An ore mining and dressing integrated system feeding device

By combining material guiding and splash prevention, active dust extraction, and high-pressure cleaning belt, the dust diffusion problem in the integrated ore mining, beneficiation, and charging system is solved, achieving efficient dust removal and stable transmission, and extending the service life of the equipment.

CN225012640UActive Publication Date: 2026-11-24SHANXI GUXIAN LAOMUPO COAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522828759.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-31
Publication Date
2026-11-24
Estimated Expiration
2035-12-31

AI Technical Summary

Technical Problem

The feeding device of the existing integrated ore mining, beneficiation and charging system generates a large amount of dust during the material transmission process after crushing, which leads to environmental pollution, health hazards, unstable transmission and equipment wear. In addition, the unreasonable design of the material guiding structure increases the risk of dust diffusion.

Method used

It adopts a combined dust removal structure of material guiding and splash prevention, active dust extraction and high-pressure belt cleaning. Combined with funnel-shaped material guiding pipe, pressure-bearing support plate and high-pressure air outlet, the material is guided to fall smoothly through the funnel-shaped material guiding pipe. The dust extraction system and high-pressure air outlet are used to clean the dust on the conveyor belt. With the help of the sealing and anti-overflow structure, multi-level dust removal and stable transmission are achieved.

Benefits of technology

It significantly improves dust removal efficiency, protects the working environment and the health of operators, enhances transmission stability and equipment lifespan, and reduces the impact of dust flying and adhesion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN225012640U_ABST
    Figure CN225012640U_ABST
Patent Text Reader

Abstract

This utility model discloses a feeding device for an integrated ore mining, beneficiation, and charging system, including a support base, a conveyor belt located at the top center of the support base, a dust collection box covering the front end of the conveyor belt at the top of the support base, a feeding pipe at the top of the dust collection box, a dust extraction system connected to the interior of the dust collection box on the outside of the dust collection box, a clean air input box at the bottom of the dust collection box, and a gas distribution pipe connected to the clean air input box at the bottom of the support base. The gas distribution pipe has multiple high-pressure air outlets aligned with the conveyor belt. The advantages of this utility model compared to existing technologies are: significant dust removal effect: adopting a combined dust removal structure of "active dust extraction + high-pressure belt cleaning + sealing and overflow prevention," controlling dust generation, diffusion, and residue from multiple stages, resulting in high dust removal efficiency and effectively solving the problem of dust flying in traditional feeding devices, protecting the working environment and the health of operators; stable and efficient transmission; and long equipment life.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates specifically to a feeding device for an integrated ore mining, beneficiation and filling system. Background Technology

[0002] In integrated ore mining, beneficiation, and filling systems, the tailings after mining are often crushed before being transported to designated locations for filling operations via a feeding device. Due to the fine particle size of the crushed tailings, traditional feeding processes easily generate large amounts of dust through material impact and conveyor belt transport. Most existing feeding devices lack effective dust removal structures, allowing dust to directly diffuse into the working environment, causing serious environmental pollution and endangering the health of operators. Simultaneously, dust easily adheres to the conveyor belt surface, affecting the stability and efficiency of material transport, and long-term accumulation exacerbates conveyor belt wear, shortening equipment lifespan. Furthermore, the guide structure design of traditional feeding devices is often flawed, leading to material splashing during descent, further increasing the risk of dust diffusion and failing to meet the demands for environmentally friendly and efficient operations. Utility Model Content

[0003] The technical problem to be solved by this utility model is to provide a feeding device for an integrated ore mining, beneficiation and feeding system, addressing the shortcomings mentioned in the background art.

[0004] To solve the above technical problems, the technical solution provided by this utility model is: a feeding device for an integrated ore mining, beneficiation and filling system, including a support base, a conveyor belt in the middle of the top of the support base, a dust collection box wrapped around the front end of the conveyor belt in the top of the support base, and a feeding pipe in the top of the dust collection box.

[0005] The dust collection box is equipped with a dust extraction system on the outside that communicates with the inside, and a clean air input box is provided at the bottom of the dust collection box.

[0006] The bottom of the support base is provided with a gas distribution pipe that is connected to the clean air input box, and the gas distribution pipe is provided with multiple high-pressure air outlets aligned with the conveyor belt.

[0007] Furthermore, the dust collection box is equipped with a funnel-shaped material guiding pipe that is connected to the feeding pipe.

[0008] Furthermore, the dust collector is provided with a discharge port on the front side, and multiple dust-blocking strips are provided on the inner side of the discharge port.

[0009] Furthermore, the support base is provided with a pressure-bearing support plate located inside the conveyor belt.

