A high-efficiency thermal management system and flow channel integrated piece
By integrating flow channel components and thermal insulation gap design, the problem of compressor refrigerant temperature not meeting the standard is solved, realizing a high-efficiency thermal management system, simplifying installation and improving heat exchange efficiency.
Patent Information
- Application Number
- CN202522831186.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-31
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2035-12-31
AI Technical Summary
In extremely cold environments, the refrigerant temperature at the compressor exhaust port is not up to standard, which affects the vehicle's heating function. The existing hot gas bypass channel and liquid tank structure design also lead to a reduction in thermal efficiency.
The integrated flow channel assembly, through the design of first and second thermal insulation gaps, isolates the hot gas bypass channel and the container structure, forming multiple temperature zones, reducing heat exchange losses, and simplifying the installation process.
It improves the energy efficiency of the compressor, reduces its size and installation complexity, and enhances the overall thermal efficiency of the thermal management system.
Smart Images

Figure CN225010974U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to an energy-saving compressor, and more particularly to a high-efficiency thermal management system. Background Technology
[0002] The description in this section provides only background information related to the disclosure of this utility model and does not constitute prior art.
[0003] In pure electric and hybrid vehicles, the vehicle's heat pump system uses a compressor to compress the refrigerant to transfer heat, and then exchanges heat through the coolant circuit to cool or heat the corresponding heat exchange units. However, in extremely cold vehicle operating environments, due to the low air temperature, the refrigerant returning from the compressor's intake port is also at a low temperature. Therefore, the refrigerant discharged from the compressor's exhaust port after being pressurized again may not reach the preset temperature range, significantly affecting the vehicle's heating function.
[0004] To address this issue, a recirculation scheme exists where a portion of the refrigerant discharged from the compressor outlet enters a hot gas bypass channel, and after throttling, is directly returned to the compressor block. Considering the principle of simplified installation, an integrated structure design is preferred. However, if this scheme uses a design where the hot gas bypass channel and the liquid receiver / receiver are located close to each other, heat exchange may occur, leading to reduced thermal efficiency. This could result in the refrigerant temperature discharged from the compressor outlet failing to reach the preset temperature threshold, significantly impacting the vehicle's heating function.
[0005] It should be noted that the above introduction to the technical background is only for the purpose of providing a clear and complete explanation of the technical solutions of this utility model and facilitating understanding by those skilled in the art. It should not be assumed that these technical solutions are known to those skilled in the art simply because they have been described in the background section of this utility model. Utility Model Content
[0006] The purpose of this utility model is to provide a high-efficiency thermal management system that reduces the size of the compressor and simplifies the installation process through integrated flow channel components. Furthermore, the construction of the first and second heat insulation gaps reduces heat loss from heat exchange and improves the energy efficiency of the compressor.
[0007] To achieve the above objectives, this utility model discloses a high-efficiency thermal management system, which includes: Compressor cylinder block; A flow channel assembly includes a hot gas bypass channel and a container mechanism. The hot gas bypass channel and the container mechanism are connected by multiple connecting ribs, forming a first heat insulation gap of a preset size between the hot gas bypass channel and the container mechanism. The flow channel assembly is mounted on the outer wall of the compressor cylinder body by mounting feet, forming a second heat insulation gap between the compressor cylinder body and the flow channel assembly. At least one functional element, said functional element being connected to the compressor cylinder and / or the flow channel assembly.
[0008] As a further description of the above technical solution, the functional components include a condenser and an evaporator; the upstream end of the hot gas bypass channel is connected to the exhaust port of the compressor cylinder after passing through a first expansion valve, and the downstream end of the hot gas bypass channel is connected to the suction port of the compressor cylinder; the upstream end of the container mechanism is connected to the condensation outlet of the condenser, and the downstream end of the container mechanism is connected to the evaporation inlet of the evaporator after passing through a second expansion valve.
[0009] As a further description of the above technical solution, the high-efficiency thermal management system also includes a first connecting plate, the condenser is brazed to the first connecting plate, the first connecting plate is fixedly connected to the compressor cylinder by fasteners, and the first connecting plate covers the outer wall of the flow channel assembly.
