Inflatable forming and demolding structure of inner bag of vulcanization mold
The inner bladder inflation molding and demolding structure solves the problems of inverted molding and demolding of thin-walled airbag products, realizes an efficient operation process, and improves production efficiency and product quality.
Patent Information
- Application Number
- CN202522313159.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-10-31
AI Technical Summary
Traditional rubber-metal molding dies cannot effectively form the internal undercut structure of thin-walled airbag products and enable rapid demolding, resulting in inflexible operation and low production efficiency.
The system employs an internal bladder inflation molding and demolding structure. By utilizing the expansion and contraction mechanism of the internal bladder and cooperating with clamping positioning components and ejector rods, the internal inverted features of thin-walled airbag products can be smoothly molded and demolded.
It improves the operational flexibility and production efficiency of thin-walled airbag products, ensures the high efficiency and stability of the feeding, molding and demolding processes, and enhances product quality.
Smart Images

Figure CN225010489U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of automotive membrane rubber metal parts processing technology, and in particular to a vulcanization mold inner bladder inflation molding and demolding structure. Background Technology
[0002] Rubber shock absorbers are a crucial solution for ensuring vehicle ride comfort, handling stability, and ride smoothness. As demands for vehicle comfort continue to rise, air suspension systems are now almost universally installed in high-end buses and sedans abroad, while mid-to-high-end buses in China are either undergoing trial use or preparing to adopt them. When a vehicle uses an air suspension system, it can automatically adjust the vehicle height to maintain a constant level. The low natural frequency of the rubber air springs provides excellent vibration damping and sound insulation, significantly improving ride smoothness, passenger comfort, and reducing the impact of the vehicle on the road surface.
[0003] Traditional rubber-metal molding dies cannot easily add preformed material into the mold, achieve inverted molding of the inner wall of the product, and facilitate quick and smooth demolding for products with large dimensions, thin walls, and internal undercut structures.
[0004] Therefore, we propose a vulcanization mold inner bladder inflation molding and demolding structure. Utility Model Content
[0005] To address the shortcomings of existing production technologies, the applicant provides a vulcanizing mold inner bladder inflation molding and demolding structure. This structure utilizes the expansion and contraction of the inner bladder to solve the problems of difficult material feeding and demolding for thin-walled air bladder products, while also efficiently completing the molding process. This significantly increases operational flexibility, and the entire feeding, molding, and demolding process is highly efficient and stable, improving product quality and production efficiency.
[0006] The technical solution adopted in this application is as follows: A vulcanizing mold inner bladder inflation molding and demolding structure, comprising: Internal capsule; The bottom clamping and positioning component clamps the bottom of the inner bladder around one ring, and the bottom clamping and positioning component is placed on the vulcanizing mold. The top clamping and positioning component clamps the top of the inner bladder around its perimeter, enabling it to be positioned with the vulcanizing mold. The second push rod, which can be raised and lowered, is threadedly connected to the bottom clamping and positioning assembly. The second push rod is a hollow rod. A first lifting rod, capable of being raised and lowered, passes through a second lifting rod and a bottom clamping and positioning assembly, and is threadedly connected to the top clamping and positioning assembly. Among them, the first push rod and the second push rod have gaps with the bottom clamping and positioning components. After the vulcanizing upper mold and the vulcanizing lower mold are closed, inert gas is filled into the inner bladder through the gap, so that the inner bladder fits with the inner wall of the pre-formed unvulcanized product, and the outer wall of the pre-formed unvulcanized product fits with the vulcanizing upper mold and the vulcanizing lower mold. After vulcanization is complete, the vulcanization mold is opened, and the inert gas is extracted through the gap. The inner bladder contracts, making it easy to demold quickly.
[0007] Its further features are: The inner capsule is made of rubber.
[0008] The bottom clamping and positioning assembly includes a first connecting block, a second connecting block, and a third connecting block. The first connecting block is fixedly connected to the second connecting block, and the second connecting block is fixedly connected to the third connecting block. The bottom clamping and positioning assembly is provided with a first through hole penetrating the first connecting block and the second connecting block. The third connecting block is provided with a threaded hole, and the threaded hole communicates with the first through hole.
[0009] A sealing ring is provided in the threaded hole.
