A highway T-beam sectional prefabrication production system
The segmental prefabrication production system for highway T-beams, employing a circulating track and a modular bottom formwork trolley design, solves the problems of high transportation and construction costs associated with long-distance overall prefabrication. It enables efficient segmental prefabrication and cross-regional transportation, improving prefabrication efficiency and production flexibility.
Patent Information
- Application Number
- CN202522406545.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-13
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-11-13
AI Technical Summary
In existing technologies, the long-line integral prefabrication of highway T-beams leads to transportation difficulties and high construction costs, and the formwork system cannot adapt to the needs of segmented production, affecting prefabrication efficiency and flexibility.
The highway T-beam segmental prefabrication production system adopts a circular walking track and a modular bottom mold trolley design. Combined with anti-tilt supports and a movable bottom mold structure, it achieves precise positioning and synchronous transfer of segmental pedestals, decomposes the T-beam into multiple segments for prefabrication, and uses modular trolleys in conjunction with a circular track system for assembly line production.
It improves prefabrication efficiency and production platform operation efficiency, reduces concrete chipping defects, lowers transportation and construction costs, and meets the needs of rapid cross-regional transportation.
Smart Images

Figure CN225010130U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology, and in particular to a segmental prefabrication production system for highway T-beams. Background Technology
[0002] Highway T-beams (also known as T-shaped beams) are commonly used load-bearing structures in highway bridges. Composed of flanges and beam ribs, they are characterized by high compressive strength, high material utilization, and mature construction technology. The cross-section of a T-beam is T-shaped, consisting of wide flanges on both sides (for compressive resistance) and a narrower beam rib in the middle (for bending resistance). This structural form can evenly distribute pressure to all parts when bearing loads, increasing load-bearing capacity compared to rectangular beams, and is particularly suitable for small- to medium-span bridges. They are widely used in the superstructure of highway and railway bridges, commonly constructed using precast components, and offer advantages such as low cost and simple construction.
[0003] Currently, the conventional practice for prefabricating highway T-beams in existing prefabrication yards is long-line integral prefabrication. For example, if an integral prefabrication of a 30-meter highway T-beam is used, the overall length is long and the weight is large. It needs to be transported according to the standards for large cargo, which is troublesome, time-consuming and labor-intensive, and cannot meet the needs of rapid transportation across cities or even provinces. Moreover, the conventional long-line integral prefabrication method requires the construction of multiple production lines when capacity needs to be expanded, which inevitably increases the construction cost of the prefabrication yard. Utility Model Content
[0004] The technical problem to be solved by this utility model is to provide a segmental prefabrication production system for highway T-beams, which has the advantages of improving prefabrication efficiency, increasing the operating efficiency of the production platform, and reducing concrete chipping defects between segments, in order to address the shortcomings of the existing technology.
[0005] To solve the above-mentioned technical problems, this utility model adopts the following technical solution: A segmental precast production system for highway T-beams includes a circulating track arranged laterally in a first casting area, a second casting area, a steam curing area, and a beam lifting station; several sets of bottom formwork trolleys mounted on the circulating track; and side formwork mechanisms detachably mounted on each of the bottom formwork trolleys, wherein: The bottom formwork trolley is composed of several segmental pedestals that can be spliced together, and the side formwork mechanism is composed of segmental side forms correspondingly arranged on each of the segmental pedestals; the first pouring area is provided with several first pouring stations corresponding to the segmental pedestals at intervals, and the second pouring area is provided with several second pouring stations corresponding to the remaining segmental pedestals, and the first pouring stations and the second pouring stations correspond to each segment of the precast T-beam.
[0006] Preferably, the circulating track includes a pouring track and a return track, wherein: The pouring track is arranged laterally at the bottom of the first pouring station, the second pouring station, and the steam curing chamber, and is used to transport the bottom formwork trolley to the corresponding station; The return track is arranged parallel to one side of the pouring track, and its two ends are connected to the two ends of the pouring track by a gantry crane or a transverse transfer car when the bottom formwork trolley changes tracks. Furthermore, expansion joint end templates are respectively provided at both ends of the side formwork mechanism corresponding to the first pouring station, and keyway end templates are provided at the opposite ends of the two adjacent segment side forms.
[0007] Preferably, each set of bottom mold trolleys includes a first segment platform, a second segment platform, a third segment platform, a fourth segment platform, and a fifth segment platform arranged sequentially on the circulating travel track and capable of being spliced together, wherein: The first-segment platform, the second-segment platform, the third-segment platform, the fourth-segment platform, and the fifth-segment platform correspond to the first segment T-beam, the second segment T-beam, the third segment T-beam, the fourth segment T-beam, and the fifth segment T-beam of the precast T-beam, respectively.