[0010] Furthermore, the dust extraction system includes a rear filter box, the top of which is provided with a dust extraction pipe, the dust extraction pipe is provided with an air distribution plate, and the air distribution plate is provided with a dust extraction pipe that communicates with the support base and the dust collection box.

[0011] Furthermore, the rear filter box is provided with a guide plate at the top, a first partition is provided below the guide plate, a first filter cylinder structure is provided on the side of the first partition facing the dust extraction pipe, a first air pump is provided inside the rear filter box behind the first filter cylinder structure, and a first sealed maintenance door is provided on the outside of the rear filter box.

[0012] Furthermore, the clean air input box has a second partition in the middle, a second filter screen structure at the bottom of the second partition, a second air pump at the top of the second partition, an air guide pipe connected to the air distribution pipe, an air inlet maintenance port at the bottom front of the clean air input box, and a second sealed maintenance door at the top of the clean air input box to cooperate with the second air pump.

[0013] The advantages of the feeding device for the integrated ore mining, beneficiation and filling system of this utility model compared with the existing technology are: significant dust removal effect: adopting a combined dust removal structure of "active dust extraction + high-pressure cleaning belt + sealing and overflow prevention", controlling multiple links such as dust generation, diffusion and residue, the dust removal efficiency is high, effectively solving the problem of dust flying in traditional feeding devices, and protecting the working environment and the health of operators.

[0014] Stable and efficient transmission: The funnel-shaped material guide pipe guides the material to fall smoothly and avoids splashing; the pressure support plate enhances the load-bearing capacity of the conveyor belt and prevents the conveyor belt from deforming; the high-pressure air outlet cleans the dust attached to the conveyor belt, reduces material slippage, and improves transmission efficiency and stability.

[0015] Long equipment lifespan: The first and second filter cylinder structures filter the dust extraction airflow and the blowing airflow respectively, preventing dust from entering the air pump and pipeline, reducing equipment wear, and extending the service life of each component. Attached Figure Description

[0016] Figure 1 This is a schematic diagram of the structure of a feeding device for an integrated ore mining, beneficiation and feeding system.

[0017] Figure 2 This is a schematic diagram of the structure of a feeding device for an integrated ore mining, beneficiation and feeding system.

[0018] Figure 3 This is a schematic diagram of the structure of a feeding device for an integrated ore mining, beneficiation and feeding system.

[0019] Figure 4This is a schematic diagram of the structure of a feeding device for an integrated ore mining, beneficiation and feeding system.

[0020] Figure 5 This is a schematic diagram of the structure of a feeding device for an integrated ore mining, beneficiation and feeding system.

[0021] As shown in the figure: 1. Support base; 2. Conveyor belt; 3. Dust collection box; 4. Feed pipe; 5. Dust extraction system; 6. Clean air input box; 7. Discharge port; 8. Dust-proof cloth strip; 9. Air distribution pipe; 10. High-pressure air outlet; 11. Funnel-shaped guide pipe; 12. Pressure-bearing support plate; 13. Rear filter box; 14. Dust extraction pipe; 15. Air distribution plate; 16. Dust extraction pipe; 17. Guide plate; 18. First partition; 19. First filter cylinder structure; 20. First air extraction pump; 21. First sealed maintenance door; 22. Second partition; 23. Second filter cylinder structure; 24. Second air extraction pump; 25. Air guide pipe; 26. Air inlet maintenance port; 27. Second sealed maintenance door. Detailed Implementation

[0022] The present invention will now be described in further detail with reference to the accompanying drawings.

[0023] Combined with appendix Figure 1-5 A feeding device for an integrated ore mining, beneficiation, and filling system includes a support base 1. A conveyor belt 2 is located at the top center of the support base 1. A dust collection box 3, which wraps around the front end of the conveyor belt 2, is located on the top of the support base 1. A feed pipe 4 is located on the top of the dust collection box 3. During equipment installation, the feed pipe 4 is generally directly connected to the discharge port of the crushing equipment to prevent excessive dust overflow. A funnel-shaped guide pipe 11, connected to the feed pipe 4, is located inside the dust collection box 3 to guide the material to fall smoothly and reduce dust splashing. A discharge port 7 is located on the front side of the dust collection box 3. Multiple dust-blocking strips 8 are located inside the discharge port 7 to prevent dust from overflowing from the discharge port 7. A pressure-bearing support plate 12 is located inside the conveyor belt 2 on the support base 1 to enhance the load-bearing capacity of the conveyor belt 2 and ensure stable material transmission.