[0010] The top clamping and positioning assembly includes a fourth connecting block, a fifth connecting block, and a connecting rod. The fourth connecting block is fixedly connected to the fifth connecting block, and the fifth connecting block is fixedly connected to the connecting rod. The connecting rod is located in the inner bladder.
[0011] The first push rod passes through the second push rod and the first through hole in sequence. There is a gap between the inner side of the second push rod and the first push rod, and there is a gap between the first push rod and the first through hole. The second push rod is threadedly connected to the third connecting block.
[0012] Before placing the product into the vulcanizing mold, the top clamping and positioning assembly moves downward via the first ejector rod, causing the inner bladder to contract.
[0013] After vulcanization is completed, the vulcanization mold is opened, and the inert gas is extracted through the gap. The first push rod drives the top clamping and positioning assembly to move downward a certain distance, and the second push rod drives the bottom clamping and positioning assembly to move upward a certain distance, causing the inner bladder to contract.
[0014] The beneficial effects of this application are as follows: This application features a compact and rational structure, and is easy to operate. The first ejector rod moves the top clamping and positioning assembly downwards a certain distance, while the second ejector rod moves the bottom clamping and positioning assembly upwards a certain distance, causing the inner bladder to contract and thus demolding the vulcanized product. Utilizing the expansion and contraction of the inner bladder, this design effectively addresses the challenges of material feeding and demolding for thin-walled airbag products, while also efficiently completing the molding process. This significantly increases operational flexibility, ensuring efficient and stable feeding, molding, and demolding, thereby improving product quality and production efficiency.
[0015] In addition, this application also has the following advantages: (1) Place the bottom clamping and positioning component on the vulcanizing lower mold, place the third connecting block into the second through hole of the vulcanizing lower mold for positioning, and thread the third connecting block to the second push rod. Insert the first push rod into the second push rod and the first through hole in sequence, and thread the first push rod to the connecting rod. Drive the first push rod downward through the lifting structure. The first push rod drives the top clamping and positioning component downward through the connecting rod, so that the inner bladder contracts to a certain height. Place the pre-formed unvulcanized product on the vulcanizing lower mold, and the pre-formed unvulcanized product is outside the inner bladder, the bottom clamping and positioning component and the top clamping and positioning component.
[0016] (2) The vulcanizing upper mold and vulcanizing lower mold are closed. Inert gas is injected through the gap between the second ejector rod and the first ejector rod. The inert gas enters the inner bladder through the gap between the first ejector rod and the first through hole. The first ejector rod drives the top clamping and positioning component to move upward, so that the top clamping and positioning component is tightly closed and positioned with the vulcanizing upper mold. As the inert gas is injected into the inner bladder, the inner bladder gradually bulges. After the inner bladder is fully bulged, the inner bladder is attached to the inner wall of the pre-formed unvulcanized product. The outer wall of the pre-formed unvulcanized product is attached to the vulcanizing upper mold and the vulcanizing lower mold. The pre-formed unvulcanized product is vulcanized by heating. After vulcanization is completed, the vulcanizing upper mold is opened, and the inert gas in the inner bladder is extracted through the gap between the first ejector rod and the first through hole, and the gap between the first ejector rod and the second ejector rod. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the structure of this application.
[0018] Figure 2 This is a schematic diagram showing the product after placement in this application.
[0019] Figure 3 This is a schematic diagram of the mold after it is closed according to this application.
[0020] Figure 4 This is a schematic diagram of the demolding process after vulcanization in this application.
[0021] Figure 5 This is a schematic diagram of the bottom clamping and positioning component of this application.
[0022] Figure 6 This is a schematic diagram of the top clamping and positioning component of this application.
[0023] The components include: 1. Inner bladder; 2. Bottom clamping and positioning assembly; 3. Top clamping and positioning assembly; 4. First ejector rod; 5. Second ejector rod; 6. Upper vulcanizing mold; 7. Lower vulcanizing mold; 8. Product; 201. First connecting block; 202. Second connecting block; 203. Third connecting block; 204. First through hole; 205. Threaded hole; 301. Fourth connecting block; 302. Fifth connecting block; 303. Connecting rod. Detailed Implementation
[0024] The specific embodiments of this application are described below with reference to the accompanying drawings.
[0025] A vulcanizing mold inner bladder inflation molding and demolding structure includes an inner bladder 1, a bottom clamping and positioning component 2, a top clamping and positioning component 3, a first ejector rod 4, and a second ejector rod 5.
