the present utility model are still within the scope of the utility model.

Claims

1. A secondary chelation treatment device for waste incineration power plants, characterized in that, The system includes an electric hoist, a sliding assembly, a sealed dust collection hood, a crushing assembly, a fly ash metering hopper, a chelating agent metering hopper, a fly ash mixing machine, a fully automatic fly ash baler, and a vertical frame. A storage hopper is located below the sealed dust collection hood. The electric hoist is mounted on the inner top of the vertical frame via the sliding assembly. The sealed dust collection hood is mounted on the vertical frame. The crushing assembly is mounted on the vertical frame, and the storage hopper is connected to the crushing assembly and located at its feed end. Both the fly ash metering hopper and the chelating agent metering hopper are mounted on the vertical frame, and the chelating agent metering hopper is connected to the fly ash mixing machine and located at its feed end. The fly ash metering hopper is also connected to the fly ash mixing machine. The fly ash mixing machine is mounted on the vertical frame, and its discharge end is connected to the fully automatic fly ash baler and located at its feed end.

2. The secondary chelation treatment device for waste incineration power plants as described in claim 1, characterized in that, The sliding assembly consists of an electric slide block and two slide rails. The electric slide block is slidably mounted on the two slide rails, and the electric hoist is located below the electric slide block. The two slide rails are respectively located at the top of the vertical frame.

3. The secondary chelation treatment device for waste incineration power plants as described in claim 2, characterized in that, The feed hopper of the chelating agent metering hopper is connected to the existing chelating agent conveying device.

4. The secondary chelation treatment device for waste incineration power plants as described in claim 3, characterized in that, The crushing assembly consists of a coarse crusher and a fine crusher. The discharge end of the coarse crusher is connected to the fine crusher and is located at the feed end of the fine crusher. The storage hopper is connected to the coarse crusher and is located at the feed end of the coarse crusher. The discharge end of the fine crusher is connected to the fly ash metering hopper and is located at the feed end of the fly ash metering hopper.

5. The secondary chelation treatment device for waste incineration power plants as described in claim 4, characterized in that, The secondary chelation treatment device for waste incineration power plants also includes an on-site dust collector, which is located on one side of the vertical frame, and the discharge end of the on-site dust collector is connected to the sealed dust collection hood and located at the feed end of the sealed dust collection hood.