[0008] Preferably, each segmental support on the bottom mold trolley includes a trolley truss, traveling wheels, a traveling motor, and a trolley bottom mold, wherein: The trolley truss is mounted on the circulating track via the traveling wheels at its bottom, and the traveling motor mounted at its bottom is connected to the traveling wheels via a drive mechanism. The trolley bottom mold is mounted on its top. Furthermore, in each group of bottom mold trolleys, a movable bottom mold that can be raised and lowered is provided between the bottom molds of two adjacent segment pedestals. Adjustable bolt assemblies are provided at the bottom of both the left and right ends of the movable bottom mold, and the adjustable bolt assemblies are provided on the trolley trusses at both ends of each segment pedestal.
[0009] Preferably, each segment of the side mold on each group of side mold mechanisms includes symmetrically arranged side templates, adjustable supports, bottom tie rods, and top tie rods, wherein: There are two side templates, which are symmetrically arranged on the corresponding segmental bases. The adjustable supports are installed on the inner and outer sides of the bottom. The lower and upper ends of the two side templates are detachably connected by the bottom tie rod and the top tie rod, respectively.
[0010] More preferably, each segment of the side formwork on each group of side formwork mechanisms further includes an attached vibrator, a construction platform, and a platform railing, wherein: The attached vibrator consists of several units, which are respectively installed on the outer side wall of each side formwork; and the outer side wall at the upper end of each side formwork is provided with a horizontally arranged construction platform, and the construction platform is provided with a platform railing.
[0011] Preferably, it further includes anti-tilting braces for supporting the side walls of each of the said segmental T-beams, wherein: The lower end of the anti-tilt brace is hinged to the truss of the bottom formwork trolley, and the upper end is inclined inward to abut against the connection between the flanges on both sides of each segment T-beam and the beam rib, and its tilt angle relative to the vertical direction is 10-30°.
[0012] Preferably, the first pouring stations within the first pouring area are arranged sequentially at intervals along the pouring track, with vacant stations positioned between adjacent first pouring stations; and The second pouring station in the second pouring area is arranged with the pouring track arranged at intervals, and the adjacent two second pouring stations are arranged as matching stations or at both ends. Each of the first pouring stations corresponds to each of the matching stations, and each of the vacant stations corresponds to each of the second pouring stations, so that each of the first pouring stations and each of the second pouring stations can be poured in sequence to complete the prefabrication of each of the segmental T-beams.
[0013] Preferably, a top slab reinforcement binding frame, a first web reinforcement binding frame, and a second web reinforcement binding frame are provided between the first pouring station in the No. 1 pouring area and the second construction passage on the outside. A corrugated pipe processing and storage area is set up between the second pouring station and the second construction channel in the No. 2 pouring area.
[0014] More preferably, it also includes a first construction passage located between the second pouring area and the steam curing area. The first construction passage is arranged longitudinally and extends to the entrance of the steam curing chamber at one end. It also includes a first beam storage area located outside the beam lifting station and a second beam storage area located outside the first beam storage area; and It also includes a second construction channel located on one side of the first and second beam storage areas and extending to the No. 1 pouring area, the second construction channel being connected to the other end of the first construction channel.
[0015] The present invention adopts the above technical solution and has the following technical effects compared with the prior art: This utility model provides a segmental prefabrication production system for highway T-beams. Through the coordinated design of a circulating walking track and a trolley with a splicable bottom mold, it achieves precise positioning and synchronous transfer of segmental supports. Combined with anti-tilt supports and a movable bottom mold structure, it effectively solves problems such as segmental misalignment, steam curing deformation, and concrete corner breakage. It has the advantages of improving segmental matching accuracy, enhancing steam curing stability, increasing trolley transfer efficiency, and reducing concrete corner breakage defects. This production system breaks through conventional prefabrication methods by adopting a segmental beam prefabrication approach. It prefabricates conventional highway T-beams into five 6-meter segments, eliminating the hassle of transporting large items and enabling centralized prefabrication and cross-city or even cross-province transportation in the future, greatly reducing the construction cost of prefabrication yards. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the planar structure of a segmental prefabrication production system for highway T-beams according to this utility model; Figure 2 This is a schematic diagram of the structure during the pouring of the No. 1 pouring area in a segmental precast production system for highway T-beams according to this utility model. Figure 3 This is a schematic diagram of the structure of the No. 2 casting area during the first casting in the segmental precast production system of highway T-beam of this utility model. Figure 4 This is a schematic diagram of the steam curing zone in a segmental prefabrication production system for highway T-beams according to this utility model. Figure 5 This is a structural diagram of the segmental dismantling process at the beam lifting station in a segmental prefabrication production system for highway T-beams according to this utility model. Figure 6 This is a schematic diagram of the assembly structure of the anti-tilt support, movable bottom mold and precast T-beam in a segmental precast production system for highway T-beams according to this utility model. Figure 7 This is a cross-sectional structural diagram of a segmental prefabrication production system for highway T-beams according to this utility model, located in the casting area. Figure 8 This is a cross-sectional structural diagram of a segmental prefabrication production system for highway T-beams according to this utility model, located in the curing chamber. Detailed Implementation
[0017] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0018] Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.
