A high pressure grouting machine
By combining the pressurizing and screening components, and using a vacuum pump and pressurizer to remove particles clogging the grouting pipe, the blockage problem in the grouting machine is solved, product quality and production efficiency are improved, and maintenance difficulty is reduced.
Patent Information
- Application Number
- CN202522757855.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-26
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-26
AI Technical Summary
During the grouting process, incompletely crushed particles in existing high-pressure grouting machines can easily clog the grouting micropores, leading to insufficient material in the molded blanks, loose bonding, and reduced product qualification rate. Furthermore, additional cleaning of residual particles and water is required after reverse pulse cleaning.
It employs a pressurizing component and a screening component. The vacuum pump creates a vacuum and the pressurizer generates a multi-stage, intermittent, and powerful suction force, which instantly disrupts the stability of the boundary layer, removes clogging particles, and uses the screening component to retain impurities and prevent particle backflow.
It effectively removes clogging particles from grouting pipes, reduces secondary cleaning, improves product quality and production efficiency, ensures slurry purity, and reduces maintenance difficulty.
Smart Images

Figure CN225010093U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of grouting machine technology, specifically a high-pressure grouting machine. Background Technology
[0002] The production of ceramic blanks is the core of ceramic technology. In the existing blank production process, in order to increase production capacity, slurry is generally poured into the plaster mold installed on it by a slurry injection machine. After drying, ceramic blanks are formed. Since the slurry is made up of a mixture of various raw materials, during the slurry injection process, particles that cannot be completely crushed may block some of the slurry injection micropores, resulting in local material shortages and incomplete filling of the formed blanks. Chinese invention patent CN111037709A discloses a high-pressure grouting machine, comprising a frame, a shell, and a grouting forming device. The shell covers the frame and encloses it to form an accommodating space, within which the grouting forming device is located. The grouting forming device includes a mold closing device, a mold sealing device, a grouting device, a forming mold, an air blowing device, and a mold washing device. The mold closing and sealing devices sequentially close and seal the forming mold. The grouting device injects grout into the sealed forming mold for forming. After the product is formed, the mold closing device releases pressure and opens the mold, the air blowing device demolds the finished product, and the mold washing device washes the mold after the product is removed. This invention not only significantly increases grouting pressure, improves grouting speed, and enhances product quality, but also has a wide range of applications. Furthermore, it avoids clogging of micropores in the mold, greatly improving mold lifespan and production efficiency. It is highly practical and has significant potential for widespread application.
[0003] During this process, blockages can lead to uneven slurry flow, voids or incomplete forming at the edges or thin walls of the blank, and intermittent slurry injection can result in poor bonding between slurry layers, leading to obvious textures after firing. Various other problems will also occur, which will not be elaborated here. All of these will reduce the product qualification rate. In the existing technology, reverse pulse cleaning technology is usually used, which uses compressed air to blow in reverse and uses an ultrasonic oscillator to loosen the particles. However, after reverse rinsing, the particles will remain in the slurry pipe and need to be removed by other technical means. Moreover, after rinsing, some water will remain on the inner wall of the slurry pipe, which means that it needs to be cleaned again before formal production. Utility Model Content
[0004] To address the problems mentioned in the background art, this utility model provides a high-pressure grouting machine, which solves the problem that using compressed air for reverse purging requires additional technical means to remove particles stuck in the grouting pipe, and water remains on the inner wall of the grouting pipe, leading to secondary cleaning.