[0024] Conveyor belt cleaning structure: The bottom of the support base 1 is provided with a gas distribution pipe 9 that is connected to the clean air input box 6. The gas distribution pipe 9 is provided with a plurality of high-pressure air outlets 10 aligned with the conveyor belt 2.

[0025] Dust extraction system: The dust collection box 3 is equipped with a dust extraction system 5 connected to the interior. The dust extraction system 5 includes a rear filter box 13. The top of the rear filter box 13 is equipped with a dust extraction pipe 16. The dust extraction pipe 16 is equipped with a gas distribution plate 15. The gas distribution plate 15 is equipped with a dust extraction pipe 14 connected to the support base 1 and the dust collection box 3 to realize simultaneous dust extraction in multiple areas. The top of the rear filter box 13 is equipped with a guide plate 17. The bottom of the guide plate 17 is equipped with a first partition 18. The side of the first partition 18 facing the dust extraction pipe 16 is equipped with a first filter screen structure 19 for filtering dust in the dust-laden gas. The rear filter box 13 is equipped with a first air pump 20 located behind the first filter screen structure 19 to provide power for dust extraction. The outside of the rear filter box 13 is equipped with a first sealed maintenance door 21 for convenient maintenance of the internal components of the rear filter box 13.

[0026] Clean air input box: The clean air input box 6 has a second partition 22 in the middle, a second filter screen structure 23 at the bottom of the second partition 22, and a second air pump 24 at the top of the second partition 22 to provide power for high-pressure blowing. The second air pump 24 has an air guide pipe 25 connected to the air distribution pipe 9. The clean air input box 6 has an air inlet maintenance port 26 at the bottom front side to facilitate cleaning of the second filter screen structure 23. The clean air input box 6 has a second sealed maintenance door 27 at the top to cooperate with the second air pump 24 for easy maintenance of the second air pump 24.

[0027] Both the first filter cylinder structure 19 and the second filter cylinder structure 23 include a support frame and a high-density metal filter screen wrapped around the outside, which can filter fine dust.

[0028] The specific implementation steps of the feeding device for the integrated system are as follows:

[0029] Equipment installation: Fix the support base 1 at the designated position for ore mining and beneficiation operations, ensuring that the support base 1 is horizontal and stable; install the conveyor belt 2, dust collector 3, feed pipe 4, dust extraction system 5, clean air input box 6 and other components in sequence, ensuring that each component is firmly connected and reliably sealed; connect the air distribution pipe 9 to the air guide pipe 25 of the clean air input box 6, ensuring that the high-pressure air outlet 10 is aligned with the surface of the conveyor belt 2.

[0030] Preoperative inspection and maintenance: Open the first sealed maintenance door 21 and check whether the first filter screen structure 19 in the rear filter box 13 is clean and intact. If there is dust blockage or filter screen damage, clean or replace it in time; open the second sealed maintenance door 27 and check the operation status of the second air pump 24 in the clean air input box 6. At the same time, check the cleanliness of the second filter screen structure 23 through the air inlet maintenance port 26 to ensure its filtration effect; check whether the dustproof cloth strip 8 is intact, whether the conveyor belt 2 runs smoothly, and whether the pressure support plate 12 is firmly installed.

[0031] Equipment startup: Start the conveyor belt 2, the first air pump 20 and the second air pump 24 in sequence. After the equipment is running stably, start the material feeding operation.

[0032] Feeding and Dust Removal Operation: The crushed ore tailings are fed into the feed pipe 4 and guided by the funnel-shaped guide pipe 11, falling smoothly onto the conveyor belt 2 to avoid material impact and the generation of a large amount of dust. The conveyor belt 2 carries the material towards the discharge port 7. During this process, the first air pump 20 connects to the inside of the dust collector 3 and the support base 1 through the dust extraction pipe 14 to draw dust-laden gas into the filter box 13. After being guided by the guide plate 17, the dust-laden gas is filtered through the first filter screen structure 19, where the dust is trapped on the surface of the filter screen and purified. The gas is discharged by the first suction pump 20; at the same time, the second suction pump 24 draws in outside air into the clean air input box 6. After the air is filtered by the second filter screen structure 23, it becomes clean gas, and then is sent into the air distribution pipe 9 through the air guide pipe 25. Finally, the high-pressure air outlet 10 blows high-pressure clean air onto the surface of the conveyor belt 2, blowing off the dust attached to the conveyor belt 2. The blown-off dust is sucked into the dust extraction pipe 14 with the airflow, realizing secondary dust removal; the dust-blocking cloth strip 8 on the inner side of the discharge port 7 of the dust removal box 3 can effectively prevent the dust in the box from overflowing outward, further improving the dust removal effect.