[0019] In existing technologies, highway T-beam prefabrication often employs a long-line, integral molding method, which suffers from problems such as large component volume and transportation limitations. Traditional prefabrication yards require the construction of multiple long production lines to meet capacity demands, leading to wasted land resources and increased construction costs. Especially in cross-regional bridge projects, integrally prefabricated T-beams are constrained by transportation conditions, making rapid turnaround difficult and affecting construction efficiency. In conventional processes, the formwork system is fixedly connected to the pedestal, which cannot adapt to the needs of segmented production, restricting the flexibility and scalability of the prefabrication process.
[0020] To address these issues, researchers discovered that breaking down the integral T-beam into multiple segments for independent prefabrication effectively reduces the weight of each transported unit. By setting up mobile production units, each segment can be poured and cured at different workstations, forming a cyclical production line. The key breakthrough lies in designing a detachable and reconfigurable foundation support system, allowing the same equipment to adapt to the prefabrication needs of different segments. After multiple trials and verifications, using modular trolleys in conjunction with a circular track system enables seamless integration of segment prefabrication and assembly processes, while reducing redundant equipment investment.
[0021] Therefore, as Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, this application proposes a segmental prefabrication production system for highway T-beams, including a circulating track 100 arranged laterally in a first casting area 010, a second casting area 020, a steam curing area 040, and a beam lifting station 050; several sets of bottom formwork trolleys 200 set on the circulating track 100; and side formwork mechanisms 300 detachably set on each bottom formwork trolley. Each bottom formwork trolley 200 consists of several interlocking segmental supports, and each side formwork mechanism 300 consists of segmental side forms corresponding to each segmental support. The first casting area 010 is provided with several first casting stations 011 corresponding to the remaining segmental supports, and the second casting area 020 is provided with several second casting stations 021 corresponding to the remaining segmental supports. The first casting stations 011 and the second casting stations 021 correspond to the segmental T-beams of the prefabricated T-beam 000.
[0022] The circular walking track 100 refers to a closed track system connecting various production areas, which can be implemented using P43 type steel rails. It works in conjunction with a gantry crane or a lateral transfer vehicle to form a continuous transportation path. The bottom formwork trolley 200 is a mobile support platform that supports concrete pouring; each segment of the trolley is bolted together to form a whole. The side formwork mechanism 300 is a reusable and detachable formwork assembly, which can be implemented using steel formwork fixed with tie rods. Adjustable supports are provided at the bottom to accommodate different segment sizes. The first pouring station 011 is the work area for pouring the initial segment, which can be implemented using spaced concrete pouring areas, controlling the pouring time difference between adjacent segments using a skip-pouring method. The second pouring station 021 is the area for matching and pouring subsequent segments, which can use the already poured segments as a reference surface for subsequent formwork positioning.
[0023] Specifically, the circulating track 100 forms a circular path, allowing the bottom formwork trolley 200 to move cyclically between the pouring, curing, and demolding stations. The bottom formwork trolley 200 is decomposed into multiple interlocking segments, each corresponding to a specific section of the precast T-beam. When pouring the first segment, the bottom formwork trolley 200 stops at the first pouring station 011, installs the corresponding segment's side formwork, and completes the concrete pouring. After initial setting, the side formwork is removed, and the bottom formwork trolley 200 is driven to move along the track to the second pouring station 021, using the already formed segment as a matching benchmark for pouring adjacent segments. The steam curing zone 040 is located along the track, allowing for continuous curing of the poured segments. The beam lifting station 050 is equipped with hoisting equipment; after the cured segment is lifted off the trolley, the empty trolley returns to the initial station via the return track 102.
[0024] Compared to existing technologies, traditional prefabrication yards require an independent platform for each T-beam, while this solution uses movable trolleys to achieve alternating production of multiple beam segments. Existing technologies rely on long platforms, resulting in low site utilization; this solution uses a circulating track system to efficiently connect various production processes within a limited space.
[0025] Through the above technical solutions, this application achieves standardized prefabrication of T-beam segments, reducing the weight of individual segments to meet the load requirements of conventional transport vehicles. The staged casting process utilizes pre-formed segments as matching benchmarks, ensuring dimensional accuracy during multi-segment assembly. The cyclical operation mode significantly improves the utilization rate of each production equipment, resulting in a substantial increase in unit area productivity compared to traditional precast beam yards.