[0005] To achieve the above objectives, the present invention provides the following technical solution: a high-pressure grouting machine, comprising a grouting machine and a grouting pipe, and further comprising: a disconnector and a screening assembly respectively installed at both ends of the grouting pipe; A pressurization assembly installed on the grouting pipe and located between the isolator and the screening assembly; The pressurization component includes a U-shaped diversion pipe, one end of which is movably mounted with a flow divider plate 2 and connected to the grouting pipe through a screening component, and the other end of which is movably mounted with a flow divider plate 1 and connected to the air inlet of the vacuum pump. A set of boosters 1 is circumferentially installed at the horizontal end of the drainage tube, and each set of boosters 1 is arranged at equal intervals inside the drainage tube. A booster 2 is installed inside the drainage tube. One of the boosters includes a metal plate connected to the annular cavity inside the drainage tube by a tension spring, and a diverting rod that is movably engaged in the inner wall of the drainage tube is symmetrically installed at both ends of the metal plate. The booster includes a sealing plate 1 and a sealing plate 2 movably installed inside the drainage tube. The sealing plate 1 is connected to the sealing plate 2 by a spring 1. Both sides of the sealing plate 1 are chamfered, while the sealing plate 2 is chamfered only on the outer side. Hydraulic oil is filled between the first sealing plate and the first diverter plate, and hydraulic oil is filled between the second sealing plate and the second diverter plate. The screening component is used to retain impurities in the slurry, and the isolator is used to close or connect the grouting pipe.
[0006] Preferably, the grouting machine is equipped with a lead screw motor and a mold. The lead screw motor can drive the mold to perform mold closing or mold opening operations. The part of the grouting pipe near the mold can be designed to extend and retract, and the rest can be fixed on the grouting machine.
[0007] Preferably, every two adjacent metal plates are interlocked, and the total length of the spring in its initial state is equal to the maximum diameter of a single diverter rod.
[0008] Preferably, the horizontal end of the drainage tube is provided with an annular cavity, the metal plate and the tension spring are both located in the annular cavity, the diverting rod is movably engaged with the inner wall of the annular cavity, and the diverting rod is made of metal with the part in contact with the annular cavity covered with rubber.
[0009] Preferably, the booster assembly further includes a fixed spring three and a spring two, the first diverter plate is connected to the drain pipe through the second spring, the second diverter plate is connected to the drain pipe through the third spring, and the first diverter plate and the second diverter plate are designed to be staggered.
[0010] Preferably, the partition includes a transfer box installed on the grouting pipe, a hydraulic rod is installed at the bottom of the transfer box, the hydraulic rod extends into the interior of the transfer box and is fitted with a partition, the partition being movably installed inside the transfer box.
[0011] Preferably, when the telescopic end of the hydraulic rod is retracted to its shortest length, the partition, together with the part that engages with the transfer box, prevents the slurry from flowing in the grouting pipe, at which point the transfer box is divided into two parts.
[0012] Preferably, the partition further includes a support tube fixed to the bottom of the transfer box, the support tube is also installed on the drain pipe, both ends of the support tube are closed and the outer periphery is provided with a slot for heat dissipation of the hydraulic rod, and a metal filter plate is provided in the slot.
[0013] Preferably, the screening assembly includes a protective box connected to the grouting pipe, and a set of screening plates are equidistantly arranged inside the protective box, with the mesh size of each screening plate increasing sequentially from top to bottom; A hydraulic rod three is installed at the bottom of the protective box. A blade that can extend into the interior of the protective box and completely cover one side of the screening plate is installed at the end of the hydraulic rod three. A metal plate is provided on the other side of the screening plate.
[0014] Preferably, the drainage pipe is connected to the protective box, and the second diverter plate is located directly below the screening plate.
[0015] Preferably, the screening assembly further includes a hydraulic rod two fixed to the side of the protective box. The movable end of the hydraulic rod two can extend into the interior of the protective box and is equipped with a cleaning plate. The cleaning plate consists of a set of scrapers. The metal plate is provided with gaps corresponding to the gaps between every two adjacent screening plates, and each scraper is located in the corresponding gap.
[0016] Compared with the prior art, the beneficial effects of this utility model are as follows: This invention, through the coordination of a pressurizing component and other structures, uses a vacuum pump to evacuate the inside of the drainage pipe. The first diverter plate and the first sealing plate move synchronously, while the second sealing plate is blocked by one of the diverter rods. A negative pressure exists between the first and second sealing plates. The inclined surface of the first sealing plate pushes the other diverter rod upwards. The initial diverter rod no longer blocks the second sealing plate. The negative pressure and the elasticity of the second sealing plate both pull it to move suddenly, generating a greater suction force. As the second pressurizer passes through multiple sets of first pressurizers, it generates strong, intermittent suction forces, creating short-term high pressure differentials that instantly disrupt boundary layer stability. The pressure differential forms local eddies or shock waves, directly "prying" the contact surface between impurities and the pipe wall, and overcoming static friction. This method is more effective than the continuous, constant suction force generated by a vacuum pump in removing particles from the grouting micropores.