[0010] As a further description of the above technical solution, the high-efficiency thermal management system also includes a second connecting plate, the evaporator is brazed to the second connecting plate, the second connecting plate is fixedly connected to the compressor cylinder by fasteners, and the second connecting plate covers the outer wall of the flow channel assembly.
[0011] As a further description of the above technical solution, the flow channel assembly also includes a flow channel plate, which is pipe-connected to the hot gas bypass channel and the container mechanism. The downstream end of the hot gas bypass channel is connected to the suction port of the compressor cylinder through the flow channel plate, and the downstream end of the container mechanism is connected to the evaporation inlet of the evaporator through the flow channel plate and the second expansion valve.
[0012] As a further description of the above technical solution, the flow channel plate is fixedly connected to the outer wall of the evaporator by fasteners.
[0013] As a further description of the above technical solution, the container mechanism includes multiple protrusions and spaced-apart baffles.
[0014] As a further description of the above technical solution, the first heat insulation gap and the second heat insulation gap are set to 2-5mm.
[0015] As a further description of the above technical solution, the surface of the compressor cylinder block opposite to the flow channel assembly is set as a contoured surface that matches the shape of the flow channel assembly.
[0016] This utility model also discloses a flow channel assembly, wherein: the flow channel assembly includes a hot gas bypass channel and a container mechanism, the hot gas bypass channel and the container mechanism are connected by a plurality of connecting ribs, and a first heat insulation gap with a preset size is formed between the hot gas bypass channel and the container mechanism; the flow channel assembly is mounted on the outer wall of the compressor cylinder by mounting feet, and a second heat insulation gap is formed between the compressor cylinder and the flow channel assembly.
[0017] Based on the above technical solution, the beneficial effects of this utility model are as follows: This high-efficiency thermal management system reduces the compressor's size and simplifies installation through an integrated flow channel component. The construction of the first and second heat insulation gaps reduces heat loss from heat exchange, thus improving compressor efficiency. Specifically, the flow channel component's hot gas bypass channel and container mechanism form two isolated temperature zones through the first heat insulation gap. The second heat insulation gap further isolates the flow channel component from the compressor cylinder, creating three isolated temperature zones for the compressor cylinder, bypass pipe, and container mechanism. This weakens heat exchange between temperature zones, thereby improving thermal efficiency. Furthermore, the integrated flow channel component combines the hot gas bypass channel and container mechanism into a single unit. The hot gas bypass channel itself, as a new structure, surrounds the container mechanism, reducing the overall volume and simplifying installation. In other words, this invention effectively utilizes an easy-to-install, compact integrated hot gas bypass channel and container mechanism design while maintaining high thermal management system efficiency.
[0018] To further understand the features and technical content of this utility model, please refer to the following detailed description and drawings of this utility model. However, the drawings provided are for reference and illustration only and are not intended to limit this utility model. Attached Figure Description
[0019] To more clearly illustrate the technical solutions in the embodiments or prior art of this specification, the drawings used in the description of the embodiments or prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this specification. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0020] Figure 1-2This is a schematic diagram of an explosion-proof high-efficiency thermal management system provided in the embodiments of this specification; Figure 3 This is a three-dimensional schematic diagram of a high-efficiency thermal management system provided in the embodiments of this specification; Figure 4-5 This is a partially exploded view of a high-efficiency thermal management system provided in the embodiments of this specification; Figure 6 This is a cross-sectional schematic diagram of a high-efficiency thermal management system provided in the embodiments of this specification; In the picture: 1. Compressor cylinder; 11. Exhaust port; 12. Intake port; 2. Flow channel assembly; 21. Hot gas bypass channel; 22. Container mechanism; 221. Baffle plate; 23. Connecting rib; 24. First thermal insulation gap; 25. Second thermal insulation gap; 26. Mounting foot; 27. Flow channel plate; 3. Condenser; 31. Condenser outlet; 4. Evaporator; 41. Evaporation inlet; 5. First connecting plate; 6. Second connecting plate; 7. First expansion valve; 8. Second expansion valve. Detailed Implementation
[0021] To enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this specification, and not all embodiments. Based on the embodiments in this specification, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of this specification.