[0026] In some of these embodiments, such as Figure 1As shown, this application further proposes a circulating travel track 100 including a pouring track 101 and a return track 102. The pouring track 101 is arranged laterally at the bottom of the first pouring station 011, the second pouring station 021, and the curing chamber 041, and is used to transport the bottom mold trolley 200 to the corresponding station. The return track 102 is arranged parallel to one side of the pouring track 101, and its two ends are connected to the two ends of the pouring track 101 by a gantry crane or a transverse transfer vehicle when the bottom mold trolley 200 changes tracks. Expansion joint end templates 006 are respectively provided at both ends of the side mold mechanism 300 corresponding to the first pouring station 011, and keyway end templates 007 are provided at the opposite ends of two adjacent side mold segments.
[0027] Among them, the casting track 101 refers to the guide structure that carries the bottom formwork trolley 200 during the prefabrication and curing processes. Specifically, it can be a continuous track formed by laying P43 steel rails. The trolley is driven by a motor to move along the track, realizing directional transportation from the casting area to the curing chamber in the beam state. The return track 102 refers to the return path of the empty trolley arranged parallel to the casting track 101. Specifically, it can use steel rails of the same specification, and a gantry crane or a lateral transfer vehicle is used to achieve a closed loop with the casting track 101. The expansion joint end template 006 refers to the template structure set at the end of the segment T-beam, forming an expansion joint shape that meets the design requirements at the prefabrication start and end ends. The keyway end template 007 refers to the template structure at the joint of the side formwork of adjacent segments, forming a shear-resistant interface through mechanical fitting to ensure the geometric accuracy of the connection surface between segments.
[0028] Specifically, the pouring track 101 covers the first pouring station 011, the second pouring station 021, and the bottom area of the curing chamber 041. The bottom formwork trolley 200 completes the concrete pouring and static curing processes sequentially along this track before entering the curing chamber 041. The return track 102 is arranged parallel to the pouring track 101. After the empty trolley completes the hoisting of the segmental T-beam, it is transferred to the return track 102 via the hoisting device 051 to return to the initial station. The expansion joint end formwork 006 is fixed to the side formwork at both ends of the segmental T-beam, forming a standard expansion joint structure after the concrete is formed. The keyway end formwork 007 is installed at the joint of the side formwork of adjacent segments. The convex and concave tooth structure achieves mechanical interlocking during the prefabrication process, ensuring the positional accuracy of the matching surfaces between segments. That is to say, the expansion joint end formwork 006 is used for the beam ends of segments 1 and 5, and the keyway end formwork 007 is used for the matching surface end formwork.
[0029] As one of the preferred embodiments, such as Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, this application further proposes that each set of bottom mold trolleys 200 includes a first segment platform 210, a second segment platform 220, a third segment platform 230, a fourth segment platform 240, and a fifth segment platform 250 arranged sequentially on the circulating travel track 100 and capable of being spliced together. The splicable segment platforms refer to independent platform units that are physically connected by bolts or mortise and tenon structures. Specifically, flanges and high-strength bolts can be used to achieve rigid connections, and positioning pins are set between adjacent platforms to ensure splicing accuracy. This feature allows the platforms to be moved as a whole and quickly disassembled, adapting to the needs of circulating flow operations.
[0030] Each segment of the platform corresponds to one of the five segments of the precast T-beam 000: T-beam 001 (first segment), T-beam 002 (second segment), T-beam 003 (third segment), T-beam 004 (fourth segment), and T-beam 005 (fifth segment). The five segments of the platform are arranged sequentially on the circular travel track 100, with each platform bearing the precast task of its corresponding numbered T-beam segment. When the bottom formwork trolley 200 moves to the pouring position, the segments of the platform are spliced together to form a continuous support surface, with the joints of the bottom formwork 200 coinciding with the matching surfaces between the T-beam segments. During prefabrication, in pouring area 010, the first segment platform 210, the third segment T-beam 003, and the fifth segment platform 250 sequentially pour concrete for the first segment T-beam 001, the third segment T-beam 003, and the fifth segment T-beam 005. After pouring, each platform remains connected and moves with the beam to the next process. In pouring area 010, the second segment T-beam 002, the third segment T-beam 003, and the fourth segment T-beam 004 are then poured. During demolding, the modular hoisting of the segment T-beams is achieved by releasing the splicing connections and independently controlling the separation of each platform.