[0017] This invention, through the coordinated arrangement of intensifier one and intensifier two, allows the sealing plate one to move and push the diverter rod in the next intensifier one to rise. Simultaneously, the corresponding metal plate pushes the previous metal plate to rise, ensuring that the diverter rod in the previous intensifier one does not obstruct the movement of the sealing plate two. Even when the spring one returns to its initial state and the sealing plate one disengages from the next diverter rod, the next tension spring pushes the corresponding metal plate and diverter rod downwards. Because even when the spring one is at its shortest compressed length, the next diverter rod will still obstruct the movement of the sealing plate two, ensuring a good coordination between intensifier one and intensifier two and generating a multi-stage strong suction effect, thus improving the precision of the coordination between the various structures.
[0018] This invention, through the coordinated arrangement of a screening component and other structures, ensures that after all the slurry enters the inlet pipe, all particles remain on the screening plate. During this process, hydraulic rod two pushes a scraper in the cleaning plate to scrape the particles on the screening plate until the scraper is flush with the side of the screening plate. Hydraulic rod three then pushes the blade upwards to remove all the particles from the side of the screening plate. When the slurry returns to the grouting pipe, the particles on the screening plate are not carried back into the grouting pipe, thus ensuring that the slurry no longer contains particles. Attached Figure Description
[0019] Figure 1 This is a first schematic diagram of the appearance and structure of this utility model; Figure 2 This is a second schematic diagram of the appearance structure of this utility model; Figure 3 This is a schematic diagram of the internal structure of the drainage tube of this utility model; Figure 4 This is a schematic diagram of the internal structure of the drainage tube and transfer box of this utility model; Figure 5 This utility model Figure 4 Enlarged view of point A in the middle; Figure 6 This is a schematic diagram of the second working positions of turbocharger one and turbocharger two; Figure 7 This is a schematic diagram showing the internal structure of the drainage tube of this utility model. Figure 8 This is a schematic diagram of the internal structure of the protective box of this utility model; Figure 9 This is a schematic diagram showing the subdivision structure in the screening component of this utility model; Figure 10 This is a cross-sectional front view of the appearance and structure of this utility model.
[0020] In the diagram: 1. Grouting machine; 2. Grouting pipe; 3. Isolator; 31. Transfer box; 32. Hydraulic rod one; 33. Partition plate; 34. Support pipe; 4. Vacuum pump; 5. Pressure boosting assembly; 51. Drainage pipe; 52. Pressure booster one; 521. Metal plate; 522. Diverter rod; 523. Tension spring; 53. Pressure booster two; 531. Sealing plate one; 532. Spring one; 533. Sealing plate two; 54. Spring two; 55. Diverter plate one; 56. Spring three; 57. Diverter plate two; 6. Screening assembly; 61. Protective box; 62. Screening plate; 63. Cleaning plate; 64. Hydraulic rod two; 65. Hydraulic rod three; 66. Blade; 7. Lead screw motor; 8. Mold. Detailed Implementation
[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0022] like Figures 1 to 10 As shown, this utility model provides a high-pressure grouting machine, including a grouting machine 1 and a grouting pipe 2, with a disconnector 3 and a screening assembly 6 respectively installed at both ends of the grouting pipe 2; A pressurizing assembly 5 is installed on the grouting pipe 2 and located between the isolator 3 and the screening assembly 6; The pressurization assembly 5 includes a U-shaped diversion pipe 51. One end of the diversion pipe 51 is movably mounted with a flow divider plate 57 and is connected to the grouting pipe 2 through the screening assembly 6. The other end of the diversion pipe 51 is movably mounted with a flow divider plate 55 and is connected to the air inlet of the vacuum pump 4. A set of boosters 52 is installed circumferentially at the horizontal end of the drainage tube 51. Each set of boosters 52 is arranged at equal intervals inside the drainage tube 51. A booster 53 is installed inside the drainage tube 51. One of the boosters 52 includes a metal plate 521 connected to the annular cavity inside the drain tube 51 by a tension spring 523. A diverter rod 522 is symmetrically installed at both ends of the metal plate 521 and is movably engaged in the inner wall of the drain tube 51. The booster 2 53 includes a sealing plate 1 531 and a sealing plate 2 533 movably installed inside the drain pipe 51. The sealing plate 1 531 is connected to the sealing plate 2 533 by a spring 1 532. Both sides of the sealing plate 1 531 are chamfered, while the sealing plate 2 533 is chamfered only on the outer side. Hydraulic oil is filled between sealing plate 1 531 and flow divider 1 55, and hydraulic oil is filled between sealing plate 2 533 and flow divider 2 57. The screening component 6 is used to retain impurities in the slurry, and the isolator 3 is used to close or connect the grouting pipe 2.