[0022] The following specific embodiments illustrate the implementation of this utility model. Those skilled in the art can understand the advantages and effects of this utility model from the content disclosed in this specification. This utility model can be implemented or applied through other different specific embodiments, and various details in this specification can also be modified and changed based on different viewpoints and applications without departing from the concept of this utility model. Furthermore, the accompanying drawings of this utility model are for simple illustration only and are not depictions of actual dimensions, as stated in advance. The following embodiments will further describe the relevant technical content of this utility model in detail, but the disclosed content is not intended to limit the scope of protection of this utility model.
[0023] It should be understood that while terms such as "first," "second," and "third" may be used in this document to describe various components or signals, these components or signals should not be limited by these terms. These terms are primarily used to distinguish one component from another, or one signal from another. Furthermore, the term "or" as used herein should, as appropriate, include any combination of one or more of the related listed items.
[0024] Please see Figure 1-6 This embodiment provides a high-efficiency thermal management system, which includes: Compressor cylinder 1; The flow channel assembly 2 includes a hot gas bypass channel 21 and a container mechanism 22. The hot gas bypass channel 21 and the container mechanism 22 are connected by multiple connecting ribs 23, forming a first heat insulation gap 24 with a preset size between the hot gas bypass channel 21 and the container mechanism 22. The flow channel assembly 2 is mounted on the outer wall of the compressor cylinder 1 by mounting feet 26, forming a second heat insulation gap 25 between the compressor cylinder 1 and the flow channel assembly 2. At least one functional element is connected to the compressor cylinder 1 and / or the flow channel assembly 2.
[0025] Based on the above-mentioned process of this utility model, during installation, the flow channel assembly 2 can be integrally cast. During the installation of the flow channel assembly 2, the mounting feet 26 corresponding to the bottom of the flow channel assembly 2 are aligned with the holes on the surface of the compressor cylinder 1. After being in place, they are locked with fasteners to form a stable connection relationship.
[0026] In the flow channel assembly 2, its container mechanism 22 can serve as the main body, forming an irregularly shaped cavity. The container mechanism 22 itself can be used as a liquid storage tank for buffering refrigerant. The hot gas bypass channel 21 is configured as a thin tube that is bent and coiled around the periphery of the container mechanism 22. Multiple connecting ribs 23 can be configured, with the multiple connecting ribs 23 spaced apart along the extension direction of the hot gas bypass channel 21.
[0027] The first heat insulation gap 24 and the second heat insulation gap 25 mentioned above are both set as grooves that penetrate the structure of the flow channel integrated component 2 itself. Their width can be set to 2-5mm, so as to provide the maximum heat insulation effect without affecting the structural strength.
[0028] The surface of the compressor cylinder 1 opposite to the flow channel assembly 2 is configured as a contoured surface that matches the shape of the flow channel assembly 2. The contoured surface structure extends along the bottom side wall of the flow channel assembly 2 and always maintains a spatial gap width of more than the second heat insulation gap 25 between it and the wall opposite to the flow channel assembly 2.
[0029] In this invention, the integrated flow channel assembly 2 reduces the compressor's size and simplifies the installation process. Furthermore, the construction of the first and second heat insulation gaps 24 and 25 reduces heat loss from heat exchange, thus improving the compressor's energy efficiency. Specifically, the hot gas bypass channel 21 and the container mechanism 22 of the flow channel assembly 2 form two isolated temperature zones through the first heat insulation gap 24. The second heat insulation gap 25 further isolates the flow channel assembly 2 from the compressor cylinder 1, creating three isolated temperature zones for the compressor cylinder 1, the bypass pipe, and the container mechanism 22. This weakens heat exchange between the temperature zones, thereby improving thermal efficiency. Simultaneously, the flow channel assembly 2 integrates the hot gas bypass channel 21 and the container mechanism 22 into a single unit. The hot gas bypass channel 21 itself, as a new structure, surrounds the container mechanism 22, reducing the overall volume and simplifying installation.
[0030] It is worth noting that the most significant innovation in this application lies in the overall isolation of most flow channels and the functions of the storage tank, such as the second thermal insulation gap 25, rather than the isolation of just one or two flow channels. Furthermore, it further refines the isolation on the basis of overall isolation, such as the first thermal insulation gap 24. Therefore, compared with general simple isolation schemes, this scheme has a higher degree of isolation and better effect.