[0031] As one of the preferred embodiments, such as Figure 7 and Figure 8 As shown, this application further proposes that each segment of the base on the bottom formwork trolley 200 includes a trolley truss 201, traveling wheels 202, a traveling motor 203, and a bottom formwork 204. The trolley truss 101 is mounted on the circulating track 100 via the traveling wheels 102 at its bottom. The traveling motor 203 is connected to the traveling wheels 102 for transmission, and the bottom formwork 204 is mounted on top. The trolley truss 201 refers to the steel frame structure used to support the bottom formwork 204 and the concrete load, and its rigid connection ensures the flatness of the bottom formwork support surface. The traveling wheels 202 refer to the wheel assembly mechanism that drives the trolley to move along the track, and synchronous control enables the coordinated movement of multiple segment bases.
[0032] In each set of bottom formwork trolleys 200, a movable bottom formwork 205 that can be raised and lowered is set between the bottom formwork of two adjacent trolley segments. Adjustable bolt assemblies are installed at the bottom of both ends of the movable bottom formwork 205, and these assemblies are mounted on the trolley trusses 201 at both ends of each segment trolley. The movable bottom formwork 205 refers to the liftable template set between adjacent trolley bottom formworks. Specifically, it can be implemented using a combination of steel plates and lifting screws. Adjusting the height prevents damage to the concrete edges during demolding. The adjustable bolt assembly refers to a conventionally known operating mechanism for controlling the position of the movable bottom formwork. Specifically, it can be implemented using a bidirectional screw structure with a locking nut. Rotating the screw allows for precise adjustment of the vertical displacement of the bottom formwork.
[0033] During use, in the pouring stage, the movable bottom formwork 205 is raised to be flush with the bottom formwork 204 on both sides of the trolley, forming a continuous pouring surface. In the demolding stage, the height of the movable bottom formwork is lowered by rotating the bolt assembly, creating operating space at the bottom of adjacent T-beam segments and preventing splintering of concrete during separation. The adjustable bolt assembly uses a bidirectional threaded structure to allow independent lifting and lowering of the bottom formwork on one side. For example, rotating the left bolt clockwise raises the height of that side, while rotating the right bolt counterclockwise lowers the height of the corresponding side. This allows adjustment of the bottom formwork's tilt angle to accommodate different separation operation requirements.
[0034] As one of the preferred embodiments, such as Figure 7 As shown, this application further proposes that each segment of the side formwork on the side formwork mechanism 300 includes symmetrically arranged side formwork, adjustable supports 301, bottom tie rods 302, and top tie rods 303. The side formwork refers to the rigid component used to form the lateral profile of the T-beam segment. The adjustable support 301 refers to the support device installed on the inner and outer sides of the bottom of the side formwork, using a conventional screw and nut combination structure, which compensates for installation errors between the platform and the formwork by adjusting the support height. The bottom tie rod 302 is a connecting component that extends laterally through the lower ends of both side formworks, specifically using precision-rolled threaded steel bars and nuts for locking, applying preload to prevent outward displacement of the bottom of the formwork. Similarly, the top tie rod 303 is a connecting component that extends laterally through the top ends of both side formworks, specifically using precision-rolled threaded steel bars of the same material as the bottom tie rods and nuts for locking, constraining the upper displacement of the formwork to prevent deformation during concrete pouring.
[0035] Specifically, there are two side formworks, symmetrically arranged on corresponding segmental pedestals, with adjustable supports 301 installed on both the inner and outer sides of the bottom. The lower and upper ends of the left and right side formworks are detachably connected via bottom tie rods 302 and top tie rods 303, respectively. The symmetrical arrangement of the side formworks creates a closed pouring space. The adjustable supports 301 on the inner and outer sides of the bottom can independently adjust the contact pressure at each point, eliminating support gaps caused by uneven pedestal surfaces. The bottom tie rods 302 and top tie rods 303 form bidirectional constraints from the lower and upper ends of the formwork, respectively. The bottom tie rods 302 and top tie rods 303 are pre-tightened with threads to generate horizontal tension to counteract the lateral pressure of the concrete. When the formwork needs to be removed, the bottom tie rods 302 and top tie rods 303 can be quickly disconnected, separating the side formwork from the concrete surface.
[0036] In addition, such as Figure 7 As shown, this application further proposes that each segment of the side formwork on each group of side formwork mechanisms 300 also includes an attached vibrator 304, a construction platform 305, and a platform railing 306. The attached vibrator 304 refers to a conventionally known concrete vibration device that is bolted to the outer wall of the side formwork, and its vibration energy is directly transmitted to the interior of the concrete through the side formwork. The construction platform 305 refers to a steel frame structure that extends horizontally along the upper outer wall of the side formwork, and its width meets the requirements for single-person passage and placement of small tools. The platform railing 306 refers to a protective structure that is vertically fixed to the edge of the construction platform, which can be implemented using a closed fence.