[0023] The above solution is adopted: when the product has obvious quality problems caused by the blockage of the grouting pipe 2, the grouting work is stopped immediately, and the isolator 3 is controlled to close the grouting pipe 2 so that the mud cannot be discharged; At this time, the vacuum pump 4 is turned on to evacuate the inside of the drain tube 51. The first diverter plate 55 rises immediately. Since the space between the first diverter plate 55 and the first sealing plate 531 is filled with hydraulic oil, the first sealing plate 531 moves synchronously. One side of the second sealing plate 533 is flat and is blocked by one of the diverter rods 522, so it cannot move. That is, there is a negative pressure between the two. When the first sealing plate 531 moves, it will push the other diverter rod 522 to rise through its chamfered inclined surface. Since both diverter rods 522 are mounted on the metal plate 521, the first diverter rod 522 no longer blocks the second sealing plate 533. The negative pressure caused by the vacuum pump 4 continues to drive the first sealing plate 531 to move. Since the first sealing plate 531 is connected to the second sealing plate 533 by the spring 532, the negative pressure and the elasticity of the second sealing plate 533 will pull the second sealing plate 533 to move suddenly and generate a greater suction force than the vacuum pump 4. During the continuous operation of vacuum pump 4, booster 2 53 will pass through multiple sets of booster 1 52, thereby generating strong suction in multiple stages. When particles are stuck in the micropores but not completely blocked, the strong suction generated suddenly can more effectively remove the particles from the grouting micropores than the constant suction generated by vacuum pump 4. That is, when the suction is constant, the fluid forms a stable laminar or turbulent flow in the pipe. The particles adhering to the pipe wall will be subject to the boundary layer effect, that is, the fluid velocity near the pipe wall is low. The continuous suction is difficult to overcome the static friction or adhesion between the particles and the pipe wall or grouting micropores, and cannot concentrate on the impurities. Therefore, the vacuum pump 4 may not be able to effectively remove the particles from the grouting micropores or the inner wall of the grouting pipe 2. The strong suction force in multiple intervals will create a short-term high pressure difference, which can instantly destroy the stability of the boundary layer. The pressure difference forms a local eddy or shock wave, which directly "pry" the contact surface between the impurities and the pipe wall. The sudden acceleration will overcome the static friction force. When the sealing plate 2 533 moves and creates strong suction in multiple intervals, it also acts on the diversion plate 2 57. Therefore, after the mud is drawn into the drainage pipe 51, it will be blocked by the diversion plate 2 57, so that it will not continue to flow down and fill the part where the booster 1 52 and booster 2 53 are located, thereby making the device operate more stably. Before the mud enters the pumped-in diversion pipe 51, it will pass through the screening component 6 first, so that the particles are retained in the screening component 6 and will not affect the subsequent grouting work. It should be noted that hydraulic oil is filled between sealing plate 531 and flow divider 55, and between sealing plate 533 and flow divider 57. Figure 4 As can be seen, the negative pressure generated by the vacuum pump 4 acts on the ends of the flow divider 55 and the guide pipe 51, creating a vacuum. Then, the hydraulic oil drives the booster 53 and the flow divider 57 to move. This reduces the vacuum pump 4's vacuuming part, and most of the transmission medium is replaced by hydraulic oil, which greatly reduces the device's working time.