[0031] Furthermore, through the design of the installation method and structural form of the flow channel integration component 2, the overall integrated installation can be made convenient even on the basis of such a complex isolation structure.
[0032] In another embodiment, the functional elements include a condenser 3 and an evaporator 4; the upstream end of the hot gas bypass channel 21 is connected to the exhaust port 11 of the compressor cylinder 1 via a first expansion valve 7, and the downstream end of the hot gas bypass channel 21 is connected to the intake port 12 of the compressor cylinder 1; the upstream end of the container mechanism 22 is connected to the condensation outlet 31 of the condenser 3, and the downstream end of the container mechanism 22 is connected to the evaporation inlet 41 of the evaporator 4 via a second expansion valve 8. After the compressor cylinder 1 compresses the refrigerant, a portion of the high-temperature and high-pressure refrigerant is throttled by the first expansion valve 7 and discharged to the suction port 12 of the compressor cylinder 1 through the hot gas bypass channel 21 to achieve gas replenishment and enthalpy increase. The other portion directly enters the condenser inlet of the condenser 3. The condenser inlet and the exhaust port 11 are directly connected. After entering the condenser 3, the refrigerant enters the container mechanism 22 and flows to the second expansion valve 8 for throttling. It then enters the evaporator 4 through the evaporation inlet 41 and enters the suction port 12 of the compressor cylinder 1 from the evaporation outlet to complete the cycle.
[0033] Based on the aforementioned condenser 3 and evaporator 4 components, the condenser 3 is mainly installed at the top of the compressor, and the evaporator 4 is installed on the side wall. The specific installation method is as follows. The high-efficiency thermal management system also includes a first connecting plate 5. The condenser 3 is brazed to the first connecting plate 5, or connected by a sealing element and bolts. The first connecting plate 5 is fixedly connected to the compressor cylinder 1 by fasteners, and the first connecting plate 5 covers the outer wall of the flow channel assembly 2. The high-efficiency thermal management system also includes a second connecting plate 6. The evaporator 4 is brazed to the second connecting plate 6, or connected by a sealing element and bolts. The second connecting plate 6 is fixedly connected to the compressor cylinder 1 by fasteners, and the second connecting plate 6 covers the outer wall of the flow channel assembly 2. Taking the first connecting plate 5 as an example, after it is welded to the bottom surface of the condenser 3, it is directly fixed to the corresponding hole on the top of the compressor cylinder 1 using the corresponding connecting holes on the first connecting plate 5. Specifically, the first connecting plate 5 covers the outer wall of the flow channel assembly 2, and as an outer cover plate, it also serves to seal the hot gas bypass channel 21 and the container mechanism 22. The second connecting plate 6 is similar.
[0034] The flow channel assembly 2 also includes a flow channel plate 27, which is pipe-connected to the hot gas bypass channel 21 and the container mechanism 22. The downstream end of the hot gas bypass channel 21 is connected to the suction port 12 of the compressor cylinder 1 through the flow channel plate 27, and the downstream end of the container mechanism 22 is connected to the evaporation inlet 41 of the evaporator 4 through the second expansion valve 8 via the flow channel plate 27. In fact, the flow channel plate 27 in the flow channel assembly 2 is a separate structure from the main structure's hot gas bypass channel 21 and container mechanism 22. The purpose is to divide the flow channel assembly 2 into upper and side parts for easier assembly. During installation, the main body of the hot gas bypass channel 21 and container mechanism 22 can be installed on top of the compressor cylinder 1, and then the flow channel plate 27 can be side-inserted and fixed. Of course, in another embodiment, the flow channel assembly 2 can also be a single integrated structure, but its casting cost is relatively higher. In the fixing of the flow channel plate 27, the flow channel plate 27 is fixedly connected to the outer wall of the evaporator 4 by fasteners. Its main fixing is achieved through the pipe insertion of the hot gas bypass channel 21 and the container mechanism 22, as described above. The fasteners are fixed to the outer wall of the evaporator 4 in conjunction with the fixing means to improve stability. Of course, the flow channel plate 27 itself can also be part of the flow channel assembly 2 and brazed to one side wall of the evaporator 4.