[0037] Specifically, several attached vibrators 034 are installed on the outer walls of each side formwork. A horizontally arranged construction platform 305 is provided on the upper outer wall of each side formwork, and a platform railing 306 is installed on the construction platform 305. The attached vibrators 304 are activated simultaneously during concrete pouring, and the vibration waves are evenly transmitted through the side formwork to the newly poured concrete area, especially in the densely reinforced area where the T-beam flange meets the beam rib, ensuring the removal of air bubbles and uniform distribution of aggregates. The construction platform 305 forms a continuous working surface during the formwork installation stage, allowing operators to stand directly on the platform during pouring to monitor the vibration status and perform localized supplementary vibration operations without the need for additional scaffolding or other working platforms.
[0038] In some of these embodiments, such as Figure 1 , Figure 4 , Figure 5 and Figure 8As shown, this application further proposes anti-tilting braces 400 for supporting the side walls of each segment of the T-beam. These braces can be installed throughout the entire process as needed, mainly to prevent the precast T-beam 000 from overturning during the movement of the bottom formwork trolley 200. Specifically, steel diagonal braces combined with adjustable locking devices can be used to constrain the lateral deformation of the segmental T-beams during steam curing.
[0039] Specifically, the lower end of the anti-tilt brace 400 is hinged to the trolley truss 201 on the bottom formwork trolley 200, and the upper end is inclined inward to abut against the connection between the flanges and the beam ribs on both sides of each segment of the T-beam, and its inclination angle relative to the vertical direction is 10-30°. Through multi-point support at key positions at the junction of the flanges and the beam ribs, a stable triangular support system is formed to prevent the beam from overturning during travel.
[0040] In some of these embodiments, such as Figure 1 As shown, this application further proposes that the pouring tracks 101 of the first pouring station 011 within the first pouring area 010 are arranged sequentially at intervals, and an empty station 012 is arranged between two adjacent first pouring stations 011. The first pouring station 011 refers to a fixed operating area used for prefabricating odd-numbered T-beam segments, and the segment prefabrication sequence is ensured by limiting the station position. The empty station 012 refers to the area reserved between adjacent first pouring stations 011 without pouring equipment, providing a spatial buffer for subsequent station switching.
[0041] Within the second pouring area 020, the pouring tracks 101 of the second pouring station 021 are arranged sequentially at intervals, and matching stations 022 are arranged between adjacent second pouring stations 021 or at both ends. The second pouring station 021 refers to a fixed operating area used for precasting even-numbered T-beam segments. Specifically, it can be implemented using a pouring platform staggered from the first pouring station, achieving segment matching pouring through alternating station arrangements. Matching stations 022 refer to the docking areas set between adjacent second pouring stations 021 or at both ends, used to support completed segments as a matching reference.
[0042] Specifically, each first pouring station 011 corresponds to each matching station 022, and each vacant station 012 corresponds to each second pouring station 021. Pouring is carried out sequentially at each first pouring station 011 and each second pouring station 021 to complete the prefabrication of each segment of the T-beam. After the odd-numbered segments are poured at the first pouring station 011, the bottom formwork trolley 200 moves with the beam to the matching station, so that the solidified segment serves as the end formwork for the second pouring station 021, and the beam poured at the first pouring station 011 serves as the matching beam for the second pouring station 021, thus avoiding misalignment of the matching surfaces due to station switching.
[0043] In one specific implementation, such as Figure 1As shown, this application further proposes that a top slab reinforcement binding frame 013, a first web reinforcement binding frame 014, and a second web reinforcement binding frame 015 be provided between the first pouring station 011 in the first pouring area 010 and the second construction passage 080 on the outside; the top slab reinforcement binding frame 013 refers to a special tooling for forming the top slab reinforcement skeleton of the precast T-beam, and the web reinforcement binding frames 014 and 015 refer to tooling for forming the web reinforcement skeleton.
[0044] like Figure 1 As shown, a corrugated pipe processing and storage area is set up between the second pouring station 021 and the second construction passage 080 in the second pouring area 020. The corrugated pipe processing and storage area refers to the area used for cutting, connecting and temporarily storing pre-embedded corrugated pipes. Specifically, a combination of a workbench with rollers and a material rack can be used to realize direct transfer to the pouring station after processing.
[0045] In one specific implementation, such as Figure 1 As shown, this application further proposes that the production system also includes a first construction passage 030 located between the second pouring area 020 and the steam curing area 040. The first construction passage 030 is arranged longitudinally, with one end extending to the entrance of the steam curing chamber 041. The first construction passage 030 refers to the construction path located between the second pouring area 040 and the steam curing area 050, facilitating workers to move to the steam curing chamber 041 for construction work or equipment maintenance via the first construction passage 030. Figure 8 As shown, steam curing chamber 041 is equipped with steam pipes and spray pipes for heating and humidification, and the steam is generated by a steam generator.