[0024] like Figure 1 As shown, the grouting machine 1 is equipped with a lead screw motor 7 and a mold 8. The lead screw motor 7 can drive the mold 8 to perform mold closing or mold opening operations. The part of the grouting pipe 2 adjacent to the mold 8 can be designed to extend and retract, and the rest can be fixed on the grouting machine 1.
[0025] The above solution will be adopted: Figure 1 As can be seen, the existing rocker arm mechanism is replaced by a lead screw motor 7, thereby realizing the mold opening and closing work of the mold 8. The size of the lead screw motor 7 is similar to that of the motor used to drive the rocker arm, so this can save the space occupied by the original rocker arm and avoid the possibility of the rocker arm hitting the outer shell of the grouting machine 1 or the maintenance workers when it moves. Since the grouting pipe 2 is actually connected to the mold 8, and the mold 8 needs to be opened or closed, it is feasible to design the part of the grouting pipe 2 near the mold 8 to be telescopic. Furthermore, if the rest of the grouting pipe 2 is fixed to the grouting machine 1, the overall working condition of the device can be more stable. In addition, the outside of the grouting pipe 2 can be covered with an insulation layer to prevent the flow of mud in the pipe from being affected when the temperature is low.
[0026] However, it should be noted that when the device is working normally, the telescopic part of the grouting pipe 2 needs to be able to withstand the high pressure of grouting to avoid the risk of grout leakage. In addition, the grouting pipe 2 is in a normally open state, so the mechanism on the grouting pipe 2 will not be affected during grouting.
[0027] like Figures 1-6 As shown, the horizontal end of the drainage tube 51 is provided with an annular cavity, and the metal plate 521 and the tension spring 523 are both located in the annular cavity. The diverting rod 522 is movably engaged on the inner wall of the annular cavity. The diverting rod 522 is made of metal and the part in contact with the annular cavity is covered with rubber.
[0028] Each pair of adjacent metal plates 521 are interlocked, and the total length of the spring 532 in its initial state is equal to the maximum diameter of a single diverter rod 522.
[0029] Using the above scheme: When sealing plate 2 533 is blocked by one of the diverter rods 522, sealing plate 1 531 moves and pushes its inclined surface to push the other diverter rod 522 upward. Simultaneously, metal plate 521 rises, and diverter rod 522 no longer obstructs sealing plate 2 533. During this time, sealing plate 2 533 is driven towards sealing plate 1 531 due to negative pressure and spring 1 532. Sealing plate 1 531 will continue to move and push the diverter rod 522 in the next booster 1 52 upward, and the corresponding metal plate 521 will also rise. Figure 5 as well as Figure 6 As can be clearly seen, every two adjacent metal plates 521 overlap, so the next metal plate 521 will push the previous metal plate 521 upwards simultaneously, and the diverter rod 522 at the bottom of the previous metal plate 521 will not obstruct the continued movement of the sealing plate 533. Therefore, even if the spring 532 returns to its initial state (note, the initial state, not the initial position shown in the diagram), the sealing plate 531 will continue to move and disengage from the next diverter rod 522. Figure 6 The diagram shows the working relationship between the first intensifier 52 and the second intensifier 53. Each tension spring 523 pushes the corresponding metal plate 521 down. At this time, the next tension spring 523 pushes the corresponding metal plate 521 and the diverter rod 522 down. Even if the first spring 532 is at its shortest compressed length, the next diverter rod 522 will also block the movement of the second sealing plate 533, so as to ensure that the first intensifier 52 and the second intensifier 53 can cooperate well and produce a multi-stage strong suction effect, which further improves the precision of the cooperation between the various structures when the device is working. It should be noted that when the vacuum pump 4 supplies gas into the drainage pipe 51 to return the pressurization component 5 to its initial state, the sealing plate 533 can push each diverter rod 522 up through its inclined surface, thus preventing the device from being used only once. However, it should be noted that the device needs to be installed close to the injection end of the grouting pipe 2 but not affecting the connection between the grouting pipe 2 and the plaster mold. The length of the drainage pipe 51 and the number of boosters 52 need to be selected according to the actual situation, and there is no limitation.