[0026] The bottom clamping and positioning component 2 is placed on the vulcanizing lower mold 7. The vulcanizing lower mold 7 is provided with a second through hole, and the third connecting block 203 is located in the second through hole to position the bottom clamping and positioning component 2.
[0027] The bottom clamping and positioning assembly 2 includes a first connecting block 201, a second connecting block 202, and a third connecting block 203. The first connecting block 201 and the second connecting block 202 are fixedly connected, and the second connecting block 202 and the third connecting block 203 are also fixedly connected. The bottom of the inner bladder 1 is clamped by the first connecting block 201 and the second connecting block 202. The bottom clamping and positioning assembly 2 is provided with a first through hole 201 that penetrates through the first connecting block 201 and the second connecting block 202. The third connecting block 203 is provided with a threaded hole 205 that communicates with the first through hole 201.
[0028] In one embodiment, the third connecting block 203 is cylindrical.
[0029] The top clamping and positioning assembly 3 includes a fourth connecting block 301, a fifth connecting block 302, and a connecting rod 303.
[0030] The fourth connecting block 301 and the fifth connecting block 302 are fixedly connected, and the fifth connecting block 302 is fixedly connected to the connecting rod 303. The top of the inner bladder 1 is clamped by the fourth connecting block 301 and the fifth connecting block 302.
[0031] The top of the fourth connecting block 301 is conical, and it is positioned with the vulcanizing upper mold 6.
[0032] The connecting rod 303 is located in the inner bladder 1.
[0033] The second push rod 5 is a hollow rod with external threads, and it is threadedly connected to the third connecting block 203.
[0034] Specifically, the external thread of the second push rod 5 is matched and connected with the threaded hole 205.
[0035] The first push rod 4 passes through the second push rod 5 and the first through hole 204 in sequence; the first push rod 4 is threadedly connected to the connecting rod 303.
[0036] There is a gap between the inner side of the second push rod 5 and the first push rod 4, and there is a gap between the first push rod 4 and the first through hole 204.
[0037] The first push rod 4 can be raised and lowered, the second push rod 5 can be raised and lowered, and the first push rod 4 and the second push rod 5 can be raised and lowered independently.
[0038] In one embodiment, the first push rod 4 can be raised and lowered by a machine platform, and the second push rod 5 can also be raised and lowered by a machine platform. The machine platform is equipped with two independent lifting structures to control the raising and lowering of the first push rod 4 and the second push rod 5 respectively.
[0039] In one embodiment, the machine tool is also provided with an inflation / deflation structure, which inflates or deflates the gap between the first push rod 4 and the second push rod 5.
[0040] In one embodiment, the inner capsule 1 is made of rubber.
[0041] In one embodiment, a sealing ring is provided in the threaded hole 205.
[0042] In practical use, the bottom clamping and positioning component 2 is placed on the vulcanizing lower mold 7, the third connecting block 203 is placed into the second through hole of the vulcanizing lower mold 7 for positioning, and the third connecting block 203 is threaded to the second push rod 5. The first push rod 4 is inserted into the second push rod 5 and the first through hole 204 in sequence, and the first push rod 4 is threaded to the connecting rod 3. The lifting structure drives the first push rod 4 to move downward. The first push rod 4 drives the top clamping and positioning component 3 to move downward a certain distance through the connecting rod 303, so that the inner bladder 1 contracts to a certain height. The pre-formed unvulcanized product is placed on the vulcanization lower mold 7, and the pre-formed unvulcanized product is located outside the inner bladder 1, the bottom clamping and positioning component 2 and the top clamping and positioning component 3. The vulcanizing upper mold 6 and vulcanizing lower mold 7 are closed. Inert gas is injected through the gap between the second ejector rod 5 and the first ejector rod 4. The inert gas enters the inner bladder 1 through the gap between the first ejector rod 4 and the first through hole 204. The first ejector rod 4 drives the top clamping and positioning component 3 to move upward, so that the top clamping and positioning component 3 is tightly closed and positioned with the vulcanizing upper mold 6. As the inert gas is injected into the inner bladder 1, the inner bladder 1 gradually bulges. After the inner bladder 1 is fully bulged, the inner bladder 1 is attached to the inner wall of the pre-formed unvulcanized product. The outer wall of the pre-formed unvulcanized product is attached to the vulcanizing upper mold 6 and vulcanizing lower mold 7. The pre-formed unvulcanized product is then heated to vulcanize. After vulcanization is completed, the vulcanization mold 6 is opened, and the inert gas in the inner bladder 1 is extracted through the gap between the first ejector rod 4 and the first through hole, and the gap between the first ejector rod 4 and the second ejector rod 5.