[0046] like Figure 1 As shown, the production system also includes a first beam storage area 060 located outside the beam lifting station 050 and a second beam storage area 070 located outside the first beam storage area 060. A gantry crane is used at the beam lifting station 050 to lift the segmental T-beams that have completed curing and transfer them to the first beam storage area 060 or the second beam storage area 070. The first beam storage area 060 and the second beam storage area 070 are designated storage areas for segmental T-beams. Specifically, they can be implemented using hardened ground areas or three-dimensional stacking racks. The zoned storage arrangement avoids spatial conflicts between lifting operations and transportation operations.
[0047] In addition, such as Figure 1 As shown, the production system also includes a second construction channel 080 located on one side of the first beam storage area 060 and the second beam storage area 070 and extending to the first pouring area 010. The second construction channel 080 is connected to the other end of the first construction channel 030. The second construction channel 080 refers to the main operation path connecting the beam storage area and the first pouring area 010. Specifically, it can be implemented as an independent channel parallel to the main production line, providing a dedicated channel for transporting idle auxiliary materials.
[0048] Combination Figures 1 to 8 As shown, the construction process of the segmental prefabrication production system for highway T-beams provided by this utility model is as follows: ① Assemble and connect the segmental platforms in the bottom formwork trolley 200; ② Install the side formwork mechanism 300 and install the expansion joint end template 006 and keyway end template 007; ③ Use the skip-casting method to precast segments 1, 3, and 5 along the casting track 101 at the first casting station 011; ④ After about 12 hours, remove the side formwork and end formwork; ⑤ Connect the power supply to each segmental platform and move it to the second casting station 021 with the beam to cast segments 2 and 4. When prefabricating segments 2 and 4, segments 1, 3, and 5 are used as matching beams. ⑥ After 12 hours, remove the side formwork and move the beam to the steam curing chamber 041; ⑦ Steam cure in the steam curing chamber for 1 day, then move the beam to the lifting position 050 again; ⑧ Remove the connecting bolts between the platform sections, lower the movable bottom formwork 205 between the sections, and separate each platform section individually. The matching surface has a concave-convex tooth design, which requires horizontal movement to disconnect the connection. After separation, lift each T-beam section by section; ⑨ After the empty platform sections are reconnected, lift them to the return track 102, and return to the first pouring position 011 via the return track to start the next production line.
[0049] In this construction method, the movement of the segmental platforms in each set of bottom formwork trolleys 200 is driven by a motor. The segmental platforms move on P43 steel rails. A production line is equipped with 4 sets of bottom formwork trolleys 200, which operate in a cyclical manner, ensuring that a production line can produce 5 segments of one beam per day. It is also worth noting that a movable bottom formwork 205 is set between two adjacent segmental platforms, which can be raised and lowered by bolts. Lowering this movable bottom formwork before demolding can effectively prevent the bottom concrete from chipping at the mating surface during demolding.
[0050] Finally, the following points should be noted: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection", and "linkage" should be interpreted broadly, and can be mechanical or electrical connections, or internal connections between two components, or direct connections. "Up", "down", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may change. Secondly, the accompanying drawings of the embodiments disclosed in this utility model only involve the structures involved in the embodiments disclosed in this utility model. Other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of this utility model can be combined with each other. Finally, the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A segmental prefabrication production system for highway T-beams, characterized in that, The system includes a circulating travel track (100) arranged laterally in the No. 1 casting area (010), the No. 2 casting area (020), the steam curing area (040), and the beam lifting station (050); several sets of bottom formwork trolleys (200) set on the circulating travel track (100); and side formwork mechanisms (300) detachably set on each of the bottom formwork trolleys (200), wherein: The bottom formwork trolley (200) is composed of several segmental pedestals that can be spliced together, and the side formwork mechanism (300) is composed of segmental side forms corresponding to each segmental pedestal; the first pouring area (010) is provided with several first pouring stations (011) of the segmental pedestals that are correspondingly spaced apart, and the second pouring area (020) is provided with several second pouring stations (021) corresponding to the remaining segmental pedestals. The first pouring station (011) and the second pouring station (021) correspond to each segment of the precast T-beam (000).
2. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, The circulating travel track (100) includes a pouring track (101) and a return track (102), wherein: The pouring track (101) is arranged laterally at the bottom of the first pouring station (011), the second pouring station (021), and the steam curing room (041) to transport the bottom mold trolley (200) to the corresponding station; The return track (102) is arranged parallel to one side of the casting track (101), and its two ends are connected to the two ends of the casting track (101) by a gantry crane or a transverse transfer vehicle when the bottom formwork trolley (200) changes tracks. Furthermore, expansion joint end templates (006) are respectively provided at both ends of the side formwork mechanism (300) corresponding to the first pouring station (011), and keyway end templates (007) are provided at the opposite ends of the two adjacent segment side forms.
3. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, Each set of bottom mold trolleys (200) includes a first segment platform (210), a second segment platform (220), a third segment platform (230), a fourth segment platform (240), and a fifth segment platform (250) arranged sequentially on the circulating travel track (100) and capable of being spliced together, wherein: The first segment platform (210), the second segment platform (220), the third segment platform (230), the fourth segment platform (240), and the fifth segment platform (250) correspond to the first segment T-beam (001), the second segment T-beam (002), the third segment T-beam (003), the fourth segment T-beam (004), and the fifth segment T-beam (005) of the precast T-beam (000), respectively.
4. The segmental prefabrication production system for highway T-beams according to claim 3, characterized in that, Each segmental support on the bottom formwork trolley (200) includes a trolley truss (201), traveling wheels (202), a traveling motor (203), and a trolley bottom formwork (204), wherein: The trolley truss (201) is mounted on the circulating walking track (100) via the traveling wheels (202) at its bottom, and the walking motor (203) mounted at its bottom is connected to the traveling wheels (202) in a transmission connection, and the trolley bottom mold (204) is mounted on its top. Furthermore, in each group of bottom mold trolleys (200), a movable bottom mold (205) that can be raised and lowered is provided between the bottom molds (204) of two adjacent segment pedestals. An adjustable bolt assembly is provided at the bottom of both the left and right ends of the movable bottom mold (205), and the adjustable bolt assembly is provided on the trolley truss (201) at both ends of each segment pedestal.
5. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, Each segment of the side mold on each group of side mold mechanisms (300) includes a side mold plate arranged symmetrically on the left and right, an adjustable support (301), a bottom tie rod (302), and a top tie rod (303), wherein: There are two side templates, which are arranged symmetrically on the corresponding segmental bases. The adjustable supports (301) are installed on the inner and outer sides of the bottom. The lower and upper ends of the two side templates are detachably connected by the bottom tie rod (302) and the top tie rod (303), respectively.
6. The segmental prefabrication production system for highway T-beams according to claim 5, characterized in that, Each segment of the side formwork on each group of the side formwork mechanisms (300) also includes an attached vibrator (304), a construction platform (305), and a platform railing (306), wherein: The attached vibrator (304) consists of several units, which are respectively installed on the outer side wall of each side formwork; and the outer side wall at the upper end of each side formwork is provided with a horizontally arranged construction platform (305), and the construction platform (305) is provided with a platform railing (306).
7. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, It also includes anti-tilt bracing (400) for supporting the side walls of each of the said segmental T-beams, wherein: The lower end of the anti-tilt brace (400) is hinged to the trolley truss (201) on the bottom formwork trolley (200), and the upper end is inclined inward to abut against the connection between the flanges on both sides of each segment T beam and the beam rib, and its tilt angle relative to the vertical direction is 10-30°.
8. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, The first pouring station (011) within the first pouring area (010) is arranged sequentially at intervals along the pouring track (101), and an empty station (012) is arranged between two adjacent first pouring stations (011); and The second pouring station (021) in the second pouring area (020) is arranged sequentially at intervals along the pouring track (101), and the adjacent two second pouring stations (021) are arranged as matching stations (022) on both ends. Each of the first pouring stations (011) corresponds to each of the matching stations (022), and each of the vacant stations (012) corresponds to each of the second pouring stations (021), so that each of the first pouring stations (011) and each of the second pouring stations (021) can be poured in sequence to complete the prefabrication of each of the segment T beams.
9. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, A top slab reinforcement binding frame (013), a first web reinforcement binding frame (014), and a second web reinforcement binding frame (015) are provided between the first pouring station (011) in the No. 1 pouring area (010) and the second construction passage (080) on the outside. A corrugated pipe processing and storage area is set up between the second pouring station (021) and the second construction passage (080) in the second pouring area (020).
10. The segmental prefabrication production system for highway T-beams according to claim 1, characterized in that, It also includes a first construction passage (030) located between the second pouring area (020) and the steam curing area (040), the first construction passage (030) being arranged longitudinally and extending at one end to the entrance of the steam curing chamber (041); It also includes a first beam storage area (060) arranged outside the beam lifting station (050) and a second beam storage area (070) arranged outside the first beam storage area (060); and It also includes a second construction channel (080) located on one side of the first beam storage area (060) and the second beam storage area (070) and extending to the first pouring area (010), the second construction channel (080) being connected to the other end of the first construction channel (030).