[0030] like Figures 1-6 As shown, the booster assembly 5 also includes a fixed spring 3 56 and a spring 2 54. The first diverter plate 55 is connected to the drain pipe 51 through the second spring 54, and the second diverter plate 57 is connected to the drain pipe 51 through the third spring 56. The first diverter plate 55 and the second diverter plate 57 are designed to be staggered.
[0031] Using the above scheme: when the pressurizing component 5 sucks up the particles and retains them in the screening component 6, the vacuum pump 4 stops working, and the spring 2 54 and the spring 3 56 will push the corresponding diverter plate 1 55 and diverter plate 2 57 back to their initial positions. The mud without impurities will also be pushed back into the grouting pipe 2, avoiding the waste of materials.
[0032] like Figures 1-6 As shown, the partition 3 includes a transfer box 31 installed on the grouting pipe 2. A hydraulic rod 32 is installed at the bottom of the transfer box 31. The hydraulic rod 32 extends into the interior of the transfer box 31 and is equipped with a partition 33. The partition 33 is movably installed inside the transfer box 31.
[0033] The partition 3 also includes a support tube 34 fixed to the bottom of the transfer box 31. The support tube 34 is also installed on the drain pipe 51. Both ends of the support tube 34 are closed and the outer periphery is provided with a slot for heat dissipation of the hydraulic rod 32. A metal filter plate is provided in the slot.
[0034] When the telescopic end of the hydraulic rod 32 is retracted to its shortest length, the partition 33, together with the part that engages with the transfer box 31, prevents the mud from flowing in the grouting pipe 2. At this time, the transfer box 31 is divided into two parts.
[0035] Using the above scheme: When the vacuum pump 4 is ready to start, the hydraulic rod 32 is preferentially driven to retract, causing the partition 33, together with the snap-fit part inside the transfer box 31, to divide the transfer box 31 into two independent parts. This prevents the residual mud inside the grouting pipe 2 from being sucked into the pressurization component 5. Figure 4 As can be seen, after the isolation device 3 is started, because the mud is relatively viscous and the output end of the grouting pipe 2 is connected to the outside, only the mud located at the output end of the grouting pipe 2 will be sucked into the drainage pipe 51, thus avoiding the intake of mud of better quality and reducing the working time of the device.
[0036] like Figures 1-10 As shown, the screening component 6 includes a protective box 61 connected to the grouting pipe 2. A set of screening plates 62 are equidistantly arranged inside the protective box 61, and the mesh size of each screening plate 62 increases sequentially from top to bottom. A hydraulic rod 65 is installed at the bottom of the protective box 61. A blade 66 is installed at the end of the hydraulic rod 65, which can extend into the interior of the protective box 61 and completely cover one side of the screening plate 62. A metal plate is provided on the other side of the screening plate 62.
[0037] The drainage pipe 51 is connected to the protective box 61, and the diversion plate 57 is located directly below the screening plate 62.
[0038] The above solution works as follows: Since both sides of each protective box 61 are blocked by metal plates and blades 66, when the slurry enters the drainage pipe 51 through the protective box 61, it can only pass through each screening plate 62. Since the mesh size of each screening plate 62 is different, larger particles are preferentially retained in the uppermost screening plate 62. Particles of different sizes are retained in sequence according to their size, which effectively avoids particles clogging the screening plate 62 and causing the slurry to be unable to pass smoothly through the protective box 61. At the same time, it reduces the strong suction force generated by the vacuum pump 4 through the pressurization component 5, which would otherwise draw particles from the screening plate 62 into the drainage pipe 51, further improving the working quality of the device.
[0039] like Figures 1-10 As shown, the screening assembly 6 also includes a hydraulic rod 64 fixed to the side of the protective box 61. The movable end of the hydraulic rod 64 can extend into the interior of the protective box 61 and is equipped with a cleaning plate 63. The cleaning plate 63 consists of a set of scrapers. The metal plate is provided with gaps corresponding to the gaps between every two adjacent screening plates 62, and each scraper is located in the corresponding gap.