[0033] Shutdown and Maintenance: After the feeding operation is completed, stop feeding material into the feed pipe 4. After the remaining material on the conveyor belt 2 has been completely conveyed through the discharge port 7, turn off the conveyor belt 2. Continue to run the first suction pump 20 and the second suction pump 24 for 5-10 minutes to remove dust. After ensuring that the residual dust inside the equipment is completely removed, turn off the two suction pumps. It is recommended to perform a comprehensive maintenance on the equipment every 8 hours of operation, including cleaning the dust on the first filter cylinder structure 19 and the second filter cylinder structure 23, checking the operating status of the suction pumps, and replacing the aging dustproof cloth strips 8, etc., to ensure the long-term stable operation of the equipment.

[0034] Working principle

[0035] This utility model achieves efficient dust removal and stable transmission during the feeding process through an integrated design of "material guiding and splash prevention + active dust extraction + high-pressure cleaning belt + sealing and overflow prevention".

[0036] The funnel-shaped material guide pipe 11 reduces the impact and splashing of materials when they fall, thus reducing dust generation at the source;

[0037] The dust extraction system 5 extracts the dust-laden gas from the dust collection box 3 and the support base 1 through the multi-channel dust extraction pipe 14, and then filters it through the first filter screen structure 19 before discharging it, thus achieving active dust removal.

[0038] The clean air input box 6 filters the outside air and converts it into high-pressure clean air. The high-pressure air outlet 10 blows air onto the conveyor belt 2 to clean it, preventing dust from adhering and affecting the transmission efficiency. At the same time, the dust blown off is collected again by the dust extraction system to improve the dust removal effect.

[0039] The sealed structure of the dust collection box 3, together with the dust-blocking cloth strip 8, forms a closed dust collection space to prevent dust from overflowing;

[0040] The pressure support plate 12 provides support for the conveyor belt 2, ensuring stability during material transmission and extending the service life of the conveyor belt.

[0041] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the inventive spirit of the present invention, such designs should fall within the protection scope of the present invention.

Claims

1. A feeding device for an integrated ore mining, beneficiation, and charging system, comprising a support base (1), wherein a conveyor belt (2) is provided at the center of the top of the support base (1), characterized in that: The support base (1) is provided with a dust collection box (3) at the top that wraps the front end of the conveyor belt (2), and the dust collection box (3) is provided with a feeding pipe (4) at the top; The dust collector (3) is provided with a dust extraction system (5) connected to the interior on the outside, and a clean air input box (6) is provided at the bottom of the dust collector (3); The bottom of the support base (1) is provided with a gas distribution pipe (9) that is connected to the clean air input box (6), and the gas distribution pipe (9) is provided with multiple high-pressure gas outlets (10) that are aligned with the conveyor belt (2).

2. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 1, characterized in that: The dust collection box (3) is equipped with a funnel-shaped material guiding pipe (11) that is connected to the feeding pipe (4).

3. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 1, characterized in that: The dust collection box (3) is provided with a discharge port (7) on the front side, and a plurality of dust-blocking cloth strips (8) are provided inside the discharge port (7).

4. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 1, characterized in that: The support base (1) is located inside the conveyor belt (2) and is provided with a pressure-bearing support plate (12).

5. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 1, characterized in that: The dust extraction system (5) includes a rear filter box (13), the top of which is provided with a dust extraction pipe (16), the dust extraction pipe (16) is provided with a gas distribution plate (15), and the gas distribution plate (15) is provided with a dust extraction pipe (14) that communicates with the support base (1) and the dust removal box (3).

6. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 5, characterized in that: The rear filter box (13) is provided with a guide plate (17) at the top, and a first partition (18) is provided below the guide plate (17). The first partition (18) is provided with a first filter screen cylinder structure (19) on the side facing the dust extraction pipe (16). The rear filter box (13) is provided with a first air pump (20) located behind the first filter screen cylinder structure (19). The rear filter box (13) is provided with a first sealing maintenance door (21) on the outside.

7. The feeding device for an integrated ore mining, beneficiation, and charging system according to claim 5, characterized in that: The clean air input box (6) is provided with a second partition (22) in the middle, a second filter screen structure (23) is provided at the bottom of the second partition (22), a second air pump (24) is provided at the top of the second partition (22), the second air pump (24) is provided with an air guide pipe (25) connected to the air distribution pipe (9), an air inlet maintenance port (26) is provided at the bottom of the front side of the clean air input box (6), and a second sealing maintenance door (27) is provided at the top of the clean air input box (6) to cooperate with the second air pump (24).