[0035] The container mechanism 22 includes multiple protruding baffles 221 spaced apart. The baffles 221 serve to guide the flow inside the container mechanism 22 and can buffer the refrigerant.
[0036] The above-disclosed content is only a preferred and feasible embodiment of the present utility model, and is not intended to limit the scope of the patent application of the present utility model. Therefore, all equivalent technical changes made using the contents of the present utility model specification and drawings are included in the scope of the patent application of the present utility model.
[0037] The various embodiments in this specification are described in a progressive manner. The same or similar parts between the various embodiments can be referred to each other. Each embodiment focuses on describing the differences from other embodiments.
[0038] Although this application has been described by way of examples, those skilled in the art will know that this application has many modifications and variations without departing from the spirit of this application, and it is intended that the appended embodiments include these modifications and variations without departing from this application.
Claims
1. A high-efficiency thermal management system, characterized in that, The high-efficiency thermal management system includes: Compressor cylinder block; A flow channel assembly includes a hot gas bypass channel and a container mechanism. The hot gas bypass channel and the container mechanism are connected by multiple connecting ribs, forming a first heat insulation gap of a preset size between the hot gas bypass channel and the container mechanism. The flow channel assembly is mounted on the outer wall of the compressor cylinder body by mounting feet, forming a second heat insulation gap between the compressor cylinder body and the flow channel assembly. At least one functional element, said functional element being connected to the compressor cylinder and / or the flow channel assembly.
2. The high-efficiency thermal management system according to claim 1, characterized in that: The functional components include a condenser and an evaporator; the upstream end of the hot gas bypass channel is connected to the exhaust port of the compressor cylinder after passing through a first expansion valve, and the downstream end of the hot gas bypass channel is connected to the intake port of the compressor cylinder; the upstream end of the container mechanism is connected to the condensation outlet of the condenser, and the downstream end of the container mechanism is connected to the evaporation inlet of the evaporator after passing through a second expansion valve.
3. The high-efficiency thermal management system according to claim 2, characterized in that: The high-efficiency thermal management system also includes a first connecting plate, to which the condenser is brazed or bolted, and the first connecting plate is fixedly connected to the compressor cylinder by fasteners, and the first connecting plate covers the outer wall of the flow channel assembly.
4. The high-efficiency thermal management system according to claim 2, characterized in that: The high-efficiency thermal management system also includes a second connecting plate. The evaporator is brazed to the second connecting plate or locked with a sealing element and bolts. The second connecting plate is fixedly connected to the compressor cylinder by fasteners, and the second connecting plate covers the outer wall of the flow channel assembly.
5. The high-efficiency thermal management system according to claim 2, characterized in that: The flow channel assembly also includes a flow channel plate, which is pipe-connected to the hot gas bypass channel and the container mechanism. The downstream end of the hot gas bypass channel is connected to the suction port of the compressor cylinder through the flow channel plate, and the downstream end of the container mechanism is connected to the evaporation inlet of the evaporator through the flow channel plate and the second expansion valve.
6. The high-efficiency thermal management system according to claim 5, characterized in that: The flow channel plate is fixedly connected to the outer wall of the evaporator by fasteners.
7. The high-efficiency thermal management system according to claim 1, characterized in that: The container mechanism includes multiple protrusions and spaced-apart baffles.
8. The high-efficiency thermal management system according to claim 1, characterized in that: The first heat insulation gap and the second heat insulation gap are set to 2-5mm.
9. The high-efficiency thermal management system according to claim 1, characterized in that: The surface of the compressor cylinder block opposite to the flow channel assembly is set as a contoured surface that matches the shape of the flow channel assembly.
10. A flow channel assembly, characterized in that: The flow channel assembly includes a hot gas bypass channel and a container mechanism. The hot gas bypass channel and the container mechanism are connected by multiple connecting ribs, forming a first heat insulation gap with a preset size between the hot gas bypass channel and the container mechanism. The flow channel assembly is mounted on the outer wall of the compressor cylinder by mounting feet, forming a second heat insulation gap between the compressor cylinder and the flow channel assembly.