[0040] Using the above scheme: After all the mud enters the inside of the diversion pipe 51, all the particles are retained on the screening plate 62. During this time, the hydraulic rod 3 65 is controlled to move the blade 66 downwards and no longer block the side of the screening plate 62. The hydraulic rod 2 64 is controlled to push the scraper in the cleaning plate 63 through the gap of the metal plate, so that it scrapes the particles on the screening plate 62. Finally, the scraper is flush with the side of the screening plate 62. The hydraulic rod 3 65 is controlled to push the blade 66, which can remove all the particles on the side of the screening plate 62. When the vacuum pump 4 moves in the opposite direction and drives the mud back into the grouting pipe 2, the particles on the screening plate 62 will not be carried back into the grouting pipe 2, thus ensuring that the mud no longer contains particles. Depend on Figure 8 As can be seen, a baffle is also provided on the side of the protective box 61. The baffle can be fixed to the protective box 61 with bolts. When a lot of particulate matter accumulates inside the protective box 61, the baffle can be opened and cleaned, thereby ensuring that the device can operate for a long time and reducing the difficulty of maintaining the device.
[0041] Working principle and usage process of this utility model: When the grouting pipe 2 is blocked, the hydraulic rod 32 drives the partition 33 to move and divide the interior of the transfer box 31; Vacuum pump 4 draws a vacuum into the inlet tube 51. The first flow divider plate 55 and the first sealing plate 531 move synchronously. The second sealing plate 533 is blocked by one of the flow divider rods 522. The pressure between the first sealing plate 531 and the second sealing plate 533 gradually becomes negative. The first sealing plate 531 moves and pushes the other flow divider rod 522 up through the inclined surface. The initial flow divider rod 522 no longer blocks the second sealing plate 533. The negative pressure and the elasticity of the second sealing plate 533 will pull the second sealing plate 533 to move suddenly and generate a greater suction force than the vacuum pump 4, which will act on the second flow divider plate 57 at the same time. The second turbocharger 53, after passing through multiple sets of first turbochargers 52, generates strong suction in multiple intermittent stages. The strong suction force in multiple intervals will create a short-term high pressure difference, which can instantly destroy the stability of the boundary layer. The pressure difference forms a local eddy or shock wave, which directly "pry" the contact surface between the impurities and the pipe wall. The sudden acceleration will overcome the static friction force. After the mud is pumped into the drainage pipe 51, it will be blocked by the diversion plate 57. During this process, the particles remain on the screening plate 62. The second hydraulic rod 64 pushes the cleaning plate 63 to scrape the particles on the screening plate 62, and the third hydraulic rod 65 pushes the blade 66 to rise, removing the particles from the side of the screening plate 62.
[0042] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0043] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A high-pressure grouting machine, comprising a grouting machine (1) and a grouting pipe (2), characterized in that, Also includes: Isolators (3) and screening components (6) are installed at both ends of the grouting pipe (2); A pressurizing assembly (5) is installed on the grouting pipe (2) and located between the partition (3) and the screening assembly (6); The pressurization assembly (5) includes a U-shaped drainage pipe (51). One end of the drainage pipe (51) is movably installed with a second diverter plate (57) and is connected to the grouting pipe (2) through a screening assembly (6). The other end of the drainage pipe (51) is movably installed with a first diverter plate (55) and is connected to the air inlet of the vacuum pump (4). A set of boosters (52) is installed circumferentially at the horizontal end of the drainage tube (51). Each set of boosters (52) is arranged at equal intervals inside the drainage tube (51). A booster (53) is installed inside the drainage tube (51). One of the boosters (52) includes a metal plate (521) connected to the annular cavity inside the drain tube (51) by a tension spring (523), and a diverter rod (522) is symmetrically installed at both ends of the metal plate (521) and is movably engaged in the inner wall of the drain tube (51). The booster 2 (53) includes a sealing plate 1 (531) and a sealing plate 2 (533) movably installed inside the drain pipe (51). The sealing plate 1 (531) is connected to the sealing plate 2 (533) by a spring 1 (532). Both sides of the sealing plate 1 (531) are chamfered, while the sealing plate 2 (533) is chamfered only on the outer side. Hydraulic oil is filled between the first sealing plate (531) and the first diverter plate (55), and hydraulic oil is filled between the second sealing plate (533) and the second diverter plate (57); The screening component (6) is used to retain impurities in the slurry, and the disconnector (3) is used to close or connect the grouting pipe (2).