[0043] The first ejector rod 4 moves the top clamping and positioning component 3 downward a certain distance, while the second ejector rod 5 moves the bottom clamping and positioning component 2 upward a certain distance. This causes the inner bladder 1 to contract, achieving demolding and allowing the vulcanized product to be removed. Utilizing the expansion and contraction of the inner bladder 1, this method effectively addresses the challenges of material feeding and demolding for thin-walled airbag products, while also efficiently completing the molding process. This significantly increases operational flexibility, making the entire feeding, molding, and demolding process highly efficient and stable, thus improving product quality and production efficiency.
[0044] The above description is an explanation of this application and not a limitation thereof. The scope of this application is defined by the claims. Within the scope of protection of this application, any form of modification may be made.
Claims
1. A vulcanizing mold inner bladder inflation molding and demolding structure, characterized in that, include: Internal capsule (1); Bottom clamping positioning component (2) clamps the bottom of the inner bladder (1) around one ring, and the bottom clamping positioning component (2) is placed on the vulcanizing mold (7); The top clamping positioning component (3) clamps the top ring of the inner bladder (1) and can be positioned with the vulcanizing upper mold (6); The second top rod (5) that can be raised and lowered is threadedly connected to the bottom clamping and positioning assembly (2), and the second top rod (5) is a hollow rod; The first lifting rod (4) passes through the second lifting rod (5) and the bottom clamping positioning assembly (2), and is threadedly connected to the top clamping positioning assembly (3); Among them, the first push rod (4) and the second push rod (5) have gaps with the bottom clamping and positioning assembly (2). After the vulcanizing upper mold (6) and vulcanizing lower mold (7) are closed, inert gas is filled into the inner bladder (1) through the gap, so that the inner bladder (1) fits with the inner wall of the pre-formed unvulcanized product (8), and the outer wall of the pre-formed unvulcanized product (8) fits with the vulcanizing upper mold (6) and vulcanizing lower mold (7). After vulcanization is completed, the vulcanization mold (6) is opened, and the inert gas is extracted through the gap. The inner bladder (1) shrinks, which facilitates quick demolding.
2. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 1, characterized in that: The inner capsule (1) is made of rubber.
3. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 1, characterized in that: The bottom clamping and positioning assembly (2) includes a first connecting block (201), a second connecting block (202) and a third connecting block (203). The first connecting block (201) is fixedly connected to the second connecting block (202), and the second connecting block (202) and the third connecting block (203) are fixedly connected. The bottom clamping and positioning assembly (2) is provided with a first through hole (204) penetrating the first connecting block (201) and the second connecting block (202). The third connecting block (203) is provided with a threaded hole (205), and the threaded hole (205) communicates with the first through hole (204).
4. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 3, characterized in that: A sealing ring is provided in the threaded hole (205).
5. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 3, characterized in that: The top clamping and positioning assembly (3) includes a fourth connecting block (301), a fifth connecting block (302) and a connecting rod (303). The fourth connecting block (301) is fixedly connected to the fifth connecting block (302), and the fifth connecting block (302) is fixedly connected to the connecting rod (303). The connecting rod (303) is located in the inner bladder (1).
6. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 5, characterized in that: The first push rod (4) passes through the second push rod (5) and the first through hole (204) in sequence. There is a gap between the inner side of the second push rod (5) and the first push rod (4). There is a gap between the first push rod (4) and the first through hole (204). The second push rod (5) is threadedly connected to the third connecting block (203).
7. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 1, characterized in that: Before placing the product (8) into the vulcanizing mold (7), the top clamping and positioning assembly (3) is driven downward by the first push rod (4), and the inner bladder (1) contracts.
8. The vulcanizing mold inner bladder inflation molding and demolding structure as described in claim 7, characterized in that: After the vulcanization is completed, the vulcanization mold (6) is opened, and the inert gas is extracted through the gap. The first push rod (4) drives the top clamping and positioning component (3) to move downward a certain distance, and the second push rod (5) drives the bottom clamping and positioning component (2) to move upward a certain distance, and the inner bladder (1) contracts.