2. The high-pressure grouting machine according to claim 1, characterized in that: The grouting machine (1) is equipped with a lead screw motor (7) and a mold (8). The lead screw motor (7) can drive the mold (8) to perform mold closing or mold opening operations. The part of the grouting pipe (2) near the mold (8) can be designed to extend and retract, and the rest can be fixed on the grouting machine (1).
3. The high-pressure grouting machine according to claim 1, characterized in that: Each pair of adjacent metal plates (521) snaps into each other, and the total length of the spring (532) in its initial state is equal to the maximum diameter of a single diverter rod (522); The horizontal end of the drainage tube (51) is provided with an annular cavity. The metal plate (521) and the tension spring (523) are both located in the annular cavity. The diverting rod (522) is movably engaged on the inner wall of the annular cavity. The diverting rod (522) is made of metal and the part in contact with the annular cavity is covered with rubber.
4. The high-pressure grouting machine according to claim 1, characterized in that: The booster assembly (5) also includes a fixed spring three (56) and a spring two (54). The first diverter plate (55) is connected to the drain pipe (51) through the second spring (54), and the second diverter plate (57) is connected to the drain pipe (51) through the third spring (56). The first diverter plate (55) and the second diverter plate (57) are designed to be staggered.
5. The high-pressure grouting machine according to claim 1, characterized in that: The partition (3) includes a transfer box (31) installed on the grouting pipe (2). A hydraulic rod (32) is installed at the bottom of the transfer box (31). The hydraulic rod (32) extends into the interior of the transfer box (31) and is equipped with a partition (33). The partition (33) is movably installed inside the transfer box (31).
6. The high-pressure grouting machine according to claim 5, characterized in that: When the telescopic end of the hydraulic rod (32) is retracted to its shortest length, the partition (33) together with the part that engages with the transfer box (31) prevents the slurry from flowing in the grouting pipe (2), at which point the transfer box (31) is divided into two parts.
7. The high-pressure grouting machine according to claim 6, characterized in that: The partition (3) also includes a support tube (34) fixed to the bottom of the transfer box (31). The support tube (34) is also installed on the drain pipe (51). Both ends of the support tube (34) are closed and the outer periphery is provided with a slot for heat dissipation of the hydraulic rod (32). A metal filter plate is provided in the slot.
8. The high-pressure grouting machine according to claim 1, characterized in that: The screening component (6) includes a protective box (61) connected to the grouting pipe (2). A set of screening plates (62) are equidistantly arranged inside the protective box (61), and the mesh count of each screening plate (62) increases sequentially from top to bottom. The bottom of the protective box (61) is equipped with a hydraulic rod three (65), and the end of the hydraulic rod three (65) is equipped with a blade (66) that can extend into the protective box (61) and completely cover one side of the screening plate (62). The other side of the screening plate (62) is provided with a metal plate.
9. The high-pressure grouting machine according to claim 8, characterized in that: The drainage pipe (51) is connected to the protective box (61), and the second diversion plate (57) is located directly below the screening plate (62).
10. The high-pressure grouting machine according to claim 8, characterized in that: The screening assembly (6) also includes a hydraulic rod two (64) fixed to the side of the protective box (61). The movable end of the hydraulic rod two (64) can extend into the interior of the protective box (61) and is equipped with a cleaning plate (63). The cleaning plate (63) consists of a set of scrapers. The metal plate is provided with a gap corresponding to the gap between each pair of adjacent screening plates (62), and each scraper is located in the corresponding gap.
Citation Information
Patent Citations
High-pressure grouting machine
CN111037709A
